1. SALVADOR SOTELO
7115 Luz De La Luna PL NW | Albuquerque, NM 87114 | (562) 824-5411 | salsotelo@verizon.net
MATERIAL/CONSTRUCTION COORDINTOR
Project Logistics | Construction Leadership | Service Excellence
Highly accomplishedconstructioncoordinatorprofessional withextensiveexperienceprovidingtheleadershipand coordinationto
see large-scaleprojects through to completion. Recognizedfortheability to gather and analyzedata, accurately assessingproblems
and needs whileprovidingrecommendedcourses of action. Strongin demonstratingmastery in company operatingprocedures,
safety codes, standards and specifications. Highly proficientintheoperation of TransmissionandElectrical Distribution
Constructionguidelines andprocedures. Able to developand maintainhighly safework environments.
Areas of Expertise
Technical Documents
Information Management
Electrical Distribution Design
Staff Safety
Project Coordination & Logistics
Written/Verbal Communication
Construction Methods
Problem Resolution
Resource Planning
Project Management
Decision Making
Staff Safety Training
P R OFE S S I ON AL E XP E R I E N CE
THE DOWNS RACETRACK & CASINO – Albuquerque, NM 2016 - Present
Security &Serveillance
Providegeneral public safety services to ensurethe protectionof both guests and team members.
Conduct inspections of assignedareas, monitoringpublic safety to identify safety breaches and reporting any potential
issues as needed.
Assists guests, horseowners, andracingofficials by givingdirections andansweringquestions in afriendly, professional
manner.
Investigate and record all unusual occurrences andincidents withinthe gaming facility.
Monitoractivities onradio and surveillanceequipment andsilentalarm system, dispatchingtheappropriate staff and
equipment duringrouting and emergency calls.
Work inaccordance withall safety related policies andprocedures.
HENKELS & MCCOY INC./FAITH ELECTRIC – Pomona , CA./Chino , CA. 2013 - 2014
ConstructionCoordinator
Successfully coordinatedthecompletionof multiplelarge-scaleprojects, consultingwithcustomers, coordinatingmaterials,
reviewingmaterial shippingand receivingdates and makingadjustments as needed to meet project goals.
Workedin collaborationwiththeplanning staff to ensure the designand materials met specific projectgoals.
Playeda key role inproject success, assistingcrews withcircuitmaps andtopographic lineand fluidinduction(TLM/FIM)
maps.
Led the process to closeoutwork orders in a timely manner.
SOUTHERN CALIFORNIA EDISON COMPANY - CA 1984 - 2013
CCM Construction/Material Coordinator (2010 – 2013)
Performed worksiteand electric distributiondesignreviewto ensure that the designand materials were appropriate to
meet strictproject goals.
Workedin a leadrole inthe coordinationof multipleprojects simultaneously,continually evaluatingprojectstatus and
institutingchanges as need to maximizecrewefficiency.
Conducted periodic inspections, analyzingcustomerinstallations to ensurethe applicableconstructionmethods andsafety
standards were met.
Finalizedjobsitereadiness, consultingwithcustomer, constructionfieldforces andcoordinatingmaterials andequipment
staging to meet project start work dates.
Carefully analyzedlineand equipmentneeds, generating requests to clearlines equipmentand coordinatecustomer
outages.
Continually reviewedmaterial shippingand receivingdates, makingadjustments as needed to meet strictproject goals.
Workedwith the planningstaff to ensure that designand materials met project goals.
Performed on-lineschedulingactivities insupportof the schedulingsupervisor.
Successfully negotiated“win-win” solutions to resolveconflict.
2. SALVADOR SOTELO Resume, Page 2
Professional Experience Continued
Correctly analyzedproblems, developingandimplementingplans of actionwithlimitedinformationundertight time
constraints to ensure the proper allocationof resources andconstructionsitereadiness.
ConstructionMaintenanceClerk (2007 – 2010)
Performed work order administration/preparation and onlineprocessingof storm, claim andnon-claim work orders while
balancingand closingwork orders when completed.
Providetracking of plant and O/M expenditures, makingadjustments as needed.
Updated and approvedwork order progress reports whilepreparing transfer vouchers fordeeded facilities.
Maintainedand updated inventory maps and passportrecords.
Conducted equipmentand material management and support ordering, trackingmaterials, transformers and equipmentto
support linecrews.
Rewired and replacedsupporting SSID, FSMRO, GridOPSand c/m.
Managed miscellaneous accountingandadministrativefunctions includingauthorizingpaymentof materials and
equipment, utility bills andinvoicesand processingtimesheets andtravel expenses.
Playeda key role inthe implementationand training of the current safety program.
Cable Splicer (2001 – 2006)
Served as an upgrade supervisor, managingboth linecrewand multipleprojects simultaneously.
Installed, removed, operated and maintainedfiber optic conduitand equipment.
Work on orin closeproximity safety withenergizedlines andequipment utilizingapprovedsafety tools andequipment in
adherence to Cal/OSHAstandards and rules.
Successfully operatedconstructionequipment, many times inextremeweather conditions.
Previous Employment: Ground-Man/ApprenticeLineman – TransmissionandDistribution, SouthernCaliforniaEdisonCompany
E DU CATI ON & CE R TI FI CATI ON S / TR AI N I N G
High School Diploma – Woodrow Wilson High School, Los Angeles, CA
Advance Modules – Fiber Optic Testing, Troubleshooting & Documentation Certification
Tower Climbing & Safety Awareness for Carrier Solutions Certification
Basic Electricity 1A Certified – Southern California Edison
Computer Based Business Skills – Larson Training Centers, Inc.
Orientation to Windows 95 Applications: Featuring Word 7.0 and Excel 7.0 – A+ Micro
M I LI TAR Y E XP E R I E N CE
Radio and Telecommunications Operator, Colorado 4th Infantry Division, 104th Military Intelligence Unit
United State Army, Fort Carson, CO (Honorable Discharge)