SlideShare a Scribd company logo
1 of 51
Download to read offline
Adani University
REALESTATE-
BUSINESS DEVELOPMENT
Year: 2023
Course Code: Trimester V,
Batch – PGDM IM & Law
Visiting Faculty: Shamik Desai
(M) 9426302503
Session 3
Thursday, 12.10.2023
2
Critical Factors & Challenges in Real
Estate Development in Urban India
1. Urban Sprawl
2. Overcrowding
3. Land scarcity, characteristics
4. Housing demand v/s supply
5. Unemployment ….disposable income
6. Slums and Squatter Settlements
7. Transport ….. all time challenge
8. Water supply
9. Sewerage Problems
10.Solid Waste Management
11.Crimes …. Law & order situation
12.Pollution
13.Educational facilities
14.Public health & re-creation facilities
15.Policies
• Land ceiling act
• Town planning
• Zoning / FSI
• Re-development bye-laws
Critical Challenges / Factors
Land as a limited resource
Land is crucial for the economic, social, and environmental
advancement of all countries.
Land is partitioned for administrative and economic purposes, and it is
used and transformed in a myriad ways.
Characteristics of land
• Relative fixity of supply
• No cost of creation
• Heterogeneity
• Absence of market for land
• Derived demand
• Law of diminishing returns
• Economic rent
Relative fixity of supply
• Land as a supply is fixed–if one type of use is increased in area it will be
at the expense of other.
• Capital changes its form and location with each turnover, while land
remains the same.
• But the intensity of use of land can be increased to serve the need.
• Can land be created???
No cost of creation
• Man has the power to create or increase their
capital, but not possible with land
• when land is developed, costs are incurred
and it becomes one of the factor of
production
• Modern technology -land reclamation:
Example: Bandra Reclamation, Palm
Jhumeria(Dubai)
• It is being practiced in coastal cities.
• Heterogeneity of land??
No cost of creation
• Man has the power to create or increase their
capital, but not land
• when land is developed, costs are incurred
and it becomes one of the factor of
production
• Modern technology - land reclamation:
Example: Bandra Reclamation, Palm
Jhumeria(Dubai)
• It is being practiced in coastal cities.
• Heterogeneity of land??
Heterogeneity
• Each land parcel is different in character; having different
advantages and disadvantages
• It might be good for one kind of use and bad for another
• Land can be classified into number of categories;
➢ Sub-marginal land: no remunerative use – not fit for farming
➢ Marginal land: break even + Profits
➢ Intra-marginal land: profit or surplus yielding
Heterogeneity
• Each land parcel is different in character; having different
advantages and disadvantages
• It might be good for one kind of use and bad for another
• Land can be classified into number of categories;
➢ Sub-marginal land: no remunerative use – not fit for farming
➢ Marginal land: break even – Profits = Costs
➢ Intra-marginal land: profit or surplus yielding
Demand for Land
• Urban land is fairly inelastic in supply- We don’t produce this stuff!!!!
• As per Ricardo: Rents were determined by the interaction of supply and demand.
• Higher urban rents are the consequences of competition between different users.
• If land is scarce in CBD and there is high demand for central sites, rents will be high.
• CBD may thus be subject to more intensive use of land and increase in spatial extent
by invading surrounding zone.
• Demand for land is a demand for space which can be varied by land use changes,
development control and regulation changes, structural changes and through the
process of property development/conversion.
CBD- Central Business District
Absence of market for land
• Land deals are transaction not in land itself but in interest or rights, possible returns
from the land.
• Rights in aggregate are known as “real property”
• Transaction in real estate market generally are conducted in private while transaction
in commodity market take place in public.
• Reliable information about land transaction in real estate is not available easily.
Land Use
SessionOutline
❑ Introduction To Real Estate Planning
Planning, Neighbourhood Planning, Planning models
❑ Sub-urbanisation Of Population And Employment
❑ Master Planning, Development Plan
Land as a resource, Land use control and zoning, Various levels of Planning
❑ Town Planning In India-past And Present
Planning Commission, NITI Ayog Etc.
❑ Urban challenges and Local Government
Present day dilemmas in different cities, Urban Issues, Governance and
Politics
❑ Housing and Real Estate Planning
Housing for all, Various schemes, Slum Rehabilitation, Real estate trends etc.
❑ Mass transit
❑ Recent trends in Urban Planning - Growth Control & Decline Management
• Planning for the future
• Smart Cities
14
Land use planning ?
• Its purpose is to select and put into practice those land uses that will
best meet the needs of the people while safeguarding resources for
the future –Sustainability
• Systematic assessment of land potential, alternatives for various uses
at a location wrt economic and social conditions
• Select and adopt the best land-use options.
• It must satisfy two broad objectives;
✓ Ensuring best possible use of land
✓ Separating incompatible land uses
Results in :
• Evaluate and record unique features.
• Preserve unique cultural or historical features.
• Conserve open space
• Plan for mixed uses in close proximity.
• Plan variety of transportation options.
• Set limits and managed growth patterns.
• Encourage development in areas of existing infrastructure.
Land Use Classification
Forest & water bodies: It includes the area under forest, sanctuary, rivers, lakes,
conservation etc.
Agricultural: It basically comprises of agricultural fields.
Residential Use: It principally comprises of dwelling (housing units), gardens,
community open spaces, convenience shopping facilities, primary schools, health
clinics, smaller service industries
Public and semi-public use: It comprise of institutional buildings which serves the
community as a whole. It includes city administration buildings, Town Hall, Museum,
Art Gallery, Library, police station, post office, fire stations, schools, charitable
institutions, hospitals, religious facilities etc.
Commercial use: It comprises offices, shopping centers, malls, retail stores, hotels,
restaurants, multiplexes and other such places housing income-generating activities.
Recreational (parks and open spaces):It includes parks, playgrounds, gardens,
amusement parks, community open spaces, toad-lot areas etc.
.
Industrial: It comprises of areas having industrial activites ranging from light industry
to heavy industry.
Roads and Transportation: It includes transport terminals like bus-stations, railways
stations, bus-stops, roads, footpaths, cycle tracts, parking arrangements, etc.
Vacant land: It includes land parcels lying vacant without any building.
GRAM
PANCHAYAT
MC
UDA
COLLECTOR
OFFICE
Agricultural Land
NA
conversion
Old tenure
7/12 7/12
Conversion to
old tenure
New Tenure Form 6A
Construction
permission
City Engineer
Gamtal Area
HNP
Area
Const.
permission
granted
Registration
& Stamp duty
Sewerage
connection
LAND
CONVERSION
PASSING
PHASE
Water
supply
UGVL
supply
BU
Application
BU
Granted
City Engineer
75%
ANTRI
RATE
2
YEARS
4.9%
JANTRI
RATE
10/-
Sq.ft
45
DAYS
3-4
MONTHS
12 – 15 DAYS
1
1. Under section 65 BLRC.
2. Under section DCR
2
Developer buys agricultural land parcel at negotiated prices from land owner
Makes Application to Collector office under section 65 of BLRC for NA conversion
Submitting a Layout proposal
Plotting scheme with access to all plots
Common plot -Reserve 10% as common area
FSI as per applicable municipal regulations (1.5 permitted in Gram Panchayat areas)
It usually takes atleast 90 days for approval
Once approved –applicant has to pay the conversion charges
Developers sells the individual plots or develops housing unit and then sales it off
Internal Infrastructure is usually provided by the developer
Levels of Planning
❑ National Level
•Policy planning & reallocation of resources
❑ State Level
•Policy planning & reallocation of resources
❑ Regional Level
•Link between policy planning and spatial planning
•Policy planning & reallocation of resources
•Regional infrastructure projects
❑ City/Town level
•Spatial planning
•Land-use control
❑ Zonal Level
•Detailed Spatial planning
•Land/Area Development Schemes
Land Development Mechanism
(Zonal Level)
Various land development mechanisms are being used by different
states across India;
Town Planning Scheme (Guj and Mah)
DDA Model (Delhi)
HUDA Modal (Haryana)
Ghaziabad Modal (Uttar Pradesh)
Hyderabad Urban development Authority Modal
Chennai Metropolitan Development Authority
DDA Model
DDA identifies and acquires land for development within the urban limits.
Land is acquired under Land Acquisition Act,1894 and compensation is provided
to the land owners
DDA then develops the acquired landby providing the necessary infrastructureand
allocates certain portion for housing (all classes EWS, LIG, MIG and HIG).
DDA constructs flats for each class and invites application –allotment is done
through draw system.
Ghaziabad Model
Its is based on joint venture between the development authority and the private
developer.
The equity sharing between the development authority and the private developer
is in the ratio of 10:90.
Private developers earn revenue from the sale of 60% of plotsin the free market
Development Authority earns annual revenue of 1%from the private developer (tie
up cost index).
In this model, 20% of the plots are reserved for the EWS/LIGat predetermined rates.
The model is applicable in selective residential areas with a minimum size of 50
acres
It does not take into consideration the city/zonal level infrastructure facilities.
Haryana Model
Development Authority acts as facilitator
The authority partners with the developers having proven track record
It issues licences to such developers –permitting acquisition of land directly from the land
owners through negotiated market price
Time frame: The entire process of negotiating the land purchase and development is to be
completed within three years.
After assembling, the developers then develops the land and construct houses based on
stipulated norms, rules and regulations
This model is applicable in residential sectors only and the minimum viable size for the scheme is
40 hectares.
Haryana Model
Developers pay development fees at the rate of Rs.3.7lakhs/acre and handle all internal
infrastructure
Other stipulations are that 20% of the plots are to be sold to EWS and LIG at a certain fixed
price. Another 25% of the plots are to be sold on no profit no loss basis.
Chennai Metropolitan Development Authority
also called “Guided Urban Development Modal”
Land is bought by the private developers and developed
Development authority purchases reserved unit at subsidized rates
Developer has a free hand fixing prices for HIG and MIG units.
Developer is responsible for development of all internal infrastructure
Co-operative societies
Group of interested individuals come together –form Housing Co-operative Societies
It then identifies land for housing
Members fund initially to purchase land
Either from open market
From development authority through auctions
Prepare layouts and gets it approved from the authority
Society then approaches various authorities for laying of roads, electricity and water
connections.
Members constructs individual unit.
Development authority provides offsite infrastructure and technical assistance
Town Planning Scheme
• Town Planning Schemes - basic concept - pooling together all the land under
different ownerships and redistributing it in a properly reconstituted form after
deducting the land required for open spaces, social infrastructure, services, housing
for the economically weaker section, and road network.
• This process enables the local authority to develop land without fully acquiring it
and gives it a positive control over the design and the limiting of the urban growth.
• This method is extensively practiced in Gujarat and Maharashtra, selectively in
Kerala and occasionally in Andhra Pradesh and Tamil Nadu.
35
Town Planning Scheme
36
➢The T.P. Schemes are prepared giving micro-level planning for smaller areas of
about 100 acres that are already under pressure of urban development.
➢T.P. Schemes are conceptualised as a joint venture between the local authorities
and the owners of the plots who agree to pool their land, redistribute and share
the development costs as per this scheme prepared by development/local
authority under the act.
➢An area of 1-2 sq. km is taken-up for a T.P. Scheme so that it can be manageable
for preparation and implementation.
➢The land parcels having common ownership are marked as one original plot on a
map and all such original plots are pooled together for planning purposes.
37
URBAN PLANNING
Necessity of Law and Legislation:
Impacts of these changes on
the city –
• Overcrowding,
• Congestion
• haphazard development of
cities.
• shortage of housing,
resulting in squatting on
public lands,
encroachment, un-
controlled settlements,
shortage of public utilities,
community facilities etc..
Growth in the cities –
Industries, and IT and other demand drivers
in the city
Migration
Urbanisation
Urban Land Ceiling Act, 1976
Introduction :
• Urban vacant lands have become highly speculative in nature
• Concentration of property in the hands of few people.
• The Govt of India passed the bill to be known as The Urban Land Ceiling Act, 1976.
• This law enacted in India with socialist objectives.
• Individual or firms can not hold vacant land beyond certain limit
• If they do then they have to declare and sell the excessive land to the Govt.
• Surplus land to be acquired by Govt. for public purpose.
• equitable distribution of the land
• uniform development of all sectors of Urban areas.
• To secure orderly Urbanization.
Transfer of Vacant Land:
•The act prohibits the transfer of vacant land by sale , mortgagee, gift, lease by a person holding excess
urban land and if it is done then such transfer is to be treated null and void.
Selection of Towns:
•was made applicable to 73 towns and cities.
•The main criteria for the inclusion of towns was its population rather than its size.
•out of 142 class I cities of 1971 census, only 73 cities (population exceeding 2 Lakhs) selected for
application.
Objects of the Act:
Ceiling Limits on Vacant land:
❑ 500 Sq.m – A grade Municipal Corporations
Delhi, Mumbai, Kolkata, Chennai
❑ 1000 Sq.m – B class area Urban agglomeration with population
exceeding 10 Lakhs.
❑ 1500 Sq.m – C class areas with population in between 3 – 10 Lakhs.
❑ 2000 Sq.m – D Class areas with Population in between 2 – 3 Lakhs.
Acquisition of excess Land:
Publication of intention in
official gazette
Preliminary survey
Making of Draft Plan by
authority and submitting it to
the govt.
Inviting and reviewing
objections and suggestions
Inviting objections and
suggestions
Modifications in draft plan
and submitting it to state
government for approval.
Final Plan
Within
60days
Within 2
yeras
Within
60days
Within 3
months
Within 1
year
Why government will acquire land?
For public purpose which includes:
• Provision/ Extension of Village sites.
• Land improvement / Development of existing village sites
• residential purposes to the poor or landless or person, slum
clearance
• Housing for project affected persons
• educational, health, housing, in other words public facilities.
• Parks , open spaces etc.
Land is not sufficient for
settlement.
Govt Can acquire
land for
development /
extension of
settlement.
Provisions in the Act:
Procedure of acquisition
•Preliminary Investigation and survey
•Declaration of the intention -issue a notification in the state Govt Gazette and publish in 2 daily
newspapers.
•Objections and suggestions within 30 days
•Owner is prevented from carrying out any works after the notice.
•Valuation of the property: The valuated value of the property in section 4 valid up to 1 year.
•Preparation of draft plan by authority and invitation for objections and suggestions.
•Modification in draft plan and Submission of report by collector to govt.
•Final permission of Govt. (Commissioner) – Can confirm the acquisition
Can cancel the acquisition
•Compensation to owner
•Detail documents/ proofs of the owner
Hearing of Objections
Objections to the acquisitions will be valid on one or more of the following grounds
1. The purpose is not a public purpose.
2. The land is not suitable for the said purpose.
3. The land is less suitable than the other piece of land
4. The area is excessive than required.
5. The acquisition will destroy historical or artistic monuments, religious buildings like temples,
graveyards, churches etc.
Provisions in the Act:
Apportionment – Distribution of compensation among all the persons known or believed to be
interested in the land
Period within which an award shall be made:
• 2yrs from the date of publication of declaration by collector
• If fails, entire proceedings gets lapsed and has to repeat whole procedure.
• Solatium – the extra value of land for the compulsory acquisition is known as ‘Solatium’.
• Collector has to grant 30 % solatium + 12% special value (i.e.. Interest ) per year.
Agricultural Field
well
Proposed Road
•Owner will also get –
1. Shifting charges
2. Loss of Business
3. Damage sustained by the persons interested
e.g. If there is any crop on the land at the time of possession,
its value should be accounted.
•Severances – When the land is divided in parts by the portion of
the land to be acquired by the Govt, the owners has to
compromise on its access or other things. This is Known as
Severance.
Provisions in the Act:
THANK YOU
Shamik Desai + 91 9426302503
desai.shamik@gmail.com

More Related Content

Similar to Critical factors & challenges in Real Estate Development in Urban India.pdf

Strategies for metropolitan planning
Strategies for metropolitan planningStrategies for metropolitan planning
Strategies for metropolitan planningASRufai
 
Managing land in the indian context
Managing land in the indian contextManaging land in the indian context
Managing land in the indian contextJIT KUMAR GUPTA
 
Land Use Planning: Conflict Management Tool in Pastoral Areas in Kenya
Land Use Planning: Conflict Management Tool in Pastoral Areas in KenyaLand Use Planning: Conflict Management Tool in Pastoral Areas in Kenya
Land Use Planning: Conflict Management Tool in Pastoral Areas in KenyaILRI
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTgayathrysatheesan1
 
Master plan and land use
Master plan and land useMaster plan and land use
Master plan and land useShourya Puri
 
Urban land use and urban land value
Urban land use and urban land valueUrban land use and urban land value
Urban land use and urban land valueChinmay Gowda
 
Transferable Development Rights
Transferable Development RightsTransferable Development Rights
Transferable Development RightsAman Kudesia
 
Urban Land Management & Options for Sourcing Land For Urban Development
Urban Land Management & Options for Sourcing Land For Urban DevelopmentUrban Land Management & Options for Sourcing Land For Urban Development
Urban Land Management & Options for Sourcing Land For Urban DevelopmentJIT KUMAR GUPTA
 
MESLand Governance in Urban and Peri-Urban areas
MESLand  Governance in Urban and Peri-Urban areasMESLand  Governance in Urban and Peri-Urban areas
MESLand Governance in Urban and Peri-Urban areasMohamed Timoulali
 
Land Pooling Models in India.pptx
Land Pooling Models in India.pptxLand Pooling Models in India.pptx
Land Pooling Models in India.pptxpoojayadav3276
 
Session 9- Urban Land values
Session 9- Urban Land valuesSession 9- Urban Land values
Session 9- Urban Land valuesMahima J
 
Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.JIT KUMAR GUPTA
 
Alice charles conference_the_potential_of_landbanking_28.04
Alice charles conference_the_potential_of_landbanking_28.04Alice charles conference_the_potential_of_landbanking_28.04
Alice charles conference_the_potential_of_landbanking_28.04Alice Charles
 
UPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptxUPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptxIvanaJoyceVillalobos
 
Regional planning ppt
Regional planning pptRegional planning ppt
Regional planning pptshradha arun
 
Land pooling Policy of DDA TPS and Magarpatta
Land pooling   Policy of DDA TPS and MagarpattaLand pooling   Policy of DDA TPS and Magarpatta
Land pooling Policy of DDA TPS and MagarpattaBhavik Raval
 
Town Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdfTown Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdfRohan Dasgupta
 

Similar to Critical factors & challenges in Real Estate Development in Urban India.pdf (20)

Strategies for metropolitan planning
Strategies for metropolitan planningStrategies for metropolitan planning
Strategies for metropolitan planning
 
Managing land in the indian context
Managing land in the indian contextManaging land in the indian context
Managing land in the indian context
 
Urban land policies
Urban land policiesUrban land policies
Urban land policies
 
Land Use Planning: Conflict Management Tool in Pastoral Areas in Kenya
Land Use Planning: Conflict Management Tool in Pastoral Areas in KenyaLand Use Planning: Conflict Management Tool in Pastoral Areas in Kenya
Land Use Planning: Conflict Management Tool in Pastoral Areas in Kenya
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
 
Master plan and land use
Master plan and land useMaster plan and land use
Master plan and land use
 
Urban land use and urban land value
Urban land use and urban land valueUrban land use and urban land value
Urban land use and urban land value
 
Slum upgradation
Slum upgradationSlum upgradation
Slum upgradation
 
Transferable Development Rights
Transferable Development RightsTransferable Development Rights
Transferable Development Rights
 
Urban Land Management & Options for Sourcing Land For Urban Development
Urban Land Management & Options for Sourcing Land For Urban DevelopmentUrban Land Management & Options for Sourcing Land For Urban Development
Urban Land Management & Options for Sourcing Land For Urban Development
 
Tdr spa bhopal
Tdr spa bhopalTdr spa bhopal
Tdr spa bhopal
 
MESLand Governance in Urban and Peri-Urban areas
MESLand  Governance in Urban and Peri-Urban areasMESLand  Governance in Urban and Peri-Urban areas
MESLand Governance in Urban and Peri-Urban areas
 
Land Pooling Models in India.pptx
Land Pooling Models in India.pptxLand Pooling Models in India.pptx
Land Pooling Models in India.pptx
 
Session 9- Urban Land values
Session 9- Urban Land valuesSession 9- Urban Land values
Session 9- Urban Land values
 
Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.
 
Alice charles conference_the_potential_of_landbanking_28.04
Alice charles conference_the_potential_of_landbanking_28.04Alice charles conference_the_potential_of_landbanking_28.04
Alice charles conference_the_potential_of_landbanking_28.04
 
UPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptxUPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptx
 
Regional planning ppt
Regional planning pptRegional planning ppt
Regional planning ppt
 
Land pooling Policy of DDA TPS and Magarpatta
Land pooling   Policy of DDA TPS and MagarpattaLand pooling   Policy of DDA TPS and Magarpatta
Land pooling Policy of DDA TPS and Magarpatta
 
Town Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdfTown Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdf
 

Recently uploaded

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 

Recently uploaded (20)

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 

Critical factors & challenges in Real Estate Development in Urban India.pdf

  • 1. Adani University REALESTATE- BUSINESS DEVELOPMENT Year: 2023 Course Code: Trimester V, Batch – PGDM IM & Law Visiting Faculty: Shamik Desai (M) 9426302503
  • 2. Session 3 Thursday, 12.10.2023 2 Critical Factors & Challenges in Real Estate Development in Urban India
  • 3. 1. Urban Sprawl 2. Overcrowding 3. Land scarcity, characteristics 4. Housing demand v/s supply 5. Unemployment ….disposable income 6. Slums and Squatter Settlements 7. Transport ….. all time challenge 8. Water supply 9. Sewerage Problems 10.Solid Waste Management 11.Crimes …. Law & order situation 12.Pollution 13.Educational facilities 14.Public health & re-creation facilities 15.Policies • Land ceiling act • Town planning • Zoning / FSI • Re-development bye-laws Critical Challenges / Factors
  • 4. Land as a limited resource Land is crucial for the economic, social, and environmental advancement of all countries. Land is partitioned for administrative and economic purposes, and it is used and transformed in a myriad ways.
  • 5. Characteristics of land • Relative fixity of supply • No cost of creation • Heterogeneity • Absence of market for land • Derived demand • Law of diminishing returns • Economic rent
  • 6. Relative fixity of supply • Land as a supply is fixed–if one type of use is increased in area it will be at the expense of other. • Capital changes its form and location with each turnover, while land remains the same. • But the intensity of use of land can be increased to serve the need. • Can land be created???
  • 7. No cost of creation • Man has the power to create or increase their capital, but not possible with land • when land is developed, costs are incurred and it becomes one of the factor of production • Modern technology -land reclamation: Example: Bandra Reclamation, Palm Jhumeria(Dubai) • It is being practiced in coastal cities. • Heterogeneity of land??
  • 8. No cost of creation • Man has the power to create or increase their capital, but not land • when land is developed, costs are incurred and it becomes one of the factor of production • Modern technology - land reclamation: Example: Bandra Reclamation, Palm Jhumeria(Dubai) • It is being practiced in coastal cities. • Heterogeneity of land??
  • 9. Heterogeneity • Each land parcel is different in character; having different advantages and disadvantages • It might be good for one kind of use and bad for another • Land can be classified into number of categories; ➢ Sub-marginal land: no remunerative use – not fit for farming ➢ Marginal land: break even + Profits ➢ Intra-marginal land: profit or surplus yielding
  • 10. Heterogeneity • Each land parcel is different in character; having different advantages and disadvantages • It might be good for one kind of use and bad for another • Land can be classified into number of categories; ➢ Sub-marginal land: no remunerative use – not fit for farming ➢ Marginal land: break even – Profits = Costs ➢ Intra-marginal land: profit or surplus yielding
  • 11. Demand for Land • Urban land is fairly inelastic in supply- We don’t produce this stuff!!!! • As per Ricardo: Rents were determined by the interaction of supply and demand. • Higher urban rents are the consequences of competition between different users. • If land is scarce in CBD and there is high demand for central sites, rents will be high. • CBD may thus be subject to more intensive use of land and increase in spatial extent by invading surrounding zone. • Demand for land is a demand for space which can be varied by land use changes, development control and regulation changes, structural changes and through the process of property development/conversion. CBD- Central Business District
  • 12. Absence of market for land • Land deals are transaction not in land itself but in interest or rights, possible returns from the land. • Rights in aggregate are known as “real property” • Transaction in real estate market generally are conducted in private while transaction in commodity market take place in public. • Reliable information about land transaction in real estate is not available easily.
  • 14. SessionOutline ❑ Introduction To Real Estate Planning Planning, Neighbourhood Planning, Planning models ❑ Sub-urbanisation Of Population And Employment ❑ Master Planning, Development Plan Land as a resource, Land use control and zoning, Various levels of Planning ❑ Town Planning In India-past And Present Planning Commission, NITI Ayog Etc. ❑ Urban challenges and Local Government Present day dilemmas in different cities, Urban Issues, Governance and Politics ❑ Housing and Real Estate Planning Housing for all, Various schemes, Slum Rehabilitation, Real estate trends etc. ❑ Mass transit ❑ Recent trends in Urban Planning - Growth Control & Decline Management • Planning for the future • Smart Cities 14
  • 15. Land use planning ? • Its purpose is to select and put into practice those land uses that will best meet the needs of the people while safeguarding resources for the future –Sustainability • Systematic assessment of land potential, alternatives for various uses at a location wrt economic and social conditions • Select and adopt the best land-use options. • It must satisfy two broad objectives; ✓ Ensuring best possible use of land ✓ Separating incompatible land uses
  • 16. Results in : • Evaluate and record unique features. • Preserve unique cultural or historical features. • Conserve open space • Plan for mixed uses in close proximity. • Plan variety of transportation options. • Set limits and managed growth patterns. • Encourage development in areas of existing infrastructure.
  • 18. Forest & water bodies: It includes the area under forest, sanctuary, rivers, lakes, conservation etc. Agricultural: It basically comprises of agricultural fields. Residential Use: It principally comprises of dwelling (housing units), gardens, community open spaces, convenience shopping facilities, primary schools, health clinics, smaller service industries Public and semi-public use: It comprise of institutional buildings which serves the community as a whole. It includes city administration buildings, Town Hall, Museum, Art Gallery, Library, police station, post office, fire stations, schools, charitable institutions, hospitals, religious facilities etc. Commercial use: It comprises offices, shopping centers, malls, retail stores, hotels, restaurants, multiplexes and other such places housing income-generating activities. Recreational (parks and open spaces):It includes parks, playgrounds, gardens, amusement parks, community open spaces, toad-lot areas etc. .
  • 19. Industrial: It comprises of areas having industrial activites ranging from light industry to heavy industry. Roads and Transportation: It includes transport terminals like bus-stations, railways stations, bus-stops, roads, footpaths, cycle tracts, parking arrangements, etc. Vacant land: It includes land parcels lying vacant without any building.
  • 20.
  • 21.
  • 22.
  • 23. GRAM PANCHAYAT MC UDA COLLECTOR OFFICE Agricultural Land NA conversion Old tenure 7/12 7/12 Conversion to old tenure New Tenure Form 6A Construction permission City Engineer Gamtal Area HNP Area Const. permission granted Registration & Stamp duty Sewerage connection LAND CONVERSION PASSING PHASE Water supply UGVL supply BU Application BU Granted City Engineer 75% ANTRI RATE 2 YEARS 4.9% JANTRI RATE 10/- Sq.ft 45 DAYS 3-4 MONTHS 12 – 15 DAYS 1 1. Under section 65 BLRC. 2. Under section DCR 2
  • 24. Developer buys agricultural land parcel at negotiated prices from land owner Makes Application to Collector office under section 65 of BLRC for NA conversion Submitting a Layout proposal Plotting scheme with access to all plots Common plot -Reserve 10% as common area FSI as per applicable municipal regulations (1.5 permitted in Gram Panchayat areas) It usually takes atleast 90 days for approval Once approved –applicant has to pay the conversion charges Developers sells the individual plots or develops housing unit and then sales it off Internal Infrastructure is usually provided by the developer
  • 26. ❑ National Level •Policy planning & reallocation of resources ❑ State Level •Policy planning & reallocation of resources ❑ Regional Level •Link between policy planning and spatial planning •Policy planning & reallocation of resources •Regional infrastructure projects ❑ City/Town level •Spatial planning •Land-use control ❑ Zonal Level •Detailed Spatial planning •Land/Area Development Schemes
  • 28. Various land development mechanisms are being used by different states across India; Town Planning Scheme (Guj and Mah) DDA Model (Delhi) HUDA Modal (Haryana) Ghaziabad Modal (Uttar Pradesh) Hyderabad Urban development Authority Modal Chennai Metropolitan Development Authority
  • 29. DDA Model DDA identifies and acquires land for development within the urban limits. Land is acquired under Land Acquisition Act,1894 and compensation is provided to the land owners DDA then develops the acquired landby providing the necessary infrastructureand allocates certain portion for housing (all classes EWS, LIG, MIG and HIG). DDA constructs flats for each class and invites application –allotment is done through draw system.
  • 30. Ghaziabad Model Its is based on joint venture between the development authority and the private developer. The equity sharing between the development authority and the private developer is in the ratio of 10:90. Private developers earn revenue from the sale of 60% of plotsin the free market Development Authority earns annual revenue of 1%from the private developer (tie up cost index). In this model, 20% of the plots are reserved for the EWS/LIGat predetermined rates. The model is applicable in selective residential areas with a minimum size of 50 acres It does not take into consideration the city/zonal level infrastructure facilities.
  • 31. Haryana Model Development Authority acts as facilitator The authority partners with the developers having proven track record It issues licences to such developers –permitting acquisition of land directly from the land owners through negotiated market price Time frame: The entire process of negotiating the land purchase and development is to be completed within three years. After assembling, the developers then develops the land and construct houses based on stipulated norms, rules and regulations This model is applicable in residential sectors only and the minimum viable size for the scheme is 40 hectares.
  • 32. Haryana Model Developers pay development fees at the rate of Rs.3.7lakhs/acre and handle all internal infrastructure Other stipulations are that 20% of the plots are to be sold to EWS and LIG at a certain fixed price. Another 25% of the plots are to be sold on no profit no loss basis.
  • 33. Chennai Metropolitan Development Authority also called “Guided Urban Development Modal” Land is bought by the private developers and developed Development authority purchases reserved unit at subsidized rates Developer has a free hand fixing prices for HIG and MIG units. Developer is responsible for development of all internal infrastructure
  • 34. Co-operative societies Group of interested individuals come together –form Housing Co-operative Societies It then identifies land for housing Members fund initially to purchase land Either from open market From development authority through auctions Prepare layouts and gets it approved from the authority Society then approaches various authorities for laying of roads, electricity and water connections. Members constructs individual unit. Development authority provides offsite infrastructure and technical assistance
  • 35. Town Planning Scheme • Town Planning Schemes - basic concept - pooling together all the land under different ownerships and redistributing it in a properly reconstituted form after deducting the land required for open spaces, social infrastructure, services, housing for the economically weaker section, and road network. • This process enables the local authority to develop land without fully acquiring it and gives it a positive control over the design and the limiting of the urban growth. • This method is extensively practiced in Gujarat and Maharashtra, selectively in Kerala and occasionally in Andhra Pradesh and Tamil Nadu. 35
  • 37. ➢The T.P. Schemes are prepared giving micro-level planning for smaller areas of about 100 acres that are already under pressure of urban development. ➢T.P. Schemes are conceptualised as a joint venture between the local authorities and the owners of the plots who agree to pool their land, redistribute and share the development costs as per this scheme prepared by development/local authority under the act. ➢An area of 1-2 sq. km is taken-up for a T.P. Scheme so that it can be manageable for preparation and implementation. ➢The land parcels having common ownership are marked as one original plot on a map and all such original plots are pooled together for planning purposes. 37
  • 38.
  • 39.
  • 40.
  • 42. Necessity of Law and Legislation: Impacts of these changes on the city – • Overcrowding, • Congestion • haphazard development of cities. • shortage of housing, resulting in squatting on public lands, encroachment, un- controlled settlements, shortage of public utilities, community facilities etc.. Growth in the cities – Industries, and IT and other demand drivers in the city Migration Urbanisation
  • 43. Urban Land Ceiling Act, 1976
  • 44. Introduction : • Urban vacant lands have become highly speculative in nature • Concentration of property in the hands of few people. • The Govt of India passed the bill to be known as The Urban Land Ceiling Act, 1976. • This law enacted in India with socialist objectives. • Individual or firms can not hold vacant land beyond certain limit • If they do then they have to declare and sell the excessive land to the Govt. • Surplus land to be acquired by Govt. for public purpose. • equitable distribution of the land • uniform development of all sectors of Urban areas. • To secure orderly Urbanization. Transfer of Vacant Land: •The act prohibits the transfer of vacant land by sale , mortgagee, gift, lease by a person holding excess urban land and if it is done then such transfer is to be treated null and void.
  • 45. Selection of Towns: •was made applicable to 73 towns and cities. •The main criteria for the inclusion of towns was its population rather than its size. •out of 142 class I cities of 1971 census, only 73 cities (population exceeding 2 Lakhs) selected for application. Objects of the Act: Ceiling Limits on Vacant land: ❑ 500 Sq.m – A grade Municipal Corporations Delhi, Mumbai, Kolkata, Chennai ❑ 1000 Sq.m – B class area Urban agglomeration with population exceeding 10 Lakhs. ❑ 1500 Sq.m – C class areas with population in between 3 – 10 Lakhs. ❑ 2000 Sq.m – D Class areas with Population in between 2 – 3 Lakhs.
  • 46. Acquisition of excess Land: Publication of intention in official gazette Preliminary survey Making of Draft Plan by authority and submitting it to the govt. Inviting and reviewing objections and suggestions Inviting objections and suggestions Modifications in draft plan and submitting it to state government for approval. Final Plan Within 60days Within 2 yeras Within 60days Within 3 months Within 1 year
  • 47. Why government will acquire land? For public purpose which includes: • Provision/ Extension of Village sites. • Land improvement / Development of existing village sites • residential purposes to the poor or landless or person, slum clearance • Housing for project affected persons • educational, health, housing, in other words public facilities. • Parks , open spaces etc. Land is not sufficient for settlement. Govt Can acquire land for development / extension of settlement. Provisions in the Act:
  • 48. Procedure of acquisition •Preliminary Investigation and survey •Declaration of the intention -issue a notification in the state Govt Gazette and publish in 2 daily newspapers. •Objections and suggestions within 30 days •Owner is prevented from carrying out any works after the notice. •Valuation of the property: The valuated value of the property in section 4 valid up to 1 year. •Preparation of draft plan by authority and invitation for objections and suggestions. •Modification in draft plan and Submission of report by collector to govt. •Final permission of Govt. (Commissioner) – Can confirm the acquisition Can cancel the acquisition •Compensation to owner •Detail documents/ proofs of the owner
  • 49. Hearing of Objections Objections to the acquisitions will be valid on one or more of the following grounds 1. The purpose is not a public purpose. 2. The land is not suitable for the said purpose. 3. The land is less suitable than the other piece of land 4. The area is excessive than required. 5. The acquisition will destroy historical or artistic monuments, religious buildings like temples, graveyards, churches etc. Provisions in the Act: Apportionment – Distribution of compensation among all the persons known or believed to be interested in the land
  • 50. Period within which an award shall be made: • 2yrs from the date of publication of declaration by collector • If fails, entire proceedings gets lapsed and has to repeat whole procedure. • Solatium – the extra value of land for the compulsory acquisition is known as ‘Solatium’. • Collector has to grant 30 % solatium + 12% special value (i.e.. Interest ) per year. Agricultural Field well Proposed Road •Owner will also get – 1. Shifting charges 2. Loss of Business 3. Damage sustained by the persons interested e.g. If there is any crop on the land at the time of possession, its value should be accounted. •Severances – When the land is divided in parts by the portion of the land to be acquired by the Govt, the owners has to compromise on its access or other things. This is Known as Severance. Provisions in the Act:
  • 51. THANK YOU Shamik Desai + 91 9426302503 desai.shamik@gmail.com