1. • The name comes from Latin hospes (host).
• A hospital, in the modern sense of the word,
is an institution for health care providing
patient treatment by specialized staff and
equipment, and often, but not always
providing for longer-term patient stays.
• Its historical meaning, until relatively recent
times, was "a place of hospitality".
CLASSIFICATION OF A HOSPITAL
(a) Depending upon the nature of the health facilities-
1.PRIMARY HEALTH CARE-
• It is a first level of care.
• Caters population of about 10,000.
2.SECONDARY HEALTH CARE-
• Special care is provided following referral from a primary health
professional.
• These are District level hospitals.
3.TERTIARY HEALTH CARE-
• Highly specialized consultative care to the patients referred from
secondary level facilities.
b)Depending upon the no. of beds
CATEGORIES NO. OF BEDS
A 25-50
B 51-100
C 101-300
D 301-500
E 501-750
INTRODUCTION
• The form of a hospital is strongly influenced by
the choice of access and circulation routes.
• It is therefore necessary to decide earlier on
whether to choose a spine form with branching
sections (individual dept.)or whether circulation
will be radially outwards from a central core.
• Consideration will be given to future expansions.
• The vertical arrangement within a hospital
should be designed so that the functional areas :
care , treatment ,supply and disposal, access for
bedridden patients, service yard underground
garage ,stores ,administration , medical services
–can be connected and accessed most
efficiently.
FORM OF HOSPITALS
ZONING
Location of the building should be convenient
to the people it serve.i.e the public zone
should be in front. Effective zoning is required
:
• public zone ,clinical zone and staff zone.
• privacy and confidentiality are important
• security and supervision in the premises
will be necessary .
• emergency should have separate entrance.
Mortuary should be linked with service
road.
• Land must not be contaminated
007
023
028
029
2. PRINCIPLES OF A HOSPITAL DESIGN
TOTAL AREA:
• The total area to be provided for a hospital
shall depend on availability of land, however an
area of 1 hectare for every 25 beds is
recommended.
LANDSCAPING
• landscape elements such as open areas,
horticulture to increase the comfort conditions
inside the building and also in the surrounding
environment should be kept in view.
SITE PLANNING:
• sensitive areas like wards, consulting &
treatment rooms and operation theaters are
placed away from the outdoor sources of
noise
ORIENTATION
• The most suitable orientation for treatment and
operating rooms is between N-W and N-E.
• For nursing wards façades south to south-east is
favorable ; pleasant morning sun , minimal heat
built up little requirement for sun shading , mild
in the evenings .
• East and west facing rooms have comparatively
deeper sun penetration , through less winter sun
.
STRUCTURAL GRID
• The constructional grid must provide a precise
guide as well as allowing for differentiation of
areas for the main functions, support functions
and vehicular traffic.
• The variation operations centers can be planned
most appropriately with a column grid spacing of
7.2m or 7.8m smaller construction grids are
problematic because large rooms (eg.operating
theatres) which must be free from internal
columns are more difficult to accommodate.
007
023
028
029
3. x
x x x
FORTIS HEART & MULTI-SPECIALITY HOSPITAL,MOHALI
CLIENT : FORTIS HEALTH CARE LIMITED
(FHL),C/O,Ranbaxy Laboratories Limited.
DESIGN TEAM : Kaplan MC Laughlin Diaz, California.
LEAD ARCHITECT : Achal Kataria & Associates, New Delhi.
TOTAL PLOT AREA : 8.22 acres.
TOTAL BUILT –UP AREA : 40000sq. M
HEIGHT OF BUILDING : 30 m (including glass tower).
YEAR OF COMPLETION : 2001.
DURATION OF CONSTRUCTION : A record 18 months.
COST OF PROJECT : 155 crores.
LOCATION :
Located in sector 62, Phase VIII, S.A.S. Nagar, Mohali (Distt. Ropar),
Punjab, India – Just 7 kms. from Chandigarh.
Very near to the bus-stand – Thus comfortable to the patients coming from
out of city.
It is 14kms from the airport, 9 kms from bus stand (sec 17) and 12 kms.
from the railway station.
FORTISHEART
&MULTISPECIALITY
HOSP
(NTS)
PSEB
BLDG.
MARKET
LOCATION PLAN
TO AIR
TERMINAL
TOBUSSTAND
FROM
CHANDIGARH
SURROUNDINGS :
The approach to the site is from a 24m wide road running all around
the site.
It has PSEB building on one side & the Punjab Urban Planning &
Development Building opposite to it and a proposed market behind it.
SITE ANALYSIS :
The linear proportions of the site 3:1 have brought out the linear plan of
the hospital building, the two entrances being on the longer side.
Spread over 8.22 acres.
Rectangular plot : 344m x 110m
SIGNIFICANT FEATURES :
With site area of (334m x 110m)sq. m.= 36740 sq. m. and permissible
ground coverage of 30%, the complex has been divided into 4 blocks –
A,B,C & D.
ORIENTATION :
The building faces north-east, the most favourable orientation.
Care has been taken to place the curved surface of the building out to that
direction to get the maximum exposure to glare-free light. CURVED
SURFACE
55%
17%
6%
7%
15%
IN PATIENT
DIAGNOSTIC AND TREATMENT
OPD AND EMERGENCY
ADMINISTRATIVE
SERVICES
FLOOR SPACE DISTRIBUTION
007
023
028
029
4. BLOCK-A BLOCK-B
BLOCK-C BLOCK-D
ZONING , CIRCULATION & PARKING
PARKING :
Paid public parking on the immediate left ( 120 cars & 50 scooters ) : P1
Parking for ambulance right next to the emergency entrance/exit: P2
Separate staff parkings: P3
Basement car park for doctors, high officials etc : P4
CIRCULATION :
All the segregations follow a defined & specified path leading
to their respective destinations..
Divided into five zones
The first:public area comprising entry/exit and parking
The second: The Rehabilitation building which has less
traffic.
The third: The Main Hospital Building approached by
patients, their visitors, the staff and doctors.
The Service dock at the back & basement parking form the
fourth zone.
Last the beautiful landscaping spread all over the site
P1
P2
P3
LANDSCAPING:
Landscaping has been paid special attention here at FORTIS, Mohali,
using it as an element of beauty & at the same time to rejuvenate the
spirit of the patients.
A stepped landscaped courtyard between the two buildings of the
hospital enabling the patients to look down on the greenery, not making
them feel sick seems to be on the pattern of Mughal gardens.
Shapes like circular & other curvilinear forms :
Thus providing harmony & unity at site level.
Road edges marked with flowers and specific
landscaped areas earmarked by flower pots.
STEPPED
LANDSCAPED
COURTYARD
N
The main hospital building
has been divided into 4
blocks:
BLOCK A: : Emergency
area, with separate gate and
entrance.
BLOCK B : Inpatient
Administration with traffic
restricted to patients
admitted & their visitors
BLOCK C Diagnostics and
Labs
BLOCK D : OPD &
Rehabilitation centre, closest
to Parking as OPD has
maximum public traffic..
There are 4 ENTRANCES
to the main hospital building
OPD, IPD, Emergency,
Services
ZONING (BUILDING LEVEL) :
007
023
028
029
5. OPD TO EMERGENCY
OUTSOOR KISOKSCOVERED
PATHWAYS FROM
OPD TO IPD
LANDSCAPED COURTYARD
OXYGEN PLANT CANCER INST. PORCH
TWO WHEELER
PARKING
FOUR WHEELER PARKING
COFFEE SHOP
N
6. • Basically the inter-departmental circulation is being
governed by 2.45m wide corridors & the intra-
departmental by 1.8m wide corridors.
• Swinging doors have been placed at regular intervals in
the corridors to provide a defined path to user zones and at
the same time to provide privacy to the various
departments.
DOUBLY LOADED
CORRIDOR
MAIN SPINAL
CORRIDOR
SINGELY LOADED
CORRIDOR
CIRCULATION :
HORIZONTAL CIRCULATION :
• Main spinal cord of the hospital : 2.45m wide.
• It bifurcates to form a doubly loaded curved corridor
(2.45m wide) in the blocks A & B.
• Another 2.45m wide singly loaded corridor runs throughout
the length of blocks C& D along a landscaped courtyard.
CURVED CORRIDORSINGLY LOADED CORRIDOR
COURTYARD
VERTICAL CIRCULATION:
It can be divided into 3 components :
Staircases, Lifts,Ramps
• STAIRCASES :
Fire-escape - 4
Public - 3
Rehab - 1
• LIFTS :
Public - 6
Bed-lifts – 2
Service - 4
Rehab - 1
• RAMP - 1
• One CAGE-LIFT in kitchen for the transportation of
material from basement stores to kitchen at the GF,
two DUMB WAITER lifts connected from CSSD to
Day care OT and Cardiac OT at 1st and 2nd floor
respectively.
• Each block has its own staircase.
• Most of the staircases are on external walls having
natural light and ventilation.
• There is a ramp ( 1:7 slope, 6m wide) going down to
the service dock for loading / unloading of material
from trucks & the staff parking in basement.
LIFTS LOBBY
RAMP TO BASEMENT
FIRE ESCAPE STAIRCASE
PUBLIC STAIRCASE
LIFTS
DUMBWAITERS
ACCESS CORRIDORS
SCRUB AREA
FOR IVF OT,S
IN THE
ACCESS
CORRIDORS
CORRIDOR OUTSIDE
CONSULTANT ROOM
007
023
028
029
7. SUMP
F
5.84.83.82.81.80.8
D
E
C
B
A
7
6
5
4
3
2
1
18.117.116.115.114.113.112.1
18
17
16
15
14
13
12
11
1098
7
2928272625242322212019
C
H
J
K
L
ELE/TEL/DATA
0070
FHC-6
3635343332313029
L
K
J
H
ELE/TEL/DATA
WASTE
DISPOSAL
WASTE
DISPOSAL
WASTE
DISPOSAL
PARKING
LOADING UNLOADING
LVL(-3.45 FFL)
ENTRY TO BASEMENT
PARKING
EMERGENCY
ENTRANCE FOR
KITCHEN GOODS
RECEIVING BAY
RAMP DN
STORE
+ 4.65 M FFL
UP
DN
LADIES
TOI.
UP
GENTS
TOI.
SCOOTER PARKING
SCOOTER PARKINGLOBBY
PRAYER
RM.
MORTURYOFF.
(RECEIVING)
STORE
LIFT LOBBY
(FOR BEDS)
LIFT LOBBY-3
(FOR SERVICE)
2450WIDE
CORRIDOR
UP
PARKING
MATERIAL TESTING
LAB
PUMP
RM.
PUMP
RM.
PUBLIC HEALTH SERVICES
OFF.
OFF.SECURITY
OFFICE
CHIEF
ENGG.
MECHANICAL
SERVICES
STORE
BLDG
ACCOMODATION
ELECTRIC
PANEL RM.
ELE/TEL/DATA
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
ENGG
DEPT.
ENGG.
DEPT
SERVICES
SUMP
PANEL
RM.
UP
DIESEL GENERATOR
SET
JAN
STAFF
CH.
RM.
STAFF
TOI.
PUMP
RM.
STAFF
TOI.
STAFF
CH.
RM.
LT PANEL
RM.
TRANSFORMER
RM.
TRANSFORMER
RM.
HT PANEL
RM.
TRANSFORMER
RM.
PANEL
RM.
UPS
STORE
STORE
CABIN
WORKSHOP
CARPENTRYWORKING
AREA
STORE
BIO MEDICAL
ENGG
PHARMACY
PHARMACY
INCHARGE
CH ENGG
DINING
BAKERY
CONFEC.
TROLLEY
PARK/WASH
CAGE
LIFT
COLD
RM.
DEEP
FREEZER
SUMP
DRY
STORE
UTILITY
RM
OFFICE
RECEIVING
BIO MEDICAL
ENGG
D.G
SET
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
STERILE
AREA
CSSD CLEAN
AREA
SUMP
CSSD
TROLLEY
WASH
CSSD
SUPERVISOR
DW DW
CSSD
DESPATCHLADIES
CH.
CSSD
RECP.
RECEIVING
CSSD
WASH
CHEMICAL STORE
FOR LAUNDRY
LAUNDRY WASHING
/DRYING
SUPERVISOR
LAUNDRY
HOUSE
KEEPING
LAUNDRY
CLEAN
AREA
LAUNDRY
STORE
( P&S)
LAUNDRY
DISPATCH
LAUNDRY
RECEIVING
LAUNDRY
ELECTRIC
PANEL
RM.
AHU
MEDICAL
RECORD
RM.
LAUNDRY CSSD
UP
KITCHEN
STORAGE
STORE
+ 4.65 M FFL
A
A'
LVL -3.15M
LVL -3.15M
LVL -3.15M
LVL -3.15M
LVL -3.15M
F
5.84.83.82.81.80.8
D
E
C
B
A
7
6
5
4
3
2
1
WASTE
DISPOSAL
WASTE
DISPOSAL
WASTE
DISPOSAL
LIFT LOBBY
(FOR BEDS)
PARKING LADIES
TOI.
LOADING UNLOADING
LVL(-3.45 FFL)
ENTRY TO BASEMENT
PARKING
EMERGENCY
ENTRANCE FOR
KITCHEN GOODS
RECEIVING BAY
RAMP DN
STORE
+ 4.65 M FFL
UP
DN
SUMP
18.117.116.115.114.113.112.1
18
17
16
15
14
13
12
11
1098
7
LADIES
TOI.
UP
GENTS
TOI.
SCOOTER PARKING
SCOOTER PARKINGLOBBY
PRAYER
RM.
MORTURYOFF.
(RECEIVING)
STORE
LIFT LOBBY
(FOR BEDS)
LIFT LOBBY-3
(FOR SERVICE)
2450WIDE
CORRIDOR
UP
PARKING
BLOCK-A
BLOCK-B
BASEMENT PLAN:
Block A & B :
Lvl. = - 3.15m
It provides staff parking for about 85 cars & 75
scooters.
Block A also houses the waste disposal storage.
It also has public toilets and a lift lobby.
Block B also has a mortuary and prayer room.
BASEMENT
STAFF PARKINGMORTUARY
BLOCK A
BLOCK B
LVL-3.15MLVL-3.15M
PARKING FOR STAFF IN THE
BASEMENT
STERILE
LAUNDRY
COLLECTION
WINDOW
N
007
023
028
029
8. 2928272625242322212019
C
H
J
K
L
ELE/TEL/DATA
0070
FHC-6
ELE/TEL/DATA
DIESEL GENERATOR
SET
JAN
STAFF
CH.
RM.
STAFF
TOI.
PUMP
RM.
STAFF
TOI.
STAFF
CH.
RM.
LT PANEL
RM.
TRANSFORMER
RM.
TRANSFORMER
RM.
HT PANEL
RM.
TRANSFORMER
RM.
PANEL
RM.
UPS
STORE
STORE
CABIN
WORKSHOP
CARPENTRYWORKING
AREA
STORE
BIO MEDICAL
ENGG
PHARMACY
PHARMACY
INCHARGE
CH ENGG
DINING
BAKERY
CONFEC.
TROLLEY
PARK/WASH
CAGE
LIFT
COLD
RM.
DEEP
FREEZER
SUMP
DRY
STORE
UTILITY
RM
OFFICE
RECEIVING
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
STERILE
AREA
CSSD CLEAN
AREA
SUMP
CSSD
TROLLEY
WASH
CSSD
SUPERVISOR
DW DW
CSSD
DESPATCHLADIES
CH.
CSSD
RECP.
RECEIVING
CSSD
WASH
CHEMICAL STORE
FOR LAUNDRY
LAUNDRY WASHING
/DRYING
SUPERVISOR
LAUNDRY
HOUSE
KEEPING
LAUNDRY
CLEAN
AREA
LAUNDRY
STORE
( P&S)
LAUNDRY
DISPATCH
LAUNDRY
RECEIVING
LAUNDRY
ELECTRIC
PANEL
RM.
AHU
MEDICAL
RECORD
RM.
UP
LVL(-3.45 FFL)
ENTRANCE FOR
KITCHEN GOODS
RECEIVING BAY
RAMP DN
STORE
+ 4.65 M FFL
CSSD
D.G
SET
TRANSFORMER
RMS.
BIO MEDICAL
ENGG
KITCHEN
STORAGE
LAUNDRY
3635343332313029
L
K
J
H
MATERIAL TESTING
LAB
PUMP
RM.
PUMP
RM.
PUBLIC HEALTH SERVICES
OFF.
OFF.SECURITY
OFFICE
CHIEF
ENGG.
MECHANICAL
SERVICES
STORE
BLDG
ACCOMODATION
ELECTRIC
PANEL RM.
ELE/TEL/DATA
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
ENGG
DEPT.
ENGG.
DEPT
SERVICES
SUMP
PANEL
RM.
UP
BLOCK-D
BLOCK-C
MEDICAL RECORD
ROOM
Block C - It has main Kitchen, a Pharmacy department, Medical
record room, Laundry, CSSD, Bio-medical engineering workshop,
carpentry unit, stores, EDP (Electronic Data Processing unit), UPS
room, Electricity panel room, diesel generator sets room, janitor,
toilets pump room.
DINING FOR STAFF
BASEMENT`
Kitchen storage & dining for staff
It consists of mainly storage areas, has a receiving bay,
a bakery, a confectionery, a cold and deep freezer, an
area for parking and washing trolleys and a special
cage lift
Laundry, CSSD & Medical Records.
Laundry placed next to the CSSD for convenience in
sterilizing clean clothes and linen.
The whole area is very efficiently planned for ease of
receiving, washing & drying, ironing with special clean
areas & dispatch.
Block D :
• It basically consists of staff rooms with toilets, 2 lift
lobbies, building automation units, panel rooms, HVAC
services,
•Public Health services, store and some space for future
expansion.
CSSD
CAGE LIFT
LAUNDRY
LT PANELROOM
PUMP ROOM
KITCHEN STORAGE
BLOCK C
BLOCK D
LVL-3.15M
LVL-3.15M
9. 5.84.83.82.81.80.8
D
E
C
B
A
7
6
5
4
3
2
1
18.117.116.115.114.113.112.1
18
17
16
15
14
13
12
11
0064D
0064C
0064B
0064A
0065D
0065C
0065B
0065A
1098
7
UP.
F
C
H
F
2928272625242322212019
J
K
L
0071G
POT WASH
JUICE&SALAD
3635343332313029
L
K
J
H
GYMNASIUM
0143
0142E
VESTIBULE
0142D
0142C
0142B
0142A
VESTIBULE
0141G
0141F
0141E
0141D
0141C
OBSERVATION BEDS
TRAUMA PATIENTS
OBSERVATION BEDS
GENERAL PATIENTS
OBSERVATION BEDS
CARDIAC PATIENTS
OBSERVATION BEDS
CARDIAC PATIENTS
TOILET
STAFF
LOUNGE
X-RAY
ROOM
DARK
ROOM
STORE
ULTRASOUND
ROOM
ECG
PLASTER
ROOM
PANTRY
MSKPSTORE SLUICE
PACE
MAKER
DU
CARDIALOGIST
1200WIDECORRIDOR
ELE/TEL/DATA
AHU
DR'S
CH. RM.
TOI. TOI.
NURSE'S
CH. RM.SCRUB
CH.STAFF
CLASS-II
STORE
OTOPERATION
RM.
SPOT
STER.
INSTR.
PREPPROCEDURE
RM.
TRIAGE
RM.
CONS.
RM.
CONS.
RM.
OFFICE
TOI.
RECEPTION
LOBBY
WAITING
PATIENTS
TOI.TROLLEY
WHEEL
CHAIR
VESTIBULE
POLICE
POST
GENTS
TOI.
LADIES
TOI. STAFF
TOI.
EMERGENCY
INCHARGE
EMER.
EXIT
ENTRY
ENT FOR EMERGENCY
EMERGENCY
STORE
+ 4.65 M FFL
WAITING
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
UP
DN.
BUSINESS
CENTER
OFFICE OFFICE OFFICE
OFFICE
OFFICE
BILING/CASH/
REGESTRATION
RECEPTION
INPATIENT LOBBY
TOI.
FLORIST
PHARMACY
+750M FFL
ENT LOBBY
ENT TO INPATIENT
HOSPITAL LOBBY
INPATIENT ENTRY
INPATIENT ADMN.
BLOOD BANK
CAFETERIA PANTRY
VESTIBULE
WAITING
BOOK
STORE
BANK
GENTS
TOI.
LADIES
TOI.
MEDICAL
EXAMIN.
DONER
MOVEMENT
BLEEDING BLOOD
COLLECTION
BLOOD
MOVEMENT
LAB
BOTTLE
WASH
COLD
STORE
STORE
RM.
STAFF
TOI.
INCHARGE
1800 WIDE
CORRIDOR
RECEPTION
WAITING MSKP
PRAYER
RM.
ELE/TEL/DATA
GENTS
TOI.
UP
DN.
LIFT LOBBY
(FOR BEDS)
STAFF
REST RM.
LIFT LOBBY-3
(FOR SERVICE) CH.CH.
CH.CH.
CH.
RESIDENT
REST RM.
NURSE'S
REST RM.
CONS'S
REST RM.
CH.
CH.
TOI.
TOI.
2450WIDE
CORRIDOR
UP
DN.
DW DW
WAITING FOR
X-RAY
RECEPTION
WAITING FOR
ULTRASOUND
USUSX-RAY SPECIAL
PROC ROOM
X-RAY
ROOM
CT
SCAN
EQUIP.
ROOM
TOI. CH.
TOI.
CH.
CH.
CH.
CH.
TOI.WAITING FOR
MRI& CT SCAN
MRI
COMMON
CONSOLE
EQUIP.
ROOM
LAB
TOI.
PHARM.
DECON
DOSE
ADMN.
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
FUTURE
EXPANSION
ULTRASOUND
PROCEDURE
EXAM.CH.
TOI.
EXAM.
COMMON
CONS.
ROOM
DARK
RM.
PANTRY
OFFICE
IMIGING
COMMON
RM.
CH.
CH.
CH.
NIGHT
DUTY
TECH.
CU DU
OFFICE
NUCLEAR
MEDI.
PHYSICIST
TOI.
TOI.
PATHOLOGIST
&SECY
TOI.
PANTRY
MICRO-
BIO
CONS.
RM.
CONS.
RM.
CYTOPATHOLOGY
STORE
HISTROLOGY
AHU FOR
LAB
2450 WIDE
CORRIDOR
FUTURE
GAMMA SCAN
1500 WIDE
CORRIDOR
GAMMA
SCAN
COMMON
CONSOLE
WAITING FOR
NUCLEAR MEDI.
CH.
CH. CH.
SAMPLE RECEIVING
& SORTING
FHC-7
RECEPTION
1800WIDE
CORRIDOR
PROCEDURE
RM.
IMMUNOLOGY
CONS.
ROOM
STORE
BIO-CHEM
WASH /
STER
CHEM
CLINIC
ORGAN
TISSUE
COLD
STORE
HEAMATOLOGY
CONS
ROOM
AHU
UP
DN.
ELE/TEL/DATA
2450 WIDE
CORRIDOR
DISH WASH
KITCHEN
CHAPATI SEC.
TANDOOR
SP COOKING
AREA
DIETICIAN
RM.
FOODPICKUPBYTROLLEY
MAIN COOKING
AREA
MAIN COOKING
AREA
BULK COOKING
AREA
PREP
AREA
PREP
AREA
STORE
+ 4.65 M FFL
LOADING UNLOADING
BELOW LANDSCAPE COURTYARD
MAIN HOSPITAL BUILDING
LABKITCHEN
GENTS
TOI.LADIES
TOI.
TROLLEY
WH CHAIR
OPD LOBBY
CUT OUT ABOVE
RECEPTION
REGISTRATION
BILING
CASHERING
2450 WIDE
CORRIDOR
ELE/TEL/DATA
PROCEDURE
RM.
CU DU
DR'S
DUTY
RM.
MANAGER'S
BACK
OFFICE
FIRE
COMMAMD
RECP.
WAITING
REHABILATION
ALLPARTITION
INDRY WALL
2450 WIDE
CORRIDOR
LIFT LOBBY
OFFICE
THER
THERCOUNSELCOUNSELTHERAPY
THERAPY
HYDRO
THERAPY
TOI.
CH.
WAX BOX TH.CONS RM.
EXAM
CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.
EXAM
INJEC
RM.
EXAMEXAMEXAM
OPD CONSULT MEDICAL CENTER
REHARB
OPD ENTRY
UPDN.
AHU
TOI. TOI.
TOI. TOI.
LADIES
TOI.
FHC-6
A
A'
LVL+0.75M
LVL+0.75M
LVL+0.75M
LVL+0.75M
LVL+0.75M
LVL -3.15M
LVL +0.75M
LVL +4.65M
LVL +8.55M
LVL +12.45M
LVL+16.35M
LVL ±0
BASEMENT
GRD. FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
OPD LOBBY AHU RECEPTION
ULTRASOUND
WAITING FOR
X-RAY
TOI.CH. TOI. CH. WAITING FOR
MRI & CT SCAN
CH.
WAITING FOR
NUCLEAR MEDI.
SAMPLE RECEIVING
& SORTING
HEAMATOLOGY
ELE/TEL/
DATA
CH.STAFF
CLASS-II
STORE
OTTOI.TOI.CORRIDOR CORRIDOR
INSTR.
PREP
OPERATION
RM. PROCEDURE
RM.
TRIAGE
RM.
CONSULT.
RM.
OFF.
AHU
STAFF'S
LOUNGE CORRIDOR TOI.
WAITING FOR
NON-INVASIVE
CARDIAC LAB
STAFF'S
LOUNGE
CLEAN SUPPLY
SORTING
FUTURE
EXPAN.
WARDS
TOI.WAITING
VISITOR'S
WHEEL
CHAIR
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOMCORRIDOR
CH.
RM.
CH.
RM.
STORE
CATH LAB CONF.
RM.
DR'S
LOUNGE AHU
STAFF'S
CH. RM. CORRIDOR
ELE/TEL/
DATA
ELE/TEL/
DATA
SLUICE PANTRY ISOLATION
ICU WARDS
OFFICESECYOFFICEOFFICEOFFICE
AHU GENTS
TOI. CINDER
FILLING
LIBRARYLIBRARIAN
BI-CARBONATE
DIALYSIS
PERITONIAL
DIALYSIS WAITING
FUTURE
EXPAN.
CINDER
FILLING
GENTS
TOI.
LADIES
TOI.
TOILET
ELE/TEL/
DATA
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
TOI. TOI.
TOI.
TOI.
PUBLIC
HEALTH
SERVICES
OFF.
SECURITY
OFFICE
ENGG
DEPT.
JAN
STAFF
TOI.
PUMP
RM.
STAFF
TOI.
STAFF
CH.
RM.
STAFF
CH.
RM.
STERILE
AREA
CSSD CLEAN
AREA
CSSD
WASH
LAUNDRY WASHING
/DRYING
LAUNDRY
DISPATCH
ELECTRIC
PANEL
RM.
ELE/TEL/
DATA CORRIDOR
WASTE
DISPOSAL
WASTE
DISPOSAL
WASTE
DISPOSAL
PARKING
CINDER
FILLING
CINDER
FILLING
CINDER
FILLING
CINDER
FILLING
Ground floor plan
SECTION AA’
WAITING
AREA IN
CONSULTA
NTS ROOM
OPD CLINIC WITH OPD CLINIC
OPD WAITING AREA
OPD RECEPTION
COUNTER
IPD WAITING
AREA
N
007
023
028
029
10. 5.84.83.82.81.80.8
D
E
C
B
A
7
6
5
4
3
2
1
OBSERVATION BEDS
TRAUMA PATIENTS
OBSERVATION BEDS
GENERAL PATIENTS
OBSERVATION BEDS
CARDIAC PATIENTS
OBSERVATION BEDS
CARDIAC PATIENTS
TOILET
STAFF
LOUNGE
X-RAY
ROOM
DARK
ROOM
STORE
ULTRASOUND
ROOM
ECG
PLASTER
ROOM
PANTRY
MSKPSTORE SLUICE
PACE
MAKER
DU
CARDIALOGIST
1200WIDECORRIDOR
ELE/TEL/DATA
TOI.
AHU
LIFT LOBBY
(FOR BEDS)DR'S
CH. RM.
TOI. TOI.
NURSE'S
CH. RM.SCRUB
CH.STAFF
CLASS-II
STORE
OTOPERATION
RM.
SPOT
STER.
INSTR.
PREPPROCEDURE
RM.
TRIAGE
RM.
CONS.
RM.
CONS.
RM.
OFFICE
TOI.
RECEPTION
LOBBY
WAITING
PATIENTS
TOI.TROLLEY
WHEEL
CHAIR
VESTIBULE
POLICE
POST
GENTS
TOI.
LADIES
TOI. STAFF
TOI.
EMERGENCY
INCHARGE
EMER.
EXIT
ENTRY
ENT FOR EMERGENCY
EMERGENCY
LOADING UNLOADING
BELOW
STORE
+ 4.65 M FFL
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
UP
DN.
18.117.116.115.114.113.112.1
18
17
16
15
14
13
12
11
1098
7
UP.
C
H
F
C
H
F
WAITING
BUSINESS
CENTER
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
BILLING/CASH/
REGISTRATION
RECEPTION
INPATIENT LOBBY
TOI.
FLORIST
PHARMACY
+750M FFL
ENT LOBBY
ENT TO INPATIENT
HOSPITAL LOBBY
CAFETERIA PANTRY
VESTIBULE
WAITING
BOOK
STORE
BANK
GENTS
TOI.
LADIES
TOI.
MEDICAL
EXAMIN.
DONER
MOVEMENT
BLEEDING BLOOD
COLLECTION
BLOOD
MOVEMENT
LAB
BOTTLE
WASH
COLD
STORE
STORE
RM.
STAFF
TOI.
INCHARGE
1800 WIDE
CORRIDOR
RECEPTION
WAITING
PRAYER
RM.
ELE/TEL/DATA
GENTS
TOI.
TOILET
STAFF
LOUNGE
EMER.
EXIT UP
DN.
LIFT LOBBY
(FOR BEDS)
AHU
STAFF
REST RM.
LIFT LOBBY-3
(FOR SERVICE) CH.CH.
CH.CH.
CH.
RESIDENT
REST RM.
NURSE'S
REST RM.
CONS'S
REST RM.
CH.
CH.
TOI.
TOI.
2450WIDE
CORRIDOR
UP
DN.
LADIES
TOI.
ENTRY
IPD ADMN.
IPD ENTRY
BLOOD BANK
BLOCK-A
BLOCK-B
GROUND FLOOR lEVEL :
EMERGENCY
ENTRANCE
Lvl. = + 0.75m
•Block A :
This block is basically the emergency area.
It has its own reception area, public toilets,
observation rooms for cardiac & trauma patients,
facilities like X ray, ultrasound, a small O.T. and
change rooms.
A special trolley bay & wheel chair parking
in the vestibule for immediate action.
In addition to all this, the block consists of
various facilities like a cafeteria (Café
Ritazza), a florist, book store, bank & a
prayer room.
IPD WAITING
• Block B :
It has the INPATIENT DEPARTMENT with the necessary facilities.
It consists of a reception area, a billing/registration counter, a waiting area, a business
centre, some offices, a pharmacy & public toilets and a blood bank.
BOOK STORE CAFÉTARIA
RECEPTION IPD
GENTS
PUBLIC TOI.
BLOCK A
BLOCK B
GROUND FLOOR
LVL+0.75
LVL+0.75
Emergency
sheltered entrance to protect patients from the
weather while unloading.
The ambulance entrance should be large
enough to admit one or more ambulances
negotiating with stretchers. it should be well
marked with proper lighting and signs and
should be easily visible and accessible from the
street
The department should be close to
admission,
medical records
cashier’s booth.
laboratory services including the blood bank
Proximity to elevators is also important in order
to proceed to surgery without loss of time.
11. 3635343332313029
L
K
J
H
GYMNASIUM
0143
0142E
VESTIBULE
0142D
0142C
0142B
0142A
VESTIBULE
0141G
0141F
0141E
0141D
0141C
GENTS
TOI.LADIES
TOI.
TROLLEY
WH CHAIR
OPD LOBBY
CUT OUT ABOVE
RECEPTION
REGISTRATION
BILLING
CASHING
2450 WIDE
CORRIDOR
ELE/TEL/DATA
PROCEDURE
RM.
CU DU
DR'S
DUTY
RM.
MANAGER'S
BACK
OFFICE
FIRE
COMMAMD
RECP.
WAITING
REHABILATION
ALL PARTITION
IN DRY WALL
2450 WIDE
CORRIDOR
LIFT LOBBY
OFFICE
THER
THERCOUNSELCOUNSELTHERAPY
THERAPY
HYDRO
THERAPY
TOI.
CH.
WAX BOX TH.CONS RM.
EXAM
CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.CONS RM.
EXAM
INJEC
RM.
EXAMEXAMEXAM
EXAM.
REHAB
OPD ENTRY
UPDN.
AHU
TOI. TOI.
TOI. TOI.
OPD CONSULTATION
RECEPTION
2928272625242322212019
C
H
J
K
L
DW DW
WAITING FOR
X-RAY
RECEPTION
WAITING FOR
ULTRASOUND
USUSX-RAY SPECIAL
PROC ROOM
X-RAY
ROOM
CT
SCAN
EQUIP.
ROOM
TOI. CH.
TOI.
CH.
CH.
CH.
CH.
TOI.WAITING FOR
MRI& CT SCAN
MRI
COMMON
CONSOLE
EQUIP.
ROOM
LAB
TOI.
PHARM.
DECON
DOSE
ADMN.
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
FUTURE
EXPANSION
ULTRASOUND
PROCEDURE
EXAM.CH.
TOI.
EXAM.
COMMON
CONS.
ROOM
DARK
RM.
PANTRYOFFICE
IMIGING
COMMON
RM.
CH.
CH.
CH.
NIGHT
DUTY
TECH.
CU DU
OFFICE
NUCLEAR
MEDI.
PHYSICIST
TOI.
TOI.
PATHOLOGIST
&SECY
TOI.
PANTRY
MICRO-
BIO
CONS.
RM.
CONS.
RM.
CYTOPATHOLOGY
STORE
HISTROLOGY
AHU FOR
LAB
2450 WIDE
CORRIDOR
FUTURE
GAMMA SCAN
1500 WIDE
CORRIDOR
GAMMA
SCAN
COMMON
CONSOLE
WAITING FOR
NUCLEAR MEDI.
CH.
CH. CH.
SAMPLE RECEIVING
& SORTING
FHC-7
1800WIDE
CORRIDOR
PROCEDURE
RM.
IMMUNOLOGY
CONS.
ROOM
STORE
BIO-CHEM
WASH /
STER
CHEM
CLINIC
ORGAN
TISSUE
COLD
STORE
HEAMATOLOGY
CONS
ROOM
AHU
UP
DN.
ELE/TEL/DATA
2450 WIDE
CORRIDOR
DISH WASH
KITCHEN
CHAPATI SEC.
TANDOOR
SP COOKING
AREA
DIETICIAN
RM.
FOODPICKUPBYTROLLEY
MAIN COOKING
AREA
MAIN COOKING
AREA
BULK COOKING
AREA
PREP
AREA
PREP
AREA
STORE
+ 4.65 M FFL
TOI.
TOI.
AHU
EXAM
FHC-6
CONS'S
REST RM.
TOI.
JUICE&SALAD
POT
WASH
LANDSCAPED COURTYARD
DIAGNOSTICSKITCHEN LABS
LOADING UNLOADING
BELOW
BLOCK-D
BLOCK-C
Block C :
• It consists of the kitchen area, labs & diagnostics.
• Separate sections in kitchen for bulk cooking, main cooking, chapattis, salads & dish washing.
• The diagnostic wing consists of various labs and the radiology department like X ray, MRI,
ultrasound, CT scan etc. with separate waiting areas, toilets & change rooms. KITCHEN DIAGNOSTIC WING
Block D:
• It consists of the main OPD area with
the Rehabilitation Centre.
• It has the main reception with enquiry
counter.
• Various consultant rooms(4-6) with
examination rooms, inspection rooms &
waiting areas are provided in the form
of clusters.
• It also has the hydro, wax and
physiotherapy areas.
RECEPTION
OPD
DOUBLE HEIGHT
LOBBY
GYMNASIUM
GROUND FLOOR
BLOCK C
BLOCK D
LVL+0.75
LVL+0.75
007
023
028
029
12. RM.
JANITOR'S
3635343332313029
L
K
J
H
2928272625242322212019
C
H
J
K
L
CORRIDOR
1500 WIDE
18.117.116.115.114.113.112.1
18
17
16
15
14
13
12
11
1098
5.84.83.82.81.80.8
D
E
C
B
A
7
6
5
4
3
2
1
DN.
UP.
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
FAMILY
ROOM
2450 WIDE
CORRIDOR
NURSE'S
STATION
NURSE'S
STATION
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
PATIENT'S
LOUNGE
CU NURSE'S
INCHARGE
STORE
PANTRY
NURSE'S
DUTY
DOCTOR'S
DUTY
DOCTOR'S
LOUNGE
CH.
TOI.
TOI.
TOI.
ELE/TEL/DATA
AHU
DOUBLE ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
SINGLE ROOM
UP
DN.
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM
FAMILY
ROOM
NURSE'S
STATION
PATIENT'S
LOUNGE
CUNURSE'S
INCHARGE
NURSE'S
DUTY
DOCTOR'S
DUTY
STORE
PANTRY
MSKP
DU
SLUICE
DOCTOR'S
LOUNGE
CH.
TOI.
MSKP
DU SLUICE
SINGLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
NURSE'S
STATIONFAMILY
ROOM
LADIES
TOI.
LIFT LOBBY
(FOR BEDS)
LIFT LOBBY
(FOR SERVICE)
2450WIDE
CORRIDOR
TOI.
TOI.
UPDN
UP
DN
AHU
ELE/TEL/DATA
GENTS
TOI.
TOI.
TOI.
CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM. CONS. RM.
LAB
EXAM. EXAM. EXAM. EXAM. EXAM. EXAM. EXAM. EXAM.INJEC
RM.
INJEC
RM.
INJEC
RM.
INJEC
RM.
INJEC
RM.
INJEC
RM.
DR'S
DUTY
RM.
PANTRY
TOI.
CU
2450 WIDE
CORRIDOR
RECEPTION WAITING
DOUBLE HEIGHT
DU
TOI.
SAMPLE
COLL.
LADIES
TOI.
PROCUDURE
RM.
GENTS
TOI.
AMBULATORY
THERAPY
AMBULATORY
THERAPY
PULMONOLOGY
LAB
STORE
WAITING
TOI.
TOI.
NEUROLOGY
ELE/TEL/DATA
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
AHU
TOI.
CONS. RM.
RECEPTION CUM WAITING UP DN
UP
DN
CH. CH. CH. FUTURE
EXPANSION
MAJOR
OT
SCRUB
MINOR
OT
SCRUB
ENDOSCOPY
ENDOSCOPY REPORTING
RM.
ECG1.
2.
3.
1.
2.
3.
1.
2.
3.
1.
2.
3.
1.
2.
3.
TMT COLOUR
DOPPLER
HOLTER
LAB
CDS
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
WAITING FOR
NON INHASIVE
CARDIAC LAB
RECEPTION
WAITING
VISITOR'S
DUCU
TOI.
CH.CH.
DR'S
LOUNGE
STAFF'S
LOUNGETOI.
TOI.
RECOVERY
RM.
OFF.
FUTURE
EXPAN.
STAFF'S
LOUNGE
STORE
STORE
STORE
FUTURE
EXPAN.
DECONT
RM
CLEAN SUPPLY
SROTINGFUTURE
EXPAN.
WARDS
STORE
PRE OPERATIONAL
BEDS
TOI.TOI.
STORE DUCUPANTRY
NURSE'S
STATION
WARDS FOR POST
OPERATIONAL
BEDS
TOI.STORE
WHEEL
CHAIR
TOI.UP
DN
ELE/TEL/DATA
FHC-6
NON INHASIVE CARDIAC LAB
OPERATION
THEATRES
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
SINGLE ROOM
DOUBLE ROOM
LVL +4.65MLVL +4.65M
LVL +4.65M
LVL +4.65M
FIRST FLOOR PLAN
BLOCK A BLOCK B
BLOCK C BLOCK D
FIRST FLOOR LEVEL
• Lvl. = + 4.65m
Block A & B :
• It basically consists of
single rooms on one side &
double rooms on the other
side with centrally placed
nursing stations.
•
• The rest of the area
includesstores,lockers, pantry, A.H.U.
& duty units etc.
• There are 4 types of wards :
• Single seaters – size 3.415m x 4.5m.
Placement of bed is such that the patient
gets maximum left hand side lighting.
• Double seaters – size 3.415m x 6.0m.
It is divided into two units with low ht.
partitions of foldable type. Distance
between two beds = 1.5m
• Double deluxe type – size is double to
that of double seater. One toilet, no
partition, 2 beds for patients & 2 for
accomplices.
• VIP suites – Two single seaters
combine to form one VIP suite.
Block C :
• This part basically consists of the Major O.T.s for
general surgeries including their pre-operative and
post-operative wards with conveniently located
nursing stations.
•
• This block also contains the non-invasive
Cardiac Labs having E.C.G.
(electrocardiography), TMT rooms & Colour
Doppler rooms with their waiting areas.
Block D :
• It mainly houses the Cardiac OPD, specialty
clinics & health maintainance clinic with their
consultant rooms & waiting areas.
• It also has some labs like Neurology &
Pulmonology with their sample collection &
waiting areas.
OT
CONSULTATION ROOM
DOUBLE SEATER
4 SEATER
VIP ROOM DR’S ROOM
CARDIAC OPD WAITING CONSULTANT
ROOMS
N
007
023
028
029
13. H
J
K
L
29 30 31 32 33 34 35 36
L
K
J
H
C
19 20 21 22 23 24 25 26 27 28 29
F
H
C
7
8 9 10
11
12
13
14
15
16
17
18
12.1 13.1 14.1 15.1 16.1 17.1 18.1
1
2
3
4
5
6
7
B
C
E
D
0.8 1.8 2.8 3.8 4.8 5.8
ICU WARD
ICU WARD
NURSE'S
STATION
2450 WIDE
CORRIDOR
NURSE'S
DUTY
TOI. TOI.
DR'S
DUTY
NURSE'S
LOUNGE
NURSE'S
DUTY
RM.
DU
CU
TOI.
ELE/TEL/DATA
TOI.
CH.
FAMILY
ROOM
ISO
ROOM
VESTIBULE
AHU
TOI.
SHOES
SLUICE
LADIES
CH.
RM.
LOCKERSLOCKERS
GENTS
CH.
RM.
1200 WIDE
CORRIDOR
SCRUB
PANTRY
LOCKERS
STAFF
CH.
RM.
ISOLATION
VESTIBULE TOI.
ICU WARD
ICU WARD
UP
DN.
NURSE'S
STATION
FAMILY
ICU WARD
FAMILY
ICU WARD
UP
DN
CHIEF OF
NURSE'S
STORE
DR'S
LOUNGE
CU
TOI.
NURSE'S
STATION
NURSES'
DUTY
RM.
MSKP
DU
SLUICE
JANITOR
TOI.
ELE/TEL/DATA
AHU
GENTS
TOI.
LADIES
TOI.
FAMILY
ROOM
VESTIBULE
ISO
ROOM
TOI.
CH.
FAMILY
ROOM
ISOLATION
VESTIBULE
TOI.
TOI.
SHOES
SLUICE
LADIES
CH.
RM.
GENTS
CH.
RM.
SCRUB
PANTRY
STAFF
CH.
RM.
LOCKERSLOCKERSLOCKERS
1200 WIDE
CORRIDOR
PHARMACY
STAT
LAB
DRS'
LOUNGE
CHIEF
CARDIOLOGIST
CHIEF
SURGEON
CHIEF
ANATHESIATIST
TOI.
TOI.
TOI.
LIFT LOBBY
(FOR BEDS)
LIFT LOBBY-3
(FOR SERVICE)
2450WIDE
CORRIDOR
UPDN
FAMILY
ICU WARD
FAMILY
ICU WARD
TOI. TOI.
STAFF
CH.RM.
NURSES'
CH.RM.
DOCTORS'
CH.RM.
DOCTORS'
LOUNGE
STAFF'S
LOUNGE
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
OPERATION
ROOM-1
OPERATION
ROOM-2
OPERATION
ROOM-3
OPERATION
ROOM-4
OPERATION
ROOM-5
OPERATION
ROOM-6
PROFUSION
ROOM
STERILE
CORE
PROPOSED
PARTITION
SCRUB
SCRUBSCRUB
SCRUB
PROFUSION
ROOM
MOBILE
CARM
STERILE
STORAGE
DECONTAMINATION
FAM
TROLLEY
PREP.
TROLLEY
PREP.
DARK
RM.
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450WIDE
CORRIDOR
DR'S
WORKSHOP
DR'S
LOUNGE
TROLLEY
BAY
POST OF
BEDS
CUSLUICE
RM.
ANAESTHESIA
ANAESTHESIST
OT
CONTROL
DOCTORS'
CH.RM.
TOI.
ELE/TEL/DATA
FHC-6
TOI.
TOI.
TOI.
STAFF
CH.RM.
NURSES'
CH.RM.
WARD BOY'S
REST ROOM
TERRACE
CH.RMS.
LOUNGE
CH.RMS.
UP
DN.
UPDN.
CATH RECOVERY
BEDS
PANTRY TROLLEY
DU
PRE.OP BEDS
PRE.OP BEDS
PRE.OP BEDS
EQUIP.RM.
2450 WIDE
CORRIDOR
CATH LAB
DONOR
RM.
TECH.
RM.
CONF.
RM.
DR'S
LOUNGE
SCRUBCUUPS
ELE/TEL/DATA
CATH
INCHARGE
OFFICEOFFICE
CATHETER
STORE
CATH
SWING LAB
CONTROL
ROOM
TECHNICAL
ROOM
CATH
SWING LAB
CATH
SWING LAB
ENTRANCE
LOBBY
AHU
CH.
RM.
CH.
RM.STORE
CU
NURSE'S
STATION
WARDS
TOI.TOI.
CATH LAB
LVL +8.55M
LVL +8.55M
LVL +8.55M
LVL +8.55M
LVL +8.55M
second floor plan
SECOND FLOOR LEVEL :
• Lvl. = + 8.55m
Block A & B:
Both these blocks have ICUs
(Intensive Care Units).
ICU
ENTRANCE
BLOCK A
BLOCK B
Right next to the entrances
are separate change rooms
& lockers for gents, ladies
& staff.
They have the nursing
stations, toilets & doctor’s
duty rooms located in the
central place.
Block C: (OT complex )
• It comprises of the Cardiac OTs.
• The OT complex basically has 3 zones :-
• Outer Zone : Consisting of the entry for
doctors, staff & patient.
• Intermediate zone : Comprising of the storage
areas, change rooms, nurse’s room & doctor’s
lounge.
• Both these areas combine to form the Sub-
Sterile area.
• Innermost zone : OTs, Scrub area & patient holding areas (Pre & Post operative room) having
highest level of sterilization.
• Also it has a storage room for sterilized equipments & linen, essential drugs, blood supply &
X-ray machine.
• There are 6 OTs ( 9875mm x 9875mm each) arranged around a common sterilized area.
• Dumbwaiters connect the OT complex to CSSD for direct supply of sterilized equipments.
Block D:
• It basically has
the invasive
cardiac lab
including 3
Cath. Labs with
separate
recovery areas.
• LOCATION: 1st floor & above very near to Surgical
wards & SICU
• CORRIDORS : 3 - 3.5 m width for easy movements
of men & machines
• Zone wise distribution of the area so as to avoid
crisscross movements of men &machine
• Provision for emergency exit
• OPERATION ROOMS: –No. & size as per the
requirement(50% of the surgical beds) Size
20’X20’X10’
• Glass windows one side only
• Sliding door, (2 Flap door,1.5 mts.)
O.T. COMPLEX
N
007
023
028
029
14. H
J
K
L
29 30 31 32 33 34 35 36
FHC-6
L
K
J
H
C
19 20 21 22 23 24 25 26 27 28 29
TOI.
GENTS
TOI.
LADIESWASH
F
H
C
UP.DN.
7
8 9 10
11
12
13
14
15
16
17
18
12.1 13.1 14.1 15.1 16.1 17.1 18.1
1
2
3
4
5
6
7
B
C
E
D
0.8 1.8 2.8 3.8 4.8 5.8
NURSE'SSTATION
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOMSINGLE
ROOM
SINGLE
ROOMSINGLE
ROOMSINGLE
ROOMSINGLE
ROOMSINGLE
ROOM
SINGLE
ROOM
FAMILY
ROOM
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
2450 WIDE
CORRIDOR
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
ELE/TEL/DATA
DU
CHDR'S
LOUNGE
TOI.
NURSE'S
DUTY
TOI.TOI.
DOCTOR'S
DUTY
PANTRYSTORE
NURSE'S
INCHARGE
CUPATIENT'S
LOUNGE
UP
DN.
NURSE'S
STATION
LIFT LOBBY
(FOR BEDS)
LIFT LOBBY-3
(FOR SERVICE)
LADIES
TOI.
SINGLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM
DOUBLE
ROOM WARD
UP
DN
DOUBLE ROOMS
WARD
SINGLE
ROOM
SINGLE
ROOM
SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM SINGLE
ROOM
SINGLE
ROOM SINGLE
ROOM
SINGLE
ROOM
FAMILY
ROOM
NURSE'S
STATION
PATIENT'S
LOUNGE
CUNURSE'S
INCHARGE
STORE
PANTRY
NURSE'S
STATION
LOBBY
DU
CH.
TOI.
DR'S
LOUNGE
AHU
GENT'S
TOI.
ELE/TEL/DATA
AHU
SINGLE
ROOM
STAFF RECREATION RM.
TOI.
TOI.
DOCTOR'S
TRAINING
NURSES'S
TRAINING
TRAINING RMS.DINING RM
DINING RM
SENIOR STAFF
DINING
DINING RM
AHU
WASHPANTRY
ELE/TEL/DATA
TERRACE
UP
DN.
GENTS
TOI.
LADIES
TOI.
LIBRARY
LIBRARIAN
BI-CARBONATE
DIALYSIS
PERITONIAL
DIALYSIS
OXYGEN&VACCUM
FUTURE
EXPANSION
RECEPTION
WAITING
CH.
DRS'
CHAMBER SUPPORT ISOLATION
RM.
ISOLATION
RM. STORE
WASH
FILTER
DW DW
TOI.
1822WIDE
CORRIDOR
2450 WIDE
CORRIDOR
LIBRARY
OPEN
OFFICES
STAFF
UPDN.
OFFICE SECY OFFICE OFFICE OFFICE
TOI. TOI.
OFFICES
HEAD
ADMN.
HEAD
LEGAL
HEAD
ADMN.
HEAD
FINANCE
HEAD
MARK.
HEAD
PR
BOARD
ROOM
DOCU.
ROOMLT
HEAD
EDP
STAFF
TRAINING
HEAD
STAFF
GENT'S
TOI.
LADIES
TOI.
PANTRY
STORE
JAN
WAITING
ROOM
MEETING
ROOM
MEETING
ROOM
MEETING
ROOM
WAITINGSERVER
2450 WIDE
CORRIDOR
UP
DN
ELE/TEL/DATA
SYNDICATE
ROOM
SYNDICATE
ROOM
AHU
MEETING &
BOARD RM
ADMN
GENERAL
WARDS
LVL+12.45MLVL+12.45M
LVL+12.45M
LVL+12.45M
LVL+12.45M
LVL+12.45M
third floor plan
THIRD FLOOR LEVEL :
• Lvl. = + 12.45m
Block A & B:
• It is similar to the First
floor level. These
blocks have single and
double rooms.
Block C:
• It is composed of a Dining Hall ( Café Jamjee), terrace
garden & a dialysis unit on one side & a nursing school
with 2 lecture halls & a conference room etc.
Block D:
• It is basically the board room & administrative areas
• It has some offices, 3 meeting rooms & area for
future expansion.
CAFÉ JAMJEE LECTURE HALLTERRACE GARDEN
BLOCK C
BLOCK A
BLOCK B
THE FORTIS INN :
30 well-furnished rooms including suites with attached baths.
It has two types of floors- standard and executive having their
own set of Deluxe, Super Deluxe rooms and suites.
ELEVATIONAL FEATURES :
Red Agra stone has been used for external
cladding along with Dhaulpur stone strips.
For curtain wall, blue glass from Belgium
along with double insulated glass for
windows has been used.
The glazing induces verticality while the
horizontal bands break the verticality thus
achieving a balanced composition.
BUILDING SERVICES :
Water supply :
There are 6 water storage tanks in hospital, which have
been, constructed underground :
Fire- water tanks- 3 nos.
Treated water tanks -2nos.
Raw water tanks – 1 no Raw water is treated ,pumped
to elevated storage tanks, distributed to different inlets at
different floors
Estimate of quantity of water (inc. laundry)= 450 litres
per head per day.
PHARMACY
DHAULPUR STONE
DELUXE ROOM
DOUBLE GLASS
WATER
TANK AND
PUMP
ROOM
IN
BASEMENT
PUMP
ROOM
STP (Sewage Treatment Plant)
• To treat all the waste water and sewage waste, sewage
treatment plant has been provided which is located on
the right side of the IPD entrance while facing
Emergency.
N
007
023
028
029
15. HVAC (Heat Ventilation & Air Conditioning unit) :
• The whole building is centrally air conditioned with toilets have ventilators opening in shafts.
• Air changes are provided by mechanical means : wards- 3 ch/hr, kitchen – 10 ch/ hr, bathrooms & WCs – 3 ch/hr, OTs – 12 ch/hr.
Procedure :
• Water-cooled chiller has been used.
• Basically the medium is chilled water.
• Pipes take the water to the FCUs ( Fan coil unit) & further to the AHUs ( Air Handling Unit).
• Chilled water comes in contact with the air & cools it.
• Chilled air is then distributed by ducts to diffusers and vents.
FIRE FIGHTING :
• Fire-resistant construction has been done using AAC blocks ( autoclaved aerated concrete blocks).
• Sprinklers have been provided @ approx. 3000mm depending upon equal distribution of width of hall
available.
Two types of detectors have been used :
Smoke sensors
Heat sensor
•In the basement-parking areas: foam extinguishers for controlling oil fires.
•Hose-reels in fire-fighting niches 4’x4’ have been used.
•Public address system & hooters have been placed strategically.
•Fire exit routes with automatic opening type doors have been provided
ELECTRICAL :
• HT (High Tension) regulators provided to regulate voltage fluctuations with 2 step down
transformers.
• In case of power failure diesel generators start automatically.
• UPS- 2 no. caters to power requirements of the Hospital Information System, Emergency, lighting
of entire hospital & all OTs.
• Colour of switches :UPS sockets- gray, normal sockets – white
BOILERS:
• Location – Basement, Block B
• 5 boilers (600 kg/hr. each) are installed.
• Steam from the boiler is fed to the laundry, kitchen, CSSD etc. for
hot water system.
REVERSE OSMOSIS WATER PLANT:
•Location – Basement, Block B
•It has been installed to produce ultra pure clean water, which
is used in scrubs, OTs, Cath labs, ICUs & CSSD.
HT PANEL ROOM
GENERATOR ROOM
HOSE REELS
FIRE PROTECTIORS NEAR
THE STAIRCASE
SPRINKLER
VIEW OF A.C. PLANT
IN BASEMENT
COOLING TOWERS AT ROOF
DUCT IN THE BASEMENT COVERED WITH
ALUMINUM FOIL
SOFT WATER PLANT :
•Location – Basement, Block B
•Soft water here produced is used for steam
boilers.
007
023
028
029
16. SEWERAGE :
All toilets have shafts adjoining to carry waste disposal pipes and water supply lines.
Soil pipes have been laid to 1:60 slope.
DRAINAGE :
For basement, sump wells have been provided at intervals where waste water is
collected and pumped out to the manholes.
Curb inlets are provided at the edges of the roads to drain the water.
MEDICAL GASES MANIFOLD :
Location : It is located behind kitchen in the basement right in front of staff
parking entrance.
The pipe line starts from gas plant & carried out till the last point at the bedside.
Laid along the walls in different colours. Outlets are provided at 4 ft.- 5ft 6in.
above floor level.
Colour coding of these lines :
• Oxygen : yellow with white bands
• Nitrous oxide : yellow with blue bands
• Compressed air : blue with white bands
• Vacuum : blue with black bands
• AGSS : red (Anesthetic gas scavenging system)
COLOUR CODING
Liquid oxygen storage
tank placed in open in
order to avoid any risks
due to its combustible
nature
STRUCTURAL DETAILS :
• Raft footing has been provided. (Combined footing)
• The grid is a combination of radial and square grid.
• RCC columns of variable sizes.
• Circular columns in basement- 850 mm dia,
• On rest of the floors : 700 mm dia.
• Retaining wall 9 inches thick.
CONSTRUCTIONAL DETAILS :
• RCC construction
• First class bricks & AAC blocks used
• As the hospital falls on aviation route, measures have
• been taken to reduce the sound level inside the hospital :
• AAC (autoclaved aerated concrete blocks) have been used.
• Acoustic false ceiling tiles have been used.
• For windows double glass has been used
• AAC blocks : 39 x 19 x 30 cms. For outer load bearing
walls
• AAC blocks : 39 x 19 x 10 cms. For inner load bearing
walls
AAC CONCRETE BLOCK
DOUBLE GLASS WINDOWS
FINISHES :
DOORS :
• Two types of doors have been provided. The ones with cedar
laminates are for patient entry and the ones with green
laminates are not for patient entry.
TYPES OF FLOORING :
• Public areas : Marble
• Patient areas : Mosaic
• OTs : Granite
• ICUs : PVC
• Radiology : PVC
• Nuclear medicine : PVC
• Public staircases : Marble
• Fire-escape staircases : Kota Stone
• Concrete blocks have been used for pavements.
• Ceramic tiles have been used in various colours and sizes.
• Chemically resistant tiles for labs.
• The interiors have been plastered and painted.
• Prefabricated furniture which is easily portable & movable has
been provided.
,MARBLE
CEDAR LAMINATES
DADO ON THE WALL OF CAFÉ
JAMJEE
GRANITE
COLUMNS
CLADDED
WITH BEIGE
SANDSTONE
RED
SANDSTONE
RED SANDSTONE
CLADDING
007
023
028
029
17. DESIGN/CRITICAL ANALYSIS :
• A unique feature of this hospital is its usage of space.
• Separate entry for OPD, IPD, Emergency and Service zone : thus segregating the traffic flow.
• A flexible & modular approach imbibed to impart adaptability to the future changes & modifications.
• The OPD has been kept on the ground and first floor : thus providing easy accessibility for patients and their attendants.
• OPD placed next to diagnostic : easy access.
• The CSSD has been placed below the OT area hence direct connection via dumbwaiters.
• A very long well-landscaped courtyard has been placed in the centre, thus providing natural light in corridors.
• Waiting areas for all OPDs are provided in the form of small clusters.
• Vertical circulation in the form of stairs and lifts is separate for all blocks.
• The shafts provided for maintainance are narrow, thus leading to inconvenience.
• Administration is provided on the third floor which is too far from the scope of visitors.
• Basement enterance is on the rear side and cannot be approached from one chance.
• Reception and cafeteria in the i.P.D. Block are quite near to each other which causes lot of confusion near the entrance.
CORRIDORS STANDARDS ON SITE ANALYSIS
Access corridor Min. 1.5m
wide
1.8m wide
Patient’s
corridor or
clean corridor
Min. 2.25m
wide
2.45m wide
Main / spine
corridor
Min. 3m
wide
2.45m wide
Doubly loaded
corridor
Min. 3m
wide
2.45m wide
STAIRCASE STANDARDS ON SITE ANALYSIS
Tread 300mm 300mm
Riser 150mm 150mm
Width 1.5m-2.4m
wide
2.1m wide
Handrail 1m high and
on both
sides of the
flight
0.8m high
and only on
one side of
the flight
LIFT STANDARDS ON SITE ANALYSIS
REQ. PRESENT
Multipurpose/bed lift 1/100 beds 5 4
Staff lift 2/100 beds 10 6
007
023
028