SlideShare a Scribd company logo
1 of 3
CAREER
OBJECTIVE
• A position of responsibility, challenge and repute in a healthy congenial working environment. The
job must provide adequate scope for self – development, opportunity for growth and new learning.
Aim is to excel in the position entrusted upon me and to be an asset to the organization.
PROFESSIONAL EXPERIENCE 54 Months
COMPANY
PROFILE
• JSW, a part of the $15 billion O.P Jindal Group, is a leading manufacturer of flat steel products in
India. Its Vijayanagar Works is presently the largest integrated steel plant in India with a present
production capacity of 12 Million Tones of hot metal per annum.
• JSW is the market leader in galvanized steel products and sells its product through a large
distribution network both in India and abroad.JSW Group has diversified interests in Steel, Energy,
Minerals and Mining, Aluminum, Infrastructure and Logistic, Cement and Information Technology.
• Energy Management Department takes care to optimize the consumption of energy of the whole
plant. The department is responsible for handling and distribution of by-product gases (Corex gas, BF
gas, LD gas, and CO gas), Special gases (Oxygen, Nitrogen and Argon), LPG and process steam.
Roles &
Responsibilities
• Ensuring Critical Services for the Production Departments for their smooth operation, hot metal and
liquid steel production by providing gases like COREX Gas, BF gas, Coke Oven Gas, LD Gas, DRI gas, LPG,
special gases, steam and coal dust.
• Preparation, handling and analysis of MIS report, specific energy report, By product gas balancing
for all the shops, Utility reports, Billing, Invoices, sustainability report and other technical reports
sought by various agencies .
• Coordinating between different department and other companies for data collection for
preparation of MIS report, specific energy report, by product gas balancing for all the shops Utility
reports, Billing, Invoices and other technical reports sought by various agencies .
• Coordinating with colleagues for energy saving projects, Dust sampling, Gas analysis, Performance
guaranteed test, combustion laboratory setup.
• Ensuring proper utilization and minimum flaring of by product gases and Special gases.
• Studying and analyzing energy consumption pattern of various energy intensive units.
• Arranging data and filling of form for energy related activity and awards.
• Analyzing financial impact of different terms and clauses of agreement (Agreement done b/w JSW
and O2 plants for special gases supply, JSW and JSWEL for O & M of captive power plants and JSW and
JSW project for utility supply etc) and suggesting the management suitable solutions.
• Coordinating with all 4 oxygen plants for smooth operation.
• Coordinating with new oxygen plant for timely and successful commissioning.
• Coordinating to conduct the mandatory energy audit for designated consumers (JSW Steel
Vijayanagar, Salem and Dolvi) as notified by GOI.
• Documentation and implementation of standards required for ISO 9004:2008, EMS 14001 and
OHSAS 18001 in the department.
• Successfully got certification of ISO 9001:2008, EMS 14001:2004 and OHSAS 18001:2007 for the
department
• Coordinating and assisting SAP team for implementation of SAP in the department as a core team
member of SAP team for MM, FICO, PP & PM module.
• Establish and ensure safe working practices and achieving zero accident targets.
1
KAPIL AGRAWAL
Mechanical Engineer. Assistant Manager
Thapar University, Patiala Energy Management Department
Mobile: +918861125462, JSW Steel Ltd.
Email-ID: kapilagrawal43@gmail.com
Technical
• Energy, Carbon and Nitrogen Balancing of different energy intensive units.
• Worked upon energy auditing of mills and potential energy saving.
• Have a wide knowledge of various energy saving projects (utilizing waste heat to generate power,
steam and to support process)
• Working on Supervisory Control and Data Acquisition (SCADA) System.
• Operation and maintenance of moist fuel gas-lines and special gas-lines.
• Operation and maintenance of Gas Holders, Gas Boosting Stations and Gas Mixing Stations.
• Project Activities in Gas Lines (From fabrication to Commissioning).
• Operating ERP software SAP
• Programming Languages :Basic of C language
• Operating Software : Photo shop(basic knowledge),Microsoft excel, power point, word,
access(basic)
• Designing Software’s: Pro E (wild fire3.0), Auto cad, Pro desktop.
• Taken basic knowledge of green belt (Six sigma) training and different departments (Maintenance,
Production, Quality, R & D, Purchase, Planning, Engineering, Stores and Six sigma departments.)
during six month training in MARATHON ELECTRIC INDIA PVT. LIMITED FARIDABAD formerly
known as GE MOTORS INDIA PVT LTD.)
Achievements
• Special prize: - Science quiz and debate on district level and participated in state level quiz and
debate at annual function of Indian academy of science.
• Ranked in the top 2% in AIEEE 2006 which was taken by more than 5, 25,000 students in India
• Qualified GATE 2012 with Ranked in the top 8.75 % which was taken by 112320
students in India.
• Qualified internal auditor exam of ISO 9004:2008, EMS 14001 and OHSAS 18001 in 2012.
• Qualified Energy Auditor Exam in 2014, Which is conducted by the BEE, Ministry of
power
PROJECTS UNDERTAKEN
JSW Steel Ltd • ISO Implementation in Energy Management Department
• SAP Implementation for departmental activities in energy Management Department
• Single Excel sheet development for all energy data management
• Nitrogen balancing of blast furnaces
• Carbon balancing for coke ovens
• Energy auditing of mills
• Nitrogen consumption reduction
• Energy Audit of mills
• Special gas line health checkups
• Conversion of gas heater to steam heaters in oxygen plant
MARATHON
ELECTRIC
INDIA PVT.
LIMITED
FARIDABAD
• Project Semester: 6 month training
• Maintenance cost reduction.
• Change over time reduction of Argon gas cylinders.
• Over all equipment effectiveness.
• First passing yield improvement.
THAPAR
UNIVERSITY
• Summer Training: 6 week training
• Objective was to learn and do practical work on basic processes in workshop.
• Project: “Fabrication of Foot Pump of 40+ psi capacity”
• A foot pump with capacity to fill air up to 40+ psi in less than 90 seconds with a cylinder
2
attached to store compressed air
ACADEMIC PROFILE
B.E (Mech) 2006-2010 Thapar University ,Punjab 73.4%
Class XII 2004-2005 U.P.Board 71.00%
Class X 2002-2003 U.P.Board 60.00%
Extra
Curricular &
Position of
Responsibility
• Audio Visual committee (Saturnalia 2007) - Joint secretary
• Renewable energy club (2008) - Executive member
• Hindi literary society (2008) - Executive member
• Aranya (technical festival, 2006, 07) - Executive member
• Saturnalia (Cultural festival, 2008) - Executive member
• Maintenance secretary (2010) (Hostel A)
• Have done yes+ (art of living course), in Jan 2007. This course helps me in
managing stress.
OTHERS
Hobbies
• Traveling
• Playing indoors and out door games(computer games,cricket,badminton)
• Making Friends
• solving Su Do Ku
• Reading news paper
• watching movies
• listening songs
• Internet surfing.
PERSONAL PARTICULARS
• Date of Birth: 9th February, 1986
• Marital Status: Single
• Nationality: Indian
• Languages Known: Hindi and English
• Permanent Address: SO Mr. Raj Kumar Agrawal
H.No. 1787,Near By L.P. Nagar Road,
Dempier Nagar, Mathura(281001)
DECLARATION • I hereby declare that the above mentioned information is correct according to my knowledge and I
bear the responsibility for correctness of above mentioned particulars.
15th Mar’15 Kapil Agrawal
3

More Related Content

Viewers also liked

Viewers also liked (9)

Smartcities 2015 - GIX
Smartcities 2015 - GIXSmartcities 2015 - GIX
Smartcities 2015 - GIX
 
Kwasi Date-Bah CV SlideShare
Kwasi Date-Bah CV SlideShareKwasi Date-Bah CV SlideShare
Kwasi Date-Bah CV SlideShare
 
InfoProlotherapy1
InfoProlotherapy1InfoProlotherapy1
InfoProlotherapy1
 
Men Want Women
Men Want WomenMen Want Women
Men Want Women
 
Eft flyer spring 2015
Eft flyer spring 2015Eft flyer spring 2015
Eft flyer spring 2015
 
Gino Palluconi resume 02182015
Gino Palluconi resume 02182015Gino Palluconi resume 02182015
Gino Palluconi resume 02182015
 
Presentation2-14JAN14-DRAFT
Presentation2-14JAN14-DRAFTPresentation2-14JAN14-DRAFT
Presentation2-14JAN14-DRAFT
 
Burn The Fat Build The Muscle
Burn The Fat Build The MuscleBurn The Fat Build The Muscle
Burn The Fat Build The Muscle
 
Vēsturisku ēku saglabāšana un energoefektivitātes uzlabošanas iespējas
Vēsturisku ēku saglabāšana un energoefektivitātes uzlabošanas iespējasVēsturisku ēku saglabāšana un energoefektivitātes uzlabošanas iespējas
Vēsturisku ēku saglabāšana un energoefektivitātes uzlabošanas iespējas
 

Similar to Kapil Agrawal

Similar to Kapil Agrawal (20)

Revathi 1
Revathi 1Revathi 1
Revathi 1
 
Roy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIM
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Subhra.doc
Subhra.docSubhra.doc
Subhra.doc
 
MR12AB Tuesday13h00 - Hemant Grover
MR12AB Tuesday13h00 - Hemant GroverMR12AB Tuesday13h00 - Hemant Grover
MR12AB Tuesday13h00 - Hemant Grover
 
MANIKANDAN_ENERGY ENGINEER_Detailed Resume
MANIKANDAN_ENERGY ENGINEER_Detailed ResumeMANIKANDAN_ENERGY ENGINEER_Detailed Resume
MANIKANDAN_ENERGY ENGINEER_Detailed Resume
 
Manikandan Energy Engineer
Manikandan Energy EngineerManikandan Energy Engineer
Manikandan Energy Engineer
 
Where Glencore Coal Assets Australia stands - Mark Winchester
Where Glencore Coal Assets Australia stands - Mark WinchesterWhere Glencore Coal Assets Australia stands - Mark Winchester
Where Glencore Coal Assets Australia stands - Mark Winchester
 
Copy of CV sarfaraz khalil bhatti
Copy of CV sarfaraz khalil bhattiCopy of CV sarfaraz khalil bhatti
Copy of CV sarfaraz khalil bhatti
 
pk
pkpk
pk
 
Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - Suncor
 
Ashik's cv
Ashik's cvAshik's cv
Ashik's cv
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
pk
pkpk
pk
 
Jacob samuel cv
Jacob samuel cvJacob samuel cv
Jacob samuel cv
 
Jacob Samuel CV
Jacob Samuel CVJacob Samuel CV
Jacob Samuel CV
 
Pankaj 1
Pankaj 1Pankaj 1
Pankaj 1
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 

Kapil Agrawal

  • 1. CAREER OBJECTIVE • A position of responsibility, challenge and repute in a healthy congenial working environment. The job must provide adequate scope for self – development, opportunity for growth and new learning. Aim is to excel in the position entrusted upon me and to be an asset to the organization. PROFESSIONAL EXPERIENCE 54 Months COMPANY PROFILE • JSW, a part of the $15 billion O.P Jindal Group, is a leading manufacturer of flat steel products in India. Its Vijayanagar Works is presently the largest integrated steel plant in India with a present production capacity of 12 Million Tones of hot metal per annum. • JSW is the market leader in galvanized steel products and sells its product through a large distribution network both in India and abroad.JSW Group has diversified interests in Steel, Energy, Minerals and Mining, Aluminum, Infrastructure and Logistic, Cement and Information Technology. • Energy Management Department takes care to optimize the consumption of energy of the whole plant. The department is responsible for handling and distribution of by-product gases (Corex gas, BF gas, LD gas, and CO gas), Special gases (Oxygen, Nitrogen and Argon), LPG and process steam. Roles & Responsibilities • Ensuring Critical Services for the Production Departments for their smooth operation, hot metal and liquid steel production by providing gases like COREX Gas, BF gas, Coke Oven Gas, LD Gas, DRI gas, LPG, special gases, steam and coal dust. • Preparation, handling and analysis of MIS report, specific energy report, By product gas balancing for all the shops, Utility reports, Billing, Invoices, sustainability report and other technical reports sought by various agencies . • Coordinating between different department and other companies for data collection for preparation of MIS report, specific energy report, by product gas balancing for all the shops Utility reports, Billing, Invoices and other technical reports sought by various agencies . • Coordinating with colleagues for energy saving projects, Dust sampling, Gas analysis, Performance guaranteed test, combustion laboratory setup. • Ensuring proper utilization and minimum flaring of by product gases and Special gases. • Studying and analyzing energy consumption pattern of various energy intensive units. • Arranging data and filling of form for energy related activity and awards. • Analyzing financial impact of different terms and clauses of agreement (Agreement done b/w JSW and O2 plants for special gases supply, JSW and JSWEL for O & M of captive power plants and JSW and JSW project for utility supply etc) and suggesting the management suitable solutions. • Coordinating with all 4 oxygen plants for smooth operation. • Coordinating with new oxygen plant for timely and successful commissioning. • Coordinating to conduct the mandatory energy audit for designated consumers (JSW Steel Vijayanagar, Salem and Dolvi) as notified by GOI. • Documentation and implementation of standards required for ISO 9004:2008, EMS 14001 and OHSAS 18001 in the department. • Successfully got certification of ISO 9001:2008, EMS 14001:2004 and OHSAS 18001:2007 for the department • Coordinating and assisting SAP team for implementation of SAP in the department as a core team member of SAP team for MM, FICO, PP & PM module. • Establish and ensure safe working practices and achieving zero accident targets. 1 KAPIL AGRAWAL Mechanical Engineer. Assistant Manager Thapar University, Patiala Energy Management Department Mobile: +918861125462, JSW Steel Ltd. Email-ID: kapilagrawal43@gmail.com
  • 2. Technical • Energy, Carbon and Nitrogen Balancing of different energy intensive units. • Worked upon energy auditing of mills and potential energy saving. • Have a wide knowledge of various energy saving projects (utilizing waste heat to generate power, steam and to support process) • Working on Supervisory Control and Data Acquisition (SCADA) System. • Operation and maintenance of moist fuel gas-lines and special gas-lines. • Operation and maintenance of Gas Holders, Gas Boosting Stations and Gas Mixing Stations. • Project Activities in Gas Lines (From fabrication to Commissioning). • Operating ERP software SAP • Programming Languages :Basic of C language • Operating Software : Photo shop(basic knowledge),Microsoft excel, power point, word, access(basic) • Designing Software’s: Pro E (wild fire3.0), Auto cad, Pro desktop. • Taken basic knowledge of green belt (Six sigma) training and different departments (Maintenance, Production, Quality, R & D, Purchase, Planning, Engineering, Stores and Six sigma departments.) during six month training in MARATHON ELECTRIC INDIA PVT. LIMITED FARIDABAD formerly known as GE MOTORS INDIA PVT LTD.) Achievements • Special prize: - Science quiz and debate on district level and participated in state level quiz and debate at annual function of Indian academy of science. • Ranked in the top 2% in AIEEE 2006 which was taken by more than 5, 25,000 students in India • Qualified GATE 2012 with Ranked in the top 8.75 % which was taken by 112320 students in India. • Qualified internal auditor exam of ISO 9004:2008, EMS 14001 and OHSAS 18001 in 2012. • Qualified Energy Auditor Exam in 2014, Which is conducted by the BEE, Ministry of power PROJECTS UNDERTAKEN JSW Steel Ltd • ISO Implementation in Energy Management Department • SAP Implementation for departmental activities in energy Management Department • Single Excel sheet development for all energy data management • Nitrogen balancing of blast furnaces • Carbon balancing for coke ovens • Energy auditing of mills • Nitrogen consumption reduction • Energy Audit of mills • Special gas line health checkups • Conversion of gas heater to steam heaters in oxygen plant MARATHON ELECTRIC INDIA PVT. LIMITED FARIDABAD • Project Semester: 6 month training • Maintenance cost reduction. • Change over time reduction of Argon gas cylinders. • Over all equipment effectiveness. • First passing yield improvement. THAPAR UNIVERSITY • Summer Training: 6 week training • Objective was to learn and do practical work on basic processes in workshop. • Project: “Fabrication of Foot Pump of 40+ psi capacity” • A foot pump with capacity to fill air up to 40+ psi in less than 90 seconds with a cylinder 2
  • 3. attached to store compressed air ACADEMIC PROFILE B.E (Mech) 2006-2010 Thapar University ,Punjab 73.4% Class XII 2004-2005 U.P.Board 71.00% Class X 2002-2003 U.P.Board 60.00% Extra Curricular & Position of Responsibility • Audio Visual committee (Saturnalia 2007) - Joint secretary • Renewable energy club (2008) - Executive member • Hindi literary society (2008) - Executive member • Aranya (technical festival, 2006, 07) - Executive member • Saturnalia (Cultural festival, 2008) - Executive member • Maintenance secretary (2010) (Hostel A) • Have done yes+ (art of living course), in Jan 2007. This course helps me in managing stress. OTHERS Hobbies • Traveling • Playing indoors and out door games(computer games,cricket,badminton) • Making Friends • solving Su Do Ku • Reading news paper • watching movies • listening songs • Internet surfing. PERSONAL PARTICULARS • Date of Birth: 9th February, 1986 • Marital Status: Single • Nationality: Indian • Languages Known: Hindi and English • Permanent Address: SO Mr. Raj Kumar Agrawal H.No. 1787,Near By L.P. Nagar Road, Dempier Nagar, Mathura(281001) DECLARATION • I hereby declare that the above mentioned information is correct according to my knowledge and I bear the responsibility for correctness of above mentioned particulars. 15th Mar’15 Kapil Agrawal 3