SlideShare a Scribd company logo
1 of 76
HEALTHCARE FACILITY
DESIGN
STAT Consultancy Pvt Ltd
Er. Arun Sebastian
Inthe slides
 Stages of healthcare facility Construction
 Functional Program
 Functional relationship Diagrams
 Room data sheets
 Room layout sheets
 Functional program development to Project Closeout
Project
Initiation
Functional
Program
Development
Detailed
design,
Planning &
Schedule
Execution
Monitor &
Control
Project
Handover
Project
Closure
Stages of healthcare facility Construction
Functional Program
A functional program, typically developed by a functional
programmer consultant, is a pre-design document describing
the functional requirements of a building or renovation in
sufficient detail to initiate schematic design.
A tool for the Key Stakeholder/Client
- it documents scope of service(s),
- objectives and basic operational methods of the specific
component;
- specifies the human, technical, and building resources
necessary to function as intended
A communication tool
it outlines whateach component intends to do and why, and
assists in securing the necessary resources and project approvals to
proceed with the project
the prescription for the building design
it provides instruction to the architectural and
engineering team for the preparation of Schematic
Design and later Detailed Design and Construction
Documents.
Functional Program must Be
• be concise and written at the level of detail
which allows for ready translation into
facility and planning requirements so that design
will support the approved functions.
• provide sound methodology for analysis and
projection of activity (e.g., functions determine
workload, which ultimately determine space).
• incorporate detailed listing of the functions
to be undertaken in the completed facility, and of the physical
requirements for performance of these functions;
Functional Program must Be
•be comprehensive to allow the
development of operational
management plans (e.g., staff and facility) and
budgets for each component, and determination of overall
operational cost impact.
•incorporate fixed and loose
equipment elements since equipment is generally
a significant expense in a construction project and is a major
consumer of space, support services, and utility requirements
and it is most subject to technological change. The purpose of
equipment planning at this stage is to list those items of
furnishings/equipment that were considered during the
programming of each component and that will be required to
make each space operational.
PLANNING PARAMETERS
• Should focus on Patient safety and privacy
• project mandate and service priorities;
• strategic intent, project vision;
• operational principles/business process;
• functional programming principles and parameters;
-guide the planning consistent with the operational principles; and –
-planning horizons (e.g., 10 years).
• Design parameters;
-derived from operational and functional needs
-Based on design standards and requirements (e.g.: LEED© objective).
• population parameters;
• defined projection methodology required to accurately projects the workload,
staffing and space.
ELEMENTS
Assumptions:
• premise(s) for the future, upon which the project is
required (e.g., occupancy at 90%, population growth,
and change in treatment protocols);
• descriptive overview of the change in the organization to
address the project;
• the supporting rationale that identifies the factors
driving the need and the planning work done to date;
• summary of needs assessment findings; and key cost,
schedule and implementation assumptions.
Activities/Functions for Each Component
within the Project:
• This section provides a detailed description of component activities and functions -
what is done (e.g., inpatient care, ambulatory care, diagnostic imaging, patient
transport, building cleaning, laundry, food services, human resources), by whom,
when and with what resources. It includes specific components within the
major activities/functions (e.g., Human Resources would be further broken down –
labour relations, payroll, accounting, etc.) and describes any transfer of
activities/function from one component to another component.
Activities/Functions for Each Component
within the Project
• operational/service planning model organization and management;
• service delivery principles and methods; hours of operation;
• client/patient flow with focus on patient privacy;
• opportunities for integration with others; scope of service (current
and future);
• client/patient profile;
• clinical roles and activities;
• education roles and activities;
• and research roles and activities.
Functional Program Workload/Volumes:
• detailed description of component workload (e.g., number of
patients, service provided);
• workload projection methodology and supporting rationale;
• projections for planning - historical, current and projected (5 &
10 year);
• number of visits/procedures – current and future; methodology
and projection of diagnostic and treatment spaces required;
• staff workload patterns and projections at maximum occupancy -
based on equivalent full-time positions including relief needs;
• projection methodology; current and projected FTE’s (over the
planning horizon of project); and head count (where relevant for
space planning).
Functional Relationships:
•External
to the component – e.g., diagram/descriptions describing critical
relationships to other programs/services/components within the
facility (e.g., patient transport from emergency department to
component, material management flow to and from the component,
etc.); and to the facility - relationships with other facilities to provide
the program context within the greater health care system (e.g.,
patient transport for specialized diagnostic procedure,
sending/receiving lab specimens).
Functional Relationships:
•Internal
relationships of sub-units within the component space (e.g., location of
nursing station to patient rooms, waiting area to reception) to facilitate
flow, functionality, etc. within the component; and visual
matrices/conceptual diagrams, not floor plans.
Locations - specify whether component must be adjoining to another
program (share common wall), adjacent (within the same physical
area) or accessible (via corridor/elevator).
Design Criteria/Physical Requirements:
• special requirements of each component (e.g., access, security, privacy, noise
control, natural light, infection prevention and control, safety, work
environment, change and flexibility, sustainability, critical dimensions, overall
layout, special needs population);
• space requirements and description of each space type, activities, what is
contained within (furniture, fixtures and equipment), special features, number
of people, etc.;
• description of essential physical spaces required to accommodate the
component (e.g., patient rooms, operating rooms, Intensive Care Unit
cubicles, support rooms and building systems spaces);
• sufficient detail regarding the use, occupancy and equipment to be located in
the spaces to assist with the determination of the room size during the design
stage; and
• brief description of the overall appearance, ambiance, configuration, traffic
flow, and privacy issues (e.g., continuous walking circuit for personal care
home residents, exterior windows in waiting area).
Design Criteria/Physical Requirements:
• special requirements of each component (e.g., access, security, privacy, noise control,
natural light, infection prevention and control, safety, work environment, change and
flexibility, sustainability, critical dimensions, overall layout, special needs population);
• space requirements and description of each space type, activities, what is contained
within (furniture, fixtures and equipment), special features, number of people, etc.;
• description of essential physical spaces required to accommodate the component (e.g.,
patient rooms, operating rooms, Intensive Care Unit cubicles, support rooms and
building systems spaces);
• sufficient detail regarding the use, occupancy and equipment to be located in the spaces
to assist with the determination of the room size during the design stage; and
• brief description of the overall appearance, ambiance, configuration, traffic flow, and
privacy issues (e.g., continuous walking circuit for personal care home residents, exterior
windows in waiting area)
Schedule of Accommodation
• room–by-room space list or schedule of accommodation of space
types identifying the number or units required and the area in net
square meters, with reference to the number of occupants and major
equipment
• component gross-up factors.
AMBULATORY UNIT-
FUNCTIONAL DIAGRAM
RECEPTION
PATIENT AREAS
CLINICAL SUPPORT
STAFF AREAS
Equipment
• preliminary list of equipment to determine space sizes, assisting in
preliminary costing, completed in detailed design (depending on the
project it could be a detailed list); and
• overview of the fixed or large loose equipment (e.g., diagnostic
imaging, sterile processing, medical gas/electrical service columns in
patient cubicles).
Impact Analysis
• impact of planned component (new or additional service) to the
overall facility/system that supports it and the specific services
including core services and clinical and support services; and
• the impacted service assess the additional workload added by the
service and what resources staff, space equipment, etc. is required to
support the component.
Development Options
(Conceptual Development Plan):
• determine optimal component location for key functional requirements
and relationships;
• gaming session/design charette (refers to a planning technique that
focuses on establishing and testing functional relationships; typically
utilizing a two or three dimension model of the buildings and/or site to
enable a variety of participants to become involved in the determination of
optimal facility layouts;
• test-fit of options – especially important in renovations/reuse of existing
buildings;
• evaluation criteria/comparative analysis of the options; and
• process should result in identification of an optimal concept design.
OTHER CONSIDERATIONS
The following may also be included in a functional program, especially
where the project is large, complex in nature, or addition to an existing
facility.
• site development plan/master plan;
• project cost plan (this would normally be part of most projects);
• operational impacts; and
• parking and traffic studies.
Appendices can include the following
• applicable guidelines and standards used to guide
functional program development;
• summary table of program/service facility support
requirements; issues documented from the project – tool
that documents the issues and resolution includes all
issues – operations, functional programming, design and
construction.
• Form of communication maintained through the life of
the project
• definitions/terminology
• planning teams and committees (e.g. planning team/roles
and responsibilities, steering committee/roles and
responsibilities, and user group/roles and
responsibilities).
Functional Relationship
Diagram
FUNCTION RELATIONSHIP
DIAGRAM-
TYPICAL HOSPITAL
LEGEND OF COLOURS FOR
FUNCTIONAL RELATIONSHIP
DIAGRAMS
FUNCTIONAL RELATIONSHIP DIAGRAM-
ADMINISTRATION
FUNCTIONAL RELATIONSHIP
DIAGRAM-
ADMISSION UNIT
FUNCTIONAL RELATIONSHIP DIAGRAM-
ALLIED HEALTH UNIT
FUNCTIONAL RELATIONSHIP DIAGRAM- AMBULANCE
UNIT
FUNCTIONAL RELATIONSHIP DIAGRAM- CATHLAB
FUNCTIONAL RELATIONSHIP DIAGRAM- CSSD
FUNCTIONAL RELATIONSHIP DIAGRAM-
CCU UNIT
FUNCTIONAL RELATIONSHIP DIAGRAM- EMERGENCY UNIT
FUNCTIONAL RELATIONSHIP DIAGRAM- INPATIENT UNIT
FUNCTIONAL RELATIONSHIP DIAGRAM- ICU
FUNCTIONAL RELATIONSHIP
DIAGRAM-
OPERATION THEATRE
FUNCTIONAL RELATIONSHIP
DIAGRAM- OPERATION THEATRE
FUNCTIONAL RELATIONSHIP DIAGRAM- DIALYSIS UNIT
ROOM DATA SHEETS /
ROOM LAYOUT SHEETS
ROOM DATA SHEETS
ROOM DATA SHEETS
ROOM LAYOUT SHEET- TYPICAL INPATIENT SUITE
ELEVATION- INPATIENT SUITE
ROOM DATA SHEET-
OPERATING ROOM
ROOM DATA SHEET- OPERATING ROOM
LAYOUT SHEET- OPERATING ROOM
LAYOUT SHEET- OPERATING ROOM
LAYOUT SHEET- OPERATING ROOM
LAYOUT SHEET- OPERATING ROOM
ROOM DATA SHEET- CRITICAL CARE
ROOM DATA SHEET- CRITICAL CARE
LAYOUT SHEET- CRITICAL CARE
LAYOUT SHEET- CRITICAL CARE
REFERENCE LAYOUT
• RAJAGIRI HOSPITAL,KOCHI
BASEMENT3
BASEMENT2
BASEMENT
GROUND
FIRST FLOOR
SECOND FLOOR
FOURTH FLOOR
WHAT NEXT ?
Detailed architectural design
layouts based on the functional
program developed
Engineering design for
 MGPS
 HVAC
 Electrical
 ELV-IT
as per the Functional Program and
architectural design layouts received
 BMS
 Fire Protection systems
 Plumbing Drainage system
 Pneumatic system
Detailed
design,
Planning &
Schedule
Execution
Monitor &
Control
Project
Handover
Project
Closure
Is Project Closure the end ?
Post Occupancy assessment and lessons learnt after the Project
Closeout.
• To understand howthe design works in reality
STAT CONSULTANCY
A range of healthcare consultancy services are offered namely Project feasibility study and
Conceptualization, Facility Planning, Medical equipment planning and Procurement, Project Management,
Operational Management, HR Planning and development, Healthcare IT, Business process re-engineering,
Quality Management & Accreditation, and Facility Management by internationally experienced professionals
associated with the company.
Since its inception in India, it has successfully completed more than 40 projects in India and GCC. In the
process we have developed a network of highly experienced healthcare professionals and international
Companies with expertise in all the areas of services offered.
STAT CONSULTANCYWHO WE ARE
• An experienced and leading healthcare Consulting firm which kicked-off in 2007
• Rendered 40+ projects
74
Medical
Equipment
Planning and
Procurement
STAT Consultancy
BPR/Quality
Management &
Accreditation
Project
Management
Facility
Management
Project Feasibility/
Conceptualization /
Facility Planning
Our services
STAT CONSULTANCY
THANK YOU
www.statconsultants.com
ARUN SEBASTIAN
+91 944600 1292
Email : arun.s@statconsultants.com

More Related Content

What's hot

Hospital literature
Hospital literatureHospital literature
Hospital literatureToleDelx
 
interior design for hospitals
interior design for hospitalsinterior design for hospitals
interior design for hospitalsAysha Asaad
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)Bee Key Verma
 
case study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaoncase study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaonSakshi Jain
 
fortis hospital mohali case study
fortis hospital mohali case study fortis hospital mohali case study
fortis hospital mohali case study Prince Pathania
 
hospital design studies - architecture
hospital design studies - architecture hospital design studies - architecture
hospital design studies - architecture Dina Mohamed
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Mayank Aggarwal
 
HEALING ARCHITECTURE FOR HOSPITAL
HEALING ARCHITECTURE FOR HOSPITALHEALING ARCHITECTURE FOR HOSPITAL
HEALING ARCHITECTURE FOR HOSPITALDipesh Anand
 
Orthopaedic Hospital Design
Orthopaedic Hospital DesignOrthopaedic Hospital Design
Orthopaedic Hospital Designtdlawson
 
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY Prince Pathania
 
Architectural Design - Cardiac Hospital
Architectural Design - Cardiac HospitalArchitectural Design - Cardiac Hospital
Architectural Design - Cardiac HospitalMukund Mundhada
 
Hospital architecture design planning
Hospital architecture design  planningHospital architecture design  planning
Hospital architecture design planningFatma Sayed Ibrahim
 
Pims HOSPITAL case study
Pims HOSPITAL case studyPims HOSPITAL case study
Pims HOSPITAL case studyPrince Pathania
 
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY Prince Pathania
 
Hospital Design Case Study
Hospital Design Case StudyHospital Design Case Study
Hospital Design Case StudyGargi Bhatele
 
Apollo Hospital case study
Apollo Hospital case studyApollo Hospital case study
Apollo Hospital case studyPulkit Yadav
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDYHOSPITAL CASE STUDY
HOSPITAL CASE STUDYRohit Saxena
 

What's hot (20)

Hospital literature
Hospital literatureHospital literature
Hospital literature
 
interior design for hospitals
interior design for hospitalsinterior design for hospitals
interior design for hospitals
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)
 
case study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaoncase study on hospital - fortis hospital, gurgaon
case study on hospital - fortis hospital, gurgaon
 
fortis hospital mohali case study
fortis hospital mohali case study fortis hospital mohali case study
fortis hospital mohali case study
 
hospital design studies - architecture
hospital design studies - architecture hospital design studies - architecture
hospital design studies - architecture
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)
 
HEALING ARCHITECTURE FOR HOSPITAL
HEALING ARCHITECTURE FOR HOSPITALHEALING ARCHITECTURE FOR HOSPITAL
HEALING ARCHITECTURE FOR HOSPITAL
 
Orthopaedic Hospital Design
Orthopaedic Hospital DesignOrthopaedic Hospital Design
Orthopaedic Hospital Design
 
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
 
Architectural Design - Cardiac Hospital
Architectural Design - Cardiac HospitalArchitectural Design - Cardiac Hospital
Architectural Design - Cardiac Hospital
 
Hospital architecture design planning
Hospital architecture design  planningHospital architecture design  planning
Hospital architecture design planning
 
Pims HOSPITAL case study
Pims HOSPITAL case studyPims HOSPITAL case study
Pims HOSPITAL case study
 
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
 
Hospital Design Case Study
Hospital Design Case StudyHospital Design Case Study
Hospital Design Case Study
 
Apollo Hospital case study
Apollo Hospital case studyApollo Hospital case study
Apollo Hospital case study
 
medicity - hospital thesis synopsis
medicity - hospital thesis synopsis medicity - hospital thesis synopsis
medicity - hospital thesis synopsis
 
Library study
Library studyLibrary study
Library study
 
Case study
Case studyCase study
Case study
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDYHOSPITAL CASE STUDY
HOSPITAL CASE STUDY
 

Viewers also liked

Evidence-Based Design for Healthcare Facilities
Evidence-Based Design for Healthcare FacilitiesEvidence-Based Design for Healthcare Facilities
Evidence-Based Design for Healthcare FacilitiesSara Marberry
 
Healthcare facility design stat consultants
Healthcare facility design stat consultantsHealthcare facility design stat consultants
Healthcare facility design stat consultantsArun Sebastian
 
Healthcare Design: Lessons Learned from the United States' First Hospital
Healthcare Design:  Lessons Learned from the United States' First HospitalHealthcare Design:  Lessons Learned from the United States' First Hospital
Healthcare Design: Lessons Learned from the United States' First HospitalSara Marberry
 
Hospital design
Hospital designHospital design
Hospital designdhobacyare
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout pptSandeep Singh
 
Hospital report
Hospital report Hospital report
Hospital report amir hamza
 
الاسس التصميمية للمستشفيات
الاسس التصميمية للمستشفيات الاسس التصميمية للمستشفيات
الاسس التصميمية للمستشفيات mohmimare
 
Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New HospitalNc Das
 
ueda2012 ada diabetes hospital management-d.diaa
ueda2012 ada diabetes hospital management-d.diaaueda2012 ada diabetes hospital management-d.diaa
ueda2012 ada diabetes hospital management-d.diaaueda2015
 
10 Trends Affecting The Future of Healthcare Facility Design
10 Trends Affecting The Future of Healthcare Facility Design10 Trends Affecting The Future of Healthcare Facility Design
10 Trends Affecting The Future of Healthcare Facility DesignSara Marberry
 
Deininger david portfolio_final
Deininger david portfolio_finalDeininger david portfolio_final
Deininger david portfolio_final2dplanning
 
Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...
Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...
Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...Eric Van 't Hoff
 
Healthcare for community india
Healthcare for community indiaHealthcare for community india
Healthcare for community indiaSana Saiyed
 
Healthcare Facility Master Plan Landscape
Healthcare Facility Master Plan LandscapeHealthcare Facility Master Plan Landscape
Healthcare Facility Master Plan Landscapenflout
 
Integra HealthCare Facility Designs
Integra HealthCare Facility DesignsIntegra HealthCare Facility Designs
Integra HealthCare Facility DesignsIntegra1000
 
Community Health Centers: Making a Difference
Community Health Centers: Making a DifferenceCommunity Health Centers: Making a Difference
Community Health Centers: Making a DifferenceGreenway Health
 
Health Care Design Final.compressed
Health Care Design Final.compressedHealth Care Design Final.compressed
Health Care Design Final.compressedNathalie Walgis
 
Quality Improvement paper
Quality Improvement paperQuality Improvement paper
Quality Improvement paperEllen Huff
 
Delight 2013 | Experience Design in Healthcare
Delight 2013 | Experience Design in HealthcareDelight 2013 | Experience Design in Healthcare
Delight 2013 | Experience Design in HealthcareDelight Summit
 

Viewers also liked (19)

Evidence-Based Design for Healthcare Facilities
Evidence-Based Design for Healthcare FacilitiesEvidence-Based Design for Healthcare Facilities
Evidence-Based Design for Healthcare Facilities
 
Healthcare facility design stat consultants
Healthcare facility design stat consultantsHealthcare facility design stat consultants
Healthcare facility design stat consultants
 
Healthcare Design: Lessons Learned from the United States' First Hospital
Healthcare Design:  Lessons Learned from the United States' First HospitalHealthcare Design:  Lessons Learned from the United States' First Hospital
Healthcare Design: Lessons Learned from the United States' First Hospital
 
Hospital design
Hospital designHospital design
Hospital design
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout ppt
 
Hospital report
Hospital report Hospital report
Hospital report
 
الاسس التصميمية للمستشفيات
الاسس التصميمية للمستشفيات الاسس التصميمية للمستشفيات
الاسس التصميمية للمستشفيات
 
Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New Hospital
 
ueda2012 ada diabetes hospital management-d.diaa
ueda2012 ada diabetes hospital management-d.diaaueda2012 ada diabetes hospital management-d.diaa
ueda2012 ada diabetes hospital management-d.diaa
 
10 Trends Affecting The Future of Healthcare Facility Design
10 Trends Affecting The Future of Healthcare Facility Design10 Trends Affecting The Future of Healthcare Facility Design
10 Trends Affecting The Future of Healthcare Facility Design
 
Deininger david portfolio_final
Deininger david portfolio_finalDeininger david portfolio_final
Deininger david portfolio_final
 
Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...
Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...
Dell Venue Pro 11 Windows 8 tablet within a Healthcare facility_Microsoft Hea...
 
Healthcare for community india
Healthcare for community indiaHealthcare for community india
Healthcare for community india
 
Healthcare Facility Master Plan Landscape
Healthcare Facility Master Plan LandscapeHealthcare Facility Master Plan Landscape
Healthcare Facility Master Plan Landscape
 
Integra HealthCare Facility Designs
Integra HealthCare Facility DesignsIntegra HealthCare Facility Designs
Integra HealthCare Facility Designs
 
Community Health Centers: Making a Difference
Community Health Centers: Making a DifferenceCommunity Health Centers: Making a Difference
Community Health Centers: Making a Difference
 
Health Care Design Final.compressed
Health Care Design Final.compressedHealth Care Design Final.compressed
Health Care Design Final.compressed
 
Quality Improvement paper
Quality Improvement paperQuality Improvement paper
Quality Improvement paper
 
Delight 2013 | Experience Design in Healthcare
Delight 2013 | Experience Design in HealthcareDelight 2013 | Experience Design in Healthcare
Delight 2013 | Experience Design in Healthcare
 

Similar to Healthcare facility design

HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxHEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxArun Sebastian
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management areaZaur Ahmadov, PMP
 
Concepts Of business analyst Practices - Part 1
Concepts Of business analyst Practices - Part 1Concepts Of business analyst Practices - Part 1
Concepts Of business analyst Practices - Part 1Moutasm Tamimi
 
Technical Comms Planning Nf
Technical Comms Planning NfTechnical Comms Planning Nf
Technical Comms Planning NfJohn_Wilson
 
Software Project Management: e-Hospital
Software Project Management: e-HospitalSoftware Project Management: e-Hospital
Software Project Management: e-HospitalNilay Kumar
 
Mine planning feasibility report
Mine planning feasibility reportMine planning feasibility report
Mine planning feasibility reportJignesh Ruperi
 
04 fse understandingrequirements
04 fse understandingrequirements04 fse understandingrequirements
04 fse understandingrequirementsMohesh Chandran
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Virtu Institute
 
Dee Adams CV 2016
Dee Adams CV 2016Dee Adams CV 2016
Dee Adams CV 2016Dee Adams
 
Transition to operations template Julie Bozzi Oregon
Transition to operations template   Julie Bozzi OregonTransition to operations template   Julie Bozzi Oregon
Transition to operations template Julie Bozzi OregonJulie Bozzi, PfPM, PMP
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answerskaranmca
 
Togaf 9 introduction
Togaf 9 introductionTogaf 9 introduction
Togaf 9 introductionVinod Wilson
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time managementImran Jamil
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptxabdo badr
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 
Project PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docxProject PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docxbriancrawford30935
 
EstimatingGuidelines.pdf
EstimatingGuidelines.pdfEstimatingGuidelines.pdf
EstimatingGuidelines.pdfIctsol
 

Similar to Healthcare facility design (20)

HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptxHEALTHCARE ENGINEERING RECOMMISSIONING.pptx
HEALTHCARE ENGINEERING RECOMMISSIONING.pptx
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management area
 
Concepts Of business analyst Practices - Part 1
Concepts Of business analyst Practices - Part 1Concepts Of business analyst Practices - Part 1
Concepts Of business analyst Practices - Part 1
 
Technical Comms Planning Nf
Technical Comms Planning NfTechnical Comms Planning Nf
Technical Comms Planning Nf
 
Software Project Management: e-Hospital
Software Project Management: e-HospitalSoftware Project Management: e-Hospital
Software Project Management: e-Hospital
 
Mine planning feasibility report
Mine planning feasibility reportMine planning feasibility report
Mine planning feasibility report
 
04 fse understandingrequirements
04 fse understandingrequirements04 fse understandingrequirements
04 fse understandingrequirements
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
 
Dee Adams CV 2016
Dee Adams CV 2016Dee Adams CV 2016
Dee Adams CV 2016
 
Transition to operations template Julie Bozzi Oregon
Transition to operations template   Julie Bozzi OregonTransition to operations template   Julie Bozzi Oregon
Transition to operations template Julie Bozzi Oregon
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answers
 
Togaf 9 introduction
Togaf 9 introductionTogaf 9 introduction
Togaf 9 introduction
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
 
Project PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docxProject PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docx
 
Marion Russell Resume
Marion Russell ResumeMarion Russell Resume
Marion Russell Resume
 
EstimatingGuidelines.pdf
EstimatingGuidelines.pdfEstimatingGuidelines.pdf
EstimatingGuidelines.pdf
 

Recently uploaded

Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...scanFOAM
 
9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery
9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery
9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Deliverymarshasaifi
 
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...delhimodelshub1
 
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near MeBook Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Menarwatsonia7
 
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy GirlsRussian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girlsddev2574
 
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...ggsonu500
 
Call Girls Hsr Layout Whatsapp 7001305949 Independent Escort Service
Call Girls Hsr Layout Whatsapp 7001305949 Independent Escort ServiceCall Girls Hsr Layout Whatsapp 7001305949 Independent Escort Service
Call Girls Hsr Layout Whatsapp 7001305949 Independent Escort Servicenarwatsonia7
 
Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...soniya singh
 
Single Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So FarSingle Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So FarCareLineLive
 
EMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareEMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareRommie Duckworth
 
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment BookingModels Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call GirlsBook Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call GirlsCall Girls Noida
 
2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology InsightsHealth Catalyst
 
College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...
College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...
College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...delhimodelshub1
 
Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...
Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...
Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...High Profile Call Girls Chandigarh Aarushi
 
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed RuleShelby Lewis
 
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts ServiceCall Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Servicenarwatsonia7
 
Call Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any TimeCall Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any Timedelhimodelshub1
 

Recently uploaded (20)

Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
 
9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery
9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery
9711199012 Najafgarh Call Girls ₹5.5k With COD Free Home Delivery
 
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
 
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near MeBook Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
Book Call Girls in Hosur - 7001305949 | 24x7 Service Available Near Me
 
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy GirlsRussian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
 
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
 
Call Girls Hsr Layout Whatsapp 7001305949 Independent Escort Service
Call Girls Hsr Layout Whatsapp 7001305949 Independent Escort ServiceCall Girls Hsr Layout Whatsapp 7001305949 Independent Escort Service
Call Girls Hsr Layout Whatsapp 7001305949 Independent Escort Service
 
Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon iffco chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
 
Single Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So FarSingle Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So Far
 
EMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareEMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical Care
 
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment BookingModels Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
Models Call Girls Electronic City | 7001305949 At Low Cost Cash Payment Booking
 
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
 
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call GirlsBook Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
Book Call Girls in Noida Pick Up Drop With Cash Payment 9711199171 Call Girls
 
2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights
 
College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...
College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...
College Call Girls Hyderabad Sakshi 9907093804 Independent Escort Service Hyd...
 
Call Girls in Lucknow Esha 🔝 8923113531 🔝 🎶 Independent Escort Service Lucknow
Call Girls in Lucknow Esha 🔝 8923113531  🔝 🎶 Independent Escort Service LucknowCall Girls in Lucknow Esha 🔝 8923113531  🔝 🎶 Independent Escort Service Lucknow
Call Girls in Lucknow Esha 🔝 8923113531 🔝 🎶 Independent Escort Service Lucknow
 
Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...
Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...
Russian Call Girls in Chandigarh Ojaswi ❤️🍑 9907093804 👄🫦 Independent Escort ...
 
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
 
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts ServiceCall Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
Call Girl Service ITPL - [ Cash on Delivery ] Contact 7001305949 Escorts Service
 
Call Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any TimeCall Girls Uppal 7001305949 all area service COD available Any Time
Call Girls Uppal 7001305949 all area service COD available Any Time
 

Healthcare facility design

  • 1. HEALTHCARE FACILITY DESIGN STAT Consultancy Pvt Ltd Er. Arun Sebastian
  • 2. Inthe slides  Stages of healthcare facility Construction  Functional Program  Functional relationship Diagrams  Room data sheets  Room layout sheets  Functional program development to Project Closeout
  • 4. Functional Program A functional program, typically developed by a functional programmer consultant, is a pre-design document describing the functional requirements of a building or renovation in sufficient detail to initiate schematic design.
  • 5. A tool for the Key Stakeholder/Client - it documents scope of service(s), - objectives and basic operational methods of the specific component; - specifies the human, technical, and building resources necessary to function as intended
  • 6. A communication tool it outlines whateach component intends to do and why, and assists in securing the necessary resources and project approvals to proceed with the project
  • 7. the prescription for the building design it provides instruction to the architectural and engineering team for the preparation of Schematic Design and later Detailed Design and Construction Documents.
  • 8. Functional Program must Be • be concise and written at the level of detail which allows for ready translation into facility and planning requirements so that design will support the approved functions. • provide sound methodology for analysis and projection of activity (e.g., functions determine workload, which ultimately determine space). • incorporate detailed listing of the functions to be undertaken in the completed facility, and of the physical requirements for performance of these functions;
  • 9. Functional Program must Be •be comprehensive to allow the development of operational management plans (e.g., staff and facility) and budgets for each component, and determination of overall operational cost impact. •incorporate fixed and loose equipment elements since equipment is generally a significant expense in a construction project and is a major consumer of space, support services, and utility requirements and it is most subject to technological change. The purpose of equipment planning at this stage is to list those items of furnishings/equipment that were considered during the programming of each component and that will be required to make each space operational.
  • 10. PLANNING PARAMETERS • Should focus on Patient safety and privacy • project mandate and service priorities; • strategic intent, project vision; • operational principles/business process; • functional programming principles and parameters; -guide the planning consistent with the operational principles; and – -planning horizons (e.g., 10 years). • Design parameters; -derived from operational and functional needs -Based on design standards and requirements (e.g.: LEED© objective). • population parameters; • defined projection methodology required to accurately projects the workload, staffing and space.
  • 11. ELEMENTS Assumptions: • premise(s) for the future, upon which the project is required (e.g., occupancy at 90%, population growth, and change in treatment protocols); • descriptive overview of the change in the organization to address the project; • the supporting rationale that identifies the factors driving the need and the planning work done to date; • summary of needs assessment findings; and key cost, schedule and implementation assumptions.
  • 12. Activities/Functions for Each Component within the Project: • This section provides a detailed description of component activities and functions - what is done (e.g., inpatient care, ambulatory care, diagnostic imaging, patient transport, building cleaning, laundry, food services, human resources), by whom, when and with what resources. It includes specific components within the major activities/functions (e.g., Human Resources would be further broken down – labour relations, payroll, accounting, etc.) and describes any transfer of activities/function from one component to another component.
  • 13. Activities/Functions for Each Component within the Project • operational/service planning model organization and management; • service delivery principles and methods; hours of operation; • client/patient flow with focus on patient privacy; • opportunities for integration with others; scope of service (current and future); • client/patient profile; • clinical roles and activities; • education roles and activities; • and research roles and activities.
  • 14. Functional Program Workload/Volumes: • detailed description of component workload (e.g., number of patients, service provided); • workload projection methodology and supporting rationale; • projections for planning - historical, current and projected (5 & 10 year); • number of visits/procedures – current and future; methodology and projection of diagnostic and treatment spaces required; • staff workload patterns and projections at maximum occupancy - based on equivalent full-time positions including relief needs; • projection methodology; current and projected FTE’s (over the planning horizon of project); and head count (where relevant for space planning).
  • 15. Functional Relationships: •External to the component – e.g., diagram/descriptions describing critical relationships to other programs/services/components within the facility (e.g., patient transport from emergency department to component, material management flow to and from the component, etc.); and to the facility - relationships with other facilities to provide the program context within the greater health care system (e.g., patient transport for specialized diagnostic procedure, sending/receiving lab specimens).
  • 16. Functional Relationships: •Internal relationships of sub-units within the component space (e.g., location of nursing station to patient rooms, waiting area to reception) to facilitate flow, functionality, etc. within the component; and visual matrices/conceptual diagrams, not floor plans. Locations - specify whether component must be adjoining to another program (share common wall), adjacent (within the same physical area) or accessible (via corridor/elevator).
  • 17. Design Criteria/Physical Requirements: • special requirements of each component (e.g., access, security, privacy, noise control, natural light, infection prevention and control, safety, work environment, change and flexibility, sustainability, critical dimensions, overall layout, special needs population); • space requirements and description of each space type, activities, what is contained within (furniture, fixtures and equipment), special features, number of people, etc.; • description of essential physical spaces required to accommodate the component (e.g., patient rooms, operating rooms, Intensive Care Unit cubicles, support rooms and building systems spaces); • sufficient detail regarding the use, occupancy and equipment to be located in the spaces to assist with the determination of the room size during the design stage; and • brief description of the overall appearance, ambiance, configuration, traffic flow, and privacy issues (e.g., continuous walking circuit for personal care home residents, exterior windows in waiting area).
  • 18. Design Criteria/Physical Requirements: • special requirements of each component (e.g., access, security, privacy, noise control, natural light, infection prevention and control, safety, work environment, change and flexibility, sustainability, critical dimensions, overall layout, special needs population); • space requirements and description of each space type, activities, what is contained within (furniture, fixtures and equipment), special features, number of people, etc.; • description of essential physical spaces required to accommodate the component (e.g., patient rooms, operating rooms, Intensive Care Unit cubicles, support rooms and building systems spaces); • sufficient detail regarding the use, occupancy and equipment to be located in the spaces to assist with the determination of the room size during the design stage; and • brief description of the overall appearance, ambiance, configuration, traffic flow, and privacy issues (e.g., continuous walking circuit for personal care home residents, exterior windows in waiting area)
  • 19. Schedule of Accommodation • room–by-room space list or schedule of accommodation of space types identifying the number or units required and the area in net square meters, with reference to the number of occupants and major equipment • component gross-up factors.
  • 25. Equipment • preliminary list of equipment to determine space sizes, assisting in preliminary costing, completed in detailed design (depending on the project it could be a detailed list); and • overview of the fixed or large loose equipment (e.g., diagnostic imaging, sterile processing, medical gas/electrical service columns in patient cubicles).
  • 26. Impact Analysis • impact of planned component (new or additional service) to the overall facility/system that supports it and the specific services including core services and clinical and support services; and • the impacted service assess the additional workload added by the service and what resources staff, space equipment, etc. is required to support the component.
  • 27. Development Options (Conceptual Development Plan): • determine optimal component location for key functional requirements and relationships; • gaming session/design charette (refers to a planning technique that focuses on establishing and testing functional relationships; typically utilizing a two or three dimension model of the buildings and/or site to enable a variety of participants to become involved in the determination of optimal facility layouts; • test-fit of options – especially important in renovations/reuse of existing buildings; • evaluation criteria/comparative analysis of the options; and • process should result in identification of an optimal concept design.
  • 28. OTHER CONSIDERATIONS The following may also be included in a functional program, especially where the project is large, complex in nature, or addition to an existing facility. • site development plan/master plan; • project cost plan (this would normally be part of most projects); • operational impacts; and • parking and traffic studies.
  • 29. Appendices can include the following • applicable guidelines and standards used to guide functional program development; • summary table of program/service facility support requirements; issues documented from the project – tool that documents the issues and resolution includes all issues – operations, functional programming, design and construction. • Form of communication maintained through the life of the project • definitions/terminology • planning teams and committees (e.g. planning team/roles and responsibilities, steering committee/roles and responsibilities, and user group/roles and responsibilities).
  • 32. LEGEND OF COLOURS FOR FUNCTIONAL RELATIONSHIP DIAGRAMS
  • 46. ROOM DATA SHEETS / ROOM LAYOUT SHEETS
  • 49. ROOM LAYOUT SHEET- TYPICAL INPATIENT SUITE
  • 52.
  • 53. ROOM DATA SHEET- OPERATING ROOM
  • 58. ROOM DATA SHEET- CRITICAL CARE
  • 59. ROOM DATA SHEET- CRITICAL CARE
  • 70. WHAT NEXT ? Detailed architectural design layouts based on the functional program developed Engineering design for  MGPS  HVAC  Electrical  ELV-IT as per the Functional Program and architectural design layouts received  BMS  Fire Protection systems  Plumbing Drainage system  Pneumatic system
  • 72. Is Project Closure the end ? Post Occupancy assessment and lessons learnt after the Project Closeout. • To understand howthe design works in reality
  • 74. A range of healthcare consultancy services are offered namely Project feasibility study and Conceptualization, Facility Planning, Medical equipment planning and Procurement, Project Management, Operational Management, HR Planning and development, Healthcare IT, Business process re-engineering, Quality Management & Accreditation, and Facility Management by internationally experienced professionals associated with the company. Since its inception in India, it has successfully completed more than 40 projects in India and GCC. In the process we have developed a network of highly experienced healthcare professionals and international Companies with expertise in all the areas of services offered. STAT CONSULTANCYWHO WE ARE • An experienced and leading healthcare Consulting firm which kicked-off in 2007 • Rendered 40+ projects 74
  • 75. Medical Equipment Planning and Procurement STAT Consultancy BPR/Quality Management & Accreditation Project Management Facility Management Project Feasibility/ Conceptualization / Facility Planning Our services STAT CONSULTANCY
  • 76. THANK YOU www.statconsultants.com ARUN SEBASTIAN +91 944600 1292 Email : arun.s@statconsultants.com