6. Task 3.6 DATA MANAGEMENT BACK UP is
still ongoing and deliverable (prototype) is
under development
Task 3.4 processor head
the team have been finalising the
integration of all
hardware/software components.
software tools have been implemented
(mostly previously developed) on the
central computer of the industrial PC
installed on the
processor/excavator.
Technical Meeting
5 Jul 16
7. The connection to the central database
(MHG) and uploading of required data
from the database is accomplished by
means of the web service.
The data are ready for integration with
other software tools, including production
plan, location map and user interface
(visualization of the logs, quality and
suggested cross-cuttings)
Technical Meeting
5 Jul 16
8. Team scheduled installation of the WIFI electronics in the central computer
The team (Compolab, Graphitech, CNR) worked on the connection of the
processor head and the cable crane (industrial PC and bananaPI)
The aim was to
verify possibility of the data transfer and further usage of the information to
be provided by the cable crane.
Technical Meeting
5 Jul 16
10. Task 3.3TECNO
As seen in yesterday demo
the status of work is as
follows:
TECNO carriage: hardware
completed, software
completed
The only function that has
still to be checked is the rfid
tag reading in the forest,
since the connection was not
available.
Yet the Antenna worked
during our testing activities
Technical Meeting
5 Jul 16
12. Chockers work status
Chokers are ready. The
mechanical part is ready. We have
managed interaction between
them and the new software
Testing activities were carried
out also between Tecno carriage
and the Chockers
Technical Meeting
5 Jul 16