Adams Challenge
Event Description [Contract] Key Date
Effective Date of Agreement 5-Nov-14
Start of Cutting Project Steel 15-Dec-14
Mobilization of Sleeper / Riser Installation Marine Spread 14-Aug-15
Completion of Full Deck Main Structure + Full Jacket Fabrication 7-Sep-15
Mobilization of Pipeline / Platform Installation Marine Spread 8-Sep-15
Installation of Jacket at the Worksite 10-Oct-15
Completion of Installation of All Pipelines 21-Nov-15
Installation of the Rashid-C Deck at the Work Site 24-Nov-15
Pre-Commissioning of All Pipelines 26-Dec-15
Mechanical Completion of All Facilities 26-Dec-15
Handover of All Project Documentation 4-Feb-16
DSV Adams Challenge
Sleepers Installation
SMART Flange Preparation
Risers Installation
Bowstring Installation
Production Spools
Metrology, Closing Spools, Jacket Grouting, Crossing
Completion, Susea Protection Frames & Bowstring Removal
Pre-commissioning Support
DSV Oceanic Installer
Subsea FCG of 14" & 20" Replacement Pipelines
Metrology, Fixed & Closing Spools Installation
G1201
Rashid C Jacket & Boat Landing Installation
Pipelines Installation (30", 20" & 14")
Pipelines Installation (18", 10" & 12")
Deck Installation
Pre-Commissioning
30", 20" & 14"
18", 12" & 10"
Feb-16 Mar-16Jan-16May-15 Dec-15Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15
Jacket
Topsides
Piles
Risers
Tie-in Spools
Installation Aids
Pre-Engineering
Survey
Geophysical & ROV Jacket Face
Surveys
Bowstring Installation (4 nos.)
Concrete Sleepers Installation
102 Km of Pipelines; 30", 20", 18", 14",
12" & 10"
In-line Barred Tees (6 nos.)
Risers (8 nos.) + Riser Clamps (29 nos.)
Free Span Corrections
Tie-in / Closing Spools
Production Spools
Smart Flanges (8 nos.)
Valve Assemblies
Subsea Protection Frames (6 nos.)
FCG & Hydrotest of all Pipeline
Systems.
De-watering & Nitrogen Purging of 10"
Gas Lift Pipeine System.
As-Built Survey ROV & CP Potential Surveys
Pre-Commissioning
Fabrication
(Dubai Dry Docks)
DSV Preparatory
Works
Scope of Work
DSV Works
Pipelying
(G1201)

More Related Content

What's hot (18)

Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
03.224 - Stern_trawler_Sandettie_upgrading.PDF
03.224 - Stern_trawler_Sandettie_upgrading.PDF03.224 - Stern_trawler_Sandettie_upgrading.PDF
03.224 - Stern_trawler_Sandettie_upgrading.PDF
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
ERNEST HODGINS CV
ERNEST HODGINS CVERNEST HODGINS CV
ERNEST HODGINS CV
 
10-02-03
10-02-0310-02-03
10-02-03
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Work Experience large
Work Experience largeWork Experience large
Work Experience large
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
CV Novo
CV NovoCV Novo
CV Novo
 
2 l 65z
2 l 65z2 l 65z
2 l 65z
 
ATTEEQUE CV
ATTEEQUE CVATTEEQUE CV
ATTEEQUE CV
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
Falcon Spirit FSO
Falcon Spirit FSOFalcon Spirit FSO
Falcon Spirit FSO
 

Similar to Rashid C_Synopsis_R6

NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS BrochureFranco R
 
Vegi Bala (International) - Final
Vegi Bala  (International) - FinalVegi Bala  (International) - Final
Vegi Bala (International) - FinalBala Vegi
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibilityguest651e92c
 
MSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015octMSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015octMark S. Davis
 
Cv paoloaguzzinov16
Cv paoloaguzzinov16Cv paoloaguzzinov16
Cv paoloaguzzinov16Paolo Aguzzi
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2Brian Quan (Minh)
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study NoordzeeSander_van_oirschot
 
Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)SangKyu Park
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's ResumeMehdi Kessouar
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.Vali ibrahim
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.vali ibrahim
 
Bgl solar update210614
Bgl solar update210614Bgl solar update210614
Bgl solar update210614Tejas Kale
 

Similar to Rashid C_Synopsis_R6 (20)

KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
 
NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS Brochure
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Vegi Bala (International) - Final
Vegi Bala  (International) - FinalVegi Bala  (International) - Final
Vegi Bala (International) - Final
 
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
MSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015octMSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015oct
 
Cv paoloaguzzinov16
Cv paoloaguzzinov16Cv paoloaguzzinov16
Cv paoloaguzzinov16
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2
 
sharndencv
sharndencvsharndencv
sharndencv
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
 
Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's Resume
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 
Bgl solar update210614
Bgl solar update210614Bgl solar update210614
Bgl solar update210614
 
DNVGL_ST_N0001 FULL.pdf
DNVGL_ST_N0001 FULL.pdfDNVGL_ST_N0001 FULL.pdf
DNVGL_ST_N0001 FULL.pdf
 

Rashid C_Synopsis_R6

  • 1. By: Tamer Farid Rev. 6 G1201 Adams Challenge Event Description [Contract] Key Date Effective Date of Agreement 5-Nov-14 Start of Cutting Project Steel 15-Dec-14 Mobilization of Sleeper / Riser Installation Marine Spread 14-Aug-15 Completion of Full Deck Main Structure + Full Jacket Fabrication 7-Sep-15 Mobilization of Pipeline / Platform Installation Marine Spread 8-Sep-15 Installation of Jacket at the Worksite 10-Oct-15 Completion of Installation of All Pipelines 21-Nov-15 Installation of the Rashid-C Deck at the Work Site 24-Nov-15 Pre-Commissioning of All Pipelines 26-Dec-15 Mechanical Completion of All Facilities 26-Dec-15 Handover of All Project Documentation 4-Feb-16 DSV Adams Challenge Sleepers Installation SMART Flange Preparation Risers Installation Bowstring Installation Production Spools Metrology, Closing Spools, Jacket Grouting, Crossing Completion, Susea Protection Frames & Bowstring Removal Pre-commissioning Support DSV Oceanic Installer Subsea FCG of 14" & 20" Replacement Pipelines Metrology, Fixed & Closing Spools Installation G1201 Rashid C Jacket & Boat Landing Installation Pipelines Installation (30", 20" & 14") Pipelines Installation (18", 10" & 12") Deck Installation Pre-Commissioning 30", 20" & 14" 18", 12" & 10" Feb-16 Mar-16Jan-16May-15 Dec-15Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Jacket Topsides Piles Risers Tie-in Spools Installation Aids Pre-Engineering Survey Geophysical & ROV Jacket Face Surveys Bowstring Installation (4 nos.) Concrete Sleepers Installation 102 Km of Pipelines; 30", 20", 18", 14", 12" & 10" In-line Barred Tees (6 nos.) Risers (8 nos.) + Riser Clamps (29 nos.) Free Span Corrections Tie-in / Closing Spools Production Spools Smart Flanges (8 nos.) Valve Assemblies Subsea Protection Frames (6 nos.) FCG & Hydrotest of all Pipeline Systems. De-watering & Nitrogen Purging of 10" Gas Lift Pipeine System. As-Built Survey ROV & CP Potential Surveys Pre-Commissioning Fabrication (Dubai Dry Docks) DSV Preparatory Works Scope of Work DSV Works Pipelying (G1201)