9. FEASIBILITY
OPTION 1: DESK BASED
• COST EFFECTIVE
• FAST EXECUTION
• ONLY BASIC LEVEL STUDY
OPTION 2: 3-D SCAN
BASED
– VERY ACCURATE
– COMPLETE SPATIAL FEASIBILITY
– DETAILED STUDY
11. WORKSHOP DWGS
• Production Design in 3-D
environment
• Pre-fab of pipe spools
• Avoid hot work on board
• Production Design outputs:
• 3-D Pipe route
• Iso-metric and spool drawings.
• Pipes installation drawings
• Cable duct/HVAC Duct routing
12. PROJECT MNGMT.
• Class Approvals
• Approvals for Retrofit Drawings
• Coordination for Class survey onboard
• Workshop Co-ordination
• Technical Specification for retrofit
• Job work order & Workshop Selection
• Supervision
• Quality inspections
(critical for in-situ fabrication)
• Workshop inspections for pre-fab pipes
13. Typical Team Composition for a BW Retrofit Engineering
Design project:
Team Composition
Project Manager
(Naval Architect or
Marine Engg)
Outfitting Lead
(Mechanical Engineer) + 2
Designers
Electrical &
Automation Lead
(Electrical Engineer) + 2
Designers
Site Lead
(Marine Engineer) + QC
inspectors
14. ASSOCIATIONS
- With All Major OEMs
- Trainings and knowledge sharing
- Access to Technical drawings
*All Trademarks are registered trademarks of their respective owners
Alfa Laval
Erma First
Ecochlor
Panasia
Optimarin
Headway