SlideShare a Scribd company logo
1 of 6
_____________________________________________________________
SUBHRA PRAKASH SARKAR
B E – Power (Mechanical), NPTI,9+ Yrs of Exp. in
POWER PLANT PROJECT EXECUTION (PROJECT MANAGEMENT,PROJECT
ENGINEERING,CONTRACT MANAGEMENT,PERFORMANCE EVALUATION,
COMMISSIONING, STABILIZATION & OPERATION),
Six Sigma Projects, Oracle ERP
Email: - spise_appu2001@yahoo.co.in
Phone: +918697702105
Home: +91-0343-2547387
_______________________________________________________________________
_
CAREER HIGHLIGHTS
• 9+ years of work experience at middle management levels in areas of
Project Management, Project execution(1X270MW,2X600MW,3X80MW
BHEL Sets including Ash Handling, Coal Handling, Fire Protection, Fuel Oil,
Cooling Tower etc), Power Plant Performance Evaluation(Turbine, Boiler,
Compressors, CT, Condenser, Heaters) for Power Plant of capacity 3 X 80
MW (O & M), Production, ISO,5S, Maintenance and Manpower Management.
PROFFESSIONAL EXPERIENCE
1.McNally Bharat Engineering Company Limited as Manager-Project
Management from Oct 2013 till date.
McNally Bharat Engineering Company Limited as Dy.Manager-Project
Management from Nov 2009 to Sep 2013.
2. Vedanta Group (Hindustan Zinc Limited) as Engineer- Power in Project
execution, Commissioning , Operation & Maintenance & Performance Evaluation
of Thermal Power Plant from June2006-Nov 2009.
Reporting to Asso.GM-Projects
Designation: Manager-Projects
Company: McNally Bharat Engineering Company Limited
Name of 2 References-
1)Utpal Banerjee(AGM-Projects),Mcnally Bharat Engineering Company Limited)
Mobile no-08697702052
2) Soumya Sarkar(Manager Civil Design, L & T )Mobile no-08588835502
.
RESPONSIBILTY HANDLED TILL DATE
• Project Management of 2X600MW Power Project of Singareni Thermal
Power Plant and 1X270MW Power plant of Ideal Energy Project. Handled
Projects of net value Rs 1500Cr.Responsibilities include handover from
Marketing, attending Pre Award Meetings with Clients, Internal Review
Meetings, Responsible for Entire Package coordination & handling from
Planning till Execution both with client and vendors. Billing, Collection,
Maintaining Cash Flow.
• Technical specification preparation & Engineering of new 270 MW
Thermal power projects for BOP systems & 80MW BTG Systems.
• Operations of the Boiler, Turbine and Generator. Mainly the control room
desk operations and field checks as and when required.
• Islanding operations of Power Plant during Grid disturbances.
• Improvement Projects & Six Sigma Projects like Auxiliary Power
Consumption, Specific Fuel & Water consumption.
• Hands on experience on Turbine, Boilers, Heat Exchangers, Compressor,
Pumps, Motors, Conveyors, Hydraulic, Pneumatic, Piping.
• Performance Calculation of Heaters, Air Preheater, Cooling Tower
efficiency, Boiler losses and Efficiency monitoring
Projects Handled
Project 1: Project Management of 2X600MW Power Project of Singareni
Thermal Power Plant and 1X270MW Power plant of Ideal Energy Project.
Project Duration:Aug'13 till present.
• Marketing Handover of Project & Contract formulation.
• Independent Handling of Cooling Tower Packages, Fuel Oil Handling
Packages, PT Packages, AHP Packages, CW system.
• Documentation Control.
• Contract Management
• Assisting Planning & Scheduling
• Billing & Collection
• Project Coordination for the entire Project
Project 2: Project Management of 1X270MW Power plant of Ideal Energy
Project. Project Period from Nov'09 to Dec'12.
• Independent Handling of Cooling Tower Packages, Fuel Oil Handling
Packages, PT Packages, AHP Packages, CW system.
• Documentation Control.
• Contract Management
• Assisting Planning & Scheduling
• Billing & Collection
• Project Coordination for the entire Project
Project 3: Installation, Engineering, Erection and Commissioning of
1x80 MW Steam Turbine & commissioning of 1x330 TPH PF Boiler
 Erection of auxiliary system like condenser, lube oil system, cooling
water system & Integral piping.
 Erection of Rotating Equipment like Boiler Feed pump, Condensate
extraction pump, Cooling water Pump.
 All commissioning activities like Hydro Test, Acid cleaning, Alkali Boil
out,passivation,Steam Blowing, Oil flushing, Steam Dumping, Vacuum
puling etc.
.Project 4: Reduction of commissioning time of Power Plant .
Project 5: Reduction of Auxiliary Power Consumption(less than 7.5%) by
six sigma project.
Project 6: Reduction of Specific Fuel Consumption by 5% by six sigma
project.
ENGINEERING DETAILS
National Power Training Institute, Durgapur (2002 – 2006)
(Under Ministry of Power, India)
 4 years engineering course in power plant (mechanical specialization)
with net 7.55 cgpa.
Training Program Undertaken:
 One month Vocational training in ALSTOM India Ltd., Durgapur
 One month Vocational training in Hydel-Power Project of WBSEB at
Jaldhaka, North Bengal.
 10Day Simulator Training on 210MW power plant at Bakeshar,WBPDCL.
 2 Day seminar on “Excellence in Maintenance in Power Plant” organized
by IIPE in collaboration with BHEL and NTPC.
 Six Sigma Green Belt Training Program
 ISO Internal Auditors Training Program.
COMPUTER PRFICIENCY
Lotus Notes, MS Office, Windows (9X, 2000, XP),Oracle ERP(Project
Management Tolls).
QUALITY CONTROL TOOLS
ISO 9001 & 14000, 5S implementation, TPM.
Extra Curriculum Activities :
 Participated in the ICSE Football Tournament held on 4th to 8th August,
1998
 Was a member of the Football Runner-up Team in the Inter School Sr.
Football Tournament organized by School Sports Association, Durgapur
Subdivision in the year 1999.
PERSONAL INFORMATION
Name of the Candidate : Subhra Prakash Sarkar
Date of Birth : 19th
November, 1982
Nationality : Indian
Religion : Hinduism
Father’ Name : Dr. Jyoti Prakas Sarkar
Father’s Occupation :Teaching; Professor & Dean, Chemical Engg. Dept
NIT (Durgapur)
Permanent Address : Flat No-1A,Block XII
Srijan Midlands,
83 Jessore Road
Kol-700132
West Bengal
Passport : Yes
PRESENT ADDRESS: Subhra Prakash Sarkar
Flat No-1A,Block XII
Srijan Midlands,83 Jessore Road
Kol-700132
Email: spise_appu2001@yahoo.co.in
Self-Appraisal Statements:
Major Strengths:
Sincerity, dedication & honesty
Ability to work in a team
Efforts towards constant update in areas of technical competence
Self-learning
(SUBHRA PRAKASH SARKAR)
Self-learning
(SUBHRA PRAKASH SARKAR)

More Related Content

What's hot

Cogeneration in NSSK Sugar Factory Bidar
Cogeneration in NSSK Sugar Factory BidarCogeneration in NSSK Sugar Factory Bidar
Cogeneration in NSSK Sugar Factory BidarMukund Hundekar
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014Umar Saeed
 
Marafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINALMarafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINALEmily Getty
 
GEA30908A_Wind_3.2-103_Brochure_LR
GEA30908A_Wind_3.2-103_Brochure_LRGEA30908A_Wind_3.2-103_Brochure_LR
GEA30908A_Wind_3.2-103_Brochure_LRHarold Schnetzka
 
Mba project - Energy management in commercial buildings of Kerala
Mba project - Energy management in commercial buildings of KeralaMba project - Energy management in commercial buildings of Kerala
Mba project - Energy management in commercial buildings of KeralaSandeep Koodalil
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintMcKenney's Inc
 
Pre-Conference Workshop: Energy Conservation in Gambling Facilities
Pre-Conference Workshop: Energy Conservation in Gambling FacilitiesPre-Conference Workshop: Energy Conservation in Gambling Facilities
Pre-Conference Workshop: Energy Conservation in Gambling FacilitiesHorizons RG
 
Customer Stories - FFCL
Customer Stories - FFCL Customer Stories - FFCL
Customer Stories - FFCL Reon Energy
 

What's hot (10)

Cogeneration in NSSK Sugar Factory Bidar
Cogeneration in NSSK Sugar Factory BidarCogeneration in NSSK Sugar Factory Bidar
Cogeneration in NSSK Sugar Factory Bidar
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014
 
Resume
ResumeResume
Resume
 
Marafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINALMarafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINAL
 
Edison Case Study-Frigitek_7.20.14
Edison Case Study-Frigitek_7.20.14Edison Case Study-Frigitek_7.20.14
Edison Case Study-Frigitek_7.20.14
 
GEA30908A_Wind_3.2-103_Brochure_LR
GEA30908A_Wind_3.2-103_Brochure_LRGEA30908A_Wind_3.2-103_Brochure_LR
GEA30908A_Wind_3.2-103_Brochure_LR
 
Mba project - Energy management in commercial buildings of Kerala
Mba project - Energy management in commercial buildings of KeralaMba project - Energy management in commercial buildings of Kerala
Mba project - Energy management in commercial buildings of Kerala
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
 
Pre-Conference Workshop: Energy Conservation in Gambling Facilities
Pre-Conference Workshop: Energy Conservation in Gambling FacilitiesPre-Conference Workshop: Energy Conservation in Gambling Facilities
Pre-Conference Workshop: Energy Conservation in Gambling Facilities
 
Customer Stories - FFCL
Customer Stories - FFCL Customer Stories - FFCL
Customer Stories - FFCL
 

Viewers also liked

Izquierdo 92315 HondaDreams CV2
Izquierdo 92315 HondaDreams CV2Izquierdo 92315 HondaDreams CV2
Izquierdo 92315 HondaDreams CV2Thomas Izquierdo
 
Izquierdo 91615 HarmoniouSustainability CV2
Izquierdo 91615 HarmoniouSustainability CV2Izquierdo 91615 HarmoniouSustainability CV2
Izquierdo 91615 HarmoniouSustainability CV2Thomas Izquierdo
 
Photo & Go Campaigns Book.compressed (1)
Photo & Go Campaigns Book.compressed (1)Photo & Go Campaigns Book.compressed (1)
Photo & Go Campaigns Book.compressed (1)Thomas Izquierdo
 
Izquierdo 100715 SaveTheTrees CV2
Izquierdo 100715 SaveTheTrees CV2Izquierdo 100715 SaveTheTrees CV2
Izquierdo 100715 SaveTheTrees CV2Thomas Izquierdo
 
Quimica aplicacion panaderia y reposteria
Quimica aplicacion panaderia y reposteriaQuimica aplicacion panaderia y reposteria
Quimica aplicacion panaderia y reposterialamouth25
 
Izquierdo 11215 DesignPortfolio.compressed
Izquierdo 11215 DesignPortfolio.compressedIzquierdo 11215 DesignPortfolio.compressed
Izquierdo 11215 DesignPortfolio.compressedThomas Izquierdo
 
Sobre Satelites
Sobre SatelitesSobre Satelites
Sobre Sateliteslamouth25
 
中高生向けUnity講座
中高生向けUnity講座中高生向けUnity講座
中高生向けUnity講座Makoto Ito
 
Unity Analyticsの使い方
Unity Analyticsの使い方Unity Analyticsの使い方
Unity Analyticsの使い方Makoto Ito
 
Unity In App Purchase (IAP)の使い方
Unity In App Purchase (IAP)の使い方Unity In App Purchase (IAP)の使い方
Unity In App Purchase (IAP)の使い方Makoto Ito
 
超便利! Unity Cloud Build の使い方
超便利! Unity Cloud Build の使い方超便利! Unity Cloud Build の使い方
超便利! Unity Cloud Build の使い方Makoto Ito
 
Unity Cloud Buildの使い方
Unity Cloud Buildの使い方Unity Cloud Buildの使い方
Unity Cloud Buildの使い方Makoto Ito
 
Unity Heatmap/Game Performance/Collaborate 紹介
Unity Heatmap/Game Performance/Collaborate 紹介Unity Heatmap/Game Performance/Collaborate 紹介
Unity Heatmap/Game Performance/Collaborate 紹介Makoto Ito
 

Viewers also liked (15)

Izquierdo 92315 HondaDreams CV2
Izquierdo 92315 HondaDreams CV2Izquierdo 92315 HondaDreams CV2
Izquierdo 92315 HondaDreams CV2
 
Izquierdo 91615 HarmoniouSustainability CV2
Izquierdo 91615 HarmoniouSustainability CV2Izquierdo 91615 HarmoniouSustainability CV2
Izquierdo 91615 HarmoniouSustainability CV2
 
Photo & Go Campaigns Book.compressed (1)
Photo & Go Campaigns Book.compressed (1)Photo & Go Campaigns Book.compressed (1)
Photo & Go Campaigns Book.compressed (1)
 
IMEX Recap
IMEX RecapIMEX Recap
IMEX Recap
 
Izquierdo 100715 SaveTheTrees CV2
Izquierdo 100715 SaveTheTrees CV2Izquierdo 100715 SaveTheTrees CV2
Izquierdo 100715 SaveTheTrees CV2
 
Quimica aplicacion panaderia y reposteria
Quimica aplicacion panaderia y reposteriaQuimica aplicacion panaderia y reposteria
Quimica aplicacion panaderia y reposteria
 
Izquierdo 11215 DesignPortfolio.compressed
Izquierdo 11215 DesignPortfolio.compressedIzquierdo 11215 DesignPortfolio.compressed
Izquierdo 11215 DesignPortfolio.compressed
 
Sobre Satelites
Sobre SatelitesSobre Satelites
Sobre Satelites
 
中高生向けUnity講座
中高生向けUnity講座中高生向けUnity講座
中高生向けUnity講座
 
Ecommerce
EcommerceEcommerce
Ecommerce
 
Unity Analyticsの使い方
Unity Analyticsの使い方Unity Analyticsの使い方
Unity Analyticsの使い方
 
Unity In App Purchase (IAP)の使い方
Unity In App Purchase (IAP)の使い方Unity In App Purchase (IAP)の使い方
Unity In App Purchase (IAP)の使い方
 
超便利! Unity Cloud Build の使い方
超便利! Unity Cloud Build の使い方超便利! Unity Cloud Build の使い方
超便利! Unity Cloud Build の使い方
 
Unity Cloud Buildの使い方
Unity Cloud Buildの使い方Unity Cloud Buildの使い方
Unity Cloud Buildの使い方
 
Unity Heatmap/Game Performance/Collaborate 紹介
Unity Heatmap/Game Performance/Collaborate 紹介Unity Heatmap/Game Performance/Collaborate 紹介
Unity Heatmap/Game Performance/Collaborate 紹介
 

Similar to Power Plant Project Manager Resume (20)

ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
CV_Gopalakrishna
CV_GopalakrishnaCV_Gopalakrishna
CV_Gopalakrishna
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Kapil Agrawal
Kapil AgrawalKapil Agrawal
Kapil Agrawal
 
CV PANKAJ SINGHAI
CV PANKAJ SINGHAICV PANKAJ SINGHAI
CV PANKAJ SINGHAI
 
720815_Jignesh
720815_Jignesh720815_Jignesh
720815_Jignesh
 
Ashok Sai
Ashok SaiAshok Sai
Ashok Sai
 
kusum_1_gs
kusum_1_gskusum_1_gs
kusum_1_gs
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Resume-Pravin_Ghatge _EA1
Resume-Pravin_Ghatge _EA1Resume-Pravin_Ghatge _EA1
Resume-Pravin_Ghatge _EA1
 
Resume akhilesh singh re-1
Resume akhilesh singh re-1Resume akhilesh singh re-1
Resume akhilesh singh re-1
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Satish Resume (21062016)
Satish Resume (21062016)Satish Resume (21062016)
Satish Resume (21062016)
 
ASIT CV
ASIT CVASIT CV
ASIT CV
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Gallagher_Resume_9-16
Gallagher_Resume_9-16Gallagher_Resume_9-16
Gallagher_Resume_9-16
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 

Power Plant Project Manager Resume

  • 1. _____________________________________________________________ SUBHRA PRAKASH SARKAR B E – Power (Mechanical), NPTI,9+ Yrs of Exp. in POWER PLANT PROJECT EXECUTION (PROJECT MANAGEMENT,PROJECT ENGINEERING,CONTRACT MANAGEMENT,PERFORMANCE EVALUATION, COMMISSIONING, STABILIZATION & OPERATION), Six Sigma Projects, Oracle ERP Email: - spise_appu2001@yahoo.co.in Phone: +918697702105 Home: +91-0343-2547387 _______________________________________________________________________ _ CAREER HIGHLIGHTS • 9+ years of work experience at middle management levels in areas of Project Management, Project execution(1X270MW,2X600MW,3X80MW BHEL Sets including Ash Handling, Coal Handling, Fire Protection, Fuel Oil, Cooling Tower etc), Power Plant Performance Evaluation(Turbine, Boiler, Compressors, CT, Condenser, Heaters) for Power Plant of capacity 3 X 80 MW (O & M), Production, ISO,5S, Maintenance and Manpower Management. PROFFESSIONAL EXPERIENCE 1.McNally Bharat Engineering Company Limited as Manager-Project Management from Oct 2013 till date. McNally Bharat Engineering Company Limited as Dy.Manager-Project Management from Nov 2009 to Sep 2013. 2. Vedanta Group (Hindustan Zinc Limited) as Engineer- Power in Project execution, Commissioning , Operation & Maintenance & Performance Evaluation of Thermal Power Plant from June2006-Nov 2009. Reporting to Asso.GM-Projects Designation: Manager-Projects Company: McNally Bharat Engineering Company Limited Name of 2 References-
  • 2. 1)Utpal Banerjee(AGM-Projects),Mcnally Bharat Engineering Company Limited) Mobile no-08697702052 2) Soumya Sarkar(Manager Civil Design, L & T )Mobile no-08588835502 . RESPONSIBILTY HANDLED TILL DATE • Project Management of 2X600MW Power Project of Singareni Thermal Power Plant and 1X270MW Power plant of Ideal Energy Project. Handled Projects of net value Rs 1500Cr.Responsibilities include handover from Marketing, attending Pre Award Meetings with Clients, Internal Review Meetings, Responsible for Entire Package coordination & handling from Planning till Execution both with client and vendors. Billing, Collection, Maintaining Cash Flow. • Technical specification preparation & Engineering of new 270 MW Thermal power projects for BOP systems & 80MW BTG Systems. • Operations of the Boiler, Turbine and Generator. Mainly the control room desk operations and field checks as and when required. • Islanding operations of Power Plant during Grid disturbances. • Improvement Projects & Six Sigma Projects like Auxiliary Power Consumption, Specific Fuel & Water consumption. • Hands on experience on Turbine, Boilers, Heat Exchangers, Compressor, Pumps, Motors, Conveyors, Hydraulic, Pneumatic, Piping. • Performance Calculation of Heaters, Air Preheater, Cooling Tower efficiency, Boiler losses and Efficiency monitoring Projects Handled Project 1: Project Management of 2X600MW Power Project of Singareni Thermal Power Plant and 1X270MW Power plant of Ideal Energy Project. Project Duration:Aug'13 till present. • Marketing Handover of Project & Contract formulation. • Independent Handling of Cooling Tower Packages, Fuel Oil Handling Packages, PT Packages, AHP Packages, CW system. • Documentation Control. • Contract Management • Assisting Planning & Scheduling • Billing & Collection • Project Coordination for the entire Project
  • 3. Project 2: Project Management of 1X270MW Power plant of Ideal Energy Project. Project Period from Nov'09 to Dec'12. • Independent Handling of Cooling Tower Packages, Fuel Oil Handling Packages, PT Packages, AHP Packages, CW system. • Documentation Control. • Contract Management • Assisting Planning & Scheduling • Billing & Collection • Project Coordination for the entire Project Project 3: Installation, Engineering, Erection and Commissioning of 1x80 MW Steam Turbine & commissioning of 1x330 TPH PF Boiler  Erection of auxiliary system like condenser, lube oil system, cooling water system & Integral piping.  Erection of Rotating Equipment like Boiler Feed pump, Condensate extraction pump, Cooling water Pump.  All commissioning activities like Hydro Test, Acid cleaning, Alkali Boil out,passivation,Steam Blowing, Oil flushing, Steam Dumping, Vacuum puling etc. .Project 4: Reduction of commissioning time of Power Plant . Project 5: Reduction of Auxiliary Power Consumption(less than 7.5%) by six sigma project. Project 6: Reduction of Specific Fuel Consumption by 5% by six sigma project. ENGINEERING DETAILS National Power Training Institute, Durgapur (2002 – 2006) (Under Ministry of Power, India)  4 years engineering course in power plant (mechanical specialization) with net 7.55 cgpa. Training Program Undertaken:  One month Vocational training in ALSTOM India Ltd., Durgapur  One month Vocational training in Hydel-Power Project of WBSEB at Jaldhaka, North Bengal.  10Day Simulator Training on 210MW power plant at Bakeshar,WBPDCL.  2 Day seminar on “Excellence in Maintenance in Power Plant” organized by IIPE in collaboration with BHEL and NTPC.
  • 4.  Six Sigma Green Belt Training Program  ISO Internal Auditors Training Program. COMPUTER PRFICIENCY Lotus Notes, MS Office, Windows (9X, 2000, XP),Oracle ERP(Project Management Tolls). QUALITY CONTROL TOOLS ISO 9001 & 14000, 5S implementation, TPM. Extra Curriculum Activities :  Participated in the ICSE Football Tournament held on 4th to 8th August, 1998  Was a member of the Football Runner-up Team in the Inter School Sr. Football Tournament organized by School Sports Association, Durgapur Subdivision in the year 1999. PERSONAL INFORMATION Name of the Candidate : Subhra Prakash Sarkar Date of Birth : 19th November, 1982 Nationality : Indian Religion : Hinduism Father’ Name : Dr. Jyoti Prakas Sarkar Father’s Occupation :Teaching; Professor & Dean, Chemical Engg. Dept NIT (Durgapur) Permanent Address : Flat No-1A,Block XII Srijan Midlands, 83 Jessore Road Kol-700132 West Bengal Passport : Yes PRESENT ADDRESS: Subhra Prakash Sarkar Flat No-1A,Block XII Srijan Midlands,83 Jessore Road Kol-700132 Email: spise_appu2001@yahoo.co.in Self-Appraisal Statements: Major Strengths: Sincerity, dedication & honesty Ability to work in a team Efforts towards constant update in areas of technical competence