The Columbus hospital proposed in Hubli is a 200
bed speciality private hospital for treatment of caner.
The hospital will come up on a 12 acre plot between
Hubli-Dharwa. A leading construction company has
come forward to complete the hospital works from
concept to commissioning in 9 months.
The promoters are willing to spend a premium to
complete the hospital in 9 month time and are not
particular about type of construction,ie,RCC,steel
frame etc.
THE KEY REQUIREMENT ARE AS FOLLOW…
*200 bed hospital of which 40 are for critical care(ICU), 40
For pre and post operative care
*4 operation theatres-2 Major(Minimum 800 SFT) and 2
minor(minimum 400 SFT each)
*One full fledged Diagonstic laboratory(1500 SFT)
*One 24*7 pharmacy(360 SFT min)
*Doctors rooms,Nurses enclosures, Change rooms
*Office with billing counters(min 2000 sqft) for all
administrative staff
*Wheel chair parking bays, stretcher parking bays in all
floors
*One cafetaria with 50 person capaity
*One conference room with multimeadia equipment(300 sft
min)
*Parking for ambulances,4 wheelers, two wheelers
*Reception and enquiry counter
*All amenities should be accessible for disabled persons
*Incinertor, waste storage and disposal area
*Generator and fuel storage area
OFFICE OF STATEWIDE HEALTH PLANNING
AND DEVELOPMENT(OSHPD)
The office of statewide health planning and development
facilities development division (OSHPD FDD),the building
permitting agency for all california hospitals, cannot issue a
building permit until the conditional use permit has been
granted. The goal is to have the time frames for discretionary
approvals and OSHPD permitting track together. No
municipality or country can issue a building permit for a
hospital since the hospital seismic safety act in 1983. In this
capacity, OSHPD is responsible for the development of
regulations and the implementation of senate bill 1953.
Hospitals are vert complex buildings and california has its own
building code for hospitals. This code includes codes for
structural integrity following an earthquake as well as quality
and performance requirements in other areas that are superior
to the national codes. Therefore it is very important to select
architects and engineers who have experience in the design of
hospitals in california.
The licensing section of the
department of health service will
request final fire safety approval
from OSHPD FDD in preparation for
the hospital to be eligible for
Medicare cerification upon approval,
the hospital will be granted a
certificate of occupancy
recongnizing that it is now complete
and ready to receive patients
THE METHODOLOGY IS GIVEN IN THE
FOLLOWING FLOW CHART
SELECTION OF SITE
SURVEYING AUTO
CAD DRAWING
ANALYSIS OF STRUCTURE
DESIGN OF STRUCTURE
RESULT AND DISCUSSION
CONCEPT DESIGN
Uppon approval of the specific program a concept design is preapared that
develops the available space into the floor plans, interior elevations,
stacking and blocking daigrams building sections, exterior elevations , and
asite plan A major addition or replacemnet uses the
same process but in a broader frame of reference.
The concept design should be detailed enough to obtain a general cost-
per-sqaure foot estimate based upon historial cst factors in the
hospital’s location.
This information while limited is often the basis for the development
of a total project cost budget.
This will be construction budget that the executive administration
and the board may approve for the entire project.
Therefore, it’s very important that percentage contingencies for
infation, unknown exisiting conditions, costs increase during
construction are included in the construction costbudget.
While the concept construction budget is cruical, the project approval
will be based upon the total project cost.
TOTAL PROJECT BUDGET COST
The total project cost budget includes architects and engineers fees,
medical equipment, furnishings and fixtures, OSHPD building permit fees
and project contingencies.
A general rule for total project cost is to multiply the construction cost
by 1.5 loss of business revenue, financing conditional use permit fees ,
non-construction related the goal of this phase isbto
obtain all the decisions necessary to move on to preparing the
construction documents when this phase is approved. Design
development is the most labor intensive for hospital personal as the
rooms require many detail decisions.
At the conclusion of this phases the design development package is
submitted is necessary prior to proceeding with construction
documents, adittioanly, if a public hearing was held, comments that
may affect design should be received from the local municipality.
The cost estimate is updated to confirm if the project is with in the
budget.
SPECIFICATION OF STRUCTURES
:
* The building roof is designed as RCC
* The flooring concrete of plain cement concrete
using broken stone will be finished with marbles
* All the surface will be plastered and all ceiling
areas…
*All the joineries like doors, windows and
ventilators are designed to meet the standard
code provisions.
*All farmed structure like column,
faoting,beam,lintels and roof are designed in
working stress methods of create M20,Grad of
stres fe 415.
*Lump sum provisions have been made towards the
arrangements, electrifications, elevation and
supplying and fixing of furnitures and peety
superrvision charges
Requirements needs in Hospital
*Instrument table:-to hold instruments during
surgering
*X-Ray viewer :-veiw and realize the results from xray
* Resucitation bag:- quikly assist a patient wo is not breathing on theirown
*Analytic balance:-measre abd contain samples in thelab
*Oxygen regulator:-help ensure patients ,recive proper amount of oxygen
during surgery
*Patient trolly:-move patients b/w rooms before and after surgery
*Defibrillator:- shock the heart of a patient incardiac arrest
*inculator:- grow culters in the lab
*Bloodbank :- store blood and plasma until eeded refrigration
*Operating:- properly lighting the patient during theater lamp surgery
*instrument:- store instrumets to be used in cabinet surgery
*Suction machine:-assist in removng liquids during surgery
*Xray safe light:-For patient safety when taking xrays
*Centrifuge:-separate substances like blood cells
*Vital signs monitor :-used during surgery to make sure that the patient is
stable
*anesthetic machine:- provide a steady release of anestgetic during
surgery
*Autoclave:-sterilize equipment before use
*Ventilator(infabt):-assist a patient who is unable to breathe on their own
*operating theater table:- hold patients during surgery
*ultrasound machine -visualize internal organs in a localizes area
*mammography unit:- visualize bret tissue
*portable xray machine:-take xrays without movig the patient
*standard xray machine:- take a xrays of patients who are brought to
rediology
Case Study
The Columbus Hospital proposed in Hubli is a
200 bed speciality private hospital for treatment
of Cancer. The hospital will come up on a 12
acre plot between Hubli - Dharwad . A leading
construction company has come forward to
complete the hospital works from concept to
commissioning in 9 months. The promoters are
willing to spend a premium to complete the
hospital in 9 month time and are not particular
about type of construction ,i.e, RCC, Steel
frame etc.
GROUND FLOOR
1ST/2ND/3RD/4TH FLOOR
5TH FLOOR
6TH FLOOR
Chemotherapy
Machines
ECG Machines Robotic Surgery
MRI Scan Machines EKG Machines Dialysis Machines
CT Scan Machines Defibrillators BRAC Analysis
PET-CT Scan Machines Anesthesia Machines VENTANA PD-L1
Assay
Proton Therapy
Machines
Ultrasound Immunotherapy
Tomotherapy Machines Hematology Analyzer /
Cell counter
Therascreen EGFR
RGQ PCR Kit
Radiation Therapy Biochemistry Analyzer Laboratory Equipments
Electrosurgical Units Infusion Pump Oxygen Cylinder
Patient Monitors Syringe Pump Nebulizer Machine
Ventilator Suction machine IMRT Scan Machines
BP, Diabetes, Pulse,
Heart Rate Monitors
Stethoscopes Procedural Medical
Equipment
X-Rays Machines Thermometers Acute Care
 Lack of Accuracy in Time Estimation : Wrong estimation of time is the
primary reason for delay in project completion. Time estimate should be both
logical and practical.
 Change In Project Scope : Change in project scope is the main reason for bot h
time overrun and cost overrun.
 Unfavourable Weather Conditions : Extreme Weather conditions slower
the pace of work.
 Lack of Accuracy in Cost/Budget Estimation : Wrong estimation is one of
the main reason for delay in project completion.
 Labour Shortages : Lack of skilled labours is one of the main reason fordelay
in construction work.
 Inefficient Material and Equipment : Inadequate amount of raw materials
will lead to more time consumption.
 Delay in Approvals : Legal/government approvals may consume more time
than our assumption.
 Lack of Funds : insufficient funds ( money ) will also leads to delay in project
completion.
 Lack of Communication : Poor communication and coordination between the
customer , project manager , team members and workers.
 Subcontractor Challenges : Subcontractor may take more time to complete
there work which causes delay in completing the main project.
 Over estimation of benefits and under estimation of costs. Using poor
methods for estimating of costs and benefits.
 Undefined scope of
 Customer may ask
 Insufficient amount
the project.
for change in the project plan of
funds.
after the work starts.
 Lack of monitoring and tracking of project developments.
 Lack of legal documentation.
 Not maintaining proper project diary and project procedure manual.
 Lack of co-ordination between project manager and subcontractors.
 Lack in estimation of resources , man-power , materials , money , methods.
 Systems and methods are not clearly defined.
 Not adopting proper safety measures. Workers will not using PPE kits
while working.
 Lack of leadership and decision making of project manager.
 Improper planning of the project.
 Lack of quality in the building.
 Wastage of materials due to human error.
 Change in law , tax , government and duties.
EVENTS/ACTIVITIES SCHEDULED TIME ( IN DAYS )
15 DAYS
50 DAYS
50 DAYS
30 DAYS
20 DAYS
10 DAYS
10 DAYS
20 DAYS
05 DAYS
20 DAYS
15 DAYS
15 DAYS
10 DAYS
PLANNING
FOUNDATION
WALLS
RCC
STAIRCASE
ELECTRICAL WORKS
FURNITURE WORKS
SANITARY WORKS
WATERPROOFING
FLOORING PAINTING
INSTALATION OF MACHINES
CLOSEING
TOTAL
270 DAYS = 9 MONTHS
 A Gantt chart is a type of bar chart that illustrates a project schedule named after
Henry Gantt, who designed such a chart around the years 1910–1915. This chart
lists the tasks to be performed on the vertical axis, and time intervals on the
horizontal axis. The width of the horizontal bars in the graph shows the
duration of each activity . Gantt charts illustrate the start and finish dates of the
terminal elements and summary elements of a project.
0 50 100 150 200 250
PLANNING
FOUNDATION
WALLS
RCC
STAIRCASE
ELECTRICAL WORKS
FURNITURE WORKS
SANITARY WORKS
WATERPROOFING
FLOORING
PAINTING
INSTALATION OF
MACHINES
CLOSEING
TIME OVERRUN ANALYSIS SHEET
PROJECT NAME:
CONSTRUCTION
OF HOSPITAL.
MONTH: JULY
PROJECT CODE: 119EC21 YEAR: 2022
PROJECT MANAGER:
TEAM 2
SL.
NO
EVENTS/ACTIVI
TIES
SCHEDULE
D TIME (IN
DAYS)
ACTUAL
TIME
(IN DAYS)
TIME
OVERRU
N
TIME
OVERRU
N
%
REASON
01. PLANNING 15 DAYS 20 DAYS 05 DAYS 33% 5 DAYS DELAY
02. FOUNDATION 50 DAYS 60 DAYS 10 DAYS 20% 10 DAYS DELAY
03. WALLS 50 DAYS 65 DAYS 15 DAYS 30% 15 DAYS DELAY
04. RCC 30 DAYS 44 DAYS 14 DAYS 46% 14 DAYS DELAY
05. STAIRCASE 20 DAYS 30 DAYS 10 DAYS 50% 10 DAYS DELAY
06. ELECTRICAL
WORKS
10 DAYS 20 DAYS 10 DAYS 100% 10 DAYS DELAY
07. FURNITURE
WORKS
10 DAYS 20 DAYS 10 DAYS 100% 10 DAYS DELAY
08. SANITARY WORKS 20 DAYS 20 DAYS 0 0 ON TIME
09. WATERPROOFING 05 DAYS 05 DAYS 0 0 ON TIME
E10. FLOORING 20 DAYS 30 DAYS 10 DAYS 50% 10 DAYS DELAY
11. PAINTING 15 DAYS 25 DAYS 10 DAYS 66% 10 DAYS DELAY
12. INSTALATION OF
MACHINES
20 DAYS 40 DAYS 20 DAYS 100% 20 DAYS DELAY
13. CLOSEING 05 DAYS 05 DAYS 0 0 ON TIME

More Related Content

What's hot

Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Vipin Kumar
 
Hospital aiims presentation
Hospital aiims presentationHospital aiims presentation
Hospital aiims presentationVishvendu pandey
 
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY Prince Pathania
 
case study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaoncase study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaonSakshi Jain
 
Healthcare public design Selected hospital design
Healthcare public design   Selected hospital designHealthcare public design   Selected hospital design
Healthcare public design Selected hospital designSiniša Prvanov
 
Literature study & analysis on hospital design
Literature study & analysis on hospital designLiterature study & analysis on hospital design
Literature study & analysis on hospital designBee Key Verma
 
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY Prince Pathania
 
Hospital literature
Hospital literatureHospital literature
Hospital literatureToleDelx
 
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARCASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARPrince Pathania
 
Continental hospital
Continental hospitalContinental hospital
Continental hospitalSandhya Sandy
 
Hospital architecture design planning
Hospital architecture design  planningHospital architecture design  planning
Hospital architecture design planningFatma Sayed Ibrahim
 
fortis hospital mohali case study
fortis hospital mohali case study fortis hospital mohali case study
fortis hospital mohali case study Prince Pathania
 
Design a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 studentsDesign a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 studentsAshvini Kumar
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Mayank Aggarwal
 
Designing of OPD and day care services
Designing of OPD and day care servicesDesigning of OPD and day care services
Designing of OPD and day care servicesDrSiddharthSingh5
 
Innovative hospital designs
Innovative hospital designsInnovative hospital designs
Innovative hospital designsLamaJassim1
 

What's hot (20)

Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)
 
Hospital aiims presentation
Hospital aiims presentationHospital aiims presentation
Hospital aiims presentation
 
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
 
case study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaoncase study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaon
 
Healthcare public design Selected hospital design
Healthcare public design   Selected hospital designHealthcare public design   Selected hospital design
Healthcare public design Selected hospital design
 
Literature study & analysis on hospital design
Literature study & analysis on hospital designLiterature study & analysis on hospital design
Literature study & analysis on hospital design
 
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
 
Case study
Case studyCase study
Case study
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDYHOSPITAL CASE STUDY
HOSPITAL CASE STUDY
 
Hospital literature
Hospital literatureHospital literature
Hospital literature
 
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARCASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
 
Continental hospital
Continental hospitalContinental hospital
Continental hospital
 
Hospital planning and designing
Hospital planning and designingHospital planning and designing
Hospital planning and designing
 
Hospital architecture design planning
Hospital architecture design  planningHospital architecture design  planning
Hospital architecture design planning
 
Library study
Library studyLibrary study
Library study
 
fortis hospital mohali case study
fortis hospital mohali case study fortis hospital mohali case study
fortis hospital mohali case study
 
Design a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 studentsDesign a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 students
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)
 
Designing of OPD and day care services
Designing of OPD and day care servicesDesigning of OPD and day care services
Designing of OPD and day care services
 
Innovative hospital designs
Innovative hospital designsInnovative hospital designs
Innovative hospital designs
 

Similar to PMS CASE STUDY - 02 .....1-2.pptx

first session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptxfirst session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptxMohamedAli242496
 
Renal Business Today
Renal Business TodayRenal Business Today
Renal Business TodayDevin Reffitt
 
Medical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salahMedical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salahMohamed Salah Aouididi
 
Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16Michele Emond
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout pptSandeep Singh
 
8.healthcare construction
8.healthcare construction8.healthcare construction
8.healthcare constructionMmedsc Hahm
 
Hospital engineering services kiran james
Hospital engineering services kiran jamesHospital engineering services kiran james
Hospital engineering services kiran jameskichu09
 
Advanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility RenovationAdvanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility RenovationAlexander Kolker
 
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxHEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxArun Sebastian
 
Medical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and RequirementsMedical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and RequirementsDr.Eng. Walid Tarawneh
 
T E C H N O L O G YBudgetingbest practicesControlling .docx
T E C H N O L O G YBudgetingbest practicesControlling .docxT E C H N O L O G YBudgetingbest practicesControlling .docx
T E C H N O L O G YBudgetingbest practicesControlling .docxssuserf9c51d
 

Similar to PMS CASE STUDY - 02 .....1-2.pptx (20)

Planning and Designing of a Hospital
Planning and Designing of a HospitalPlanning and Designing of a Hospital
Planning and Designing of a Hospital
 
first session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptxfirst session - medical planning -MOHAMED ALAZAB .pptx
first session - medical planning -MOHAMED ALAZAB .pptx
 
Organisation
Organisation Organisation
Organisation
 
Renal Business Today
Renal Business TodayRenal Business Today
Renal Business Today
 
Medical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salahMedical equipment planning by Eng aouididi mohamed salah
Medical equipment planning by Eng aouididi mohamed salah
 
Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16
 
Mata ppt
Mata pptMata ppt
Mata ppt
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout ppt
 
8.healthcare construction
8.healthcare construction8.healthcare construction
8.healthcare construction
 
Sehat hospital final
Sehat hospital finalSehat hospital final
Sehat hospital final
 
Hospital engineering services kiran james
Hospital engineering services kiran jamesHospital engineering services kiran james
Hospital engineering services kiran james
 
Advanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility RenovationAdvanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility Renovation
 
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxHEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
 
Equipping hospital
Equipping hospitalEquipping hospital
Equipping hospital
 
Medical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and RequirementsMedical Equipment Planner Qualifications and Requirements
Medical Equipment Planner Qualifications and Requirements
 
T E C H N O L O G YBudgetingbest practicesControlling .docx
T E C H N O L O G YBudgetingbest practicesControlling .docxT E C H N O L O G YBudgetingbest practicesControlling .docx
T E C H N O L O G YBudgetingbest practicesControlling .docx
 
HOSPITAL PLANNING
HOSPITAL PLANNINGHOSPITAL PLANNING
HOSPITAL PLANNING
 
HOSPITAL PLANNING .ppt
HOSPITAL PLANNING .pptHOSPITAL PLANNING .ppt
HOSPITAL PLANNING .ppt
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
Session 4 4th edition PMP
Session   4 4th edition PMPSession   4 4th edition PMP
Session 4 4th edition PMP
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 

PMS CASE STUDY - 02 .....1-2.pptx

  • 1.
  • 2. CASE STUDY OF….. The Columbus hospital proposed in Hubli is a 200 bed speciality private hospital for treatment of caner. The hospital will come up on a 12 acre plot between Hubli-Dharwa. A leading construction company has come forward to complete the hospital works from concept to commissioning in 9 months. The promoters are willing to spend a premium to complete the hospital in 9 month time and are not particular about type of construction,ie,RCC,steel frame etc.
  • 3. THE KEY REQUIREMENT ARE AS FOLLOW… *200 bed hospital of which 40 are for critical care(ICU), 40 For pre and post operative care *4 operation theatres-2 Major(Minimum 800 SFT) and 2 minor(minimum 400 SFT each) *One full fledged Diagonstic laboratory(1500 SFT) *One 24*7 pharmacy(360 SFT min) *Doctors rooms,Nurses enclosures, Change rooms *Office with billing counters(min 2000 sqft) for all administrative staff *Wheel chair parking bays, stretcher parking bays in all floors *One cafetaria with 50 person capaity *One conference room with multimeadia equipment(300 sft min) *Parking for ambulances,4 wheelers, two wheelers *Reception and enquiry counter *All amenities should be accessible for disabled persons *Incinertor, waste storage and disposal area *Generator and fuel storage area
  • 4. OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT(OSHPD) The office of statewide health planning and development facilities development division (OSHPD FDD),the building permitting agency for all california hospitals, cannot issue a building permit until the conditional use permit has been granted. The goal is to have the time frames for discretionary approvals and OSHPD permitting track together. No municipality or country can issue a building permit for a hospital since the hospital seismic safety act in 1983. In this capacity, OSHPD is responsible for the development of regulations and the implementation of senate bill 1953. Hospitals are vert complex buildings and california has its own building code for hospitals. This code includes codes for structural integrity following an earthquake as well as quality and performance requirements in other areas that are superior to the national codes. Therefore it is very important to select architects and engineers who have experience in the design of hospitals in california.
  • 5. The licensing section of the department of health service will request final fire safety approval from OSHPD FDD in preparation for the hospital to be eligible for Medicare cerification upon approval, the hospital will be granted a certificate of occupancy recongnizing that it is now complete and ready to receive patients
  • 6. THE METHODOLOGY IS GIVEN IN THE FOLLOWING FLOW CHART SELECTION OF SITE SURVEYING AUTO CAD DRAWING ANALYSIS OF STRUCTURE DESIGN OF STRUCTURE RESULT AND DISCUSSION
  • 7.
  • 8. CONCEPT DESIGN Uppon approval of the specific program a concept design is preapared that develops the available space into the floor plans, interior elevations, stacking and blocking daigrams building sections, exterior elevations , and asite plan A major addition or replacemnet uses the same process but in a broader frame of reference. The concept design should be detailed enough to obtain a general cost- per-sqaure foot estimate based upon historial cst factors in the hospital’s location. This information while limited is often the basis for the development of a total project cost budget. This will be construction budget that the executive administration and the board may approve for the entire project. Therefore, it’s very important that percentage contingencies for infation, unknown exisiting conditions, costs increase during construction are included in the construction costbudget. While the concept construction budget is cruical, the project approval will be based upon the total project cost.
  • 9. TOTAL PROJECT BUDGET COST The total project cost budget includes architects and engineers fees, medical equipment, furnishings and fixtures, OSHPD building permit fees and project contingencies. A general rule for total project cost is to multiply the construction cost by 1.5 loss of business revenue, financing conditional use permit fees , non-construction related the goal of this phase isbto obtain all the decisions necessary to move on to preparing the construction documents when this phase is approved. Design development is the most labor intensive for hospital personal as the rooms require many detail decisions. At the conclusion of this phases the design development package is submitted is necessary prior to proceeding with construction documents, adittioanly, if a public hearing was held, comments that may affect design should be received from the local municipality. The cost estimate is updated to confirm if the project is with in the budget.
  • 10. SPECIFICATION OF STRUCTURES : * The building roof is designed as RCC * The flooring concrete of plain cement concrete using broken stone will be finished with marbles * All the surface will be plastered and all ceiling areas… *All the joineries like doors, windows and ventilators are designed to meet the standard code provisions. *All farmed structure like column, faoting,beam,lintels and roof are designed in working stress methods of create M20,Grad of stres fe 415. *Lump sum provisions have been made towards the arrangements, electrifications, elevation and supplying and fixing of furnitures and peety superrvision charges
  • 11. Requirements needs in Hospital *Instrument table:-to hold instruments during surgering *X-Ray viewer :-veiw and realize the results from xray * Resucitation bag:- quikly assist a patient wo is not breathing on theirown *Analytic balance:-measre abd contain samples in thelab *Oxygen regulator:-help ensure patients ,recive proper amount of oxygen during surgery *Patient trolly:-move patients b/w rooms before and after surgery *Defibrillator:- shock the heart of a patient incardiac arrest
  • 12. *inculator:- grow culters in the lab *Bloodbank :- store blood and plasma until eeded refrigration *Operating:- properly lighting the patient during theater lamp surgery *instrument:- store instrumets to be used in cabinet surgery *Suction machine:-assist in removng liquids during surgery *Xray safe light:-For patient safety when taking xrays *Centrifuge:-separate substances like blood cells *Vital signs monitor :-used during surgery to make sure that the patient is stable
  • 13. *anesthetic machine:- provide a steady release of anestgetic during surgery *Autoclave:-sterilize equipment before use *Ventilator(infabt):-assist a patient who is unable to breathe on their own *operating theater table:- hold patients during surgery *ultrasound machine -visualize internal organs in a localizes area *mammography unit:- visualize bret tissue *portable xray machine:-take xrays without movig the patient *standard xray machine:- take a xrays of patients who are brought to rediology
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. Case Study The Columbus Hospital proposed in Hubli is a 200 bed speciality private hospital for treatment of Cancer. The hospital will come up on a 12 acre plot between Hubli - Dharwad . A leading construction company has come forward to complete the hospital works from concept to commissioning in 9 months. The promoters are willing to spend a premium to complete the hospital in 9 month time and are not particular about type of construction ,i.e, RCC, Steel frame etc.
  • 23.
  • 24. Chemotherapy Machines ECG Machines Robotic Surgery MRI Scan Machines EKG Machines Dialysis Machines CT Scan Machines Defibrillators BRAC Analysis PET-CT Scan Machines Anesthesia Machines VENTANA PD-L1 Assay Proton Therapy Machines Ultrasound Immunotherapy Tomotherapy Machines Hematology Analyzer / Cell counter Therascreen EGFR RGQ PCR Kit Radiation Therapy Biochemistry Analyzer Laboratory Equipments Electrosurgical Units Infusion Pump Oxygen Cylinder Patient Monitors Syringe Pump Nebulizer Machine Ventilator Suction machine IMRT Scan Machines BP, Diabetes, Pulse, Heart Rate Monitors Stethoscopes Procedural Medical Equipment X-Rays Machines Thermometers Acute Care
  • 25.
  • 26.
  • 27.  Lack of Accuracy in Time Estimation : Wrong estimation of time is the primary reason for delay in project completion. Time estimate should be both logical and practical.  Change In Project Scope : Change in project scope is the main reason for bot h time overrun and cost overrun.  Unfavourable Weather Conditions : Extreme Weather conditions slower the pace of work.  Lack of Accuracy in Cost/Budget Estimation : Wrong estimation is one of the main reason for delay in project completion.  Labour Shortages : Lack of skilled labours is one of the main reason fordelay in construction work.  Inefficient Material and Equipment : Inadequate amount of raw materials will lead to more time consumption.  Delay in Approvals : Legal/government approvals may consume more time than our assumption.  Lack of Funds : insufficient funds ( money ) will also leads to delay in project completion.  Lack of Communication : Poor communication and coordination between the customer , project manager , team members and workers.  Subcontractor Challenges : Subcontractor may take more time to complete there work which causes delay in completing the main project.
  • 28.  Over estimation of benefits and under estimation of costs. Using poor methods for estimating of costs and benefits.  Undefined scope of  Customer may ask  Insufficient amount the project. for change in the project plan of funds. after the work starts.  Lack of monitoring and tracking of project developments.  Lack of legal documentation.  Not maintaining proper project diary and project procedure manual.  Lack of co-ordination between project manager and subcontractors.  Lack in estimation of resources , man-power , materials , money , methods.  Systems and methods are not clearly defined.  Not adopting proper safety measures. Workers will not using PPE kits while working.  Lack of leadership and decision making of project manager.  Improper planning of the project.  Lack of quality in the building.  Wastage of materials due to human error.  Change in law , tax , government and duties.
  • 29. EVENTS/ACTIVITIES SCHEDULED TIME ( IN DAYS ) 15 DAYS 50 DAYS 50 DAYS 30 DAYS 20 DAYS 10 DAYS 10 DAYS 20 DAYS 05 DAYS 20 DAYS 15 DAYS 15 DAYS 10 DAYS PLANNING FOUNDATION WALLS RCC STAIRCASE ELECTRICAL WORKS FURNITURE WORKS SANITARY WORKS WATERPROOFING FLOORING PAINTING INSTALATION OF MACHINES CLOSEING TOTAL 270 DAYS = 9 MONTHS
  • 30.  A Gantt chart is a type of bar chart that illustrates a project schedule named after Henry Gantt, who designed such a chart around the years 1910–1915. This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. The width of the horizontal bars in the graph shows the duration of each activity . Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. 0 50 100 150 200 250 PLANNING FOUNDATION WALLS RCC STAIRCASE ELECTRICAL WORKS FURNITURE WORKS SANITARY WORKS WATERPROOFING FLOORING PAINTING INSTALATION OF MACHINES CLOSEING
  • 31. TIME OVERRUN ANALYSIS SHEET PROJECT NAME: CONSTRUCTION OF HOSPITAL. MONTH: JULY PROJECT CODE: 119EC21 YEAR: 2022 PROJECT MANAGER: TEAM 2
  • 32. SL. NO EVENTS/ACTIVI TIES SCHEDULE D TIME (IN DAYS) ACTUAL TIME (IN DAYS) TIME OVERRU N TIME OVERRU N % REASON 01. PLANNING 15 DAYS 20 DAYS 05 DAYS 33% 5 DAYS DELAY 02. FOUNDATION 50 DAYS 60 DAYS 10 DAYS 20% 10 DAYS DELAY 03. WALLS 50 DAYS 65 DAYS 15 DAYS 30% 15 DAYS DELAY 04. RCC 30 DAYS 44 DAYS 14 DAYS 46% 14 DAYS DELAY 05. STAIRCASE 20 DAYS 30 DAYS 10 DAYS 50% 10 DAYS DELAY 06. ELECTRICAL WORKS 10 DAYS 20 DAYS 10 DAYS 100% 10 DAYS DELAY 07. FURNITURE WORKS 10 DAYS 20 DAYS 10 DAYS 100% 10 DAYS DELAY 08. SANITARY WORKS 20 DAYS 20 DAYS 0 0 ON TIME 09. WATERPROOFING 05 DAYS 05 DAYS 0 0 ON TIME E10. FLOORING 20 DAYS 30 DAYS 10 DAYS 50% 10 DAYS DELAY 11. PAINTING 15 DAYS 25 DAYS 10 DAYS 66% 10 DAYS DELAY 12. INSTALATION OF MACHINES 20 DAYS 40 DAYS 20 DAYS 100% 20 DAYS DELAY 13. CLOSEING 05 DAYS 05 DAYS 0 0 ON TIME