SlideShare a Scribd company logo
1 of 3
Download to read offline
FJ Strategic Solutions Inc. A North-American Facilities Service Provider Website: www.fjstrategic.com
(Main Office: Montreal Area, QC, Canada) Contact us: fjs-rfp@fjstrategic.com
1 info@fjstrategic.com
FACILITY LIFE CYCLE
How Do You Prioritize Projects to Address Risks,
Given Limited Capital Dollars?
FJ Strategic Solutions Inc.
Facilities Management Services: Risk Management — Cash Flow Management — Life Cycle Costing — Reserve Study
OPTIMIZATION OF BUILDING POTENTIAL AND CASH FLOW MANAGEMENT
The Facility Life Cycle Costing approach applies advanced an-
alytics to existing facility data to provide a rich view of one or
multiple facilities conditions. Results are detailed and actiona-
ble, including prioritized risk scoring of repair and replace-
ment activities based on the likelihood and consequences of
component failures. Risk scores are assigned at the individu-
al component level, and results are summarized in visual Risk
Dashboards. Finally, a funding plan is created to ensure that
cash flows are adequate.
The prioritization process can be difficult when handling costs
and cash flows with very limited budgets. The Facility Life Cycle
Costing fosters strategic decisions by providing Managers and
Owners with different scenarios which evaluate life-cycle risks
and impacts affecting both immediate and predictable needs.
FJ Strategic Solutions Inc. A North-American Facilities Service Provider Website: www.fjstrategic.com
(Main Office: Montreal Area, QC, Canada) Contact us: fjs-rfp@fjstrategic.com
2 info@fjstrategic.com
The Facility Life Cycle Costing Process
 Data Collection: A careful inventory is carried out and in-
cludes relevant items needed in the building Life Cycle
Costing and Reserve Study analyses. This information can
be obtained from building plans and facilities management
records (component lists, unit prices, service life, replace-
ment, data from trusted sources such as RS Means etc.).
 Analysis, Part 1: During this phase, each component is inde-
pendently assessed through survivor curves, powered by
Monte Carlo simulations, that relate to its age, geography
and utilization. These operations result to the calculation of
the probability of failure for each component.
 Analysis, Part 2: Once replacement or repair
costs are identified for all components, direct
and indirect impacts to the building operabil-
ity, security and overall safety can be deter-
mined.
 Financial Planning: The last step consists of
establishing the most accurate methods to
fund repairs, replacements and additions via
optimization procedures applicable to targets
strategically selected or percent funded tar-
gets supplemented with What-if scenarios.
FJ Strategic Solutions Inc. A North-American Facilities Service Provider Website: www.fjstrategic.com
(Main Office: Montreal Area, QC, Canada) Contact us: fjs-rfp@fjstrategic.com
3 info@fjstrategic.com
Projected Annual Expenses ($)
$0.00
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
$300,000.00
$350,000.00
$400,000.00
$450,000.00
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
YearlyCost
Projected Cash flow ($)
-$200,000.00
-$100,000.00
$0.00
$100,000.00
$200,000.00
$300,000.00
$400,000.00
$500,000.00
$600,000.00
$700,000.00
$800,000.00
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
 Building models that rate the repair and replacement costs, probable useful life and criticality of all
systems and components.
 Budget scenarios: Suited for specific budget constraints or percent funded targets; therefore, en-
hancing the strategic decision-making process for Owners and facilities management professionals.
 Funding plans that meet short-term and long-term goals.
 Risk analysis report: Monte Carlo simulations are used to obtain reliable assessment of the unpre-
dictability associated with every system and component.
 Professional expertise in risk management and development of risk response strategies.
 Advanced failure analyses designed to address specific urgent needs.
 Assistance in the establishment of sustainable and eco-friendly solutions in compliance with applicable local
standards and codes.
 Follow Up Reserve Studies (Contingency Reserve Fund Studies): With or without Site Visits.
The recommended cash flow
curve is optimized to conform
with each company’s financial
situation or reserve study
goals (graphical and tabular
results).
Recommended
Specific benchmarks can be incor-
porated for more accurate studies,
and also to better visualize and
compare scenarios (graphical and
tabular results).
Reserve studies do not incorporate
operation and minor replacement/
repair costs (included in non-
reserve budgets).
DELIVERABLES
WE ALSO PROVIDE…

More Related Content

Viewers also liked

Tourism multipliers
Tourism multipliersTourism multipliers
Tourism multipliers
Anita Sajit
 
Economic importance of tourism
Economic importance of tourismEconomic importance of tourism
Economic importance of tourism
Shantimani
 
Environmental impact of tourism
Environmental impact of tourismEnvironmental impact of tourism
Environmental impact of tourism
Marlene Gonsalvez
 
Week 3 the study of tourism
Week 3  the study of tourismWeek 3  the study of tourism
Week 3 the study of tourism
jay
 
Sec 5 NA Tourism (3)
Sec 5 NA Tourism (3)Sec 5 NA Tourism (3)
Sec 5 NA Tourism (3)
chua.geog
 
The Role of LGUs Toward Tousirm Development
The Role of LGUs Toward Tousirm DevelopmentThe Role of LGUs Toward Tousirm Development
The Role of LGUs Toward Tousirm Development
jo bitonio
 

Viewers also liked (20)

Tourism multipliers
Tourism multipliersTourism multipliers
Tourism multipliers
 
Economic importance of tourism
Economic importance of tourismEconomic importance of tourism
Economic importance of tourism
 
Chap5 (tourism impacts)
Chap5 (tourism impacts)Chap5 (tourism impacts)
Chap5 (tourism impacts)
 
Environmental impact of tourism
Environmental impact of tourismEnvironmental impact of tourism
Environmental impact of tourism
 
The Dignified Learning Project: What is Dialogue?
The Dignified Learning Project: What is Dialogue?The Dignified Learning Project: What is Dialogue?
The Dignified Learning Project: What is Dialogue?
 
Economics impacts of tourism by lalit rava
Economics impacts of tourism by lalit rava Economics impacts of tourism by lalit rava
Economics impacts of tourism by lalit rava
 
Cultura maya
Cultura mayaCultura maya
Cultura maya
 
Economic Strategy Jean-Antoine Moreau
Economic Strategy Jean-Antoine MoreauEconomic Strategy Jean-Antoine Moreau
Economic Strategy Jean-Antoine Moreau
 
DMAI Fundamentals - Chapter 4 - Tourism Research & Performance Reporting
DMAI Fundamentals - Chapter 4 - Tourism Research & Performance ReportingDMAI Fundamentals - Chapter 4 - Tourism Research & Performance Reporting
DMAI Fundamentals - Chapter 4 - Tourism Research & Performance Reporting
 
Working Towards Tourism for All: Accessible Tourism as A Means of Economic an...
Working Towards Tourism for All: Accessible Tourism as A Means of Economic an...Working Towards Tourism for All: Accessible Tourism as A Means of Economic an...
Working Towards Tourism for All: Accessible Tourism as A Means of Economic an...
 
Tourism development
Tourism developmentTourism development
Tourism development
 
Tourism governance for local economic development in the Philippines
Tourism governance for local economic development in the PhilippinesTourism governance for local economic development in the Philippines
Tourism governance for local economic development in the Philippines
 
Arts, Tourism and Economic Development" from Rural Arts and Culture Summit/Ce...
Arts, Tourism and Economic Development" from Rural Arts and Culture Summit/Ce...Arts, Tourism and Economic Development" from Rural Arts and Culture Summit/Ce...
Arts, Tourism and Economic Development" from Rural Arts and Culture Summit/Ce...
 
Week 3 the study of tourism
Week 3  the study of tourismWeek 3  the study of tourism
Week 3 the study of tourism
 
The role of ict in tourism industry on economic growth case study iran
 The role of ict in tourism industry on economic growth case study iran The role of ict in tourism industry on economic growth case study iran
The role of ict in tourism industry on economic growth case study iran
 
Tourism Assessment Example - Level 5
Tourism Assessment Example - Level 5Tourism Assessment Example - Level 5
Tourism Assessment Example - Level 5
 
Tourism and local economic development in england
Tourism and local economic development in englandTourism and local economic development in england
Tourism and local economic development in england
 
Sec 5 NA Tourism (3)
Sec 5 NA Tourism (3)Sec 5 NA Tourism (3)
Sec 5 NA Tourism (3)
 
Economic Development and Tourism
Economic Development and Tourism Economic Development and Tourism
Economic Development and Tourism
 
The Role of LGUs Toward Tousirm Development
The Role of LGUs Toward Tousirm DevelopmentThe Role of LGUs Toward Tousirm Development
The Role of LGUs Toward Tousirm Development
 

Similar to Facility Life Cycle Costing Process

chet_newman_9_CO_resume_2015
chet_newman_9_CO_resume_2015chet_newman_9_CO_resume_2015
chet_newman_9_CO_resume_2015
Chet Newman
 
Creditscore
CreditscoreCreditscore
Creditscore
kevinlan
 
Mar 12 2010 Sap
Mar 12 2010 SapMar 12 2010 Sap
Mar 12 2010 Sap
philip
 
Shannon Bragg_Resume
Shannon Bragg_ResumeShannon Bragg_Resume
Shannon Bragg_Resume
Shannon Bragg
 

Similar to Facility Life Cycle Costing Process (20)

Pro Forma Financials And Forecasts
Pro Forma Financials And ForecastsPro Forma Financials And Forecasts
Pro Forma Financials And Forecasts
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
Nce603 mod unit3
Nce603 mod unit3Nce603 mod unit3
Nce603 mod unit3
 
Tim Howard
Tim HowardTim Howard
Tim Howard
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
 
Encoursa Webinar: Developing Your First Cost and Price Proposal
Encoursa Webinar: Developing Your First Cost and Price ProposalEncoursa Webinar: Developing Your First Cost and Price Proposal
Encoursa Webinar: Developing Your First Cost and Price Proposal
 
The Journey Towards Asset Management Excellence
The Journey Towards Asset Management ExcellenceThe Journey Towards Asset Management Excellence
The Journey Towards Asset Management Excellence
 
The Uniquely Refinable Digital- Digital Assimilation v1
The Uniquely Refinable Digital-  Digital  Assimilation v1The Uniquely Refinable Digital-  Digital  Assimilation v1
The Uniquely Refinable Digital- Digital Assimilation v1
 
chet_newman_9_CO_resume_2015
chet_newman_9_CO_resume_2015chet_newman_9_CO_resume_2015
chet_newman_9_CO_resume_2015
 
Item # 5&6 - Water & Sewer Rate Study
Item # 5&6 - Water & Sewer Rate StudyItem # 5&6 - Water & Sewer Rate Study
Item # 5&6 - Water & Sewer Rate Study
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Creditscore
CreditscoreCreditscore
Creditscore
 
Mar 12 2010 Sap
Mar 12 2010 SapMar 12 2010 Sap
Mar 12 2010 Sap
 
Mar 12 2010 Sap
Mar 12 2010 SapMar 12 2010 Sap
Mar 12 2010 Sap
 
Shannon Bragg_Resume
Shannon Bragg_ResumeShannon Bragg_Resume
Shannon Bragg_Resume
 
Pallavi Shrivastava- Finance
Pallavi Shrivastava- FinancePallavi Shrivastava- Finance
Pallavi Shrivastava- Finance
 
Backlog, Deferred Maintenance and its use in Planning
Backlog, Deferred Maintenance and its use in PlanningBacklog, Deferred Maintenance and its use in Planning
Backlog, Deferred Maintenance and its use in Planning
 
Logistics Department Strategy Plan 2020-2023
Logistics Department Strategy Plan 2020-2023Logistics Department Strategy Plan 2020-2023
Logistics Department Strategy Plan 2020-2023
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation Slides
 

Facility Life Cycle Costing Process

  • 1. FJ Strategic Solutions Inc. A North-American Facilities Service Provider Website: www.fjstrategic.com (Main Office: Montreal Area, QC, Canada) Contact us: fjs-rfp@fjstrategic.com 1 info@fjstrategic.com FACILITY LIFE CYCLE How Do You Prioritize Projects to Address Risks, Given Limited Capital Dollars? FJ Strategic Solutions Inc. Facilities Management Services: Risk Management — Cash Flow Management — Life Cycle Costing — Reserve Study OPTIMIZATION OF BUILDING POTENTIAL AND CASH FLOW MANAGEMENT The Facility Life Cycle Costing approach applies advanced an- alytics to existing facility data to provide a rich view of one or multiple facilities conditions. Results are detailed and actiona- ble, including prioritized risk scoring of repair and replace- ment activities based on the likelihood and consequences of component failures. Risk scores are assigned at the individu- al component level, and results are summarized in visual Risk Dashboards. Finally, a funding plan is created to ensure that cash flows are adequate. The prioritization process can be difficult when handling costs and cash flows with very limited budgets. The Facility Life Cycle Costing fosters strategic decisions by providing Managers and Owners with different scenarios which evaluate life-cycle risks and impacts affecting both immediate and predictable needs.
  • 2. FJ Strategic Solutions Inc. A North-American Facilities Service Provider Website: www.fjstrategic.com (Main Office: Montreal Area, QC, Canada) Contact us: fjs-rfp@fjstrategic.com 2 info@fjstrategic.com The Facility Life Cycle Costing Process  Data Collection: A careful inventory is carried out and in- cludes relevant items needed in the building Life Cycle Costing and Reserve Study analyses. This information can be obtained from building plans and facilities management records (component lists, unit prices, service life, replace- ment, data from trusted sources such as RS Means etc.).  Analysis, Part 1: During this phase, each component is inde- pendently assessed through survivor curves, powered by Monte Carlo simulations, that relate to its age, geography and utilization. These operations result to the calculation of the probability of failure for each component.  Analysis, Part 2: Once replacement or repair costs are identified for all components, direct and indirect impacts to the building operabil- ity, security and overall safety can be deter- mined.  Financial Planning: The last step consists of establishing the most accurate methods to fund repairs, replacements and additions via optimization procedures applicable to targets strategically selected or percent funded tar- gets supplemented with What-if scenarios.
  • 3. FJ Strategic Solutions Inc. A North-American Facilities Service Provider Website: www.fjstrategic.com (Main Office: Montreal Area, QC, Canada) Contact us: fjs-rfp@fjstrategic.com 3 info@fjstrategic.com Projected Annual Expenses ($) $0.00 $50,000.00 $100,000.00 $150,000.00 $200,000.00 $250,000.00 $300,000.00 $350,000.00 $400,000.00 $450,000.00 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 YearlyCost Projected Cash flow ($) -$200,000.00 -$100,000.00 $0.00 $100,000.00 $200,000.00 $300,000.00 $400,000.00 $500,000.00 $600,000.00 $700,000.00 $800,000.00 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043  Building models that rate the repair and replacement costs, probable useful life and criticality of all systems and components.  Budget scenarios: Suited for specific budget constraints or percent funded targets; therefore, en- hancing the strategic decision-making process for Owners and facilities management professionals.  Funding plans that meet short-term and long-term goals.  Risk analysis report: Monte Carlo simulations are used to obtain reliable assessment of the unpre- dictability associated with every system and component.  Professional expertise in risk management and development of risk response strategies.  Advanced failure analyses designed to address specific urgent needs.  Assistance in the establishment of sustainable and eco-friendly solutions in compliance with applicable local standards and codes.  Follow Up Reserve Studies (Contingency Reserve Fund Studies): With or without Site Visits. The recommended cash flow curve is optimized to conform with each company’s financial situation or reserve study goals (graphical and tabular results). Recommended Specific benchmarks can be incor- porated for more accurate studies, and also to better visualize and compare scenarios (graphical and tabular results). Reserve studies do not incorporate operation and minor replacement/ repair costs (included in non- reserve budgets). DELIVERABLES WE ALSO PROVIDE…