SYL’s project monitoring trip to Mongolia / IEC was conducted between 15th and 29th of August 2012.
Representatives of SYL were the development cooperation coordinator Johanna Ursin-Escobar and Ilona
Kalliola a KENKKU-member. During the trip, SYL’s representatives had discussions and meetings with IEC’s
management, staff in project areas and beneficiaries. We also participated in a meeting of different
organizations working in the Bayankhoshuu area of Songkinkhairkhan district in Ulaanbaator. The principal
objectives of the trip were to see how the new project has started, how preparatory activities for the
project were done, and to revise the objectives and indicators of the project, as well as to meet some
beneficiaries. Also, the Memorandum of understanding for the ETVO –program was written. This report will
present the major findings of the trip. At the end of the report is the program for the monitoring trip. This
document is written for the use of SYL (board, KENKKU and all members) and IEC (management and other
staff).

In general, the project has started almost as planned. The preparatory activities had all been done as
planned and the baseline studies were done in a very detailed manner. In Songkinkhairkhan district, the
baseline study was more general, because the area was new to IEC. There have also been slight problems
with starting the project because a) the area is new and the inhabitants do not know the organization, and
b) elections at different governmental levels have temporarily lowered the willingness of politicians to
support the project. People have also been suspicious that IEC has political connections. For these reasons,
IEC has not yet been capable of establishing as many community groups as was planned. In Arkhangai, the
project has started well and many community groups are already forming.

The objectives and indicators were discussed together with IEC’s management and staff. Due to the
challenges in Songkinkhairkhan district, the number of community groups to be formed was lowered from
20 to 10 during the first year and raised from 15 to 20 during the second year. Also, the number of khoroos
was lowered from three to two because of the high population density in the area. Some indicators were
formulated again in more detail, but there were no bigger changes.

We met two potential community groups in Songkinkhairkhan district in Ulaanbaatar and many groups in
the province of Arkhangai. All groups are still in their formation phase and they have participated in IEC’s
basic trainings on community groups. All groups had also already participated in some other trainings such
as business and milk production trainings.

We discussed the ETVO -volunteer program and the duties of IEC towards the volunteer. Also, the
Memorandum of Understanding was written together to agree together on the specific job description of
the volunteer. The Memorandum is an annex to the Etvo partnership agreement between SYL and IEC.
The program:

Day            Activity
15.8.2012      Flights Helsinki – Ulaanbaator (UB)
16.8.2012      Morning: Arrival to UB
               Afternoon: Meeting with IEC’s personnal in the office, planning the trip
17.8.2012      Morning: Meeting with organizations working in Bayankhoshuu (in district
               Songkinkhairkhan)
               Afternoon: meeting with IEC’s staff in Bayankhoshuu and meetings with
               representatives of two community groups (vegetable and sewing groups)
18.8.2012      Morning: free
               Afternoon: meeting in the IEC’s office, Etvo
19.8.2012      Whole day: trip UB-Arkhangai (Tsetserleg)
20.8.2012      Morning: Work at IEC’s office in Tsetserleg, revision of project situation in Arkhangai
               Afternoon: trip to Tsenkher soum and meeting with one community group (sewing)
21.8.2012      Morning: meeting with one community group (vegetable)
               Afternoon: trip to Chuluut soum (Khaluun-Usbagh)
               Evening: meeting with one community group (leather products and milk products)
22.8.2012      Morning: Visit to volcano and trip to another bagh
               Afternoon: Meeting with two community group (milk products)
               Evening: Trip to Tsetserleg
23.8.2012      Morning: Revision of the project objectives and indicator in IEC’s office
               Afternoon: Meeting with two community groups (Vegetarian food and milk products)
24.8.2012      Whole day: training of IEC’s staff on Outcome Mapping
25.8.2012      Whole day: trip to UB
26.8.2012      Morning: independent work
               Afternoon: Meeting at the IEC’s office
27.8.2012      Morning: independent work
               Afternoon: free
28.8.2012      Flights UB - Helsinki
29.9.2012      Arrival in Helsinki

More Related Content

Similar to Report project monitoring_trip_mongolia 2012 _id 1379_

Mongolia trip report 2011
Mongolia trip report 2011Mongolia trip report 2011
Mongolia trip report 2011SYL
 
Mongolia trip report 2011
Mongolia trip report 2011Mongolia trip report 2011
Mongolia trip report 2011SYL
 
Acmei Newsletter 2
Acmei Newsletter 2Acmei Newsletter 2
Acmei Newsletter 2Pia Antonaci
 
Björn grönholm successful city development
Björn grönholm successful city developmentBjörn grönholm successful city development
Björn grönholm successful city developmentgerttusimm
 
Consolidated report on cba eng
Consolidated report on cba engConsolidated report on cba eng
Consolidated report on cba engcbaorgua
 
Energy efficiency & protection of the environment
Energy efficiency & protection of the environmentEnergy efficiency & protection of the environment
Energy efficiency & protection of the environmenteurosportelloveneto
 
EU COOPERATION NEWS, 8.02.2013
EU  COOPERATION NEWS, 8.02.2013EU  COOPERATION NEWS, 8.02.2013
EU COOPERATION NEWS, 8.02.2013Moldova Europeană
 
Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...
Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...
Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...Марина Козловская
 
Human Dynamics Newsletter april, 2017
Human Dynamics Newsletter april, 2017Human Dynamics Newsletter april, 2017
Human Dynamics Newsletter april, 2017Rade Glomazic
 
Learnings of the SI-Drive project on employment, related to social innovation...
Learnings of the SI-Drive project on employment, related to social innovation...Learnings of the SI-Drive project on employment, related to social innovation...
Learnings of the SI-Drive project on employment, related to social innovation...Peter Oeij
 
Helsinki draft agendas (13 april 2015)
Helsinki draft agendas (13 april 2015)Helsinki draft agendas (13 april 2015)
Helsinki draft agendas (13 april 2015)Stefanus Snyman
 
Project plan mon_2010-11_final
Project plan mon_2010-11_finalProject plan mon_2010-11_final
Project plan mon_2010-11_finalSYL
 
Project plan mon_2010-11_final
Project plan mon_2010-11_finalProject plan mon_2010-11_final
Project plan mon_2010-11_finalSYL
 
UnivSSE Coop Presentation 1-2023 EN 2.ppt
UnivSSE Coop Presentation 1-2023 EN 2.pptUnivSSE Coop Presentation 1-2023 EN 2.ppt
UnivSSE Coop Presentation 1-2023 EN 2.pptKostas Nikolaou
 
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...Orgiltsogtslokh Enkhbaatar
 
International Upcycling Research Network 2nd advisory board meeting slides
International Upcycling Research Network 2nd advisory board meeting slides International Upcycling Research Network 2nd advisory board meeting slides
International Upcycling Research Network 2nd advisory board meeting slides Kyungeun Sung
 
Oleg koefoed culture and sustainability sympo nord quebec feb 2015
Oleg koefoed culture and sustainability sympo nord quebec feb 2015Oleg koefoed culture and sustainability sympo nord quebec feb 2015
Oleg koefoed culture and sustainability sympo nord quebec feb 2015Oleg Koefoed
 
ELS 2006 Final Narrative Report signed ENG
ELS 2006 Final Narrative Report signed ENGELS 2006 Final Narrative Report signed ENG
ELS 2006 Final Narrative Report signed ENGEmilio Valli
 

Similar to Report project monitoring_trip_mongolia 2012 _id 1379_ (20)

Mongolia trip report 2011
Mongolia trip report 2011Mongolia trip report 2011
Mongolia trip report 2011
 
Mongolia trip report 2011
Mongolia trip report 2011Mongolia trip report 2011
Mongolia trip report 2011
 
Acmei Newsletter 2
Acmei Newsletter 2Acmei Newsletter 2
Acmei Newsletter 2
 
Björn grönholm successful city development
Björn grönholm successful city developmentBjörn grönholm successful city development
Björn grönholm successful city development
 
Consolidated report on cba eng
Consolidated report on cba engConsolidated report on cba eng
Consolidated report on cba eng
 
Energy efficiency & protection of the environment
Energy efficiency & protection of the environmentEnergy efficiency & protection of the environment
Energy efficiency & protection of the environment
 
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdfAcademies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
 
EU COOPERATION NEWS, 8.02.2013
EU  COOPERATION NEWS, 8.02.2013EU  COOPERATION NEWS, 8.02.2013
EU COOPERATION NEWS, 8.02.2013
 
Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...
Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...
Marina Kozlovs'ka, Technical Policy of the EU: Methodology and Tools (environ...
 
Planet dissemination seminar
Planet dissemination seminarPlanet dissemination seminar
Planet dissemination seminar
 
Human Dynamics Newsletter april, 2017
Human Dynamics Newsletter april, 2017Human Dynamics Newsletter april, 2017
Human Dynamics Newsletter april, 2017
 
Learnings of the SI-Drive project on employment, related to social innovation...
Learnings of the SI-Drive project on employment, related to social innovation...Learnings of the SI-Drive project on employment, related to social innovation...
Learnings of the SI-Drive project on employment, related to social innovation...
 
Helsinki draft agendas (13 april 2015)
Helsinki draft agendas (13 april 2015)Helsinki draft agendas (13 april 2015)
Helsinki draft agendas (13 april 2015)
 
Project plan mon_2010-11_final
Project plan mon_2010-11_finalProject plan mon_2010-11_final
Project plan mon_2010-11_final
 
Project plan mon_2010-11_final
Project plan mon_2010-11_finalProject plan mon_2010-11_final
Project plan mon_2010-11_final
 
UnivSSE Coop Presentation 1-2023 EN 2.ppt
UnivSSE Coop Presentation 1-2023 EN 2.pptUnivSSE Coop Presentation 1-2023 EN 2.ppt
UnivSSE Coop Presentation 1-2023 EN 2.ppt
 
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
Energy safe cities program by ICLEI East Asian secretariat and Mongolian ener...
 
International Upcycling Research Network 2nd advisory board meeting slides
International Upcycling Research Network 2nd advisory board meeting slides International Upcycling Research Network 2nd advisory board meeting slides
International Upcycling Research Network 2nd advisory board meeting slides
 
Oleg koefoed culture and sustainability sympo nord quebec feb 2015
Oleg koefoed culture and sustainability sympo nord quebec feb 2015Oleg koefoed culture and sustainability sympo nord quebec feb 2015
Oleg koefoed culture and sustainability sympo nord quebec feb 2015
 
ELS 2006 Final Narrative Report signed ENG
ELS 2006 Final Narrative Report signed ENGELS 2006 Final Narrative Report signed ENG
ELS 2006 Final Narrative Report signed ENG
 

More from SYL

Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013SYL
 
Mos project monitoring_trip_report_2013
Mos project monitoring_trip_report_2013Mos project monitoring_trip_report_2013
Mos project monitoring_trip_report_2013SYL
 
Kyky kuulumiset 3 2013
Kyky kuulumiset 3 2013Kyky kuulumiset 3 2013
Kyky kuulumiset 3 2013SYL
 
Kenkkuillaan syksy 2013 sv (id 3185)
Kenkkuillaan syksy 2013 sv (id 3185)Kenkkuillaan syksy 2013 sv (id 3185)
Kenkkuillaan syksy 2013 sv (id 3185)SYL
 
Kenkkuillaan syksy 2013 eng (id 3184)
Kenkkuillaan syksy 2013 eng (id 3184)Kenkkuillaan syksy 2013 eng (id 3184)
Kenkkuillaan syksy 2013 eng (id 3184)SYL
 
Kenkkuillaan syksy 2013 (id 3186)
Kenkkuillaan syksy 2013 (id 3186)Kenkkuillaan syksy 2013 (id 3186)
Kenkkuillaan syksy 2013 (id 3186)SYL
 
Innolla opiskelukykyä - materiaali
Innolla opiskelukykyä - materiaaliInnolla opiskelukykyä - materiaali
Innolla opiskelukykyä - materiaaliSYL
 
130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)
130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)
130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)SYL
 
130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okm130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okmSYL
 
Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)SYL
 
130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslaki130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslakiSYL
 
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...SYL
 
SYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelustaSYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelustaSYL
 
Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013SYL
 
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)SYL
 
Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)SYL
 
Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)SYL
 
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenEka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenSYL
 
Eka vuosi ryhmäkeskustelut (id 2278)
Eka vuosi  ryhmäkeskustelut (id 2278)Eka vuosi  ryhmäkeskustelut (id 2278)
Eka vuosi ryhmäkeskustelut (id 2278)SYL
 
20130115 utufye
20130115 utufye20130115 utufye
20130115 utufyeSYL
 

More from SYL (20)

Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013Mozambique project plan 2013-15_final_updatetd_9.2013
Mozambique project plan 2013-15_final_updatetd_9.2013
 
Mos project monitoring_trip_report_2013
Mos project monitoring_trip_report_2013Mos project monitoring_trip_report_2013
Mos project monitoring_trip_report_2013
 
Kyky kuulumiset 3 2013
Kyky kuulumiset 3 2013Kyky kuulumiset 3 2013
Kyky kuulumiset 3 2013
 
Kenkkuillaan syksy 2013 sv (id 3185)
Kenkkuillaan syksy 2013 sv (id 3185)Kenkkuillaan syksy 2013 sv (id 3185)
Kenkkuillaan syksy 2013 sv (id 3185)
 
Kenkkuillaan syksy 2013 eng (id 3184)
Kenkkuillaan syksy 2013 eng (id 3184)Kenkkuillaan syksy 2013 eng (id 3184)
Kenkkuillaan syksy 2013 eng (id 3184)
 
Kenkkuillaan syksy 2013 (id 3186)
Kenkkuillaan syksy 2013 (id 3186)Kenkkuillaan syksy 2013 (id 3186)
Kenkkuillaan syksy 2013 (id 3186)
 
Innolla opiskelukykyä - materiaali
Innolla opiskelukykyä - materiaaliInnolla opiskelukykyä - materiaali
Innolla opiskelukykyä - materiaali
 
130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)
130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)
130626 syl lausunto yths-kokeilun jatkosta vuoden 2015 loppuun (id 3064)
 
130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okm130620 syl lausunto_opintotukilaki_luonnos_okm
130620 syl lausunto_opintotukilaki_luonnos_okm
 
Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)Kyky kuulumiset 2 2013 (id 2915)
Kyky kuulumiset 2 2013 (id 2915)
 
130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslaki130523 syl lausunto_yhdenvertaisuuslaki
130523 syl lausunto_yhdenvertaisuuslaki
 
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
Tiedosta kauppatavaraa? - Näkökulmia koulutuksen kaupallistumiseen ja kansain...
 
SYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelustaSYL:n lausunto koulutuksen uudelleenajattelusta
SYL:n lausunto koulutuksen uudelleenajattelusta
 
Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013Kyky kuulumiset 1{2}2013
Kyky kuulumiset 1{2}2013
 
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
Kyky terveystutkimus kott_130213 (id 2326) (id 2490)
 
Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)Kenkku newsletter 1_2012 (id 1137)
Kenkku newsletter 1_2012 (id 1137)
 
Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)Kenkuillaan 2013 final (id 2294)
Kenkuillaan 2013 final (id 2294)
 
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinenEka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
Eka vuosi työpaja16.1.2013 mäkinen.pdf eka vuosi työpaja16.1.2013_mäkinen
 
Eka vuosi ryhmäkeskustelut (id 2278)
Eka vuosi  ryhmäkeskustelut (id 2278)Eka vuosi  ryhmäkeskustelut (id 2278)
Eka vuosi ryhmäkeskustelut (id 2278)
 
20130115 utufye
20130115 utufye20130115 utufye
20130115 utufye
 

Report project monitoring_trip_mongolia 2012 _id 1379_

  • 1. Mongolia: Project monitoring trip report 2012 Written by Johanna Ursin-Escobar & Ilona Kalliola SYL’s project monitoring trip to Mongolia / IEC was conducted between 15th and 29th of August 2012. Representatives of SYL were the development cooperation coordinator Johanna Ursin-Escobar and Ilona Kalliola a KENKKU-member. During the trip, SYL’s representatives had discussions and meetings with IEC’s management, staff in project areas and beneficiaries. We also participated in a meeting of different organizations working in the Bayankhoshuu area of Songkinkhairkhan district in Ulaanbaator. The principal objectives of the trip were to see how the new project has started, how preparatory activities for the project were done, and to revise the objectives and indicators of the project, as well as to meet some beneficiaries. Also, the Memorandum of understanding for the ETVO –program was written. This report will present the major findings of the trip. At the end of the report is the program for the monitoring trip. This document is written for the use of SYL (board, KENKKU and all members) and IEC (management and other staff). In general, the project has started almost as planned. The preparatory activities had all been done as planned and the baseline studies were done in a very detailed manner. In Songkinkhairkhan district, the baseline study was more general, because the area was new to IEC. There have also been slight problems with starting the project because a) the area is new and the inhabitants do not know the organization, and b) elections at different governmental levels have temporarily lowered the willingness of politicians to support the project. People have also been suspicious that IEC has political connections. For these reasons, IEC has not yet been capable of establishing as many community groups as was planned. In Arkhangai, the project has started well and many community groups are already forming. The objectives and indicators were discussed together with IEC’s management and staff. Due to the challenges in Songkinkhairkhan district, the number of community groups to be formed was lowered from 20 to 10 during the first year and raised from 15 to 20 during the second year. Also, the number of khoroos was lowered from three to two because of the high population density in the area. Some indicators were formulated again in more detail, but there were no bigger changes. We met two potential community groups in Songkinkhairkhan district in Ulaanbaatar and many groups in the province of Arkhangai. All groups are still in their formation phase and they have participated in IEC’s basic trainings on community groups. All groups had also already participated in some other trainings such as business and milk production trainings. We discussed the ETVO -volunteer program and the duties of IEC towards the volunteer. Also, the Memorandum of Understanding was written together to agree together on the specific job description of the volunteer. The Memorandum is an annex to the Etvo partnership agreement between SYL and IEC.
  • 2. The program: Day Activity 15.8.2012 Flights Helsinki – Ulaanbaator (UB) 16.8.2012 Morning: Arrival to UB Afternoon: Meeting with IEC’s personnal in the office, planning the trip 17.8.2012 Morning: Meeting with organizations working in Bayankhoshuu (in district Songkinkhairkhan) Afternoon: meeting with IEC’s staff in Bayankhoshuu and meetings with representatives of two community groups (vegetable and sewing groups) 18.8.2012 Morning: free Afternoon: meeting in the IEC’s office, Etvo 19.8.2012 Whole day: trip UB-Arkhangai (Tsetserleg) 20.8.2012 Morning: Work at IEC’s office in Tsetserleg, revision of project situation in Arkhangai Afternoon: trip to Tsenkher soum and meeting with one community group (sewing) 21.8.2012 Morning: meeting with one community group (vegetable) Afternoon: trip to Chuluut soum (Khaluun-Usbagh) Evening: meeting with one community group (leather products and milk products) 22.8.2012 Morning: Visit to volcano and trip to another bagh Afternoon: Meeting with two community group (milk products) Evening: Trip to Tsetserleg 23.8.2012 Morning: Revision of the project objectives and indicator in IEC’s office Afternoon: Meeting with two community groups (Vegetarian food and milk products) 24.8.2012 Whole day: training of IEC’s staff on Outcome Mapping 25.8.2012 Whole day: trip to UB 26.8.2012 Morning: independent work Afternoon: Meeting at the IEC’s office 27.8.2012 Morning: independent work Afternoon: free 28.8.2012 Flights UB - Helsinki 29.9.2012 Arrival in Helsinki