WADHWA PROJECT BRIEFING, ACHIEVEMENT & APPRECIATION
WELCOME
Client : Wadhwa Developers
Architect : Shakti Parmer & Associates ( Conceptual )
D S P Design Associates Pvt ltd ( Detailing )
Consultant : Structural : L & T ECC EDRC Division
: Services : Spectral Services Consultant Pvt ltd.
Civil Contractor : L & T Construction
SCOPE OF PROJECT: 10 Residential Towers of 32 floors (03 Basement+Ground floor+28 floors) of area 02
million sqft, car parking podium of 05 floors with all amenities of area 02 million sqft. Total no of super luxury=36
flats, semi luxury=648 flats, luxury=376 flats.
PROJECT VALUE : 608.8 Cr.INR (structure+ finishing).
The contractual start & finish date: 27/01/10 & 26/10/13+ Extension.....
Cumulative running billed up value as of July'13 480 Cr INR.
Team work:
The Team of L&T Employees involved in the project is 60 staff .
No: of Workmen deployed at the peak work: 2600 no’s
PLANT & MACHINERY:
 CP 30 Batching plant=01no’s,
 Tower crane 05 no’s,
ACHEVEMENT & SUCCESS OF PROJECT:
1. Achieved 20 million safe man hours for the span of my tenure in project without any major incidents.
2. National Record in concrete production with CP30 batching plant : 792 cum/24 hours with
outstanding contribution of 110% plant efficiency of 33.7 cum/hrs.
3. 1,52,000 cum of concrete production overall in site.
Page 2 of 6
4. Crossed 4.0 lakhs cum of excavation.
5. 21,500 MT of Torsteel used in site.
6. Prefabricated Reinforcement for walls.
MY SCOPE OF RESPONSBILITY IN NON-TOWER PODIUM:
Date of join @ site : March 2010
Date of transfer from site : July 2013
As a Execution in-charge for the Construction of Podium Non-Tower Parking of 05 floors of Composite RC flat slab
structure of completed 5.2 lakhs sqft out of 20 lakhs sqft.
Shuttering Rebar ConcreteExcavation Rock anchoring Micropilling Basement subsoil drain
work,Pillng Underground water tank Waterproofing work..
 With the Team strength of 05 junior engineers of cumulative invoice value is
42 Cr INR.
Project Director : Mr.V.J.Ravindra Kumar, vjrk@lntecc.com
Immediate Superior : Mr.Mareeswaran, Construction Manager, marees@lntecc.com
: Mr.V.V.Giribabu, Construction Manager, vvgiri@lntecc.com.
FORMWORK MATERIAL USED:
 kungkong Aluminum shuttering for Residential Towers.
 Doka, Topec, Conventional shuttering for Non-Tower Podium car parking area.
INDIVIDUAL APPRECIATION:
Page 3 of 6
Page 4 of 6
TEAM ACHIEVEMENT & APPRECIATION:
Page 5 of 6
Page 6 of 6
“To be successful you have to enjoy doing your best while at the same time contributing to something
beyond yourself “
“Success seems to be connected with action. Successful people keep moving. They make mistakes,
but they don't quit.”
......................Job Transferred because of strategic Permission/ Height Clearance
from BMC, Aviation Department........................

More Related Content

Viewers also liked

Viewers also liked (9)

Project Profile ECD and F Small
Project Profile ECD and F SmallProject Profile ECD and F Small
Project Profile ECD and F Small
 
ELLANAR FILMS | Creative Agency
ELLANAR FILMS | Creative AgencyELLANAR FILMS | Creative Agency
ELLANAR FILMS | Creative Agency
 
Why mixed age teaching?
Why mixed age teaching?Why mixed age teaching?
Why mixed age teaching?
 
Voulez-vous, 'n ABBA musiekblyspel
Voulez-vous, 'n ABBA musiekblyspelVoulez-vous, 'n ABBA musiekblyspel
Voulez-vous, 'n ABBA musiekblyspel
 
Ahamed kabir HVAC ENGINEER
Ahamed kabir  HVAC ENGINEERAhamed kabir  HVAC ENGINEER
Ahamed kabir HVAC ENGINEER
 
Заповед обществен съвет
Заповед обществен съветЗаповед обществен съвет
Заповед обществен съвет
 
Tecnologia Pràctiques Cocodrile
Tecnologia Pràctiques Cocodrile Tecnologia Pràctiques Cocodrile
Tecnologia Pràctiques Cocodrile
 
Produksi multimedia
Produksi multimediaProduksi multimedia
Produksi multimedia
 
Poa Nudesa Ed N Caixanova Grupo 4
Poa Nudesa Ed N Caixanova Grupo 4Poa Nudesa Ed N Caixanova Grupo 4
Poa Nudesa Ed N Caixanova Grupo 4
 

Similar to wadhwa Briefing & Achievement

SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1naveed ahmed
 
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)rajguptanitw
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyRp Singh
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017muhammad azeem
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaNarayan Gupta
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)pranay kumar
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...Arman Hashmi
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering Ram1239
 

Similar to wadhwa Briefing & Achievement (20)

SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
 
CV
CVCV
CV
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - Copy
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL Patna
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Resume: Aman ray
Resume: Aman rayResume: Aman ray
Resume: Aman ray
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
ER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdfER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdf
 
AASHRAY DESIGN CONSULTANTS _FEW -RESIDENTIAL PROJECTS_.pptx
AASHRAY DESIGN CONSULTANTS _FEW -RESIDENTIAL PROJECTS_.pptxAASHRAY DESIGN CONSULTANTS _FEW -RESIDENTIAL PROJECTS_.pptx
AASHRAY DESIGN CONSULTANTS _FEW -RESIDENTIAL PROJECTS_.pptx
 

wadhwa Briefing & Achievement

  • 1. Page 1 of 6 WADHWA PROJECT BRIEFING, ACHIEVEMENT & APPRECIATION WELCOME Client : Wadhwa Developers Architect : Shakti Parmer & Associates ( Conceptual ) D S P Design Associates Pvt ltd ( Detailing ) Consultant : Structural : L & T ECC EDRC Division : Services : Spectral Services Consultant Pvt ltd. Civil Contractor : L & T Construction SCOPE OF PROJECT: 10 Residential Towers of 32 floors (03 Basement+Ground floor+28 floors) of area 02 million sqft, car parking podium of 05 floors with all amenities of area 02 million sqft. Total no of super luxury=36 flats, semi luxury=648 flats, luxury=376 flats. PROJECT VALUE : 608.8 Cr.INR (structure+ finishing). The contractual start & finish date: 27/01/10 & 26/10/13+ Extension..... Cumulative running billed up value as of July'13 480 Cr INR. Team work: The Team of L&T Employees involved in the project is 60 staff . No: of Workmen deployed at the peak work: 2600 no’s PLANT & MACHINERY:  CP 30 Batching plant=01no’s,  Tower crane 05 no’s, ACHEVEMENT & SUCCESS OF PROJECT: 1. Achieved 20 million safe man hours for the span of my tenure in project without any major incidents. 2. National Record in concrete production with CP30 batching plant : 792 cum/24 hours with outstanding contribution of 110% plant efficiency of 33.7 cum/hrs. 3. 1,52,000 cum of concrete production overall in site.
  • 2. Page 2 of 6 4. Crossed 4.0 lakhs cum of excavation. 5. 21,500 MT of Torsteel used in site. 6. Prefabricated Reinforcement for walls. MY SCOPE OF RESPONSBILITY IN NON-TOWER PODIUM: Date of join @ site : March 2010 Date of transfer from site : July 2013 As a Execution in-charge for the Construction of Podium Non-Tower Parking of 05 floors of Composite RC flat slab structure of completed 5.2 lakhs sqft out of 20 lakhs sqft. Shuttering Rebar ConcreteExcavation Rock anchoring Micropilling Basement subsoil drain work,Pillng Underground water tank Waterproofing work..  With the Team strength of 05 junior engineers of cumulative invoice value is 42 Cr INR. Project Director : Mr.V.J.Ravindra Kumar, vjrk@lntecc.com Immediate Superior : Mr.Mareeswaran, Construction Manager, marees@lntecc.com : Mr.V.V.Giribabu, Construction Manager, vvgiri@lntecc.com. FORMWORK MATERIAL USED:  kungkong Aluminum shuttering for Residential Towers.  Doka, Topec, Conventional shuttering for Non-Tower Podium car parking area. INDIVIDUAL APPRECIATION:
  • 4. Page 4 of 6 TEAM ACHIEVEMENT & APPRECIATION:
  • 6. Page 6 of 6 “To be successful you have to enjoy doing your best while at the same time contributing to something beyond yourself “ “Success seems to be connected with action. Successful people keep moving. They make mistakes, but they don't quit.” ......................Job Transferred because of strategic Permission/ Height Clearance from BMC, Aviation Department........................