FEEDER SANITIZATION ACTIVITY
Input Required:
 DT wise hard copies of Maps
 Consumer Data Collection Format
Activity:
 Asset Verification
 Consumer Collection in predefined format
 Daily Progress Reporting
2
FEEDER SANITIZATION ACTIVITY
Methodology:
 First team will visit on field to verify & identify new assets as per current
ground condition versus provided DT wise maps
 Coding of newly/bifurcated assets on ground using permanent marker &
same coding on the provided maps
 Second team will count number of service lines connected to pole
 Collection of door to door consumers details in predefined format
3
FEEDER SANITIZATION ACTIVITY
Coding Technique:
 Suppose we have 3 new poles between 2 identified poles
 Suppose we have n number of poles at end of the earlier identified network
4
FEEDER SANITIZATION ACTIVITY
Reporting Formats:
5
Incremental GIS Data Incorporation into Centralized Geo-database
Objective of this programme is to update and maintain centralized geo-
database by implementing periodical updates in the system through a process
driven mechanism so that higher objectives of already running RAPDRP
programme such as up to date AT&C Loss Report Generation, GIS Based
Network Analysis, DT wise SBM billing, Asset management etc can be met.
SCOPE OF WORK:
1. Going Forward Activity
2. One time activity (Current Delta Gap)
6
SCOPE OF WORK
Going Forward Activity: This includes incorporation of field changes in
electrical network in terms of assets and consumers along with relevant
network to centralized geo database. Activity will be restricted to
incorporation of new network / bifurcated network after the project
commencement. HCL will add and update the GIS data of new networks,
bifurcated networks and will geo-tag newly recorded consumers as per the
necessary information collected from utility on regular basis.
One time activity (Current Delta Gap): During execution of this
activity, existing electrical network assets available in current geo-database
will be updated as per present ground scenario. This will be one time
exercise in order to make the network data up-to-date.
7
METHODOLOGY: GOING FORWARD ACTIVITY
 Field survey will be conducted for the newly augmented network assets and
newly recorded consumers after the date of commencement of the project.
 All new consumers will be tagged in GIS up to DTR/ pole level.
 Utility will verify the updated data through GIS application and confirm HCL
via e-mail and after which the data will be made available on production.
 GIS Production data will be disseminated and synchronized with other
modules to generate accurate AT&C losses report.
 In field asset painting would be done only for below cases:-
- Newly augmented asset networks
- On existing assets of which paint codes are not visible in field.
8
METHODOLOGY: ONE TIME ACTIVITY
 Survey for validation will be done using hard copy maps to identify the gaps.
 Identified gaps (Internal bifurcation/Newly Augmented Network)will be
analyzed to capture required information of the change network assets from
field.
 The validated survey data will be used as an input for creating GIS data in
the system.
 The GIS data created in the system will be checked thoroughly through
internal QC/QA processes to meet the business requirements.
 The validated GIS data will be posted into centralized geo-database and it
will be disseminated to other modules for synchronization and AT&C loss
report generation
9
DELIVERABLES
 All the data related deliverables will be submitted in the form of softcopy
 Up-to-date network data mapped in GIS for newly augmented and non-
augmented assets/networks.
 Incremental new consumer’s data mapped in GIS (w.r.t augmented and non-
augmented assets/networks).
 Mapping of re-aligned consumer’s in GIS as per ground condition.
 In field asset painting would be done only for below cases:-
– Newly augmented asset networks
– On existing assets of which paint codes are not visible in field.
10
ASSET PAINTING SCHEMA, DVVNL
11

More Related Content

What's hot

Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterhydrologywebsite1
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3SLOPE Project
 
Serving GIS Data To Electrical Distribution Analysis
Serving GIS Data To Electrical Distribution AnalysisServing GIS Data To Electrical Distribution Analysis
Serving GIS Data To Electrical Distribution Analysispdituri
 
APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16
APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16
APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16Thomas Olejniczak
 
Mid-term Review Meeting - WP5
Mid-term Review Meeting - WP5Mid-term Review Meeting - WP5
Mid-term Review Meeting - WP5SLOPE Project
 

What's hot (6)

Ramabrahmachary Sattenapalli
Ramabrahmachary SattenapalliRamabrahmachary Sattenapalli
Ramabrahmachary Sattenapalli
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3
 
Serving GIS Data To Electrical Distribution Analysis
Serving GIS Data To Electrical Distribution AnalysisServing GIS Data To Electrical Distribution Analysis
Serving GIS Data To Electrical Distribution Analysis
 
APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16
APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16
APL_Poster2_LabVIEW_ThomasOlejniczak_Spr16
 
Mid-term Review Meeting - WP5
Mid-term Review Meeting - WP5Mid-term Review Meeting - WP5
Mid-term Review Meeting - WP5
 

Similar to IGDI DVVNL

Capgemini ses - smart grid operational services - gis pov (gr)
Capgemini   ses - smart grid operational services - gis pov (gr)Capgemini   ses - smart grid operational services - gis pov (gr)
Capgemini ses - smart grid operational services - gis pov (gr)Gord Reynolds
 
S.2.g Meter and Sensor Data Management Service
S.2.g Meter and Sensor Data Management ServiceS.2.g Meter and Sensor Data Management Service
S.2.g Meter and Sensor Data Management ServiceSUNSHINEProject
 
REAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATION
REAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATIONREAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATION
REAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATIONIJCSEA Journal
 
Joep Luijten.pdf
Joep Luijten.pdfJoep Luijten.pdf
Joep Luijten.pdfGokhul2
 
Ima an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networksIma an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networkssudhakar5472
 
Ima an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networksIma an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networkssudhakar5472
 
GIS-Based Design for Effective Smart Grid Strategies
GIS-Based Design for Effective Smart Grid StrategiesGIS-Based Design for Effective Smart Grid Strategies
GIS-Based Design for Effective Smart Grid StrategiesSchneider Electric
 
Systematic Approch to a GIS
Systematic Approch to a GISSystematic Approch to a GIS
Systematic Approch to a GISElizabeth Runkle
 
Evolving Gas Utility Mapping with FME
Evolving Gas Utility Mapping with FMEEvolving Gas Utility Mapping with FME
Evolving Gas Utility Mapping with FMESafe Software
 
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORKSUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORKReza Nourjou, Ph.D.
 
IOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptx
IOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptxIOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptx
IOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptxCHEEDARABHAVANI
 
IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...
IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...
IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...IRJET Journal
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 

Similar to IGDI DVVNL (20)

GIS for City Gas Networks
GIS for City Gas NetworksGIS for City Gas Networks
GIS for City Gas Networks
 
Capgemini ses - smart grid operational services - gis pov (gr)
Capgemini   ses - smart grid operational services - gis pov (gr)Capgemini   ses - smart grid operational services - gis pov (gr)
Capgemini ses - smart grid operational services - gis pov (gr)
 
S.2.g Meter and Sensor Data Management Service
S.2.g Meter and Sensor Data Management ServiceS.2.g Meter and Sensor Data Management Service
S.2.g Meter and Sensor Data Management Service
 
REAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATION
REAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATIONREAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATION
REAL TIME WEB BASED SYSTEM FOR OBSERVING SAG AT SUBSTATION
 
CBEC-LAN-v9-0.ppt
CBEC-LAN-v9-0.pptCBEC-LAN-v9-0.ppt
CBEC-LAN-v9-0.ppt
 
Vikas_Resume
Vikas_ResumeVikas_Resume
Vikas_Resume
 
Joep Luijten.pdf
Joep Luijten.pdfJoep Luijten.pdf
Joep Luijten.pdf
 
Ima an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networksIma an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networks
 
Ima an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networksIma an integrated monitoring architecture with sensor networks
Ima an integrated monitoring architecture with sensor networks
 
GIS-Based Design for Effective Smart Grid Strategies
GIS-Based Design for Effective Smart Grid StrategiesGIS-Based Design for Effective Smart Grid Strategies
GIS-Based Design for Effective Smart Grid Strategies
 
Systematic Approch to a GIS
Systematic Approch to a GISSystematic Approch to a GIS
Systematic Approch to a GIS
 
Evolving Gas Utility Mapping with FME
Evolving Gas Utility Mapping with FMEEvolving Gas Utility Mapping with FME
Evolving Gas Utility Mapping with FME
 
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORKSUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
 
Fiber_GIS_Software2010
Fiber_GIS_Software2010Fiber_GIS_Software2010
Fiber_GIS_Software2010
 
Process Model
Process ModelProcess Model
Process Model
 
ECS
ECSECS
ECS
 
IOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptx
IOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptxIOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptx
IOT BASED SMART ENERGY METER BILLING MONITORING PPT.pptx
 
IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...
IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...
IoT Based Control and Monitoring of Smart Grid and Power Theft Detection by L...
 
Gis
GisGis
Gis
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 

Recently uploaded

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 

Recently uploaded (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 

IGDI DVVNL

  • 1. Presentation on Incremental GIS Data Incorporation into Centralized Geo-database ABHISHEK Geo-Spatial Division, HCL 1
  • 2. FEEDER SANITIZATION ACTIVITY Input Required:  DT wise hard copies of Maps  Consumer Data Collection Format Activity:  Asset Verification  Consumer Collection in predefined format  Daily Progress Reporting 2
  • 3. FEEDER SANITIZATION ACTIVITY Methodology:  First team will visit on field to verify & identify new assets as per current ground condition versus provided DT wise maps  Coding of newly/bifurcated assets on ground using permanent marker & same coding on the provided maps  Second team will count number of service lines connected to pole  Collection of door to door consumers details in predefined format 3
  • 4. FEEDER SANITIZATION ACTIVITY Coding Technique:  Suppose we have 3 new poles between 2 identified poles  Suppose we have n number of poles at end of the earlier identified network 4
  • 6. Incremental GIS Data Incorporation into Centralized Geo-database Objective of this programme is to update and maintain centralized geo- database by implementing periodical updates in the system through a process driven mechanism so that higher objectives of already running RAPDRP programme such as up to date AT&C Loss Report Generation, GIS Based Network Analysis, DT wise SBM billing, Asset management etc can be met. SCOPE OF WORK: 1. Going Forward Activity 2. One time activity (Current Delta Gap) 6
  • 7. SCOPE OF WORK Going Forward Activity: This includes incorporation of field changes in electrical network in terms of assets and consumers along with relevant network to centralized geo database. Activity will be restricted to incorporation of new network / bifurcated network after the project commencement. HCL will add and update the GIS data of new networks, bifurcated networks and will geo-tag newly recorded consumers as per the necessary information collected from utility on regular basis. One time activity (Current Delta Gap): During execution of this activity, existing electrical network assets available in current geo-database will be updated as per present ground scenario. This will be one time exercise in order to make the network data up-to-date. 7
  • 8. METHODOLOGY: GOING FORWARD ACTIVITY  Field survey will be conducted for the newly augmented network assets and newly recorded consumers after the date of commencement of the project.  All new consumers will be tagged in GIS up to DTR/ pole level.  Utility will verify the updated data through GIS application and confirm HCL via e-mail and after which the data will be made available on production.  GIS Production data will be disseminated and synchronized with other modules to generate accurate AT&C losses report.  In field asset painting would be done only for below cases:- - Newly augmented asset networks - On existing assets of which paint codes are not visible in field. 8
  • 9. METHODOLOGY: ONE TIME ACTIVITY  Survey for validation will be done using hard copy maps to identify the gaps.  Identified gaps (Internal bifurcation/Newly Augmented Network)will be analyzed to capture required information of the change network assets from field.  The validated survey data will be used as an input for creating GIS data in the system.  The GIS data created in the system will be checked thoroughly through internal QC/QA processes to meet the business requirements.  The validated GIS data will be posted into centralized geo-database and it will be disseminated to other modules for synchronization and AT&C loss report generation 9
  • 10. DELIVERABLES  All the data related deliverables will be submitted in the form of softcopy  Up-to-date network data mapped in GIS for newly augmented and non- augmented assets/networks.  Incremental new consumer’s data mapped in GIS (w.r.t augmented and non- augmented assets/networks).  Mapping of re-aligned consumer’s in GIS as per ground condition.  In field asset painting would be done only for below cases:- – Newly augmented asset networks – On existing assets of which paint codes are not visible in field. 10