SlideShare a Scribd company logo
1 of 1
Download to read offline
Key Projects Completed at Vodafone
EDN Upgrade - Management of the upgrade to the strategic core enterprise data
network comprising the update of switchgear, hardware and software, to return
systems into vendor (Cisco) support. Project includes additional physical diversity
with fibre routes between switch rooms. Works had significant business impact with
the temporary shutdown or suspension of critical systems and applications requiring
the management of stakeholders from IT, Customer Care, Retail, Regional
Operations and Technology. Project completed overnight on Saturday as agreed by
business stakeholders, this required the co-ordinated shutdown and re-start of over
365 systems and applications by 120 people. 11/05-03/06
Installation of SigTran (SS7 over IP) to alleviate capacity issues with redundant legacy
equipment. Project consists of three phases; 1 – Upgrades to existing hardware, 2-
Installation of new switchgear and migration of legacy systems, 3 – New hardware
for SMS delivery systems. The project introduces a new equipment vendor (Cisco)
and technology requiring the management of training requirements for first and
second line maintenance teams, the setup up of maintenance and support contracts
for reactive fault fix, including hardware replacement, plus planned maintenance
and ongoing support activities. Management of a complex list of dependencies
including other new technologies and new products and services, balancing the
requirements for system stability against the need for additional capacity and
utilisation of the MPLS/DWDM network. 03/06-05/07
Delivery of two new variant hardware platforms (HP servers) into remote data
centres (MTX), incorporating physical access, DC power and earthing, network
connectivity, on site acceptance testing and network integration. Production of
specifications and methodology for platform introduction and type approval for
platform variant. 11/04-03/05
Work stream management for the migration of prepay services from obsolete
hardware to new HP service execution points (servers), works include the cutover
and removal of traffic from the 64 existing prepayment control manager platforms
and physical removal of end of life equipment from the network. Removal of
equipment from site, safe disconnection of power supplies and removal of cabling
from within a working switch room. Planning includes the removal of geographical
resilience simplifying physical connections and maintenance. 02/05-07/05
Management of the delivery of a new software release and hardware upgrade for
Nortel GGSN (switch). The project is a ‘Verification Offer’ of pre customer release
software providing final testing in a live environment prior to general customer
release. Verification and testing of software in both lab and ‘live’ network conditions
to both UK and Global Vodafone standards. Project was completed under a
partnership agreement with a collocated team from Nortel and Vodafone working to
an agreed combined plan. Project completed by national rollout to all six Nortel
GGSNs. 04/05-12/05

More Related Content

What's hot

Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016Schneider Electric
 
nokia_netact_brochure
nokia_netact_brochurenokia_netact_brochure
nokia_netact_brochureAna Sousa
 
Overview Of I E C61850 Presentation..... W S M
Overview Of  I E C61850  Presentation..... W S MOverview Of  I E C61850  Presentation..... W S M
Overview Of I E C61850 Presentation..... W S Mginquesada
 
Common industrial protocol
Common industrial protocolCommon industrial protocol
Common industrial protocolHuấn Trần
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015Moreau Mulume
 
DeVry Senior Project Final
DeVry Senior Project FinalDeVry Senior Project Final
DeVry Senior Project FinalAnthony Noland
 
Award Winning IIoT Plant Asset Management
Award Winning IIoT Plant Asset ManagementAward Winning IIoT Plant Asset Management
Award Winning IIoT Plant Asset ManagementYokogawa1
 
Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8Panduit
 
Performance management leaflet
Performance management leafletPerformance management leaflet
Performance management leafletnerdic
 
View Orchestration from Model Driven Engineering Prospective
View Orchestration from Model Driven Engineering ProspectiveView Orchestration from Model Driven Engineering Prospective
View Orchestration from Model Driven Engineering ProspectiveRichard Kuo
 
CV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylCV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylGerhard van Zyl
 
Carrier grade linux maintenance
Carrier grade linux maintenanceCarrier grade linux maintenance
Carrier grade linux maintenanceNagesh Kollu
 
NFF-GO (YANFF) - Yet Another Network Function Framework
NFF-GO (YANFF) - Yet Another Network Function FrameworkNFF-GO (YANFF) - Yet Another Network Function Framework
NFF-GO (YANFF) - Yet Another Network Function FrameworkMichelle Holley
 
Benchmarking Services Offered By MCPS Inc.
Benchmarking Services Offered By MCPS Inc.Benchmarking Services Offered By MCPS Inc.
Benchmarking Services Offered By MCPS Inc.mcpsinc
 
Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)Frans_Joubert
 

What's hot (19)

Power grid monitoring solution
Power grid monitoring solutionPower grid monitoring solution
Power grid monitoring solution
 
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
 
nokia_netact_brochure
nokia_netact_brochurenokia_netact_brochure
nokia_netact_brochure
 
Modification of a functional split
Modification of a functional splitModification of a functional split
Modification of a functional split
 
Overview Of I E C61850 Presentation..... W S M
Overview Of  I E C61850  Presentation..... W S MOverview Of  I E C61850  Presentation..... W S M
Overview Of I E C61850 Presentation..... W S M
 
Common industrial protocol
Common industrial protocolCommon industrial protocol
Common industrial protocol
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015
 
DeVry Senior Project Final
DeVry Senior Project FinalDeVry Senior Project Final
DeVry Senior Project Final
 
Award Winning IIoT Plant Asset Management
Award Winning IIoT Plant Asset ManagementAward Winning IIoT Plant Asset Management
Award Winning IIoT Plant Asset Management
 
Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8
 
Performance management leaflet
Performance management leafletPerformance management leaflet
Performance management leaflet
 
View Orchestration from Model Driven Engineering Prospective
View Orchestration from Model Driven Engineering ProspectiveView Orchestration from Model Driven Engineering Prospective
View Orchestration from Model Driven Engineering Prospective
 
CV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylCV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van Zyl
 
Carrier grade linux maintenance
Carrier grade linux maintenanceCarrier grade linux maintenance
Carrier grade linux maintenance
 
NFF-GO (YANFF) - Yet Another Network Function Framework
NFF-GO (YANFF) - Yet Another Network Function FrameworkNFF-GO (YANFF) - Yet Another Network Function Framework
NFF-GO (YANFF) - Yet Another Network Function Framework
 
Benchmarking Services Offered By MCPS Inc.
Benchmarking Services Offered By MCPS Inc.Benchmarking Services Offered By MCPS Inc.
Benchmarking Services Offered By MCPS Inc.
 
N
NN
N
 
Bj4101347351
Bj4101347351Bj4101347351
Bj4101347351
 
Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)
 

Similar to Key Projects Completed at Vodafone

IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxpriestmanmable
 
Erik Franzen Linkedin Resume
Erik Franzen Linkedin ResumeErik Franzen Linkedin Resume
Erik Franzen Linkedin ResumeErik Franzen
 
CV MP (Engl.)2 - Daniel Loiola
CV MP (Engl.)2 - Daniel LoiolaCV MP (Engl.)2 - Daniel Loiola
CV MP (Engl.)2 - Daniel LoiolaDaniel Loiola
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarterrichlan421
 
Network Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_ConsolidatedNetwork Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_ConsolidatedKBIZEAU
 
Kirk OHagan Resume 2016
Kirk OHagan Resume 2016Kirk OHagan Resume 2016
Kirk OHagan Resume 2016Kirk O'Hagan
 
Adrian Resume ver1.2
Adrian Resume ver1.2Adrian Resume ver1.2
Adrian Resume ver1.2Adrian Tan
 
Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0
Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0
Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0Mitchell Menezes
 
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
IRJET-  	  Implementation of Dynamic Internetworking in the Real World it DomainIRJET-  	  Implementation of Dynamic Internetworking in the Real World it Domain
IRJET- Implementation of Dynamic Internetworking in the Real World it DomainIRJET Journal
 
Updates on NFV and SDN Activities from the Broadband Forum
Updates on NFV and SDN Activities from the Broadband ForumUpdates on NFV and SDN Activities from the Broadband Forum
Updates on NFV and SDN Activities from the Broadband ForumOpen Networking Summit
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichard Laca
 

Similar to Key Projects Completed at Vodafone (20)

Steve_Cooper_2016
Steve_Cooper_2016Steve_Cooper_2016
Steve_Cooper_2016
 
IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docx
 
Erik Franzen Linkedin Resume
Erik Franzen Linkedin ResumeErik Franzen Linkedin Resume
Erik Franzen Linkedin Resume
 
Neeraj_PM
Neeraj_PMNeeraj_PM
Neeraj_PM
 
Kelly Howard Resume_10_2015
Kelly Howard Resume_10_2015Kelly Howard Resume_10_2015
Kelly Howard Resume_10_2015
 
CV MP (Engl.)2 - Daniel Loiola
CV MP (Engl.)2 - Daniel LoiolaCV MP (Engl.)2 - Daniel Loiola
CV MP (Engl.)2 - Daniel Loiola
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarter
 
Network Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_ConsolidatedNetwork Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_Consolidated
 
CV NG van Zyl Feb 2016
CV NG van Zyl Feb 2016CV NG van Zyl Feb 2016
CV NG van Zyl Feb 2016
 
CV HARRAK Yasser_EN
CV HARRAK Yasser_ENCV HARRAK Yasser_EN
CV HARRAK Yasser_EN
 
Kirk OHagan Resume 2016
Kirk OHagan Resume 2016Kirk OHagan Resume 2016
Kirk OHagan Resume 2016
 
Adrian Resume ver1.2
Adrian Resume ver1.2Adrian Resume ver1.2
Adrian Resume ver1.2
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
CBEC-LAN-v9-0.ppt
CBEC-LAN-v9-0.pptCBEC-LAN-v9-0.ppt
CBEC-LAN-v9-0.ppt
 
Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0
Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0
Smallworld_Network_Inventory_Brochure_-_print-HR_with_bleed_for_printers_0
 
Mallikarjuna_Resume
Mallikarjuna_ResumeMallikarjuna_Resume
Mallikarjuna_Resume
 
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
IRJET-  	  Implementation of Dynamic Internetworking in the Real World it DomainIRJET-  	  Implementation of Dynamic Internetworking in the Real World it Domain
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
 
Updates on NFV and SDN Activities from the Broadband Forum
Updates on NFV and SDN Activities from the Broadband ForumUpdates on NFV and SDN Activities from the Broadband Forum
Updates on NFV and SDN Activities from the Broadband Forum
 
Stanley marius RESUME
Stanley marius RESUMEStanley marius RESUME
Stanley marius RESUME
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-Telecom
 

Key Projects Completed at Vodafone

  • 1. Key Projects Completed at Vodafone EDN Upgrade - Management of the upgrade to the strategic core enterprise data network comprising the update of switchgear, hardware and software, to return systems into vendor (Cisco) support. Project includes additional physical diversity with fibre routes between switch rooms. Works had significant business impact with the temporary shutdown or suspension of critical systems and applications requiring the management of stakeholders from IT, Customer Care, Retail, Regional Operations and Technology. Project completed overnight on Saturday as agreed by business stakeholders, this required the co-ordinated shutdown and re-start of over 365 systems and applications by 120 people. 11/05-03/06 Installation of SigTran (SS7 over IP) to alleviate capacity issues with redundant legacy equipment. Project consists of three phases; 1 – Upgrades to existing hardware, 2- Installation of new switchgear and migration of legacy systems, 3 – New hardware for SMS delivery systems. The project introduces a new equipment vendor (Cisco) and technology requiring the management of training requirements for first and second line maintenance teams, the setup up of maintenance and support contracts for reactive fault fix, including hardware replacement, plus planned maintenance and ongoing support activities. Management of a complex list of dependencies including other new technologies and new products and services, balancing the requirements for system stability against the need for additional capacity and utilisation of the MPLS/DWDM network. 03/06-05/07 Delivery of two new variant hardware platforms (HP servers) into remote data centres (MTX), incorporating physical access, DC power and earthing, network connectivity, on site acceptance testing and network integration. Production of specifications and methodology for platform introduction and type approval for platform variant. 11/04-03/05 Work stream management for the migration of prepay services from obsolete hardware to new HP service execution points (servers), works include the cutover and removal of traffic from the 64 existing prepayment control manager platforms and physical removal of end of life equipment from the network. Removal of equipment from site, safe disconnection of power supplies and removal of cabling from within a working switch room. Planning includes the removal of geographical resilience simplifying physical connections and maintenance. 02/05-07/05 Management of the delivery of a new software release and hardware upgrade for Nortel GGSN (switch). The project is a ‘Verification Offer’ of pre customer release software providing final testing in a live environment prior to general customer release. Verification and testing of software in both lab and ‘live’ network conditions to both UK and Global Vodafone standards. Project was completed under a partnership agreement with a collocated team from Nortel and Vodafone working to an agreed combined plan. Project completed by national rollout to all six Nortel GGSNs. 04/05-12/05