SlideShare a Scribd company logo
1 of 2
Shawn M. Maloney, PE, SE, PMP 860-638-7758 • shawnmaloney12@yahoo.com
18 Burlington Road • Harwinton, CT 06791
Overview
Power industry manager with 10 years of experience in engineering, construction, project management and general
management. Capable of taking on difficult, high profile challenges with a focus on successful execution. Excellent
teambuilding and communication skills, customer relations and ability to perform under pressure.
Highlights
• Manager, Construction Engineering and Field Services for organization
• Managed all licensing for the Company including business and contractors’ licensing
• Recognized by large international organization, Alstom, as being a “high potential” and given additional
training, mentoring and opportunities to facilitate career growth
• Proven leader with numerous incremental responsibilities assigned over career
• Developed an 18 month rotational training program for new field engineers consisting of classroom training,
one-on-one training, on-the-job training and mentoring/partnering.
• Worked with team of managers world-wide to develop a cross-training program to help business units that
were lacking resources (“one-level-deep” organizations)
• Maintained PE licenses, SE license, PMP certification, eight state contractors licenses and TWIC certification
• Developed an engineering library and lessons learned database for greater visibility, cost reduction and lean
improvement
Professional Engineering and Management Experience
Alstom Power Inc. – APComPower Inc. October, 2013– Present: Manager, Construction Engineering and
Field Services
• Managed all Company engineering activities including: Construction Engineering, Welding Engineering,
Field Engineering, Project Engineering, Subcontract Engineering and NDE
• Managed all licensing for the Company including business and contractors’ licensing
• Developed new work procedures for numerous engineering activities as required
• Developed lessons learned database for capturing best practices and knowledge transfer
• Participated and championed numerous Continuous Improvement Projects including: Company
Reorganization for Success, Employee Skills, Competencies and Gap Analysis, Projects looking for
People, Execution Plan Validation and others
• Participated in customer meetings and presentations for bid reviews and project execution meetings
• Ran technical risk review meetings with team members and management to ensure scope was clearly
covered and risk monies were accounted for as required
• Acted as lead engineer for Alabama Power, Miller Station precipitator rebuild project due to complexity
o Stepped into numerous roles during execution including: lead engineer, site engineer and
construction manager
Alstom Power Inc. – APComPower Inc. March 2011 – October, 2013: Manager, Construction Engineering
• Developed an engineering library for the Company to store drawings, calculations and backup material
from previous projects and proposal efforts
• Facilitated and led lean seminars for major projects to develop faster, more efficient project execution
strategies
• Managed and led Continuous Improved Projects for project financial tracking, site scoping and HRSG
advanced welding for R&D department
• Acted as lead engineer for TransAlta, Sundance project due to size and complexity - $138M
Alstom Power Inc. – APComPower Inc. December, 2009 – March, 2011: Supervisor, Construction
Engineering
• Managed a group of construction/structural engineers with a combined 135 years of experience and the
Company’s level III NDE supervisor.
• Monitored progress of work and ensured compliance with quality, schedule and cost commitments.
Investigated complex problems and independently initiated effective measures for their solution.
Coordinated activities with related groups and, as warranted, modified schedules to most efficiently
achieve objectives while ensuring customer satisfaction. Assisted less experienced engineers with the
more complex aspects of their assignments.
• Maintained awareness of new design developments and technologies and made recommendations
regarding feasibility of utilizing alternative approaches, modified or replaced equipment to reduce costs or
improve quality. As assigned, devised and implemented new approaches to recurring problems.
Prepared or assisted in preparing budgets and ensured adherence to approved budget plans.
• Developed an 18 month rotational training program for new field engineers consisting of classroom
training, one-on-one training, on-the-job training and mentoring/partnering.
• Continued to take on engineering projects and assignments as required.
Alstom Power Inc. – APComPower Inc. October, 2007 – December 2009: Construction Engineer
• Analyzed, designed and modelled lifting plans for power plant construction projects around the United
States. Projects included new construction, rehabilitation and environmental retrofits ranging from $100k
to $650M.
• Completed analyses and designs on numerous structural projects using RISA 3D and STAAD. Design
codes included ASD and LRFD.
• Conducted construction site feasibility studies and determined best construction methods.
• Utilized AutoCAD 3D to model, calculate weights and center of gravities for power plant components.
• Designed temporary lifting structures to aid in installation of critical parts using Allowable Strength Design
and Load and Resistance Factor Design.
• Planned and established work schedules considering customer requirements, priorities and availability of
resources.
• Participated in tendering, bid analysis, risk reviews, turnover to execution and execution phases of
projects
• Managed a group of Construction Engineers, Welding Engineers, Field Engineers, Project Engineers and
NDE technicians
• Managed numerous internal improvement projects for various departments including: finance,
engineering, quality and field support services.
Cianbro Corporation June, 2005 – October, 2007: Project Engineer
• Managed the building renovations at the Rte. 1 Devon Bridge in Milford, CT during the 2005-2007
bascule bridge rehabilitation project. Duties included: procurement of materials, scheduling and
managing team members and subcontractors and directed work crews with solutions to problems as
required.
• Worked with concrete, steel, pile driving and millwrights crews and provided methods for installation of
work on a daily basis.
• Designed temporary and permanent structures for components within the bascule piers at the Devon
Bridge
• Conducted layout for bridge machinery, pier fender system, secondary power generation unit and
water/wastewater system.
• Tracked daily productions of several work crews. Analyzed the work and daily production rates to
maximize the efficiency of the team members and their daily activities.
• Oversaw field engineering activities on site.
Education Clarkson University, Potsdam, NY May, 2005
• Major: Civil Engineering, Structural Engineering Concentration GPA: 3.15
Technical Computer Skills Arcview GIS, AutoCAD, STAAD, RISA 3D
Licenses Held CT Professional Engineer, AL Professional Engineer, VT Structural Professional Engineer,
Project Management Professional (PMP), State Contractors’ Licenses in: Virginia, Georgia, South Carolina, Alabama,
Nevada, California, Louisiana, Mississippi – All contractors licenses listed required experience, state validation and
testing, TWIC Certification
Relevant Training Received
Training covered dozens of topics including: General management, Risk management, Boiler and Energy, ASME &
NBIC, Safety, Quality, Ethics and Engineering specific

More Related Content

What's hot

Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ finalScott Coombes
 
RESUME Zhou Gary 2016
RESUME Zhou Gary  2016RESUME Zhou Gary  2016
RESUME Zhou Gary 2016Gary zhou
 
Mahesh k. mokire resume nov 7th, 2019
Mahesh k. mokire resume  nov 7th, 2019Mahesh k. mokire resume  nov 7th, 2019
Mahesh k. mokire resume nov 7th, 2019Mahesh Mokire
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeRené Rodríguez, Jr.
 
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...Malik Liaqat Ali
 
Tapan_Pandya_Resume
Tapan_Pandya_ResumeTapan_Pandya_Resume
Tapan_Pandya_ResumeTapan Pandya
 
Michael E Soukup Resume 6-25-15
Michael E  Soukup Resume 6-25-15Michael E  Soukup Resume 6-25-15
Michael E Soukup Resume 6-25-15Mike E Soukup
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016Frank Burton
 
David Whitaker 8-10-14
David Whitaker 8-10-14David Whitaker 8-10-14
David Whitaker 8-10-14David Whitaker
 
Resume_RyanMuller_2
Resume_RyanMuller_2Resume_RyanMuller_2
Resume_RyanMuller_2Ryan Muller
 

What's hot (20)

ac (1)
ac (1)ac (1)
ac (1)
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
Ethan M MCGuire
Ethan M MCGuireEthan M MCGuire
Ethan M MCGuire
 
RESUME Zhou Gary 2016
RESUME Zhou Gary  2016RESUME Zhou Gary  2016
RESUME Zhou Gary 2016
 
Scott E Huston Resume
Scott E Huston ResumeScott E Huston Resume
Scott E Huston Resume
 
Mahesh k. mokire resume nov 7th, 2019
Mahesh k. mokire resume  nov 7th, 2019Mahesh k. mokire resume  nov 7th, 2019
Mahesh k. mokire resume nov 7th, 2019
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 
Curriculam Vitae
Curriculam VitaeCurriculam Vitae
Curriculam Vitae
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_Resume
 
Choudhary Divyang Resume
Choudhary Divyang ResumeChoudhary Divyang Resume
Choudhary Divyang Resume
 
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
 
Tapan_Pandya_Resume
Tapan_Pandya_ResumeTapan_Pandya_Resume
Tapan_Pandya_Resume
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
Anand B S - CV
Anand B S - CVAnand B S - CV
Anand B S - CV
 
M.Ali CV
M.Ali  CVM.Ali  CV
M.Ali CV
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
 
Michael E Soukup Resume 6-25-15
Michael E  Soukup Resume 6-25-15Michael E  Soukup Resume 6-25-15
Michael E Soukup Resume 6-25-15
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
David Whitaker 8-10-14
David Whitaker 8-10-14David Whitaker 8-10-14
David Whitaker 8-10-14
 
Resume_RyanMuller_2
Resume_RyanMuller_2Resume_RyanMuller_2
Resume_RyanMuller_2
 

Viewers also liked

timothy_stock_resume
timothy_stock_resumetimothy_stock_resume
timothy_stock_resumeTimothy Stock
 
Brent Wilkins Resume
Brent Wilkins ResumeBrent Wilkins Resume
Brent Wilkins ResumeBrent Wilkins
 
Travis_Farris_Resume
Travis_Farris_ResumeTravis_Farris_Resume
Travis_Farris_ResumeTravis Farris
 
Diane Hercher's Resume
Diane Hercher's ResumeDiane Hercher's Resume
Diane Hercher's ResumeDiane Hercher
 
Harmik Uchian .Net Resume
Harmik Uchian .Net ResumeHarmik Uchian .Net Resume
Harmik Uchian .Net Resumeharmiku
 

Viewers also liked (8)

Saroj_Mahanta
Saroj_MahantaSaroj_Mahanta
Saroj_Mahanta
 
timothy_stock_resume
timothy_stock_resumetimothy_stock_resume
timothy_stock_resume
 
Brent Wilkins Resume
Brent Wilkins ResumeBrent Wilkins Resume
Brent Wilkins Resume
 
BrentonKriegerResume
BrentonKriegerResumeBrentonKriegerResume
BrentonKriegerResume
 
Travis_Farris_Resume
Travis_Farris_ResumeTravis_Farris_Resume
Travis_Farris_Resume
 
Diane Hercher's Resume
Diane Hercher's ResumeDiane Hercher's Resume
Diane Hercher's Resume
 
Navin resume
Navin resumeNavin resume
Navin resume
 
Harmik Uchian .Net Resume
Harmik Uchian .Net ResumeHarmik Uchian .Net Resume
Harmik Uchian .Net Resume
 

Similar to LinkedIn

ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016Ed Santavicca
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedulesaieq
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Kenneth Ifidon
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmNicholas Koehler
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.gorg3337
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016Robert Duffy
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen
 

Similar to LinkedIn (20)

ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016
 
Kevin Galvin CV
Kevin Galvin CVKevin Galvin CV
Kevin Galvin CV
 
Aamir CV (1)
Aamir CV (1)Aamir CV (1)
Aamir CV (1)
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pm
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Gareth Fulton FDM 1
Gareth Fulton FDM 1Gareth Fulton FDM 1
Gareth Fulton FDM 1
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Assarpour_Amir
Assarpour_AmirAssarpour_Amir
Assarpour_Amir
 
Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
Resume
ResumeResume
Resume
 

LinkedIn

  • 1. Shawn M. Maloney, PE, SE, PMP 860-638-7758 • shawnmaloney12@yahoo.com 18 Burlington Road • Harwinton, CT 06791 Overview Power industry manager with 10 years of experience in engineering, construction, project management and general management. Capable of taking on difficult, high profile challenges with a focus on successful execution. Excellent teambuilding and communication skills, customer relations and ability to perform under pressure. Highlights • Manager, Construction Engineering and Field Services for organization • Managed all licensing for the Company including business and contractors’ licensing • Recognized by large international organization, Alstom, as being a “high potential” and given additional training, mentoring and opportunities to facilitate career growth • Proven leader with numerous incremental responsibilities assigned over career • Developed an 18 month rotational training program for new field engineers consisting of classroom training, one-on-one training, on-the-job training and mentoring/partnering. • Worked with team of managers world-wide to develop a cross-training program to help business units that were lacking resources (“one-level-deep” organizations) • Maintained PE licenses, SE license, PMP certification, eight state contractors licenses and TWIC certification • Developed an engineering library and lessons learned database for greater visibility, cost reduction and lean improvement Professional Engineering and Management Experience Alstom Power Inc. – APComPower Inc. October, 2013– Present: Manager, Construction Engineering and Field Services • Managed all Company engineering activities including: Construction Engineering, Welding Engineering, Field Engineering, Project Engineering, Subcontract Engineering and NDE • Managed all licensing for the Company including business and contractors’ licensing • Developed new work procedures for numerous engineering activities as required • Developed lessons learned database for capturing best practices and knowledge transfer • Participated and championed numerous Continuous Improvement Projects including: Company Reorganization for Success, Employee Skills, Competencies and Gap Analysis, Projects looking for People, Execution Plan Validation and others • Participated in customer meetings and presentations for bid reviews and project execution meetings • Ran technical risk review meetings with team members and management to ensure scope was clearly covered and risk monies were accounted for as required • Acted as lead engineer for Alabama Power, Miller Station precipitator rebuild project due to complexity o Stepped into numerous roles during execution including: lead engineer, site engineer and construction manager Alstom Power Inc. – APComPower Inc. March 2011 – October, 2013: Manager, Construction Engineering • Developed an engineering library for the Company to store drawings, calculations and backup material from previous projects and proposal efforts • Facilitated and led lean seminars for major projects to develop faster, more efficient project execution strategies • Managed and led Continuous Improved Projects for project financial tracking, site scoping and HRSG advanced welding for R&D department • Acted as lead engineer for TransAlta, Sundance project due to size and complexity - $138M Alstom Power Inc. – APComPower Inc. December, 2009 – March, 2011: Supervisor, Construction Engineering • Managed a group of construction/structural engineers with a combined 135 years of experience and the Company’s level III NDE supervisor. • Monitored progress of work and ensured compliance with quality, schedule and cost commitments. Investigated complex problems and independently initiated effective measures for their solution. Coordinated activities with related groups and, as warranted, modified schedules to most efficiently achieve objectives while ensuring customer satisfaction. Assisted less experienced engineers with the more complex aspects of their assignments.
  • 2. • Maintained awareness of new design developments and technologies and made recommendations regarding feasibility of utilizing alternative approaches, modified or replaced equipment to reduce costs or improve quality. As assigned, devised and implemented new approaches to recurring problems. Prepared or assisted in preparing budgets and ensured adherence to approved budget plans. • Developed an 18 month rotational training program for new field engineers consisting of classroom training, one-on-one training, on-the-job training and mentoring/partnering. • Continued to take on engineering projects and assignments as required. Alstom Power Inc. – APComPower Inc. October, 2007 – December 2009: Construction Engineer • Analyzed, designed and modelled lifting plans for power plant construction projects around the United States. Projects included new construction, rehabilitation and environmental retrofits ranging from $100k to $650M. • Completed analyses and designs on numerous structural projects using RISA 3D and STAAD. Design codes included ASD and LRFD. • Conducted construction site feasibility studies and determined best construction methods. • Utilized AutoCAD 3D to model, calculate weights and center of gravities for power plant components. • Designed temporary lifting structures to aid in installation of critical parts using Allowable Strength Design and Load and Resistance Factor Design. • Planned and established work schedules considering customer requirements, priorities and availability of resources. • Participated in tendering, bid analysis, risk reviews, turnover to execution and execution phases of projects • Managed a group of Construction Engineers, Welding Engineers, Field Engineers, Project Engineers and NDE technicians • Managed numerous internal improvement projects for various departments including: finance, engineering, quality and field support services. Cianbro Corporation June, 2005 – October, 2007: Project Engineer • Managed the building renovations at the Rte. 1 Devon Bridge in Milford, CT during the 2005-2007 bascule bridge rehabilitation project. Duties included: procurement of materials, scheduling and managing team members and subcontractors and directed work crews with solutions to problems as required. • Worked with concrete, steel, pile driving and millwrights crews and provided methods for installation of work on a daily basis. • Designed temporary and permanent structures for components within the bascule piers at the Devon Bridge • Conducted layout for bridge machinery, pier fender system, secondary power generation unit and water/wastewater system. • Tracked daily productions of several work crews. Analyzed the work and daily production rates to maximize the efficiency of the team members and their daily activities. • Oversaw field engineering activities on site. Education Clarkson University, Potsdam, NY May, 2005 • Major: Civil Engineering, Structural Engineering Concentration GPA: 3.15 Technical Computer Skills Arcview GIS, AutoCAD, STAAD, RISA 3D Licenses Held CT Professional Engineer, AL Professional Engineer, VT Structural Professional Engineer, Project Management Professional (PMP), State Contractors’ Licenses in: Virginia, Georgia, South Carolina, Alabama, Nevada, California, Louisiana, Mississippi – All contractors licenses listed required experience, state validation and testing, TWIC Certification Relevant Training Received Training covered dozens of topics including: General management, Risk management, Boiler and Energy, ASME & NBIC, Safety, Quality, Ethics and Engineering specific