MULTI-STORY PARKING FACILITY
NEW ON-CAMPUS
CONSTRUCTION
Educational
Activities Building
(EAB)
Student Enrichment
Center
(SEC)
EDUCATIONAL ACTIVITIES
BUILDING
• Occupies 51,000
square feet of land
on campus
• Houses civil,
mechanical, and
electrical labs
• $20 million in
construction costs
STUDENT ENRICHMENT CENTER
• Occupies 70,000
square feet of land
on campus
• Houses an
auditorium, spiritual
center, bookstore,
and dinning
• Roughly $30 million
in construction
costs
BUILDING INFORMATION
MODELING (BIM)
• Process involving the generation
and management of models.
• BIM was incorporated into the virtual
model of the buildings.
• Features
– Clash Detection
– Schedule and Quantity
Connection
– Estimates
BENEFITS OF UTILIZING BIM
• Architecture: Ability to create 3D model of design
concept.
• Structural: Help streamline products, enhance
collaborative work, and reduce risk.
• MEP: Improve collaboration and communication,
and streamline project delivery of design,
fabrication, and installation.
• Owner: delivers demonstrable value from
design, through construction, and into
operations.
STRUCTURAL ANALYSIS (SEC)
• Slabs
• Beams
• Girders
• Columns
• Base Plates
• Foundations
Rendering of the SEC from Revit
PROJECTED STUDENT GROWTH
Enrollment Years
ProjectedEnrollment
STUDENT SURVEY
GROWTH COMPLICATIONS
• Lack of parking spaces
– Creates inability to host larger events
– Longer walks across campus
• Traffic Issues
– Increased congestion at intersections and
crosswalks.
• Safety Issues
– High foot traffic
OUR PROPOSED ENHANCEMENT
• Materials
– Precast concrete
– Brick
– Large curtainwall
• Usability
– Adds over 368
parking spaces
• Size
– 240,000 square feet
3 story parking facility
PARKING ANALYSIS
• Total current parking
spaces: over 2000
• Parking spaces
throughout construction:
1643 (15.3% decrease)
• Parking spaces after the
completion: 2199 (18.4%
increase)
BENEFITS OF OUR ENHANCEMENT
• Expansion opportunities
• Traffic Logisitcs
– Reduction of traffic
TRAFFIC DENSITY
• Applicable to foot and vehicle traffic density
• Peak high density hours
- Class transition period
- Morning arrivals
- Afternoon departures
• Peak average to low density hours
- Late evening and early morning class times
- During class times
- Any other off peak time periods
VEHICLE TRAFFIC
• Two access points
- O Street
- Wharton Avenue
• 100 ft. minimum site
distance
• Suspended and wall
mounted directions
PEDESTRIAN TRAFFIC
• Two main stairwells
- EAB / CUB
- SEC / Library
• Arrow system
• Painted crosswalks
• Connections to existing
walkways
- SEC / Library
- College Avenue
ZONING
• Most notable Zoning
Ordinances
– 1 Parking space
Required for every 5
classroom seats on
campus
– Height restriction of
35 Feet
Middletown Borough Zoning Map
PERMITS
• Obtained through Code Enforcement Officer
and Borough Manager
• Building Permit required before construction
• Other Important Permits
– Site Permit
– Electrical Permits
– Mechanical Permits
– Fire Permits
BUILDING CODE
• State, Federal, International
Organizations
– International Building Code
– ASCE
– ACI
– PA Construction Code
– Uniform Construction Code
BUILDING CODE
INTERIOR LAYOUT
Building Design
Building Design
Building Design
Building Design
Building Design
Building Design
Building Design
Exterior Design
PRE-CASTED AND PRE-STRESSED
CONCRETE
• Ease of constructability
• Controlled environment
• Structural advantages
• More aesthetically
pleasing
Construction of a parking garage using pre-
casted concrete
PROPERTIES OF PRE-CASTED AND
PRE-STRESSED CONCRETE
f’c = 5000 psi
f’pu = 270,000 psi
f’se = 170,000 psi
270 Grade, 7-Wire Pre-stressing Strand
DOUBLE T DESIGN
• Beam: 12DT28+2
• Strand Pattern: 108-S
INVERTED T-BEAM DESIGN
• Beam: 34IT28+2
• Strand Pattern: 208-S
L-BEAM DESIGN
• Beam: 20LB60
• Strand Pattern: 278-S
STRUCTURAL COMPONENTS
Inverted T- Beam
L-Beam
CONSTRUCTION SCHEDULE
• 6 - 8 month completion goal
• Time Reductions
– Prefabricated members
• Grass seeding/landscaping weather
permitting
• Completion date: Spring 2017
GANTT CHART OF THE
CONSTRUCTION SCHEDULE
COST ESTIMATION (DIVISION 3)
• Concrete
– Columns = $180,000
– Footings = $110,000
– Double Tees = 250+ total = $1,050,000
– Inverted Tees = $145,000
– L-Beams = $350,000
Assuming 10% waste factor
Total Concrete Cost = $1,835,000
COST ESTIMATION (DIVISION 4)
• Masonry
• Brick - column and wall exterior
• Modular - 3 ⅝” x 2 ¼” x 7 ⅝”
• 6.75 bricks/ft2
• Standard grout joint = ⅜”
• More than 6500 ft2 of brick face
• 30,000+ linear feet of grout
• 3% brick and 25% mortar waste
• Total Cost = $169,000
Typical Brick Dimensions
TOTAL COST ESTIMATION
• Main divisions
- Division 3 = $1,835,000
- Division 4 = $169,000
- Division 5 = not applicable
• Misc. ($2.5-3 million)
- Stairwell / Elevator
- Glass / Lighting / Line Painting
• Fees, Bond, Insurance = $1,000,000
• Estimated Budget: $6-8 million
CLOSING COMMENTS

More Related Content

What's hot

Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRTCrosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open houseCrosstown TO
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House SlidesCrosstown TO
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open houseCrosstown TO
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house Crosstown TO
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018Crosstown TO
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house Crosstown TO
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Samantha Coren
 
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
Urban design analysis, Circulation, Architecture, London, Redevelopment  studiesUrban design analysis, Circulation, Architecture, London, Redevelopment  studies
Urban design analysis, Circulation, Architecture, London, Redevelopment studiesSujeet Thakare
 
Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open houseCrosstown TO
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Lmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpLmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpE'ville Eye
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationCrosstown TO
 

What's hot (20)

Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
Urban design analysis, Circulation, Architecture, London, Redevelopment  studiesUrban design analysis, Circulation, Architecture, London, Redevelopment  studies
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
 
Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open house
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Lmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpLmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdp
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 

Viewers also liked

Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea
Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea
Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea Sindilojas Porto Alegre
 
Interview voorhoede versie DEF
Interview voorhoede versie DEFInterview voorhoede versie DEF
Interview voorhoede versie DEFEipie Bonnema
 
Lessons From the Dark Side
Lessons From the Dark SideLessons From the Dark Side
Lessons From the Dark Sidekrisroadruck
 
Morelia workshop presentation william ross
Morelia workshop presentation william rossMorelia workshop presentation william ross
Morelia workshop presentation william rossBenito Ortiz Bejar
 
T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102Sadia Mitu
 
T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)S M Rahat Rahman
 
Cơ Sở Dữ Liệu - Chương 1
Cơ Sở Dữ Liệu - Chương 1Cơ Sở Dữ Liệu - Chương 1
Cơ Sở Dữ Liệu - Chương 1Nguyễn Trọng
 
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-Nixzalis Bourdier
 
Dystopian Controls #2 DBlock
Dystopian Controls  #2 DBlockDystopian Controls  #2 DBlock
Dystopian Controls #2 DBlockdonamore1
 
5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodology5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodologyjmcmahon89
 
Kommunikationsparadies — Neustart ins Jahr 2016
Kommunikationsparadies — Neustart ins Jahr 2016Kommunikationsparadies — Neustart ins Jahr 2016
Kommunikationsparadies — Neustart ins Jahr 2016Andreas Weber
 

Viewers also liked (16)

maq 02
maq 02maq 02
maq 02
 
Health & safety
Health & safetyHealth & safety
Health & safety
 
Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea
Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea
Café com Lojistas - Pós NRF 2016 | Palestrante: Fabiano Zortea
 
Interview voorhoede versie DEF
Interview voorhoede versie DEFInterview voorhoede versie DEF
Interview voorhoede versie DEF
 
Lessons From the Dark Side
Lessons From the Dark SideLessons From the Dark Side
Lessons From the Dark Side
 
NEERAJ CV NEW
NEERAJ CV NEWNEERAJ CV NEW
NEERAJ CV NEW
 
Kerstvloed 1717, in Groningse Volksalmanak 1918
Kerstvloed 1717, in Groningse Volksalmanak 1918Kerstvloed 1717, in Groningse Volksalmanak 1918
Kerstvloed 1717, in Groningse Volksalmanak 1918
 
Morelia workshop presentation william ross
Morelia workshop presentation william rossMorelia workshop presentation william ross
Morelia workshop presentation william ross
 
Fundamentos de la estructura organizacional
Fundamentos de la estructura organizacionalFundamentos de la estructura organizacional
Fundamentos de la estructura organizacional
 
T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102
 
T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)
 
Cơ Sở Dữ Liệu - Chương 1
Cơ Sở Dữ Liệu - Chương 1Cơ Sở Dữ Liệu - Chương 1
Cơ Sở Dữ Liệu - Chương 1
 
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-
 
Dystopian Controls #2 DBlock
Dystopian Controls  #2 DBlockDystopian Controls  #2 DBlock
Dystopian Controls #2 DBlock
 
5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodology5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodology
 
Kommunikationsparadies — Neustart ins Jahr 2016
Kommunikationsparadies — Neustart ins Jahr 2016Kommunikationsparadies — Neustart ins Jahr 2016
Kommunikationsparadies — Neustart ins Jahr 2016
 

Similar to Capstone Design conference

North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiKrystian Gnysinski
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Bernard Koblinsky
 
IKM Architects: Case Study Higher Education Renovation-2012
IKM Architects: Case Study Higher Education Renovation-2012IKM Architects: Case Study Higher Education Renovation-2012
IKM Architects: Case Study Higher Education Renovation-2012IKM Incorporated
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)gn022010sem1
 
Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham
 
Measuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionMeasuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionCarlos Costa
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Crosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Crosstown TO
 
Workshop 2 Presentation final
Workshop 2 Presentation  finalWorkshop 2 Presentation  final
Workshop 2 Presentation finalCrowdbrite
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects UpdateTownofAddison
 

Similar to Capstone Design conference (20)

RiverArch Investor Summary - Sponsor.pdf
RiverArch Investor Summary - Sponsor.pdfRiverArch Investor Summary - Sponsor.pdf
RiverArch Investor Summary - Sponsor.pdf
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
 
September 1 - 0153 - Bailey Griffin
September 1 - 0153 - Bailey GriffinSeptember 1 - 0153 - Bailey Griffin
September 1 - 0153 - Bailey Griffin
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14
 
TMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility StudyTMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility Study
 
IKM Architects: Case Study Higher Education Renovation-2012
IKM Architects: Case Study Higher Education Renovation-2012IKM Architects: Case Study Higher Education Renovation-2012
IKM Architects: Case Study Higher Education Renovation-2012
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
 
Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26
 
Measuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionMeasuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed Session
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Workshop 2 Presentation final
Workshop 2 Presentation  finalWorkshop 2 Presentation  final
Workshop 2 Presentation final
 
September 1 - 0830 - Bethany Brittenham
September 1 - 0830 - Bethany BrittenhamSeptember 1 - 0830 - Bethany Brittenham
September 1 - 0830 - Bethany Brittenham
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 

Capstone Design conference

  • 1. Presented By: 1. Patrick Lumsden 2. Kyle Purcell 3. Rieley Loch 4. Gregory Cooper 5. Wesley Ovens 6. Kristin Peckman 7. Barry Porter MULTI-STORY PARKING FACILITY
  • 3. EDUCATIONAL ACTIVITIES BUILDING • Occupies 51,000 square feet of land on campus • Houses civil, mechanical, and electrical labs • $20 million in construction costs
  • 4. STUDENT ENRICHMENT CENTER • Occupies 70,000 square feet of land on campus • Houses an auditorium, spiritual center, bookstore, and dinning • Roughly $30 million in construction costs
  • 5. BUILDING INFORMATION MODELING (BIM) • Process involving the generation and management of models. • BIM was incorporated into the virtual model of the buildings. • Features – Clash Detection – Schedule and Quantity Connection – Estimates
  • 6. BENEFITS OF UTILIZING BIM • Architecture: Ability to create 3D model of design concept. • Structural: Help streamline products, enhance collaborative work, and reduce risk. • MEP: Improve collaboration and communication, and streamline project delivery of design, fabrication, and installation. • Owner: delivers demonstrable value from design, through construction, and into operations.
  • 7. STRUCTURAL ANALYSIS (SEC) • Slabs • Beams • Girders • Columns • Base Plates • Foundations Rendering of the SEC from Revit
  • 8. PROJECTED STUDENT GROWTH Enrollment Years ProjectedEnrollment
  • 10. GROWTH COMPLICATIONS • Lack of parking spaces – Creates inability to host larger events – Longer walks across campus • Traffic Issues – Increased congestion at intersections and crosswalks. • Safety Issues – High foot traffic
  • 11. OUR PROPOSED ENHANCEMENT • Materials – Precast concrete – Brick – Large curtainwall • Usability – Adds over 368 parking spaces • Size – 240,000 square feet 3 story parking facility
  • 12. PARKING ANALYSIS • Total current parking spaces: over 2000 • Parking spaces throughout construction: 1643 (15.3% decrease) • Parking spaces after the completion: 2199 (18.4% increase)
  • 13. BENEFITS OF OUR ENHANCEMENT • Expansion opportunities • Traffic Logisitcs – Reduction of traffic
  • 14. TRAFFIC DENSITY • Applicable to foot and vehicle traffic density • Peak high density hours - Class transition period - Morning arrivals - Afternoon departures • Peak average to low density hours - Late evening and early morning class times - During class times - Any other off peak time periods
  • 15. VEHICLE TRAFFIC • Two access points - O Street - Wharton Avenue • 100 ft. minimum site distance • Suspended and wall mounted directions
  • 16. PEDESTRIAN TRAFFIC • Two main stairwells - EAB / CUB - SEC / Library • Arrow system • Painted crosswalks • Connections to existing walkways - SEC / Library - College Avenue
  • 17. ZONING • Most notable Zoning Ordinances – 1 Parking space Required for every 5 classroom seats on campus – Height restriction of 35 Feet Middletown Borough Zoning Map
  • 18. PERMITS • Obtained through Code Enforcement Officer and Borough Manager • Building Permit required before construction • Other Important Permits – Site Permit – Electrical Permits – Mechanical Permits – Fire Permits
  • 19. BUILDING CODE • State, Federal, International Organizations – International Building Code – ASCE – ACI – PA Construction Code – Uniform Construction Code
  • 30. PRE-CASTED AND PRE-STRESSED CONCRETE • Ease of constructability • Controlled environment • Structural advantages • More aesthetically pleasing Construction of a parking garage using pre- casted concrete
  • 31. PROPERTIES OF PRE-CASTED AND PRE-STRESSED CONCRETE f’c = 5000 psi f’pu = 270,000 psi f’se = 170,000 psi 270 Grade, 7-Wire Pre-stressing Strand
  • 32. DOUBLE T DESIGN • Beam: 12DT28+2 • Strand Pattern: 108-S
  • 33. INVERTED T-BEAM DESIGN • Beam: 34IT28+2 • Strand Pattern: 208-S
  • 34. L-BEAM DESIGN • Beam: 20LB60 • Strand Pattern: 278-S
  • 36. CONSTRUCTION SCHEDULE • 6 - 8 month completion goal • Time Reductions – Prefabricated members • Grass seeding/landscaping weather permitting • Completion date: Spring 2017
  • 37. GANTT CHART OF THE CONSTRUCTION SCHEDULE
  • 38. COST ESTIMATION (DIVISION 3) • Concrete – Columns = $180,000 – Footings = $110,000 – Double Tees = 250+ total = $1,050,000 – Inverted Tees = $145,000 – L-Beams = $350,000 Assuming 10% waste factor Total Concrete Cost = $1,835,000
  • 39. COST ESTIMATION (DIVISION 4) • Masonry • Brick - column and wall exterior • Modular - 3 ⅝” x 2 ¼” x 7 ⅝” • 6.75 bricks/ft2 • Standard grout joint = ⅜” • More than 6500 ft2 of brick face • 30,000+ linear feet of grout • 3% brick and 25% mortar waste • Total Cost = $169,000 Typical Brick Dimensions
  • 40. TOTAL COST ESTIMATION • Main divisions - Division 3 = $1,835,000 - Division 4 = $169,000 - Division 5 = not applicable • Misc. ($2.5-3 million) - Stairwell / Elevator - Glass / Lighting / Line Painting • Fees, Bond, Insurance = $1,000,000 • Estimated Budget: $6-8 million