Wunderlich–Malec N2 Integration
S4 Open: BACnet-N2 Router Case Study
Customer
The customer is a pharmaceuticals company in the Denver, Colorado metro area. As a worldwide leader
in generics, their product has a reputation for exceptional quality and is available to 90 percent of
people across the world.
Project Overview
This project was unique because of both its size and complexity. Wunderlich–Malec needed to
demonstrate expertise in process control, building automation, the pharmaceutical industry processes
and procedures, and FDA regulations- in addition to the technical expertise necessary to meet the
customer’s functional and operational requirements. Wunderlich–Malec had a long term relationship
with the customer and previously provided general automation support and system integration for GMP
systems for this facility. The bulk of their previous work was related to industrial controls (PLC, SCADA,
and HMI), as well as commissioning and qualification support.
They also had to demonstrate the ability to implement their proposed solution with minimal
interruption to product manufacturing and with no risk to product yields or quality. Meeting these goals
meant using technology from multiple vertical markets and integrating them into one cohesive solution.
Initial Situation
The goal of the project was to replace/upgrade all of the software and hardware within the facility that
were nearing the end of their useful lifecycle.
 Prior to this project, the BMS for the generic pharmaceutical facility utilized Johnson
Controls Metasys® software called M5 Metasys for Validated Environments (MVE) for
graphics, trending, alarming, and field device programming. The basic functionality of the
Metasys® M5 Metasys software that was currently being used needed to be improved upon.
 Ten Johnson Controls Network Control Modules (NCMs) were used at the site to act as
supervisory controllers for approximately 366 field devices. Each supervisory controller had
its own N2 network that served dedicated areas of the site.
 Most importantly, validation, security and audit trail features and procedures were in place
since the BMS system is a FDA validated GMP-critical system with regulatory requirements
including 21 CFR Part 11.
Customer Needs/Requirements
The customer expressed several needs and requirements for the job:
Wunderlich–Malec N2 Integration
S4 Open: BACnet-N2 Router Case Study
 Maintain installed base of N2 field device controllers
 Provide programming capability from a single workstation to the installed base (ten
networks) of N2 field device controllers.
 Replace the JCI Metasys® M5 Metasys for Validated Environments system with ICONICS
Genesis64 SCADA
 Ensure an upgrade path (BACnet) exists for future projects, knowing that the proprietary N2
communication protocol support/hardware had been phased out by JCI.
 Ensure the upgraded BMS could be successfully commissioned, qualified, and validated in
parallel with the legacy JCI Metasys® M5 system.
 Some added features are also desirable with an eye toward future capabilities and
expandability.
 Provide an open architecture BMS platform utilizing new technology, eliminating the
dependence on any single vendor for sustaining support.
Solution
This upgrade project will maintain communications to the existing N2 field devices, but add BACnet
communication networks so industry standard BACnet is available for future field device upgrades.
Site Preparation – Each existing N2 bus was validated for proper operation and verified to be
electrically within specification using the ComBus Quick Tester. One of our ten N2 networks was
marginal. The ComBus Quick Tester enabled the engineers to pinpoint where on the N2 network the
problems were located; the issue was addressed by inserting a B&B serial repeater.
Pre-integration bench testing – Wunderlich–Malec invested an extensive amount of time bench
testing the solution prior to performing the integrations in order to insure that the project goals
were met with minimal interruption to operational systems and production schedules.
Phase 1 – Establish multi-dimensional integration between the legacy Metasys® system and the new
technology being introduced.
 Use the Upstream N2 Interface of the S4 Open: BACnet-N2 Routers paired with each legacy
NCM for connectivity to the legacy NCM supervisory capabilities.
 Use the BACnet IP port of the BACnet-N2 Router as the interface to new JACE-6 controllers
which eventually replaced the NCM controllers.
 Use the Downstream N2 interface of the BACnet-N2 Router for connectivity to legacy N2
network field controllers.
Wunderlich–Malec N2 Integration
S4 Open: BACnet-N2 Router Case Study
 Utilize the JACE-6 controllers to serve BACnet points to the ICONICS Genesis64 system via a
Kepware KepserverEX OPC server.
 Develop BACnet communication standards between JACE-6 and ICONICS utilizing inherent
BACnet functionality (Override at various priorities, Set Out of Service, and monitored
Present Value and Status Flags – Alarm, Override, Fault, and Out of Service)
This phase was used to ensure “like for like” functionality as we ran the legacy JCI M5 Metasys
System in parallel with the new ICONICS Genesis64 system.
Phase 2 – Phase out the legacy NCM supervisory controllers and replace Metasys® configuration and
commissioning capabilities.
 Establish a PC based “engineering workstation” to host JCI’s HVAC Pro and GX-9100
configuration and commissioning utilities. The engineering workstation is considered a
shared resource for all Metasys® networks in the facility. A unique communication solution
allowed the operator to target the desired N2 bus providing the ability to communicate
(e.g., program and configure) with any N2 device in the facility.
 Phase out the NCM in use on each Metasys® network as all NCM based services and logic
were moved to the JACE-6 controllers.
 Use the Upstream N2 Interface of the BACnet-N2 Router for the connectivity from the
Engineering Workstation for ongoing N2 device maintenance and support.
Wunderlich–Malec N2 Integration
S4 Open: BACnet-N2 Router Case Study
Results
All project design and operational goals were met and this system is now in production. It has been fully
qualified and validated.
 Provided “like for like” functionality
 Ensure the upgraded BMS could be successfully commissioned, qualified, and validated
Wunderlich–Malec N2 Integration
S4 Open: BACnet-N2 Router Case Study
About The Parties Involved
Wunderlich–Malec
 Previously provided general automation support and system integration for GMP systems. The
bulk of our work was related to industrial controls (PLC, SCADA, and HMI), as well as
commissioning and qualification support. Industrial control systems, commercial control
systems, system Integration, and life-science experience.
 Experience integrating a variety of platforms (hardware and software) from a variety of vendors.
 Contact Michael Norman, Operations Manager for more information about this project.
mike.norman@wmeng.com 303-590-9415
The S4 Group, Inc.
The S4 Group, Inc. is an innovator in software and network appliance development. Products include the
S4 Open family of network appliances that enable the opening up of legacy BAS systems and integrating
them into open protocols such as BACnet and OPC.
For additional information, please visit our website at www.thes4group.com or contact Steve Jones,
steve@thes4group.com .

More Related Content

What's hot

Lawrence J Carder LinkedIn
Lawrence J Carder LinkedInLawrence J Carder LinkedIn
Lawrence J Carder LinkedIn
Larry Carder
 
Ch2-Software Engineering 9
Ch2-Software Engineering 9Ch2-Software Engineering 9
Ch2-Software Engineering 9
Ian Sommerville
 
Jarrel Thomas Project History
Jarrel Thomas Project HistoryJarrel Thomas Project History
Jarrel Thomas Project History
Jarrel Thomas
 
Informatica certification
Informatica certificationInformatica certification
Informatica certification
bnjkukunuri
 
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
David Stokes
 

What's hot (18)

DMAP\'s Brochure
DMAP\'s BrochureDMAP\'s Brochure
DMAP\'s Brochure
 
Leading Bank Leverages Growth through Implementation and Upgrade Services
Leading Bank Leverages Growth through Implementation and Upgrade ServicesLeading Bank Leverages Growth through Implementation and Upgrade Services
Leading Bank Leverages Growth through Implementation and Upgrade Services
 
ETSI NFV#13 NFV resiliency presentation - ali kafel - stratus
ETSI NFV#13   NFV resiliency presentation - ali kafel - stratusETSI NFV#13   NFV resiliency presentation - ali kafel - stratus
ETSI NFV#13 NFV resiliency presentation - ali kafel - stratus
 
DO254 DMAP Training 2011 Trailer
DO254 DMAP Training 2011 TrailerDO254 DMAP Training 2011 Trailer
DO254 DMAP Training 2011 Trailer
 
Lawrence J Carder LinkedIn
Lawrence J Carder LinkedInLawrence J Carder LinkedIn
Lawrence J Carder LinkedIn
 
DO-254 for dummies 7
DO-254 for dummies 7DO-254 for dummies 7
DO-254 for dummies 7
 
Digital signature implementation
Digital signature implementationDigital signature implementation
Digital signature implementation
 
Ch2-Software Engineering 9
Ch2-Software Engineering 9Ch2-Software Engineering 9
Ch2-Software Engineering 9
 
Stratus Fault-Tolerant Cloud Infrastructure Software for NFV using OpenStack
Stratus Fault-Tolerant Cloud Infrastructure Software for NFV using OpenStackStratus Fault-Tolerant Cloud Infrastructure Software for NFV using OpenStack
Stratus Fault-Tolerant Cloud Infrastructure Software for NFV using OpenStack
 
Jarrel Thomas Project History
Jarrel Thomas Project HistoryJarrel Thomas Project History
Jarrel Thomas Project History
 
Informatica certification
Informatica certificationInformatica certification
Informatica certification
 
Nice Pm Introduction Cert
Nice Pm Introduction CertNice Pm Introduction Cert
Nice Pm Introduction Cert
 
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
 
Dmap Ip Do254 White Paper En
Dmap Ip Do254 White Paper EnDmap Ip Do254 White Paper En
Dmap Ip Do254 White Paper En
 
GR_Narendra __Resume
GR_Narendra __ResumeGR_Narendra __Resume
GR_Narendra __Resume
 
Gilbert_Benitez_Jr
Gilbert_Benitez_JrGilbert_Benitez_Jr
Gilbert_Benitez_Jr
 
Validation : Project Management
Validation : Project ManagementValidation : Project Management
Validation : Project Management
 
Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentation
 

Viewers also liked

Chipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International AirportChipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International Airport
Steve Jones
 
Case Study ATS Jackson Federal Building
Case Study ATS Jackson Federal BuildingCase Study ATS Jackson Federal Building
Case Study ATS Jackson Federal Building
Steve Jones
 
S4 Value Proposition
S4 Value PropositionS4 Value Proposition
S4 Value Proposition
Steve Jones
 
ENTEC Case Study
ENTEC Case StudyENTEC Case Study
ENTEC Case Study
Steve Jones
 
CaseStudy_EnergyETC
CaseStudy_EnergyETCCaseStudy_EnergyETC
CaseStudy_EnergyETC
Steve Jones
 
Pacific Brochure Products
Pacific Brochure ProductsPacific Brochure Products
Pacific Brochure Products
Jason Salsbury
 
Jarrell Case Study
Jarrell Case StudyJarrell Case Study
Jarrell Case Study
Steve Jones
 
S4 Open Appliances V7
S4 Open Appliances V7S4 Open Appliances V7
S4 Open Appliances V7
Steve Jones
 

Viewers also liked (11)

CV MARR ING
CV MARR INGCV MARR ING
CV MARR ING
 
Chipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International AirportChipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International Airport
 
Case Study ATS Jackson Federal Building
Case Study ATS Jackson Federal BuildingCase Study ATS Jackson Federal Building
Case Study ATS Jackson Federal Building
 
S4 Value Proposition
S4 Value PropositionS4 Value Proposition
S4 Value Proposition
 
ENTEC Case Study
ENTEC Case StudyENTEC Case Study
ENTEC Case Study
 
CaseStudy_EnergyETC
CaseStudy_EnergyETCCaseStudy_EnergyETC
CaseStudy_EnergyETC
 
Pacific Brochure Products
Pacific Brochure ProductsPacific Brochure Products
Pacific Brochure Products
 
Jarrell Case Study
Jarrell Case StudyJarrell Case Study
Jarrell Case Study
 
S4 Open Appliances V7
S4 Open Appliances V7S4 Open Appliances V7
S4 Open Appliances V7
 
Primicias Año 2015
Primicias Año 2015Primicias Año 2015
Primicias Año 2015
 
Secretos de la santa cena
Secretos de la santa cenaSecretos de la santa cena
Secretos de la santa cena
 

Similar to final draft Wonderlich-Malec case study

Ba cnet bldg_auto_solutions_brochure_sb008_a
Ba cnet bldg_auto_solutions_brochure_sb008_aBa cnet bldg_auto_solutions_brochure_sb008_a
Ba cnet bldg_auto_solutions_brochure_sb008_a
alfmich
 
BACnet_Bldg_Auto_Solutions_Brochure_SB008B
BACnet_Bldg_Auto_Solutions_Brochure_SB008BBACnet_Bldg_Auto_Solutions_Brochure_SB008B
BACnet_Bldg_Auto_Solutions_Brochure_SB008B
Mark Stucky
 
Product Information Management System
Product Information Management SystemProduct Information Management System
Product Information Management System
Relevantz
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
PANKAJ PAL
 

Similar to final draft Wonderlich-Malec case study (20)

BACnet Protocol Training & Consultancy
BACnet Protocol Training & ConsultancyBACnet Protocol Training & Consultancy
BACnet Protocol Training & Consultancy
 
Ba cnet bldg_auto_solutions_brochure_sb008_a
Ba cnet bldg_auto_solutions_brochure_sb008_aBa cnet bldg_auto_solutions_brochure_sb008_a
Ba cnet bldg_auto_solutions_brochure_sb008_a
 
resume2
resume2resume2
resume2
 
VMworld 2013: Architecting the Software-Defined Data Center
VMworld 2013: Architecting the Software-Defined Data Center VMworld 2013: Architecting the Software-Defined Data Center
VMworld 2013: Architecting the Software-Defined Data Center
 
CaseStudyCSI
CaseStudyCSICaseStudyCSI
CaseStudyCSI
 
RA TechED 2019 - PR03 - Implementation of PlantPAx Systems
RA TechED 2019 - PR03 - Implementation of PlantPAx SystemsRA TechED 2019 - PR03 - Implementation of PlantPAx Systems
RA TechED 2019 - PR03 - Implementation of PlantPAx Systems
 
BACnet_Bldg_Auto_Solutions_Brochure_SB008B
BACnet_Bldg_Auto_Solutions_Brochure_SB008BBACnet_Bldg_Auto_Solutions_Brochure_SB008B
BACnet_Bldg_Auto_Solutions_Brochure_SB008B
 
Ctek Cellular Automation & Control Catalag 2014
Ctek Cellular Automation & Control Catalag 2014Ctek Cellular Automation & Control Catalag 2014
Ctek Cellular Automation & Control Catalag 2014
 
IQ Inc Web Presentation
IQ Inc Web PresentationIQ Inc Web Presentation
IQ Inc Web Presentation
 
RA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxRA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptx
 
BACnet Interface for VFD Drive in HVAC
BACnet Interface for VFD Drive in HVACBACnet Interface for VFD Drive in HVAC
BACnet Interface for VFD Drive in HVAC
 
Vinay Resume
Vinay ResumeVinay Resume
Vinay Resume
 
Jd phillips 2015
Jd phillips 2015Jd phillips 2015
Jd phillips 2015
 
Cruatech Services Intro
Cruatech Services IntroCruatech Services Intro
Cruatech Services Intro
 
Aniruddha_More_Resume
Aniruddha_More_ResumeAniruddha_More_Resume
Aniruddha_More_Resume
 
Product Information Management System
Product Information Management SystemProduct Information Management System
Product Information Management System
 
Why Network Functions Virtualization sdn?
Why Network Functions Virtualization sdn?Why Network Functions Virtualization sdn?
Why Network Functions Virtualization sdn?
 
Simplifying your network management using software tools
Simplifying your network management using software toolsSimplifying your network management using software tools
Simplifying your network management using software tools
 
Aerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyAerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves money
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 

final draft Wonderlich-Malec case study

  • 1. Wunderlich–Malec N2 Integration S4 Open: BACnet-N2 Router Case Study Customer The customer is a pharmaceuticals company in the Denver, Colorado metro area. As a worldwide leader in generics, their product has a reputation for exceptional quality and is available to 90 percent of people across the world. Project Overview This project was unique because of both its size and complexity. Wunderlich–Malec needed to demonstrate expertise in process control, building automation, the pharmaceutical industry processes and procedures, and FDA regulations- in addition to the technical expertise necessary to meet the customer’s functional and operational requirements. Wunderlich–Malec had a long term relationship with the customer and previously provided general automation support and system integration for GMP systems for this facility. The bulk of their previous work was related to industrial controls (PLC, SCADA, and HMI), as well as commissioning and qualification support. They also had to demonstrate the ability to implement their proposed solution with minimal interruption to product manufacturing and with no risk to product yields or quality. Meeting these goals meant using technology from multiple vertical markets and integrating them into one cohesive solution. Initial Situation The goal of the project was to replace/upgrade all of the software and hardware within the facility that were nearing the end of their useful lifecycle.  Prior to this project, the BMS for the generic pharmaceutical facility utilized Johnson Controls Metasys® software called M5 Metasys for Validated Environments (MVE) for graphics, trending, alarming, and field device programming. The basic functionality of the Metasys® M5 Metasys software that was currently being used needed to be improved upon.  Ten Johnson Controls Network Control Modules (NCMs) were used at the site to act as supervisory controllers for approximately 366 field devices. Each supervisory controller had its own N2 network that served dedicated areas of the site.  Most importantly, validation, security and audit trail features and procedures were in place since the BMS system is a FDA validated GMP-critical system with regulatory requirements including 21 CFR Part 11. Customer Needs/Requirements The customer expressed several needs and requirements for the job:
  • 2. Wunderlich–Malec N2 Integration S4 Open: BACnet-N2 Router Case Study  Maintain installed base of N2 field device controllers  Provide programming capability from a single workstation to the installed base (ten networks) of N2 field device controllers.  Replace the JCI Metasys® M5 Metasys for Validated Environments system with ICONICS Genesis64 SCADA  Ensure an upgrade path (BACnet) exists for future projects, knowing that the proprietary N2 communication protocol support/hardware had been phased out by JCI.  Ensure the upgraded BMS could be successfully commissioned, qualified, and validated in parallel with the legacy JCI Metasys® M5 system.  Some added features are also desirable with an eye toward future capabilities and expandability.  Provide an open architecture BMS platform utilizing new technology, eliminating the dependence on any single vendor for sustaining support. Solution This upgrade project will maintain communications to the existing N2 field devices, but add BACnet communication networks so industry standard BACnet is available for future field device upgrades. Site Preparation – Each existing N2 bus was validated for proper operation and verified to be electrically within specification using the ComBus Quick Tester. One of our ten N2 networks was marginal. The ComBus Quick Tester enabled the engineers to pinpoint where on the N2 network the problems were located; the issue was addressed by inserting a B&B serial repeater. Pre-integration bench testing – Wunderlich–Malec invested an extensive amount of time bench testing the solution prior to performing the integrations in order to insure that the project goals were met with minimal interruption to operational systems and production schedules. Phase 1 – Establish multi-dimensional integration between the legacy Metasys® system and the new technology being introduced.  Use the Upstream N2 Interface of the S4 Open: BACnet-N2 Routers paired with each legacy NCM for connectivity to the legacy NCM supervisory capabilities.  Use the BACnet IP port of the BACnet-N2 Router as the interface to new JACE-6 controllers which eventually replaced the NCM controllers.  Use the Downstream N2 interface of the BACnet-N2 Router for connectivity to legacy N2 network field controllers.
  • 3. Wunderlich–Malec N2 Integration S4 Open: BACnet-N2 Router Case Study  Utilize the JACE-6 controllers to serve BACnet points to the ICONICS Genesis64 system via a Kepware KepserverEX OPC server.  Develop BACnet communication standards between JACE-6 and ICONICS utilizing inherent BACnet functionality (Override at various priorities, Set Out of Service, and monitored Present Value and Status Flags – Alarm, Override, Fault, and Out of Service) This phase was used to ensure “like for like” functionality as we ran the legacy JCI M5 Metasys System in parallel with the new ICONICS Genesis64 system. Phase 2 – Phase out the legacy NCM supervisory controllers and replace Metasys® configuration and commissioning capabilities.  Establish a PC based “engineering workstation” to host JCI’s HVAC Pro and GX-9100 configuration and commissioning utilities. The engineering workstation is considered a shared resource for all Metasys® networks in the facility. A unique communication solution allowed the operator to target the desired N2 bus providing the ability to communicate (e.g., program and configure) with any N2 device in the facility.  Phase out the NCM in use on each Metasys® network as all NCM based services and logic were moved to the JACE-6 controllers.  Use the Upstream N2 Interface of the BACnet-N2 Router for the connectivity from the Engineering Workstation for ongoing N2 device maintenance and support.
  • 4. Wunderlich–Malec N2 Integration S4 Open: BACnet-N2 Router Case Study Results All project design and operational goals were met and this system is now in production. It has been fully qualified and validated.  Provided “like for like” functionality  Ensure the upgraded BMS could be successfully commissioned, qualified, and validated
  • 5. Wunderlich–Malec N2 Integration S4 Open: BACnet-N2 Router Case Study About The Parties Involved Wunderlich–Malec  Previously provided general automation support and system integration for GMP systems. The bulk of our work was related to industrial controls (PLC, SCADA, and HMI), as well as commissioning and qualification support. Industrial control systems, commercial control systems, system Integration, and life-science experience.  Experience integrating a variety of platforms (hardware and software) from a variety of vendors.  Contact Michael Norman, Operations Manager for more information about this project. mike.norman@wmeng.com 303-590-9415 The S4 Group, Inc. The S4 Group, Inc. is an innovator in software and network appliance development. Products include the S4 Open family of network appliances that enable the opening up of legacy BAS systems and integrating them into open protocols such as BACnet and OPC. For additional information, please visit our website at www.thes4group.com or contact Steve Jones, steve@thes4group.com .