1. ALTOHES GREEN ENERGY POWER PLANT
With the new turbine technology we have developed,
1 MW Pumped Hydroelectricity 7/24 Productıon 7.700.000 kWh / Year
WORKİNG PRİNCİPLE OF THE POWER PLANT
Altohes technology The plant generates 3 MW energy and uses 2 MW of the energy produced for its pumps
and supplies 1 MW for external use.
In the first movement of the plant, 6 minutes of energy is supplied from the mains or generator. It is ensured
that the upper pool and pipes are filled with water.
When energy production starts, the electronic system automatically cuts off the external energy and the
power plant uses 3/2 of the energy produced and the power plant is put into the energy production cycle.
EFFİCİENCY TECHNİCAL DESCRİPTİON: Code: 980-100
ALTOHES Code: 980-1000 Power Plants will be used, Code: 960 1.120 and Code: 960 2.280 2 turbines will
fall from 30 meters. It will produce 3,400 kW (mechanical) power with 4.8 tons of water per second.
ALTOHES Code: 980-1000 power plant, 3.4 MW generation power produced by it, it consumes 1.12 MW
part for alternator, it consumes 2,28 MW part for its pumps and it gives 900 kW energy to external usage.
160 m2 gross open area and h 38 mt height are required.
The production capacity of the power plant will be designed according to the demand. With the combination
of many units, power plants can be established with great power.
ALTOHES Code: 980-1000, 1 MW Power Plant investment amount 2.2 million Euro
ALKILINC ENERJI www.alkilinctech.com