RDP Semester Review
Sarah Brown, 12/18/14
Agenda
 Introduction
 Facts About the Rotation
 Projects Led
 Continues Improvement Initiatives
 Lessons Learned
2
Introduction
University Attended &
Majors/Minors
Indiana University – Purdue University Indianapolis (IUPUI)
Mechanical Engineering Technology
Technical Communications Certificate
Lean Six Sigma Green Belt
Organization Involvement
Society of Women Engineers
Engineers Without Borders
American Society of Mechanical Engineers
Society of Manufacturing Engineers
Engineering Technology Student Council
International Society of Automation
Engineering Technology Leadership Development Program
Study Abroad Experience
No International Experience
Travel throughout the United States with organizations:
- California, Michigan, Wisconsin, Florida, Ohio, Illinois,
Louisiana, New York
- Heard from many local engineers on their companies and
what they are doing in varying industries
Fun Facts about Yourself
- I can speak some Spanish & Italian and am working to
become more fluent in both
- I play the violin and the piano
- I enjoy cooking
- I love to travel & try to visit at least one new place per year
Facts About the Rotation
Rotation # 1
Core Field Operations
Executive Mentor Keith Warf
Site Manager John Dunlap (June-November)/Tony Gonzales (December)
Location / Division Faurecia Emissions Control Technology – Louisville, KY
Objectives of the
Rotation
1. Learn the Operations (technologies, products, etc.) from the production floor
2. Spend 3 weeks on the production line supporting different shifts and areas
3. Spend a minimum of 4 months in the role of Production Supervisor
4. Attend Faurecia Excellence School Training to learn FES
Next Rotation Faurecia Automotive Seating – Sterling Heights, MI
5
Facts About the Rotation
• Supervisor in 2 Areas
 UAP 1 GAPs 8 & 9 (WDWK Chrysler) Bending as acting supervisor – 4 months
 UAP 2 GAPs 10 & 12 (CD Chrysler & S550 Ford) as acting supervisor – 1 month
• Supervisor Dashboard – UAP 1
 Targets:
1. Scrap $ per day at or below: $90
2. PDP Attainment to target (DL % of Cost): 95%
3. OT Hours per day to Target (DL % of Cost): 3.5
4. Supervisor Standardized work audits - % complete: 100%
5. Improvement Ideas Implemented Target: 5 per month
 Results (Averaged in UAP 1)
1. $97 (3/4 months under target)
2. 97%
3. 4 hours (2 months over target)
4. 112%
5. 11 per month
Projects Led
Updating and Centralizing HSE Documentation in Gaps 8 & 9
• Problem:
1. HSE Instructions and Sign-Off Sheets were outdated and scattered around each machine
2. HSE Instructions did not always match the specifics of the machine
3. FES Audit complications due to instruction unfamiliarity and obscure locations
• Solution
1. Update HSE Instructions to reflect machine specifics and fix any other
discrepancies
2. Simplify Instructions for operator understanding and execution
3. Create a consistent layout for all HSE Instructions
4. Centralize each Gap’s HSE Instructions in one location
Projects Led
7
Updating and Centralizing HSE
Documentation in Gaps 8 & 9
• Execution
1. HSE & PM Board in each Gap
2. One sign-off for the Gap Leader & Supervisor
3. Quicker checks that save the Gap Leader &
Supervisor time
4. Easier for FES auditors to find and check HSE
Documentation
5. Related Improvement: Purchasing of new E-Stops
w/ “Start” & “Lock Out” features built in.
8
Projects Led
UAP Level QRCIs
• Problem
o Part #1553672x had returns from Toledo plant with splits, incorrect sizing, and
dents/wrinkles.
• Actions
o QRCIs opened to contain problem & protect customer
o Whole process took about 3 months to complete and gather evidence
o Found root causes and addressed
- Started bending part on a newer bender & trained operators on SWIs w/
documentation of training
9
Projects Led
UAP Level QRCIs - #12 Top Half
10
Projects Led
UAP Level QRCIs - #12 Bottom Half
11
Projects Led
UAP Level QRCIs – Evidence
• Containment Sorting Sheet
• Quality Hold reporting sheet from Return RMA
• 672x Scrap from 3 months prior to incident
• Standardized Work Instructions that outline
OK/NOK conditions
• On the Job Training (OJT) sheet for quality stand
down immediately after incident
• On the Job Training (OJT) sheet for quality
inspection training for operator
• Ok 1st Part Sheet that documents visual check for
defects
• Gap Board Scrap sheet that documents daily
scrap target
• Scrap Reports documenting daily scrap after the
incident
• J&J Invoice for tooling to rebuild bender part was
originally created on
12
Projects Led
RDP Supervisor Guide
• Development of Guide for training RDP Trainees
• Guide includes:
 Schedule breakdown for training and shadowing
o Outline of different support groups to train with and learn how they affect production
 Documentation call-outs and definitions
 A contact list of people and their contact information
 Suggestions to program managers
 Suggestions to trainees
 Pictures of documentation so trainees can get familiar during shadowing/training
 Instructions on how to input production data into relevant programs and documents
 Information referenced that can guide trainees to ask questions and get the most out of their
rotation
Continues Improvement Initiatives
• RDP Supervisor Guide
• Update & Replacement of all Kanban cards in GAPs 8 & 9
• Replacement of zoning corners and labels throughout GAPs
• Creation of HSE Board & Updating of Documentation
• Updating/Training on GAP Boards to get back to FES Standard
• Gap Leader Training on line side QRCI boards to adhere to FES Standard
Lessons Learned
• A supervisor must always know what is going on in their GAPs – who’s involved, what is being
done, when tasks are planned to be accomplished, etc.
• It is important to know the capabilities of the GAPs in order to make adjustments to production
when any issues come up.
• There is always room for improvement in production and even the tiniest changes will make a
difference to the line.
• Getting to know the operators is imperative to being a good supervisor. Different people need
different types of leadership styles to find their potential.
• Communication is key to production. Communication between shift supervisors, between Gap
Leaders/Supervisors/Operators, between support functions, maintenance, and those on the
floor. This is an area of improvement across the plant.
RDP Semester Review Highlights Key Projects

More Related Content

What's hot

Kinshuk Bardhan_ PM_May 15_ CV
Kinshuk Bardhan_ PM_May 15_ CV Kinshuk Bardhan_ PM_May 15_ CV
Kinshuk Bardhan_ PM_May 15_ CV Kinshuk Bardhan
 
APQP Application
APQP ApplicationAPQP Application
APQP ApplicationEddie Lam
 
Wendell J. Kelly Resume
Wendell J. Kelly ResumeWendell J. Kelly Resume
Wendell J. Kelly ResumeWendell Kelly
 
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016) LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016) College/University
 
My Curriculum Vitæ
My Curriculum VitæMy Curriculum Vitæ
My Curriculum VitæLucas Souza
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra Urs
 
Testing Does Not Equal Quality
Testing Does Not Equal QualityTesting Does Not Equal Quality
Testing Does Not Equal Qualitylazygolfer
 
Joel Ramos Resume
Joel Ramos ResumeJoel Ramos Resume
Joel Ramos Resumejoelra1234
 
John Gwozdz - resume 8-10-16
John Gwozdz - resume  8-10-16John Gwozdz - resume  8-10-16
John Gwozdz - resume 8-10-16John Gwozdz
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS ResultsJohn Dermody
 
Alan Berow Process Engineer Resume
Alan Berow Process Engineer ResumeAlan Berow Process Engineer Resume
Alan Berow Process Engineer ResumeAlanBerowLSSGBCSM
 

What's hot (18)

Rogeliodevenencia
RogeliodevenenciaRogeliodevenencia
Rogeliodevenencia
 
Kinshuk Bardhan_ PM_May 15_ CV
Kinshuk Bardhan_ PM_May 15_ CV Kinshuk Bardhan_ PM_May 15_ CV
Kinshuk Bardhan_ PM_May 15_ CV
 
APQP Application
APQP ApplicationAPQP Application
APQP Application
 
raman cv
raman cvraman cv
raman cv
 
Wendell J. Kelly Resume
Wendell J. Kelly ResumeWendell J. Kelly Resume
Wendell J. Kelly Resume
 
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016) LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
 
GP_RESUME
GP_RESUMEGP_RESUME
GP_RESUME
 
CV_Castillo, Jecrison D.
CV_Castillo, Jecrison D.CV_Castillo, Jecrison D.
CV_Castillo, Jecrison D.
 
My Curriculum Vitæ
My Curriculum VitæMy Curriculum Vitæ
My Curriculum Vitæ
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015
 
Testing Does Not Equal Quality
Testing Does Not Equal QualityTesting Does Not Equal Quality
Testing Does Not Equal Quality
 
Joel Ramos Resume
Joel Ramos ResumeJoel Ramos Resume
Joel Ramos Resume
 
John Gwozdz - resume 8-10-16
John Gwozdz - resume  8-10-16John Gwozdz - resume  8-10-16
John Gwozdz - resume 8-10-16
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS Results
 
Alan Berow Process Engineer Resume
Alan Berow Process Engineer ResumeAlan Berow Process Engineer Resume
Alan Berow Process Engineer Resume
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
RamkumarMV15
RamkumarMV15RamkumarMV15
RamkumarMV15
 
Vivek G
Vivek GVivek G
Vivek G
 

Similar to RDP Semester Review Highlights Key Projects

Similar to RDP Semester Review Highlights Key Projects (20)

Tough projects keeping them on course -1- mike mellin 02-18-16
Tough projects   keeping them on course -1- mike mellin 02-18-16Tough projects   keeping them on course -1- mike mellin 02-18-16
Tough projects keeping them on course -1- mike mellin 02-18-16
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Abhinav Aditya
Abhinav AdityaAbhinav Aditya
Abhinav Aditya
 
LanningJeffreyresumerev
LanningJeffreyresumerevLanningJeffreyresumerev
LanningJeffreyresumerev
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
 
CV
CVCV
CV
 
CV
CVCV
CV
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
Resume 6-18-2016
Resume 6-18-2016Resume 6-18-2016
Resume 6-18-2016
 
09a Resume 7.25.16
09a Resume 7.25.1609a Resume 7.25.16
09a Resume 7.25.16
 
Polca Qrm Presentation Final
Polca Qrm Presentation FinalPolca Qrm Presentation Final
Polca Qrm Presentation Final
 
Lean project plan
Lean project plan Lean project plan
Lean project plan
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)
 
Resume[1][2]
Resume[1][2]Resume[1][2]
Resume[1][2]
 
APICS Top Management Night
APICS  Top Management NightAPICS  Top Management Night
APICS Top Management Night
 

RDP Semester Review Highlights Key Projects

  • 1. RDP Semester Review Sarah Brown, 12/18/14
  • 2. Agenda  Introduction  Facts About the Rotation  Projects Led  Continues Improvement Initiatives  Lessons Learned 2
  • 3. Introduction University Attended & Majors/Minors Indiana University – Purdue University Indianapolis (IUPUI) Mechanical Engineering Technology Technical Communications Certificate Lean Six Sigma Green Belt Organization Involvement Society of Women Engineers Engineers Without Borders American Society of Mechanical Engineers Society of Manufacturing Engineers Engineering Technology Student Council International Society of Automation Engineering Technology Leadership Development Program Study Abroad Experience No International Experience Travel throughout the United States with organizations: - California, Michigan, Wisconsin, Florida, Ohio, Illinois, Louisiana, New York - Heard from many local engineers on their companies and what they are doing in varying industries Fun Facts about Yourself - I can speak some Spanish & Italian and am working to become more fluent in both - I play the violin and the piano - I enjoy cooking - I love to travel & try to visit at least one new place per year
  • 4. Facts About the Rotation Rotation # 1 Core Field Operations Executive Mentor Keith Warf Site Manager John Dunlap (June-November)/Tony Gonzales (December) Location / Division Faurecia Emissions Control Technology – Louisville, KY Objectives of the Rotation 1. Learn the Operations (technologies, products, etc.) from the production floor 2. Spend 3 weeks on the production line supporting different shifts and areas 3. Spend a minimum of 4 months in the role of Production Supervisor 4. Attend Faurecia Excellence School Training to learn FES Next Rotation Faurecia Automotive Seating – Sterling Heights, MI
  • 5. 5 Facts About the Rotation • Supervisor in 2 Areas  UAP 1 GAPs 8 & 9 (WDWK Chrysler) Bending as acting supervisor – 4 months  UAP 2 GAPs 10 & 12 (CD Chrysler & S550 Ford) as acting supervisor – 1 month • Supervisor Dashboard – UAP 1  Targets: 1. Scrap $ per day at or below: $90 2. PDP Attainment to target (DL % of Cost): 95% 3. OT Hours per day to Target (DL % of Cost): 3.5 4. Supervisor Standardized work audits - % complete: 100% 5. Improvement Ideas Implemented Target: 5 per month  Results (Averaged in UAP 1) 1. $97 (3/4 months under target) 2. 97% 3. 4 hours (2 months over target) 4. 112% 5. 11 per month
  • 6. Projects Led Updating and Centralizing HSE Documentation in Gaps 8 & 9 • Problem: 1. HSE Instructions and Sign-Off Sheets were outdated and scattered around each machine 2. HSE Instructions did not always match the specifics of the machine 3. FES Audit complications due to instruction unfamiliarity and obscure locations • Solution 1. Update HSE Instructions to reflect machine specifics and fix any other discrepancies 2. Simplify Instructions for operator understanding and execution 3. Create a consistent layout for all HSE Instructions 4. Centralize each Gap’s HSE Instructions in one location
  • 7. Projects Led 7 Updating and Centralizing HSE Documentation in Gaps 8 & 9 • Execution 1. HSE & PM Board in each Gap 2. One sign-off for the Gap Leader & Supervisor 3. Quicker checks that save the Gap Leader & Supervisor time 4. Easier for FES auditors to find and check HSE Documentation 5. Related Improvement: Purchasing of new E-Stops w/ “Start” & “Lock Out” features built in.
  • 8. 8 Projects Led UAP Level QRCIs • Problem o Part #1553672x had returns from Toledo plant with splits, incorrect sizing, and dents/wrinkles. • Actions o QRCIs opened to contain problem & protect customer o Whole process took about 3 months to complete and gather evidence o Found root causes and addressed - Started bending part on a newer bender & trained operators on SWIs w/ documentation of training
  • 9. 9 Projects Led UAP Level QRCIs - #12 Top Half
  • 10. 10 Projects Led UAP Level QRCIs - #12 Bottom Half
  • 11. 11 Projects Led UAP Level QRCIs – Evidence • Containment Sorting Sheet • Quality Hold reporting sheet from Return RMA • 672x Scrap from 3 months prior to incident • Standardized Work Instructions that outline OK/NOK conditions • On the Job Training (OJT) sheet for quality stand down immediately after incident • On the Job Training (OJT) sheet for quality inspection training for operator • Ok 1st Part Sheet that documents visual check for defects • Gap Board Scrap sheet that documents daily scrap target • Scrap Reports documenting daily scrap after the incident • J&J Invoice for tooling to rebuild bender part was originally created on
  • 12. 12 Projects Led RDP Supervisor Guide • Development of Guide for training RDP Trainees • Guide includes:  Schedule breakdown for training and shadowing o Outline of different support groups to train with and learn how they affect production  Documentation call-outs and definitions  A contact list of people and their contact information  Suggestions to program managers  Suggestions to trainees  Pictures of documentation so trainees can get familiar during shadowing/training  Instructions on how to input production data into relevant programs and documents  Information referenced that can guide trainees to ask questions and get the most out of their rotation
  • 13. Continues Improvement Initiatives • RDP Supervisor Guide • Update & Replacement of all Kanban cards in GAPs 8 & 9 • Replacement of zoning corners and labels throughout GAPs • Creation of HSE Board & Updating of Documentation • Updating/Training on GAP Boards to get back to FES Standard • Gap Leader Training on line side QRCI boards to adhere to FES Standard
  • 14. Lessons Learned • A supervisor must always know what is going on in their GAPs – who’s involved, what is being done, when tasks are planned to be accomplished, etc. • It is important to know the capabilities of the GAPs in order to make adjustments to production when any issues come up. • There is always room for improvement in production and even the tiniest changes will make a difference to the line. • Getting to know the operators is imperative to being a good supervisor. Different people need different types of leadership styles to find their potential. • Communication is key to production. Communication between shift supervisors, between Gap Leaders/Supervisors/Operators, between support functions, maintenance, and those on the floor. This is an area of improvement across the plant.