SlideShare a Scribd company logo
1 of 63
1
Points and Crossings:
The arrangements by which different
routes, diverging from the first track,
are connected to facilitate the
diversion of trains from one track to
another track without any obstruction
are known as points and crossings.
2
Points and Crossings:
Turn out:
A complete set of points and crossings
provides for diverting the trains from a
main track to a branch track is known as
turn out.
https://www.youtube.com/watch?v=owmJ2
J1B6g4
3
4
5
6
Right Hand Turn out:
Animated diagram of a right-hand railroad switch, rail
track A divides into two track B (the straight track) and
track C (the diverging track)
12
Right Hand Turn out:
13
Left Hand Turn out:
14
Turn out:
lead rails
17
Crossing Nose
It is a arrangement of rails introduced at the
junction where two rails cross to permit the wheel
flange of a railway vehicle to pass from one track to
another track.
Stretcher bar
Used to connect the toe of the tongue rails so that both
the tongues moves through the same distance or gap
Generally 2 or 3 bars are used near and behind the toe
Turn out:
20
22
Important Terms in connection with switches
Points or switch-- A pair of tongue and stock rails with
the necessary connections and fittings forms a switch.
Heel clearance / Heel divergence
It is the distance between the running face of the stock
rail and gauge face of the tongue rail measured at the
heel of the switch.
Heel clearance according to Indian standards for different
gauges:
B.G Track:- 13.3cm to 13.7cm
M.G Track :- 11.7cm to 12.1cm
N.G Track:- 9.8cm
Flangeway clearance
It is the distance between the adjacent faces of the stock
rail and the check rail.
It is provided as a clearance for the free movement of the
wheel flange
Flangeway should take into account the amount of wear.
It is observed that upto 6cm flangeway clearance, wear
takes place.
Indian standards for the value of Flangeway clearance on
the basis of wear are:
For 1 in 12 crossing angle, F.C = 6.3cm
For 1 in 8 ½ crossing angle, F.C = 6.6cm
26
27
28
29
30
31
32
33
2. Split Switch
In this type of switch a tongue rail is combined with
the stock rail.
Split Switches are classified as:
A) On the basis of fixation at heel:
(i) Loose Heel Type
- In this type, tongue rails are joined to lead rails by means of
fish plates.
- Two front bolts are kept loose to allow the throw of the switch
and these bolts are kept tight when the tongue is open
- This is suitable for short length switches.
Loose heel type
Loose heel type
37
38
Loose heel type
(ii) Fixed Heel Type (Flexible Type)
- This is an improvement over loose heel type
switch.
- In this all the 4 bolts are tight when the tongue is
closed
- Gives satisfactory results when long tongue are
used
- It is suitable for long tongue rails only.
Fixed heel type
40
Fixed heel type
B)
(i) Under Cut Switches
- In case the height of the stock and tongue rail is
same, it is desirable to cut out a portion of flange
at the foot of the stock rail so that toe of tongue
rail is accommodated under head of the stock rail.
- The disadvantage of this type of switch is that it
becomes weak because flange portion is cut out.
- These switch are generally used in narrow gauge
lines.
Under Cut Switches
43
ii) Over riding Switches:
- In this type separate rail sections of stock rail and
tongue rail are adopted.
- The stock rail of heavy section and tongue rail of light
section are used instead of cutting the flange rather than
weakening the stock rail as in case of undercut switch.
- The tongue rail rides over the flange of the stock rail.
- Generally used in B.G and M.G track.
iii) Straight cut Switches:
- In this type the tongue rail is cut straight in the line with
the stock rail.
- This is done to increase the thickness of toe of the
tongue rail, which increases its strength
- This type of switch is suitable for Bull Headed rails.
Crossings:
The arrangements by which different
routes, are connected without any
obstructions is called crossings.
48
49
50
51
52
Crossings:
53
Crossings Can Be Classified As Follows:
 On the Basis of Shape of Crossing
1.Square Crossing
2.Acute Angle or V-crossing or Frog
3.Obtuse Angle or Diamond Crossing
 On The Basis Of Assembly Of Crossing
1.Ramped Crossing
2.Spring Or Movable Crossing
Crossings:
Acute Angle
Obtuse
Angle
Right
Angle
According to Angle
54
55
Square Crossing:
Square Crossing is formed when two straight tracks of same or different gauge,
cross each other at right angles. This type of crossing should be avoided on main lines
because of heavy wear of rails.
Acute Angle Crossing:
Acute angle crossing is formed when left-hand rail of one track crosses right-hand
rail of another track at an acute angle or vice versa. This type of crossing consists of a pair of
wing rails, a pair of check rail and a splice rail. This crossing is widely used. This is also
called V-crossing or frog.
Obtuse Angle Crossing:
The obtuse crossing is formed when left-hand rail of one track crosses right-hand
rail of another track at an obtuse angle or vice versa. This type of crossing consists mainly of
two acute and two obtuse angle crossings. This is also called Diamond crossing.
56
57
58
59
Crossings:
Spring Crossing:
In this crossing wing rail is strongly
connected to V part by
helical spring so that’s why this
crossing is called spring crossing.
These crossings used in USA but not in
INDIA.
According to Diversion
60
Crossings:
Spring Crossing
61
Crossings:
Crossover Crossing
Function of this crossing is to
connect two parallel
or diverging tracks.
According to Diversion
62
Crossings:
Crossover
Crossing
63

More Related Content

Similar to POINTS AND CROSSINGS (1) FINAL.pptx

Points, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptxPoints, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptx
dshah162002
 

Similar to POINTS AND CROSSINGS (1) FINAL.pptx (20)

Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
1Point & crossing.pdf
1Point & crossing.pdf1Point & crossing.pdf
1Point & crossing.pdf
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in rails
 
Points, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptxPoints, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptx
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Track junction and simple track layouts
Track junction and simple track layoutsTrack junction and simple track layouts
Track junction and simple track layouts
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
Rail Joints.pdf
Rail Joints.pdfRail Joints.pdf
Rail Joints.pdf
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and components
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
TRAIN TRACK JUNCTION
TRAIN TRACK JUNCTIONTRAIN TRACK JUNCTION
TRAIN TRACK JUNCTION
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layouts
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 

More from ShruthiBS13 (9)

suitable water system.pptx water treatment
suitable water system.pptx  water treatmentsuitable water system.pptx  water treatment
suitable water system.pptx water treatment
 
Paies Agreement.pptx
Paies Agreement.pptxPaies Agreement.pptx
Paies Agreement.pptx
 
SDGs.pptx
SDGs.pptxSDGs.pptx
SDGs.pptx
 
LCA.pptx
LCA.pptxLCA.pptx
LCA.pptx
 
LCA Brief.pptx
LCA Brief.pptxLCA Brief.pptx
LCA Brief.pptx
 
LCA.pptx
LCA.pptxLCA.pptx
LCA.pptx
 
LCA Brief.pptx
LCA Brief.pptxLCA Brief.pptx
LCA Brief.pptx
 
SBS 1.pptx
SBS 1.pptxSBS 1.pptx
SBS 1.pptx
 
SBS 1.pptx
SBS 1.pptxSBS 1.pptx
SBS 1.pptx
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

POINTS AND CROSSINGS (1) FINAL.pptx

  • 1. 1
  • 2. Points and Crossings: The arrangements by which different routes, diverging from the first track, are connected to facilitate the diversion of trains from one track to another track without any obstruction are known as points and crossings. 2 Points and Crossings:
  • 3. Turn out: A complete set of points and crossings provides for diverting the trains from a main track to a branch track is known as turn out. https://www.youtube.com/watch?v=owmJ2 J1B6g4 3
  • 4. 4
  • 5. 5
  • 6. 6
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Right Hand Turn out: Animated diagram of a right-hand railroad switch, rail track A divides into two track B (the straight track) and track C (the diverging track) 12
  • 13. Right Hand Turn out: 13
  • 14. Left Hand Turn out: 14
  • 15.
  • 16.
  • 18. Crossing Nose It is a arrangement of rails introduced at the junction where two rails cross to permit the wheel flange of a railway vehicle to pass from one track to another track.
  • 19. Stretcher bar Used to connect the toe of the tongue rails so that both the tongues moves through the same distance or gap Generally 2 or 3 bars are used near and behind the toe
  • 21.
  • 22. 22
  • 23. Important Terms in connection with switches Points or switch-- A pair of tongue and stock rails with the necessary connections and fittings forms a switch. Heel clearance / Heel divergence It is the distance between the running face of the stock rail and gauge face of the tongue rail measured at the heel of the switch. Heel clearance according to Indian standards for different gauges: B.G Track:- 13.3cm to 13.7cm M.G Track :- 11.7cm to 12.1cm N.G Track:- 9.8cm
  • 24.
  • 25. Flangeway clearance It is the distance between the adjacent faces of the stock rail and the check rail. It is provided as a clearance for the free movement of the wheel flange Flangeway should take into account the amount of wear. It is observed that upto 6cm flangeway clearance, wear takes place. Indian standards for the value of Flangeway clearance on the basis of wear are: For 1 in 12 crossing angle, F.C = 6.3cm For 1 in 8 ½ crossing angle, F.C = 6.6cm
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. 32
  • 33. 33
  • 34.
  • 35. 2. Split Switch In this type of switch a tongue rail is combined with the stock rail. Split Switches are classified as: A) On the basis of fixation at heel: (i) Loose Heel Type - In this type, tongue rails are joined to lead rails by means of fish plates. - Two front bolts are kept loose to allow the throw of the switch and these bolts are kept tight when the tongue is open - This is suitable for short length switches.
  • 39. (ii) Fixed Heel Type (Flexible Type) - This is an improvement over loose heel type switch. - In this all the 4 bolts are tight when the tongue is closed - Gives satisfactory results when long tongue are used - It is suitable for long tongue rails only. Fixed heel type
  • 41. B) (i) Under Cut Switches - In case the height of the stock and tongue rail is same, it is desirable to cut out a portion of flange at the foot of the stock rail so that toe of tongue rail is accommodated under head of the stock rail. - The disadvantage of this type of switch is that it becomes weak because flange portion is cut out. - These switch are generally used in narrow gauge lines.
  • 42.
  • 44. ii) Over riding Switches: - In this type separate rail sections of stock rail and tongue rail are adopted. - The stock rail of heavy section and tongue rail of light section are used instead of cutting the flange rather than weakening the stock rail as in case of undercut switch. - The tongue rail rides over the flange of the stock rail. - Generally used in B.G and M.G track.
  • 45.
  • 46. iii) Straight cut Switches: - In this type the tongue rail is cut straight in the line with the stock rail. - This is done to increase the thickness of toe of the tongue rail, which increases its strength - This type of switch is suitable for Bull Headed rails.
  • 47.
  • 48. Crossings: The arrangements by which different routes, are connected without any obstructions is called crossings. 48
  • 49. 49
  • 50. 50
  • 51. 51
  • 52. 52
  • 53. Crossings: 53 Crossings Can Be Classified As Follows:  On the Basis of Shape of Crossing 1.Square Crossing 2.Acute Angle or V-crossing or Frog 3.Obtuse Angle or Diamond Crossing  On The Basis Of Assembly Of Crossing 1.Ramped Crossing 2.Spring Or Movable Crossing
  • 55. 55 Square Crossing: Square Crossing is formed when two straight tracks of same or different gauge, cross each other at right angles. This type of crossing should be avoided on main lines because of heavy wear of rails. Acute Angle Crossing: Acute angle crossing is formed when left-hand rail of one track crosses right-hand rail of another track at an acute angle or vice versa. This type of crossing consists of a pair of wing rails, a pair of check rail and a splice rail. This crossing is widely used. This is also called V-crossing or frog. Obtuse Angle Crossing: The obtuse crossing is formed when left-hand rail of one track crosses right-hand rail of another track at an obtuse angle or vice versa. This type of crossing consists mainly of two acute and two obtuse angle crossings. This is also called Diamond crossing.
  • 56. 56
  • 57. 57
  • 58. 58
  • 59. 59
  • 60. Crossings: Spring Crossing: In this crossing wing rail is strongly connected to V part by helical spring so that’s why this crossing is called spring crossing. These crossings used in USA but not in INDIA. According to Diversion 60