1. Nitesh Amarlal Hinduja
E-501, Vaishnodevi Township,
Jahangirpura, Surat-395009, India.
Cell No.: +91 9586680526,
Email: nahinduja123@yahoo.co.in
Objective:
Position as Mechanical Maintenance and Planning Engineer using over 12 years of experience in this field.
Summary of Qualification
• Graduate in Mechanical Engineering with CGPA 7.25 from Institution of Engineers, India in
December 2014.
• Diploma in Mechanical Engineering from Shri K.J.Polytechnic, Gujarat University with 68.7%
in the December 2002
Achievements:
• Preparation of various project related documents like EPC Bid document, Techno Economic
Feasibility Reports, Material Balance etc.
• Worked as Maintenance Planner for BOROUGE-2 UOE Project and handled planning for
Mechanical, Electrical and Instrumentation activities single handedly.
• Worked as Utilities Area in charge for Sponge Iron Plant of ESSAR STEEL LTD.
• Core team member of SAP ECC 6.0 PM Module and ensured successful functional implementation
of same within the department, provided end user training to all the colleagues.
• Received Positive Action Award for Portable platform fabrication for Vessels with in-house
resources, in stipulated time.
• Actively involved in successful erection and commissioning of Demineralization Water Plant.
• Actively involved in successful erection of 24” Pipe line @400 meters.
Summary of Experience & Skills
• Routine job planning/execution.
• Shut down planning/execution.
• Spares Management
• Preventive Maintenance scheduling through SAP ECC 6.0 PM MODULE
• Work Orders creation for maintenance internally or by external parties.
2. • Preparation of Maintenance Manuals of all Equipment’s.
• Looked after Utility Area as Area In charge from Maintenance.
• Conversant with MS Office, SAP R3- PM Module, Primavera P6, AutoCAD
• Languages known – English, Hindi, Gujarati & Sindhi
Professional Background:
• December 2010 to till date, working as “Deputy Manager Mechanical with Essar
Steel Ltd. At Hazira, Surat, India.
Details:
Recently worked in Capital Shutdown for ESSAR OIL Refinery VGO Unit. Looked after
maintenance of Vessels, Columns, Reactors, High and Low pressure heat exchangers.
I am presently working as Technical assistant to Chief Operating Officer Middle East, for
project of Integrated Steel plant. Have been actively involved in preparation of EPC Bid
documents, Techno Economic feasibility Reports, EPC Proposals for the project and
Planning of its daily activities.
I had worked as Shift In charge in HBI plant of “ESSAR STEEL LTD”, world’s largest gas
based sponge iron plant.
Philosophy of P3M Maintenance is followed i.e. Preventive, Proactive & Predictive
Maintenance.
Working as SAP Co-ordinator for PM Module and has been member of Core team for
Implementation of SAP in my dept. It involves Maintenance plans, task list creation for
equipment’s.
3. Creation Bill of Material for Functional Location, Equipment’s & Material & Catalogue
profiles generation for equipment’s.
• July 2009 to October 2010 as Maintenance Planner with Technicas Reunidas ,
Abu Dhabi, UAE
Projects: - Abu Dhabi Polymers Company, BOROUGE-2 UOE Projects.
Details:
Looked after Utilities, off sites & External Interconnections area maintenance planning.
Daily Job Planning, distribution of manpower & ensuring job execution as per planning.
Preparing Weekly Report displaying job planned Vs Jobs Completed & creating Back log
to forward for next week.
Construction Stage:
It includes Preservation Scheduling & execution tracking of all the equipments that are
being installed in the plant.
Planning for the execution of the punch list generated during preservation inspection.
Commissioning Stage:
Lubrication Schedule Preparation as per lubrication data sheets provided by vendor &
estimation of oil consumption during the year.
Preparation of schedule for oil sample for analysis.
Oil replacement of the equipment’s if recommended by Vendor before start up.
Maintaining the records of equipment’s start up for activation of preventive maintenance
plans of Mechanical, Electrical & Instrumentation.
Operation Stage:
It includes Preventive Maintenance Schedule implementation for Mechanical, Electrical &
Instrumentation Equipment’s.
Preparation of daily & weekly job planning & ensure the execution for the same.
Calculation of man hours consumed for the job.
Management of available resources by discussion with respective supervisors to ensure
successful completion of planned-unplanned jobs.
Planning of jobs after confirmation of material availability.
Philosophy of P3M Maintenance is followed i.e. Preventive, Proactive & Predictive
Maintenance.
Maintaining History of jobs executed.
4. • June 2003 to October 2008, Mechanical Engineer Maintenance with ESSAR STEEL
LTD, Hazira, Surat, India
• Details:
Handling maintenance activities in SPONGE IRON PLANT of ESSAR having capacity of
5.2 MTPA. Worked as Shift In charge with team of 6 engineers. Carried out routine
inspection and maintenance activities. PMI activities as per scheduled maintenance plan.
Maintenance in charge for utilities which included Thickener, centrifugal & reciprocating
pumps, agitators, Water treatment plant, Fire water pump house, sewage treatment plants
etc. Contractor administration for effective output, preparing FMEA projects for most critical
equipment’s in Plant.
Training to all colleagues in department for SAP PM MODULE.
I was also involved in Master Data Creation in SAP & have been working with successful
implementation of SAP ECC 6.0 in my department.
I have been co-ordinating with Material Management crew SAP ECC 6.0 MM Module to
sort out the difficulties arising during that phase
• Planning Jobs:
Planning & scheduling of various maintenance activities.
Leveling of Resources
Tracking the progress of the project/ maintenance plan execution
Earned Value Analysis, this includes tracking of “SVI” & “CPI”.
Expert in SAP ECC 6.0 PM MODULE & also familiar with MM Module
Master Data creation in SAP.
Creation of Functional Location, Work Orders & Maintenance Strategy.
Maintaining history records
Calculation MTTR & MTBF for equipment’s maintenance.
Training:
• “SAP Module:- Plant Maintenance Conducted by Accenture”
• “PRIMAVERA P6 from CADD Centre”.
• ”Total Productivity Maintenance”
5. Other Details:
• D.O.B. : 10
th
July ‘84
• Passport no. & validity: Z3049091 valid up to 25/12/2024
• Marital Status : Married
6. Other Details:
• D.O.B. : 10
th
July ‘84
• Passport no. & validity: Z3049091 valid up to 25/12/2024
• Marital Status : Married