STAKES

         A pointed piece of wood or other material driven or to be driven into the ground as a marker or support.


BATTERBOARDS

         Suitable marks placed for use as references or guides during the initial excavation and rough grading of a building
          construction and/or a sewer line stakeout.
         Temporary devices that support the stretched cords that mark the outline and grade of the structure.
         Batter boards ensure that all of the foundation walls are at the right angles.




          Stakes are driven about 3 to 4 ft away from the building line where they will not be affected by the
construction. They are driven far enough apart to straddle the line to be marked. Note in figure 14-40, only
three stakes are driven on outside corners because one of them is a common post for two directions.

The length of the stakes is determined by the required grade line. They must be long enough to accept the 1- by 6-in.
crosspiece to mark the grade. The 1- by 6-in. crosspiece is cut long enough to join both stakes and is nailed firmly to
them after the grade has been established. The top of the crosspiece becomes the mark from which the grade will be
measured. All batter boards for one structure are set to the same grade or level line. A transit is used to locate the
building lines and to mark them on the top edge of the crosspiece.

A nail is driven at each of these marked points, or a V notch is carved at the top outer edge of the crosspiece
towards the marked point and the nail is driven on the outer face of the board. When a string is stretched over the top
edge of the two batter boards and is held against the nails or against the bottom of the notch, the string will define the outside
building line and grade elevation. Sometimes a transit is not available for marking the building line on the batter boards,
but the corner stakes have not been disturbed. A cord is stretched over two opposite batter boards, and plumb
bobs are held over the corner stakes; then the building line can be transferred to the batter boards. The cord is moved on each
batter board until it just touches both plumb bob strings.
This position of the cords is marked, and nails are driven into the top of the batter boards .Batter boards are set and marked as
follows:

1. After the corner stakes are laid out, 2-by4-in. stakes are driven 3 to 4 ft outside of each corner. These are selected to bring
all crosspieces to the same elevation.
2. These stakes are marked at the grade of the top of the foundation or at some whole number of inches or feet above
or below the top of the foundation. A level is used to mark the same grade or elevation on all stakes.
3. One- by six-in. boards are nailed to the stakes so the edge of the boards is flush with the grade marks.
4. The prolongation of the building lines on the batter boards is located by using a transit or by using a line and plumb
bob.
5. Either nails are driven into the top edges of the batter boards or the boards are notched to mark the building line.




Putting up you’re the Batter boards using 3 stakes:

Peg the Corners
You will be using the building plans to put up your batter boards, so make sure that they are somewhere visible and easily
accessible. Your pegs are used as guides for building your batter boards and once the foundation is made, will be disregarded.
Because of this, your pegs can be made out of any building material.
According to the building plans, place your first peg in one of the corners of the structure. Using the measurements in the plans,
measure the proper distance from the first pegged corner to where the second corner should be and install a peg. Once again
using the measurements from the building plan, measure from the second pegged corner to where the third peg should go and
add the third peg. Repeat to place the final peg.

Place Support Stakes
You will need 12 stakes made out of 2 X 4 pieces of wood. Each corner requires two additional stakes. Measure out 4 feet
diagonally from the first corner stake and hammer your stake into the ground. Measure 8 feet from this stake to the left and
the right, placing the other two stakes. Repeat for the remaining three corners. Don’t worry about whether or not you drive the
stakes in equally; you will be marking and leveling the cross boards later.

Place Your Batter Boards
At the corner where the ground is highest, make a level mark about 6 inches up on the outside of all three stakes. Using that
corner as a guide, make level marks on the remaining stakes.
Once you have achieved a level line and all of the stakes have been marked, nail the batter boards to the outside of the stakes.
When nailing the batter boards, make sure that the top of each batter board is flush with the level line. Using a level, double
check that each batter board is level once you have attached it. When done, each corner’s batter boards should make an L
shape.

Place the Strings
Secure a piece of string from batter board to batter board width-wise and then length-wise. Make sure the string is taut and
passes directly over the guide pegs. Attach the string between two guide nails.

Checking Your Diagonals and Parallels
Next you need to double check to make sure that you have a perfect square. Measure the distance between the strings on the
horizontal and vertical lines. Both horizontal should be the same distance and both verticals should be the same distance. Next,
check the diagonals to make sure that they are equal as well. If your measurements are off, you will need to make some
adjustments. Once everything is equal, you have a perfect square to start building your foundation.

(report courtesy of BT-1 reporters under the 8:00-9:00am batch, under Arch. Seno)

More Related Content

What's hot

Classification of Hand Tools - PART 1
Classification of Hand Tools - PART 1Classification of Hand Tools - PART 1
Classification of Hand Tools - PART 1Pilita Santos
 
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)ArchiEducPH
 
Brick masonry tools
Brick masonry toolsBrick masonry tools
Brick masonry toolsSahil Pahal
 
Technical Drafting Module 4
Technical Drafting Module 4Technical Drafting Module 4
Technical Drafting Module 4DepEd
 
Carpentry 7. Interpreting Technical Drawings and Plans.pptx
Carpentry 7. Interpreting Technical Drawings and Plans.pptxCarpentry 7. Interpreting Technical Drawings and Plans.pptx
Carpentry 7. Interpreting Technical Drawings and Plans.pptxEDMARKPONCE2
 
Module 5 module 3 draft electrical and electronic layout and details
Module 5   module 3 draft electrical and electronic layout and detailsModule 5   module 3 draft electrical and electronic layout and details
Module 5 module 3 draft electrical and electronic layout and detailsGilbert Bautista
 
Types of fittings and materials in plumbing
Types of fittings and materials in plumbingTypes of fittings and materials in plumbing
Types of fittings and materials in plumbingHoneyGrace Gonzales
 
Masonry learning module
Masonry learning moduleMasonry learning module
Masonry learning moduleyongex123
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbingLiguidliguid
 
TLE : carpentry and masonry
TLE : carpentry and masonry  TLE : carpentry and masonry
TLE : carpentry and masonry Alistair Datu
 
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development PlanTLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development PlanJuan Miguel Palero
 
Architectural Drawing
Architectural DrawingArchitectural Drawing
Architectural DrawingLea Alberto
 
Draft structural floor and roof framing plans
Draft structural floor and roof framing plansDraft structural floor and roof framing plans
Draft structural floor and roof framing planscesumnida Largado
 
Working drawing
Working drawingWorking drawing
Working drawingbruhsocool
 
Roof system and roof construction
Roof system and roof constructionRoof system and roof construction
Roof system and roof constructionEyobAlene1
 

What's hot (20)

plumbing
plumbingplumbing
plumbing
 
Classification of Hand Tools - PART 1
Classification of Hand Tools - PART 1Classification of Hand Tools - PART 1
Classification of Hand Tools - PART 1
 
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
HISTORY: Philippine Architecture (Construction Practices, Vernacular Terms)
 
Brick masonry tools
Brick masonry toolsBrick masonry tools
Brick masonry tools
 
Technical Drafting Module 4
Technical Drafting Module 4Technical Drafting Module 4
Technical Drafting Module 4
 
HOA_2 LECTURE.pdf
HOA_2 LECTURE.pdfHOA_2 LECTURE.pdf
HOA_2 LECTURE.pdf
 
Carpentry 7. Interpreting Technical Drawings and Plans.pptx
Carpentry 7. Interpreting Technical Drawings and Plans.pptxCarpentry 7. Interpreting Technical Drawings and Plans.pptx
Carpentry 7. Interpreting Technical Drawings and Plans.pptx
 
Module 5 module 3 draft electrical and electronic layout and details
Module 5   module 3 draft electrical and electronic layout and detailsModule 5   module 3 draft electrical and electronic layout and details
Module 5 module 3 draft electrical and electronic layout and details
 
Types of fittings and materials in plumbing
Types of fittings and materials in plumbingTypes of fittings and materials in plumbing
Types of fittings and materials in plumbing
 
Masonry learning module
Masonry learning moduleMasonry learning module
Masonry learning module
 
Floor plans
Floor plansFloor plans
Floor plans
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 
TLE : carpentry and masonry
TLE : carpentry and masonry  TLE : carpentry and masonry
TLE : carpentry and masonry
 
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development PlanTLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
 
Architectural Drawing
Architectural DrawingArchitectural Drawing
Architectural Drawing
 
Draft structural floor and roof framing plans
Draft structural floor and roof framing plansDraft structural floor and roof framing plans
Draft structural floor and roof framing plans
 
Basic Hand Tools for Carpentry Work
Basic Hand Tools for Carpentry WorkBasic Hand Tools for Carpentry Work
Basic Hand Tools for Carpentry Work
 
Working drawing
Working drawingWorking drawing
Working drawing
 
Roof system and roof construction
Roof system and roof constructionRoof system and roof construction
Roof system and roof construction
 
Types of floor finishes
Types of floor finishesTypes of floor finishes
Types of floor finishes
 

Similar to Bt 1: Stakes and batterboards

2. How to build a shed floor?
2. How to build a shed floor?2. How to build a shed floor?
2. How to build a shed floor?icreatablesseo
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof raftersicreatablesseo
 
Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railingZulaiha Amaria
 
Installing deck joists
Installing deck joistsInstalling deck joists
Installing deck joistsZulaiha Amaria
 
5. How to build shed walls
5. How to build shed walls5. How to build shed walls
5. How to build shed wallsicreatablesseo
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514Jeff Vetterick
 
Installing deck boards
Installing deck boardsInstalling deck boards
Installing deck boardsZulaiha Amaria
 
6. How to install sheet siding on your storage shed
6. How to install sheet siding on your storage shed6. How to install sheet siding on your storage shed
6. How to install sheet siding on your storage shedicreatablesseo
 
Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairsZulaiha Amaria
 
joinery setting out and marking out
joinery setting out and marking outjoinery setting out and marking out
joinery setting out and marking outkevin porter
 
Masonry Presentation
Masonry PresentationMasonry Presentation
Masonry Presentationflrbc1avtech
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of buildingARUN KUMAR
 

Similar to Bt 1: Stakes and batterboards (20)

2. How to build a shed floor?
2. How to build a shed floor?2. How to build a shed floor?
2. How to build a shed floor?
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
 
Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railing
 
Deck marking
Deck markingDeck marking
Deck marking
 
Deck marking
Deck markingDeck marking
Deck marking
 
Installing deck posts
Installing deck postsInstalling deck posts
Installing deck posts
 
Installing deck joists
Installing deck joistsInstalling deck joists
Installing deck joists
 
5. How to build shed walls
5. How to build shed walls5. How to build shed walls
5. How to build shed walls
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514
 
Installing deck boards
Installing deck boardsInstalling deck boards
Installing deck boards
 
6. How to install sheet siding on your storage shed
6. How to install sheet siding on your storage shed6. How to install sheet siding on your storage shed
6. How to install sheet siding on your storage shed
 
Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairs
 
joinery setting out and marking out
joinery setting out and marking outjoinery setting out and marking out
joinery setting out and marking out
 
Masonry Presentation
Masonry PresentationMasonry Presentation
Masonry Presentation
 
Lean-toToolShed.pdf
Lean-toToolShed.pdfLean-toToolShed.pdf
Lean-toToolShed.pdf
 
Lean-toToolShed.pdf
Lean-toToolShed.pdfLean-toToolShed.pdf
Lean-toToolShed.pdf
 
Lean-toToolShed.pdf
Lean-toToolShed.pdfLean-toToolShed.pdf
Lean-toToolShed.pdf
 
Roof framing
Roof framingRoof framing
Roof framing
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
How to install False Ceiling?
How to install False Ceiling?How to install False Ceiling?
How to install False Ceiling?
 

More from Tabitha Fuentebella

More from Tabitha Fuentebella (10)

State-Society relations
State-Society relationsState-Society relations
State-Society relations
 
Manual for the implementation of the essential health care program in filipin...
Manual for the implementation of the essential health care program in filipin...Manual for the implementation of the essential health care program in filipin...
Manual for the implementation of the essential health care program in filipin...
 
Philippines: Early Childhood Care and Education Programmes (ECCE)
Philippines: Early Childhood Care and Education Programmes (ECCE)Philippines: Early Childhood Care and Education Programmes (ECCE)
Philippines: Early Childhood Care and Education Programmes (ECCE)
 
Bt 1: Cement
Bt 1: CementBt 1: Cement
Bt 1: Cement
 
BT 1: Concrete and Admixtures
BT 1: Concrete and AdmixturesBT 1: Concrete and Admixtures
BT 1: Concrete and Admixtures
 
BT 1: Concrete Hollow Blocks
BT 1: Concrete Hollow BlocksBT 1: Concrete Hollow Blocks
BT 1: Concrete Hollow Blocks
 
BT 1: Types of Foundation
BT 1: Types of FoundationBT 1: Types of Foundation
BT 1: Types of Foundation
 
Bt 1: Excavation
Bt 1: ExcavationBt 1: Excavation
Bt 1: Excavation
 
Hardware
HardwareHardware
Hardware
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 

Recently uploaded

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 

Bt 1: Stakes and batterboards

  • 1. STAKES  A pointed piece of wood or other material driven or to be driven into the ground as a marker or support. BATTERBOARDS  Suitable marks placed for use as references or guides during the initial excavation and rough grading of a building construction and/or a sewer line stakeout.  Temporary devices that support the stretched cords that mark the outline and grade of the structure.  Batter boards ensure that all of the foundation walls are at the right angles. Stakes are driven about 3 to 4 ft away from the building line where they will not be affected by the construction. They are driven far enough apart to straddle the line to be marked. Note in figure 14-40, only three stakes are driven on outside corners because one of them is a common post for two directions. The length of the stakes is determined by the required grade line. They must be long enough to accept the 1- by 6-in. crosspiece to mark the grade. The 1- by 6-in. crosspiece is cut long enough to join both stakes and is nailed firmly to them after the grade has been established. The top of the crosspiece becomes the mark from which the grade will be measured. All batter boards for one structure are set to the same grade or level line. A transit is used to locate the building lines and to mark them on the top edge of the crosspiece. A nail is driven at each of these marked points, or a V notch is carved at the top outer edge of the crosspiece towards the marked point and the nail is driven on the outer face of the board. When a string is stretched over the top edge of the two batter boards and is held against the nails or against the bottom of the notch, the string will define the outside building line and grade elevation. Sometimes a transit is not available for marking the building line on the batter boards, but the corner stakes have not been disturbed. A cord is stretched over two opposite batter boards, and plumb bobs are held over the corner stakes; then the building line can be transferred to the batter boards. The cord is moved on each batter board until it just touches both plumb bob strings.
  • 2. This position of the cords is marked, and nails are driven into the top of the batter boards .Batter boards are set and marked as follows: 1. After the corner stakes are laid out, 2-by4-in. stakes are driven 3 to 4 ft outside of each corner. These are selected to bring all crosspieces to the same elevation. 2. These stakes are marked at the grade of the top of the foundation or at some whole number of inches or feet above or below the top of the foundation. A level is used to mark the same grade or elevation on all stakes. 3. One- by six-in. boards are nailed to the stakes so the edge of the boards is flush with the grade marks. 4. The prolongation of the building lines on the batter boards is located by using a transit or by using a line and plumb bob. 5. Either nails are driven into the top edges of the batter boards or the boards are notched to mark the building line. Putting up you’re the Batter boards using 3 stakes: Peg the Corners You will be using the building plans to put up your batter boards, so make sure that they are somewhere visible and easily accessible. Your pegs are used as guides for building your batter boards and once the foundation is made, will be disregarded. Because of this, your pegs can be made out of any building material. According to the building plans, place your first peg in one of the corners of the structure. Using the measurements in the plans, measure the proper distance from the first pegged corner to where the second corner should be and install a peg. Once again using the measurements from the building plan, measure from the second pegged corner to where the third peg should go and add the third peg. Repeat to place the final peg. Place Support Stakes You will need 12 stakes made out of 2 X 4 pieces of wood. Each corner requires two additional stakes. Measure out 4 feet diagonally from the first corner stake and hammer your stake into the ground. Measure 8 feet from this stake to the left and the right, placing the other two stakes. Repeat for the remaining three corners. Don’t worry about whether or not you drive the stakes in equally; you will be marking and leveling the cross boards later. Place Your Batter Boards At the corner where the ground is highest, make a level mark about 6 inches up on the outside of all three stakes. Using that corner as a guide, make level marks on the remaining stakes. Once you have achieved a level line and all of the stakes have been marked, nail the batter boards to the outside of the stakes. When nailing the batter boards, make sure that the top of each batter board is flush with the level line. Using a level, double check that each batter board is level once you have attached it. When done, each corner’s batter boards should make an L shape. Place the Strings Secure a piece of string from batter board to batter board width-wise and then length-wise. Make sure the string is taut and passes directly over the guide pegs. Attach the string between two guide nails. Checking Your Diagonals and Parallels Next you need to double check to make sure that you have a perfect square. Measure the distance between the strings on the horizontal and vertical lines. Both horizontal should be the same distance and both verticals should be the same distance. Next, check the diagonals to make sure that they are equal as well. If your measurements are off, you will need to make some adjustments. Once everything is equal, you have a perfect square to start building your foundation. (report courtesy of BT-1 reporters under the 8:00-9:00am batch, under Arch. Seno)