Sharing Experiences of Flood Modelling Using MIKE 21
Senior Design Presentation - Fall Term
1. INVESTIGATION OF PINE ROAD BRIDGE
OVER PENNYPACK CREEK
Faculty Advisor: Dr. Ivan Bartoli
Technical Advisors: Dr. Emin Aktan and Ben Cohen
SENIOR DESIGN TEAM: 26
TEAM MEMBERS: MATAN ALEXANDER, CASSANDRA PRUEFER, DEREK ZACCHEO, GARY
REIFF, AND STEVEN KREELEY
3. PROBLEM STATEMENT
3
• Load Reduction caused by
Deterioration
• Emergency Retrofit After
Latest Inspection
• Need for Long-Term Solution
• Consideration of Different
Alternatives
• Recommend Efficient Long
Term Solution
5. • Two Sidewalks
• 44 foot Roadway
Curb to Curb
• 82° skew angle
• Oriented East-West
• Reinforced Concrete
Deck
• 8 Weathering Steel
Girders
5
STRUCTURAL DESCRIPTION
•Single-Span of 80 Feet
between Abutments
•Two Lanes of Traffic
6. HIGH STRENGTH, LOW ALLOY STEEL
6
Wong, c. (2009) Fact or Fiction-weathering steel can provide effective
corrosion protection to steel structures. electrical substation structures
2009: pp1-8.
•Weathering Structural Steel
•Forms a Patina of Rust to Seal the Surface
•Poor Performance under Wet Conditions
•May Require Additional Maintenance
7. COMMUNITY IMPACT
7
•Evaluated over 5 Mile
Radius
•Connection of
Bustleton and Fox
Chase/Burholme
•Resident, Commerce,
and Emergency Routes
Examined
8. COMMUNITY IMPACT
8
Bridge #205
Engine 62
Engine 58
Police 7th District
•Schools (Blue)
Prevalent in
Bustleton
•Fire and Police
Stations along
Bustleton Avenue
12. TASKS PERFORMED TO DATE
12
•Panel Meeting with City
•Submission of Preliminary Statement of Interest
•Obtained Most Recent Inspection Reports
•Conducted Bridge Inspection
•Submission of Proposal
23. APPROACH (Life Cycle Assessment)
23
•2 Similar Bridges
•Performed on all Four Alternatives
•Modeled with SimaPro
•Based on Cost and Quantity of Materials
•Factors in Environmental Impacts
•Considers Possible Population Growth
24. APPROACH (H & H ANALYSIS)
24
•FEMA Zone AE,
Approximate Analysis
•Determine Peak Flow
Rates Using Existing
Hydrology
•Perform Hydraulic
Analysis on Existing
Conditions
•Compare Changes
25. APPROACH (STRUCTURAL DESIGN)
25
•Examine Multiple Alternatives
•Rehabilitate Abutments, Beam
End, and End of Deck
•Retrofit with Additional
Drainage
•Replace with Steel or
Prestressed Concrete Girders
•Perform all Relevant Structural
Calculations
29. SUMMARY AND CONCLUSIONS
29
•Inspect the Structure to Determine Defects
•Attempt to Ascertain causes of Deterioration
•Examine Multiple Alternatives
•Recommend Most Efficient Solution