1
ADVANCE
VIBRATION
 Introduction
 Vibration source in HPS
 Monitoring Vibration in HPS
2
ADVANCE
VIBRATION
Introduction
• Hydropower is a renewable and sustainable energy source, having
multiple advantages and benefits in the field of economy and
environment when compared with traditional fossil fuel, which motivates
the universal construction of hydropower stations in many countries.
• Vibrationof equipment has beena severe problemin Hydro Power
Stations (HPS) fromthe verybeginning of power generation.
• Failure of the equipment due to vibration causes shut down, or
sometimes, even a disaster in hydro power station (HPS).
3
ADVANCE
VIBRATION
• VCM has to be done to examine the performance of such
equipment online automatically and to know the status of
complex systems in hydropower generation.
• In HPS, online vibration monitoring is provided in various
parts of hydrogenating equipment’s including relative
shaft vibration, bearings absolute vibration, turbine
cover vibration, thrust bearing axial vibration, stator
core vibrations, stator bar vibrations, stator end
winding vibrations.
• Non-contact capacitive proximity probes are usually
provided to dynamically monitor the motion of the
generator/turbine shaft relative to the bearings.
4
ADVANCE
VIBRATION
Reason of vibration for HPS
Performance of a Machine or equipment are defined by vibration
amplitude.
As this vibration amplitude increases the rotational elements cause
more severe problems.
The main sources of vibration are:-
Electrical vibration
Mechanical vibration
Hydraulic vibration
Vibrations occur not only on rotating equipment, but also on non-rotating equipment
5
ADVANCE
VIBRATION
Rotating equipment
• Turbine runner
• Rotor
• Motor
• Mechanical imbalance
• Hydraulic imbalance
• Misalignment
• Cavitation
• Turbine bearing instability
• Rough zone operation
• Improper lubrication of
mechanical parts
• Defective bearing
Reasons of vibration
6
ADVANCE
VIBRATION
Non rotating equipment
•Transformer
•Penstock
•Generator
• Draft tube: Cavitation, Power
Swings and Draft Tube
Resonance.
• Seal erosion: Depends on water
quality.
• Penstock resonance: Cavitation
• Generator: Electromagnetic
force
• Transformer: Magneto motive
forces
Reason for vibration
7
ADVANCE
VIBRATION
Vibration control mechanism
•VM technique is very useful
for timely identification of
the fault due to excessive
vibration
8
ADVANCE
VIBRATION
• Signal acquisitionand processing is requiredto distinguishthe vibration
fault in HPS equipment whichnormally varies depending upon thenature
of the fault
• VCMof the equipment in a plant gives the correlationbetween recorded
vibrationdata and its mechanical condition
• Proper VCManalysis facilitates to detectthe equipment degradation prior
to damage.
• Vibrationoccurs when the natural frequency of a machineshaft matches
with the frequencycomponents of fluctuations
9
ADVANCE
VIBRATION
• When the vibration level is above permissible limits, sources of
vibrations should be identified and proper action should be
taken to bring it within safe limits.
• Condition monitoring and fault diagnostics are involved with
the following steps.
10
Signal acquisition
Signal analysis
Signal storage
Data transfer and
storage
Data selection
ADVANCE
VIBRATION
• On-line condition monitoring and diagnostic give
information to on-site working personnel and to control
room display as well
• OVC can detect shaft misalignment, bearing damage,
shaft imbalance etc. with different generator data.
• Vibration information is necessary for finding the health
of hydro power generator.
• Different vibration sensors used to monitor the hydro
power generator are accelerometers, audio microphones,
and eddy current proximity probes
Online VCM
11
ADVANCE
VIBRATION
Cont.…,
The advantages of on-line monitoring of
Hydro generating equipment have been
mentioned below.
• Operation and maintenance cost can
be reduced.
• Risks to the person can be reduced.
• According to system parameters,
equipment can be replaced.
• Major breakdowns can be
minimized.
• Life and efficiency of equipment can
be improved.
12
ADVANCE
VIBRATION
Offline VCM
• In this technique, maintenance is normally scheduled at
regular or irregular basis as corrective or preventive
maintenance.
• Technician could collect information manually and the
collected information will be analyzed and then,
interpreted
13
ADVANCE
VIBRATION
Thank you !
14

More Related Content

What's hot

Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
dwessin
 
Medium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage AutotransformerMedium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage Autotransformer
michaeljmack
 
Masterthesis_Madan_GaN_Univ
Masterthesis_Madan_GaN_UnivMasterthesis_Madan_GaN_Univ
Masterthesis_Madan_GaN_Univ
Abhimanyu Madan
 
Upgrading gen protect and grounding
Upgrading gen protect and groundingUpgrading gen protect and grounding
Upgrading gen protect and grounding
michaeljmack
 
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric materialCondition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric material
eSAT Publishing House
 
Product presentation usa
Product presentation  usaProduct presentation  usa
Product presentation usa
meltric
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
michaeljmack
 

What's hot (20)

2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
 
Faults in 300k w transmitter
Faults in 300k w transmitterFaults in 300k w transmitter
Faults in 300k w transmitter
 
Medium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage AutotransformerMedium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage Autotransformer
 
Masterthesis_Madan_GaN_Univ
Masterthesis_Madan_GaN_UnivMasterthesis_Madan_GaN_Univ
Masterthesis_Madan_GaN_Univ
 
Improving substation reliability & availability
Improving substation reliability & availability Improving substation reliability & availability
Improving substation reliability & availability
 
Electrical condition monitoring part 2
Electrical condition monitoring part 2Electrical condition monitoring part 2
Electrical condition monitoring part 2
 
Motor Current Signature Analysis
Motor Current Signature AnalysisMotor Current Signature Analysis
Motor Current Signature Analysis
 
electrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoringelectrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoring
 
Blind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Blind Spots of Low Voltage Testing Webinar Presented by Megger BakerBlind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Blind Spots of Low Voltage Testing Webinar Presented by Megger Baker
 
Upgrading gen protect and grounding
Upgrading gen protect and groundingUpgrading gen protect and grounding
Upgrading gen protect and grounding
 
Bushing test tap
Bushing test tapBushing test tap
Bushing test tap
 
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric materialCondition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric material
 
Electrical Condition monitoring part 1
Electrical Condition monitoring part 1Electrical Condition monitoring part 1
Electrical Condition monitoring part 1
 
MEDIUM VOLTAGE SWITCHGEAR
MEDIUM VOLTAGE SWITCHGEARMEDIUM VOLTAGE SWITCHGEAR
MEDIUM VOLTAGE SWITCHGEAR
 
Product presentation usa
Product presentation  usaProduct presentation  usa
Product presentation usa
 
Fault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibrationFault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibration
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
 
Condition monitoring of induction motor with a case study
Condition monitoring of induction motor with a case studyCondition monitoring of induction motor with a case study
Condition monitoring of induction motor with a case study
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 

Similar to A vibration presentation

2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...
2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...
2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...
vutnm94
 
Vibration analysis at thermal power plants
Vibration analysis at thermal power plantsVibration analysis at thermal power plants
Vibration analysis at thermal power plants
SHIVAJI CHOUDHURY
 

Similar to A vibration presentation (20)

VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...
 
2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...
2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...
2-HVPD-Night-2-On-line-Partial-Discharge-OLPD-Monitoring-of-Complete-HV-Netwo...
 
Vibration measurement
Vibration measurement Vibration measurement
Vibration measurement
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
Forced Oscillation Event Analysis
Forced Oscillation Event AnalysisForced Oscillation Event Analysis
Forced Oscillation Event Analysis
 
Unit 6 power quality
Unit 6 power qualityUnit 6 power quality
Unit 6 power quality
 
Overcurrent Protection
Overcurrent ProtectionOvercurrent Protection
Overcurrent Protection
 
14793 vibration studies
14793 vibration studies14793 vibration studies
14793 vibration studies
 
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
 
Vibration analysis at thermal power plants
Vibration analysis at thermal power plantsVibration analysis at thermal power plants
Vibration analysis at thermal power plants
 
A-ConMonIntro.ppt
A-ConMonIntro.pptA-ConMonIntro.ppt
A-ConMonIntro.ppt
 
63-pq.ppt
63-pq.ppt63-pq.ppt
63-pq.ppt
 
63-pq.ppt
63-pq.ppt63-pq.ppt
63-pq.ppt
 
EE554Introductrion power sytability .ppt
EE554Introductrion power sytability .pptEE554Introductrion power sytability .ppt
EE554Introductrion power sytability .ppt
 
Fusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity CircuitsFusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity Circuits
 
Introduction to vibration monitoring
Introduction to vibration monitoringIntroduction to vibration monitoring
Introduction to vibration monitoring
 
2 CIRCUIT BKR MAINT PRESENTATION 11kv VCB.ppt
2 CIRCUIT BKR MAINT PRESENTATION 11kv VCB.ppt2 CIRCUIT BKR MAINT PRESENTATION 11kv VCB.ppt
2 CIRCUIT BKR MAINT PRESENTATION 11kv VCB.ppt
 
LIGHTENING ARRESTER.pptx
LIGHTENING ARRESTER.pptxLIGHTENING ARRESTER.pptx
LIGHTENING ARRESTER.pptx
 
WAMS Applications , Wide Area Monitoring Systems WAMS
WAMS Applications , Wide Area Monitoring Systems WAMSWAMS Applications , Wide Area Monitoring Systems WAMS
WAMS Applications , Wide Area Monitoring Systems WAMS
 

Recently uploaded

Pests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
PirithiRaju
 
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bAsymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Sérgio Sacani
 
Disentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOSTDisentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOST
Sérgio Sacani
 
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroidsHubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
Sérgio Sacani
 
DIFFERENCE IN BACK CROSS AND TEST CROSS
DIFFERENCE IN  BACK CROSS AND TEST CROSSDIFFERENCE IN  BACK CROSS AND TEST CROSS
DIFFERENCE IN BACK CROSS AND TEST CROSS
LeenakshiTyagi
 
Labelling Requirements and Label Claims for Dietary Supplements and Recommend...
Labelling Requirements and Label Claims for Dietary Supplements and Recommend...Labelling Requirements and Label Claims for Dietary Supplements and Recommend...
Labelling Requirements and Label Claims for Dietary Supplements and Recommend...
Lokesh Kothari
 

Recently uploaded (20)

Botany krishna series 2nd semester Only Mcq type questions
Botany krishna series 2nd semester Only Mcq type questionsBotany krishna series 2nd semester Only Mcq type questions
Botany krishna series 2nd semester Only Mcq type questions
 
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
PossibleEoarcheanRecordsoftheGeomagneticFieldPreservedintheIsuaSupracrustalBe...
 
Recombinant DNA technology (Immunological screening)
Recombinant DNA technology (Immunological screening)Recombinant DNA technology (Immunological screening)
Recombinant DNA technology (Immunological screening)
 
Botany 4th semester file By Sumit Kumar yadav.pdf
Botany 4th semester file By Sumit Kumar yadav.pdfBotany 4th semester file By Sumit Kumar yadav.pdf
Botany 4th semester file By Sumit Kumar yadav.pdf
 
Botany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdfBotany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdf
 
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
 
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bAsymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
 
Disentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOSTDisentangling the origin of chemical differences using GHOST
Disentangling the origin of chemical differences using GHOST
 
Green chemistry and Sustainable development.pptx
Green chemistry  and Sustainable development.pptxGreen chemistry  and Sustainable development.pptx
Green chemistry and Sustainable development.pptx
 
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 60009654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
9654467111 Call Girls In Raj Nagar Delhi Short 1500 Night 6000
 
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls AgencyHire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
Hire 💕 9907093804 Hooghly Call Girls Service Call Girls Agency
 
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroidsHubble Asteroid Hunter III. Physical properties of newly found asteroids
Hubble Asteroid Hunter III. Physical properties of newly found asteroids
 
GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)
 
DIFFERENCE IN BACK CROSS AND TEST CROSS
DIFFERENCE IN  BACK CROSS AND TEST CROSSDIFFERENCE IN  BACK CROSS AND TEST CROSS
DIFFERENCE IN BACK CROSS AND TEST CROSS
 
Labelling Requirements and Label Claims for Dietary Supplements and Recommend...
Labelling Requirements and Label Claims for Dietary Supplements and Recommend...Labelling Requirements and Label Claims for Dietary Supplements and Recommend...
Labelling Requirements and Label Claims for Dietary Supplements and Recommend...
 
Natural Polymer Based Nanomaterials
Natural Polymer Based NanomaterialsNatural Polymer Based Nanomaterials
Natural Polymer Based Nanomaterials
 
VIRUSES structure and classification ppt by Dr.Prince C P
VIRUSES structure and classification ppt by Dr.Prince C PVIRUSES structure and classification ppt by Dr.Prince C P
VIRUSES structure and classification ppt by Dr.Prince C P
 
Spermiogenesis or Spermateleosis or metamorphosis of spermatid
Spermiogenesis or Spermateleosis or metamorphosis of spermatidSpermiogenesis or Spermateleosis or metamorphosis of spermatid
Spermiogenesis or Spermateleosis or metamorphosis of spermatid
 
Chemistry 4th semester series (krishna).pdf
Chemistry 4th semester series (krishna).pdfChemistry 4th semester series (krishna).pdf
Chemistry 4th semester series (krishna).pdf
 
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCRStunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
Stunning ➥8448380779▻ Call Girls In Panchshil Enclave Delhi NCR
 

A vibration presentation

  • 1. Advance VIBRATION TITLE :- REASON OF VIBRATION IN HYDROPOWER PALNT AND WAY OF ALLEVATING Student Sisay K. Instructor Prof Rao. 1
  • 2. ADVANCE VIBRATION  Introduction  Vibration source in HPS  Monitoring Vibration in HPS 2
  • 3. ADVANCE VIBRATION Introduction • Hydropower is a renewable and sustainable energy source, having multiple advantages and benefits in the field of economy and environment when compared with traditional fossil fuel, which motivates the universal construction of hydropower stations in many countries. • Vibrationof equipment has beena severe problemin Hydro Power Stations (HPS) fromthe verybeginning of power generation. • Failure of the equipment due to vibration causes shut down, or sometimes, even a disaster in hydro power station (HPS). 3
  • 4. ADVANCE VIBRATION • VCM has to be done to examine the performance of such equipment online automatically and to know the status of complex systems in hydropower generation. • In HPS, online vibration monitoring is provided in various parts of hydrogenating equipment’s including relative shaft vibration, bearings absolute vibration, turbine cover vibration, thrust bearing axial vibration, stator core vibrations, stator bar vibrations, stator end winding vibrations. • Non-contact capacitive proximity probes are usually provided to dynamically monitor the motion of the generator/turbine shaft relative to the bearings. 4
  • 5. ADVANCE VIBRATION Reason of vibration for HPS Performance of a Machine or equipment are defined by vibration amplitude. As this vibration amplitude increases the rotational elements cause more severe problems. The main sources of vibration are:- Electrical vibration Mechanical vibration Hydraulic vibration Vibrations occur not only on rotating equipment, but also on non-rotating equipment 5
  • 6. ADVANCE VIBRATION Rotating equipment • Turbine runner • Rotor • Motor • Mechanical imbalance • Hydraulic imbalance • Misalignment • Cavitation • Turbine bearing instability • Rough zone operation • Improper lubrication of mechanical parts • Defective bearing Reasons of vibration 6
  • 7. ADVANCE VIBRATION Non rotating equipment •Transformer •Penstock •Generator • Draft tube: Cavitation, Power Swings and Draft Tube Resonance. • Seal erosion: Depends on water quality. • Penstock resonance: Cavitation • Generator: Electromagnetic force • Transformer: Magneto motive forces Reason for vibration 7
  • 8. ADVANCE VIBRATION Vibration control mechanism •VM technique is very useful for timely identification of the fault due to excessive vibration 8
  • 9. ADVANCE VIBRATION • Signal acquisitionand processing is requiredto distinguishthe vibration fault in HPS equipment whichnormally varies depending upon thenature of the fault • VCMof the equipment in a plant gives the correlationbetween recorded vibrationdata and its mechanical condition • Proper VCManalysis facilitates to detectthe equipment degradation prior to damage. • Vibrationoccurs when the natural frequency of a machineshaft matches with the frequencycomponents of fluctuations 9
  • 10. ADVANCE VIBRATION • When the vibration level is above permissible limits, sources of vibrations should be identified and proper action should be taken to bring it within safe limits. • Condition monitoring and fault diagnostics are involved with the following steps. 10 Signal acquisition Signal analysis Signal storage Data transfer and storage Data selection
  • 11. ADVANCE VIBRATION • On-line condition monitoring and diagnostic give information to on-site working personnel and to control room display as well • OVC can detect shaft misalignment, bearing damage, shaft imbalance etc. with different generator data. • Vibration information is necessary for finding the health of hydro power generator. • Different vibration sensors used to monitor the hydro power generator are accelerometers, audio microphones, and eddy current proximity probes Online VCM 11
  • 12. ADVANCE VIBRATION Cont.…, The advantages of on-line monitoring of Hydro generating equipment have been mentioned below. • Operation and maintenance cost can be reduced. • Risks to the person can be reduced. • According to system parameters, equipment can be replaced. • Major breakdowns can be minimized. • Life and efficiency of equipment can be improved. 12
  • 13. ADVANCE VIBRATION Offline VCM • In this technique, maintenance is normally scheduled at regular or irregular basis as corrective or preventive maintenance. • Technician could collect information manually and the collected information will be analyzed and then, interpreted 13