SlideShare a Scribd company logo
1 of 15
Internship Report
By: Yasin Abdella
ID No: 100820
CONTENTS
01 BACKGROUND OF
THE CAMPANY 02
INDUSTRIAL INTERNSHIP
PROJECTS AND
ACTIVITIES
CONCLUSION AND
RECOMMENDATIONS
03 Lesson learned and
experience gained
04
BACKGROUND OF THE CAMPANY
Archi Design And Consultancy PLC
July 2013 with three members which are
1. Architect Yohannes Kassa
2. Architect Yamin Amin
3. Engineer Zeki Abdulfetah
Location Addis Ababa, Kirkos sub city, Woreda 08 house number 053
The main services
Design works Architectural, Structural, Electrical,Surveying,sanitary and quantity . Contract
administration.
Contract administration bid preparation, selection of contractor and Supervision works.
3.METESASEB SHOPING MALL
architects: yohannes kassa
yamin amin seman
office: archi design
area: 1000 sqm.
estimated cost: 35,000,000
project status: design phase
location: merkato, addis
ababa, ethiopia
Architects: yohannes kassa
yamin amin seman
Office: archi design
Area: 950 sqm.
Estimated cost:650,000,000
Project status: construction phase
Location: vatican embassy area
ADDIS LIFE 2B+G+24 APARTMENT
INDUSTRIAL INTERNSHIP PROJECTS
AND ACTIVITIES
CATE NEW VIEW TEMPLATE
My first office work is crate ARCH
DESIGN rivet view template that holes
several office standards like for
designing drafting publication
City Real Estate
preliminary design ,
modeling and organizing files
preparation of drafting,
preparation of working drawing and
designing of facad and balcony.
Preliminary Design of Zewdu residence
Client : ATO ZEWEDU TAMENE MEKONNEN
Project name: G+4 RESIDENCE
Function: residence
Location: Sub City- Bole,
Wereda-12 B.No-BBR-B8-32
preparation of drafting and
preparation of working drawing
Tajir apartment facade design
In this project the client want
economical design so, the facad design
was done using elements of the
building.
Tsehay residence drafting
prepared drafting for both floor
plan,section and elevation views.
Site Visit
I got the opportunity to visit two sites.
The first one is around sarbet near to vatican embassy
The second one was around jemmo micheal
Some of the materials and instrument used on those sites are
presented below
Bonding agent
Spacers
Timber form work Scaffolding
Expansion joints
LESSON LEARNED AND
EXPERIENCE GAINED
■ I gain various technical and interpersonal skill
○ software skills
○ Architectural Drawing and Drafting skills
○ Teamwork
○ Time Management
○ Upgrade our theoretical knowledge
○ Improve our interpersonal communication
skills
○ Understand about work ethic related issues
○ Entrepreneurship skills acquired
CONCLUSION AND
RECOMMENDATIONS
The internship, overall was both exciting
It opened my eye to a whole new world of a construction process
and the professional life of an Architect.
I think it is more than safe to say that I had tried to the best of my
ability to somehow meet the goals of the internship program.
The internship was not free from challenges
THANKY0U

More Related Content

Similar to internship report.pptx

Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
Ahmed Shafik
 
CV-Lynsey Dyer
CV-Lynsey DyerCV-Lynsey Dyer
CV-Lynsey Dyer
lynseydyer
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
jolynnTJL
 
Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)
mustafa menaisy
 

Similar to internship report.pptx (20)

My Portfolio - 2014 - updated
My Portfolio - 2014 - updated  My Portfolio - 2014 - updated
My Portfolio - 2014 - updated
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
DvJ Design Capability Statement
DvJ Design Capability StatementDvJ Design Capability Statement
DvJ Design Capability Statement
 
CV-Lynsey Dyer
CV-Lynsey DyerCV-Lynsey Dyer
CV-Lynsey Dyer
 
Magazine (ICI)
Magazine (ICI)Magazine (ICI)
Magazine (ICI)
 
MAGAZINE.ppt
MAGAZINE.pptMAGAZINE.ppt
MAGAZINE.ppt
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
 
Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)
 
B Square Profile
B Square ProfileB Square Profile
B Square Profile
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
 
Chandni's Portfolio
Chandni's PortfolioChandni's Portfolio
Chandni's Portfolio
 
Chandni Patel's Portfolio
Chandni Patel's PortfolioChandni Patel's Portfolio
Chandni Patel's Portfolio
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pm
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pm
 
Maks Professional Portfolio
Maks Professional Portfolio Maks Professional Portfolio
Maks Professional Portfolio
 
CAS Profile 2016
CAS Profile 2016CAS Profile 2016
CAS Profile 2016
 

More from SinafikeBekele (10)

how to write budget and time frame for research.pptx
how to write budget and time frame for research.pptxhow to write budget and time frame for research.pptx
how to write budget and time frame for research.pptx
 
RESEARCH METHOD three FINALnnnnnnnnnnnnnnnn.pptx
RESEARCH METHOD three FINALnnnnnnnnnnnnnnnn.pptxRESEARCH METHOD three FINALnnnnnnnnnnnnnnnn.pptx
RESEARCH METHOD three FINALnnnnnnnnnnnnnnnn.pptx
 
Architectural Practice Lecture 1.ppt
Architectural Practice Lecture 1.pptArchitectural Practice Lecture 1.ppt
Architectural Practice Lecture 1.ppt
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
flamingo .pptx
flamingo .pptxflamingo .pptx
flamingo .pptx
 
concept.pptx
concept.pptxconcept.pptx
concept.pptx
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
URBAN PLANNING...final (1).pptx
URBAN PLANNING...final (1).pptxURBAN PLANNING...final (1).pptx
URBAN PLANNING...final (1).pptx
 
GORO PRESENTATION.pptx
GORO PRESENTATION.pptxGORO PRESENTATION.pptx
GORO PRESENTATION.pptx
 
LECTURE 3.pptx
LECTURE 3.pptxLECTURE 3.pptx
LECTURE 3.pptx
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 

internship report.pptx

  • 1. Internship Report By: Yasin Abdella ID No: 100820
  • 2. CONTENTS 01 BACKGROUND OF THE CAMPANY 02 INDUSTRIAL INTERNSHIP PROJECTS AND ACTIVITIES CONCLUSION AND RECOMMENDATIONS 03 Lesson learned and experience gained 04
  • 3. BACKGROUND OF THE CAMPANY Archi Design And Consultancy PLC July 2013 with three members which are 1. Architect Yohannes Kassa 2. Architect Yamin Amin 3. Engineer Zeki Abdulfetah Location Addis Ababa, Kirkos sub city, Woreda 08 house number 053 The main services Design works Architectural, Structural, Electrical,Surveying,sanitary and quantity . Contract administration. Contract administration bid preparation, selection of contractor and Supervision works.
  • 4. 3.METESASEB SHOPING MALL architects: yohannes kassa yamin amin seman office: archi design area: 1000 sqm. estimated cost: 35,000,000 project status: design phase location: merkato, addis ababa, ethiopia
  • 5. Architects: yohannes kassa yamin amin seman Office: archi design Area: 950 sqm. Estimated cost:650,000,000 Project status: construction phase Location: vatican embassy area ADDIS LIFE 2B+G+24 APARTMENT
  • 6. INDUSTRIAL INTERNSHIP PROJECTS AND ACTIVITIES CATE NEW VIEW TEMPLATE My first office work is crate ARCH DESIGN rivet view template that holes several office standards like for designing drafting publication
  • 7. City Real Estate preliminary design , modeling and organizing files preparation of drafting, preparation of working drawing and designing of facad and balcony.
  • 8. Preliminary Design of Zewdu residence Client : ATO ZEWEDU TAMENE MEKONNEN Project name: G+4 RESIDENCE Function: residence Location: Sub City- Bole, Wereda-12 B.No-BBR-B8-32 preparation of drafting and preparation of working drawing
  • 9. Tajir apartment facade design In this project the client want economical design so, the facad design was done using elements of the building.
  • 10. Tsehay residence drafting prepared drafting for both floor plan,section and elevation views.
  • 11. Site Visit I got the opportunity to visit two sites. The first one is around sarbet near to vatican embassy The second one was around jemmo micheal Some of the materials and instrument used on those sites are presented below Bonding agent
  • 12. Spacers Timber form work Scaffolding Expansion joints
  • 13. LESSON LEARNED AND EXPERIENCE GAINED ■ I gain various technical and interpersonal skill ○ software skills ○ Architectural Drawing and Drafting skills ○ Teamwork ○ Time Management ○ Upgrade our theoretical knowledge ○ Improve our interpersonal communication skills ○ Understand about work ethic related issues ○ Entrepreneurship skills acquired
  • 14. CONCLUSION AND RECOMMENDATIONS The internship, overall was both exciting It opened my eye to a whole new world of a construction process and the professional life of an Architect. I think it is more than safe to say that I had tried to the best of my ability to somehow meet the goals of the internship program. The internship was not free from challenges