1. Curriculum Vitae
Personal Details :
Name: Shaikh Mobin Ilahi
Date of Birth: 10th May 1970
Nationality: Indian
Marital Status: Married
Phone: 0091-657-2340627 / 09835118055 / 09430137633
( India )
Mobile: 00966-536342256 / 536342257
E-mail: mobiniahi@yahoo.co.in / mobinilahi@hotmail.com
Executive Summary :
Over 20 years working experience in Petrochemical Industry, Plants , Oil & Gas sector,
Buildings and Refinery related to Electrical ,Instrumentation Controls, Engineering Design,
Project Management at SABIC, Non-SABIC Companies and Saudi Aramco at strategic locations
i.e. Khobar, Rastanura , Riyadh , Al-Khafji, Al-Kharz and Jubail etc. at positions of Responsible
Design Engineer, Senior Engineer, Project Coordinator, Project Superintendent and Manager
Project Support. Extensive Experience of Project Management, Engineering Procurement
Construction ( EPC ), Management of Change ( MOC ), Detailed Engineering, Front End
Engineering Design (FEED) ,Estimating, Bidding Process, Evaluation of Technical &
Commercial Proposals, Procurement, Construction Maintenance ,Plant Shutdown. Mega cum
multiple Projects. Familiar with tools viz. Project Evaluation & Review Technique (PERT ),
Critical Path Method (CPM ) , GANTTChart, S-Curve etc. , Project Cost & Profit cum Feasibility
Study Report Analysis ,Concept Development ( CDP ) package ,Testing & Commissioning
,Interfacing with Contractor / Stakeholders / End User / Management , Root Cause
Analysis ( RCA) etc. Physically fit for hard work, willing to relocate and join immediately
and work in any location
Project Engineering Management Services for various SABIC affiliates and Non-SABIC facilities.
The projects supervised are Rastanura Refinery Upgrade Project, SABIC Technology Projects
such as KFIP Upgrade Project, Jubail Port Expansion Projects, comprising construction of new
Berths as Product Shipping outlets, Enhancement Project, Product Tank Farm construction
and expansion facilities, Plant Expansion. Also Saudi Aramco Plant Upgradation at facilities
including Shutgum, Uthmaniya, Jubail etc. John Zink system, Upgrade of Electrical Protection
System / Equipment, DCS, ESD, Fire/Gas Detection and Protection Systems, Emergency Siren
System and CCTV Systems at various SABIC/Non-SABIC facilities Jubail, Saudi Arabia.
Extensive experience of Project Management, FEED, DetailEngineering, Designing, MOC, EPC,
participating in Hazops, and Factory Acceptance Tests / Site Acceptance Test related to all
kind of Electrical Equipment including Transformers, Switchgears, DCS System, PLC Systems,
Automatic Transfer Switch (ATS ), Wireless System, Transmitters at various vendor facilities.
Also extensive experience of Reviewing / Approval of Engineering Design Packages comprising
of Key Engineering drawings and documents based on SABIC / ARAMCO/ NEC/ IEEE
Engineering Standards, HCIS Standards, RoyalCommission Environmental Regulations.Project
Management utilizing expertise skill and Tools viz. Project Evaluation & Review Technique.
Expertise of Optimal utilization of resources including manpower and material. Freezing of
2. Project deliverables including Design documents viz. number of existing design documents to
be revised and new documents to be generated etc. Scrutinize engineering, procurement,
construction and commissioning activities of multiple Projects to ensure compliance with
project specifications and standards. Supervise discipline Engineers / Supervisors and
Contractors to ensure efficient and smooth workflow. Provide engineering support and
distribute workload to team and ensure proper coverage.
Build relationship with vendors, service providers, end users, stakeholders and work with the
operations and maintenance teams. Support operation and maintenance team in setting up
operations and maintenance systems and procedures including provision of data and
documentation. Also assist asset Management System for various activities. Prepare
justifications, scope of work, man-hour estimates for accommodating changes/modifications
as part of Management of Change (MOC).Responsible for review and approval of Technical
Submittals/ Packages, Feasibility Study Reports, Design Documents including calculations viz.
sizing , Wiring Diagrams , Interconnection & Schematic Diagrams , Electrical Overall Power
Distribution System / Single Line Diagram, Protection Relay Coordination Report of Electrical
system / equipments viz. Generator / Feeder / Transformer / Busbar / Motor etc. complying
with relevant standards viz.NEC / IEEE / SABIC / Saudi Aramco etc. Review of ETAP / EDSA
report for load flow, Short Circuit Current Analysis, Harmonic analysis etc. Burner
Management System, Building Management System ( BMS ) , Fire Protection System, Gas
Detectors, Sprinkler System, Interfacing of low voltage system, , Power Distribution Board etc.
Also familiar with multiple Instrumentation Projects viz Berthold Gama Radioactive Source
Level Transmitters / side detectors, Interfacing of Low Voltage Systems, Transfer of
Radioactive Gama Source from old container to new container with pneumatic actuators, GWR
Level Transmitters, ControlValves with Pneumatic Actuators , Continuous Emission Monitoring
System ( CEMS ) Analyzer for NOX /CO at Flare Stack including sample handling system,
Teledyne Oxygen Analyzer, Gas Chromatograph, Transmitters viz.Temperature/ Pressure /
Flow/ DP Type LevelMeasurement , Sizing of Orifice Plate , Control Valve Cv value calculations
, Upgradation of DCS , ESD , F & G System , Burner Management System , Control Valves,
On-OFF Valves , Pneumatic Actuators ,Plant Horn / PLC upgradation system etc. Executed
some mega Projects viz. Acrylic Acid and Butanol Plant .Extensive experience of Technical
Review/approval and Interfacing with EPC Contractor and Management to provide technical
details / support and resolve outstanding issues. Review / Approve Submittal including
specifications, datasheets, and layouts. Calculation and sizing of Lightings / Motors/ UPS
Systems/ UPS Battery /Transformers / ATS / Feeder Power & Control Cable/ Circuit Breakers
/ Protection Relays , Generator set, etc.Evalaution of Motor Curves / Speed & Torque curve
etc.,
Coordination with EPC contractors / multi discipline engineers to provide technical input and
resolve outstanding issues. Evaluating Technical Proposals and finalizing deliverables .Review
and approval of Technical Submittals including revised design documents , Drawing Submittal
, calculations , Material Submittal, Take off / BOQ , Specifications , Data Sheet etc. by GES
/EPC contractors. Involved for Testing, Pre-commissioning & Commissioning activities of
Electrical & Instrumentation Projects .Responsible for review and approval of final submittal
including Markup & Engineering packages, Inspection & Testing Plan (ITP), method statement
and closeout documents of respective projects etc. Conduct regular tool box topics and safety
awareness to site personnel and consistent identification of risks before starting the work using
job safety analysis and procedures .Leading Team for the Engineering / Detail Engineering of
the respective Project until submission / handover of package. Submittal including Drawing
and Material viz. Calculations for Sizing of individual electrical equipments considering
standards and specification viz. Busbar ,Feeder Cables , Circuit Breakers ,MCC/ Switchgears /
Switchboard and cubicles, Transformer, Generator set, Motor, UPS , Protection Relays,
Batteries, Power Distribution Board , Grounding and Lightening System ,Access Control, Public
Address, Lighting, Capacitor Bank , Battery Bank , HVAC / AHU , Low Voltage system etc. ,
layout Drawings for the Equipments , Substation Equipment Layout , Power / Control /
Instrument cables Layout , Electrical Heat Tracing & Cathodic Protection System Design, ETAP
/ EDSA Protection Relay Coordination Study Report for analyzing of load flow, short circuit
current harmonic distortion etc. Hook Up drawing, Mounting details, Tie in Points, Material
3. Specifications & Data Sheet etc. Review and check engineering design documents produced
during FEED, detailed engineering, procurement, construction, and commissioning to ensure
compliance to international design codes and best engineering practices. Also check project
electrical standards and specifications to ensure adequacy to meet safe operability and
maintainability of respective facilities. Review and Approval of Detail Engineering packages
including Calculations , Schematic & Interconnection Diagrams , Wiring Diagram , ETAP / EDSA
report, Technical Proposals/ submittals , Material Specifications & Data Sheets ,Drawing
Submittal etc. for multiple Projects. Technical evaluations of technical proposal submitted by
multiple Bidders, leading for the Bidding Process & Formalities until issue of PO. Scrutinize
engineering, procurement, construction and commissioning activities of electrical power
distribution system for the respective facilities to ensure compliance with project specifications
and standards. Supervise discipline Engineers to ensure efficient and smooth workflow.
Provide engineering support and distribute workload to within team to ensure proper
coverage. Attend engineering reviews and studies at contractors, vendors, stakeholders, end
user for .HAZOP, PSSR, FAT, SAT etc. Provide field engineering support during the construction
phase. Also Prepare justifications, scope of work, man-hour estimates for accommodating
changes/modifications during design stage as well as during operation period. Review of
Planner Report for Project Schedule / Achievement status for Planned versus Actual of each
activities for the respective Projects. Responsible for the final submittal of Markup &
Engineering packages, Inspection & Testing Plan (ITP), method statement and closeout
documents of the respective Projects
Career Objective:
• Secure a challenging engineering position where in my team player attributes, experience,
and communication skills can be utilized in obtaining personal career goals and those of the
employer. Work in progressive highly motivate and dynamic professional organization with
proven analytical skills and ample scope for carrier development. I have the ability to work
hard under pressure with good communication skills .Looking forward to work on challenging
assignments & seeking environment which helps my knowledge and allow me to prove my
capabilities toward growth of organization.
Computer Applications :
SAP, MS-Project, MS-Office , Internate etc.
Work Experience :
Period: February 2015 – Till Date
Position: Senior Project Engineer
Company & Location: SABTANK Petrochemical, Saudi Arabia
Projects Accomplishments:
o Major Projects Accomnplishment
o Upgradation of Electrical Emergency Power Backup System
including Transformer , installation & commissioning of Gas
Insulated Switchgears ( GIS ) etc. of all SABIC Affiliates/ Berths.
o Upgradation of Electrical Protection System / Relay Settings
including ETAP / EDSA study.
o Fire & Gas System Upgrade of all SABIC Affiliates including
Berths and interfacing with DCS System.
o Upgrade Plant Uninterruptible Power System ( UPS ), Auto
Transfer Switch ( ATS ) of all Affiliates and Berths.
o Replacement and Upgradation Obsolete Electrical Equipments,
Transformers etc.
o Upgradation of CCTV System of Plant Operation and Interfacing
with DCS System.
4. o Upgradation of Grounding Systems of multiple facilities / Berths
and interfacing with existing grounding grid.
o NOVEC Fire Suppression System of mutiple facilities.
o Plant Bagging System including Counters and interfacing with
DCS.
o Upgradation of Electrical Power Distribution & Grounding
System.
o Upgradation of HVAC / Chillers of multiple facilities.
o DCS Upgradation System of multible SABIC facilities , CCR and
Local Control Room .
o Materiological Station for forecasing of weathers , humidity ,
wind directions etc.
o Upgradation of Plant Lighting System to comply NEC / IEEE
standard LUX level of all SABIC / Non-SABIC facilities.
Period: April 10th
2009 – February 2015
Position: Senior Project Engineer
Company & Location: TASNEE Petrochemical, Saudi Arabia
Projects Accomplishments:
o Major Projects Accomnplishment
o Acrylic Acid & Butanol Plant .Interfacing & Coordinating with
EPC Contractors , Stakeholder ,End Users and Management for
technical support / communication.
o Upgradation of Protection Relay System / settings as per ETAP
/ EDSA study report
o Plant Uninterruptible Power System ( UPS ) for Security Low
Voltage Electronic loads viz. CCTV , Access Control etc. to
comply with High Commission of Indudtrial Security ( HCIS )
standards / Guidelines.
o Upgradation of Substation Switchgear / MCC / Switchboard and
Cubicles, ATS , SIEMENS Transformer Cooling System complete
with feeder.
o Chiller & AHU System , Elevators , Motor Operated Valves ( MOV
), EOT Cranes, Electric Heat Tracing & Cathodic Protection
System
o Upgradation of PLC System for Plant Security Bollad / Road
Blocker and interfacing with low voltage system complete with
Power Distribution System and feeder.
o Continuous Emission Monitoring System ( CEMS ) Analyzer for
NOX /CO at Flare Stack including sample handling
system,Teledyne Oxygen Analyzer & Gas Chromatograph
System
o Berthold Gama Radioactive Source Level Transmitters with side
detectors / Transfer of Radioactive Gama Source from old
container to new container with pneumatic actuators.
o Upgradation of Plant Lighting System to comply NEC / IEEE
standard LUX level
o Plant TETRA Radio system and communication Tower complete
with interfacing of all low voltage and Power Distribution
system.
o Upgradation of Plant Fire Proitection , Gas Detectors ,Public
Address & Horn System. etc.
o Plant Electrical Heat Tracing System and interfacing with DCS
System complete with Power Distribution System and feeder.
5. o Upgradation of Lighting System for LDPE / HDPE Plant comply
with NEC / IEEE Standards for the LUX level
o Data Center UPS Power Upgradation and integrating with
existing Power Distribution System for the additional IT loads
Period: June1st
2005 – Feb 10th
2009
Position: Senior Electrical Design Engineer
Company & Location: Zuhair Fayez Engineering Consultants ( SAUDI ARAMCO )
Saudi Arabia
Projects Accomplishments:
o Major Project Accomplishments
o Power Substation Unit complete with Building , Switchgears/
Circuit Breakers/ Switchboard and cubicles, Capacitor Bank, DC
Power Distribution System , Busbar, Feeder , HVAC System, Low
Voltage System etc. for the new Facilities
o Upgradation of Motor Actuators ( Motor Operated Valves ) for
the Plant complete with Power Distribution System / feeder
o Upgradation of Plant Lighting and Public Address System of
complete facility for respective project.
o Fire Protection / Sprinkler / CCTV / Gas Detectors / Access
Control system of the Plant with interfacing existing low voltage
system
o Installation / Erection of Oil and Dry Type Transformers of
respective facilities complete with feeder layout
o Electrical Heat Tracing / Grounding / Lightening System of the
Plant
o Data Center complete with normal and UPS Power Distribution
System / feeder
o Upgradation of Plant Building HVAC / AHU System and
interfacting with Low Voltage complete with Power Distribution
System and feeder.
o Building Management System complete with interfaing of low
voltage and Power Distribution System
o Capacitor Bank and Auto Transfer Switch System of respective
Substation complete with Power Distribution / feeder
Period: Jan 6th
2000 – April 26th
2005
Position: Senior Electrical Project Engineer
Company & Location: SSCL Company , Saudi Arabia
Projects Accomplishments:
o Major Project Accomplishments
o Benzene , Xylene & Tulene ( BTX ) Removal Plant for the
ARAMCO . Interfacing & Coordinating with EPC Contractors ,
Stakeholder ,End Users and Management for technical support
/ communication.
o Substation Unit complete with Building , Switchgears, Circuit
Breakers, Capacitor Bank, DC Power Distribution System ,
Busbar, Feeder ,Transformer, HVAC System , Battery Bank ,
Low Voltage System etc. for the new Facilities complete with
Power Distribution System.
o Upgradation of Motor Actuators ( Motor Operated Valves ) for
the Plant complete with Power Distribution System
o Upgradation of Protection Relay System for the Substation
with ETAP / EDSA Study
6. o Ring Main Unit for Power Distribution System of the facilities
and integrating with existing power distribution system
complete with feeder cable
o Fire Protection / Sprinkler / CCTV / Public Address / Access
Control system of the Plant
o Installation / Erection of Oil and Dry Type Transformers of
respective facilities complete with feeder layout
o Electrical Heat Tracing / Grounding / Lightening Protection
System of the Plant
o Elevator and EOT Crane for the Plant complete with Power
Distribution System
o Upgradation of Plant Building HVAC / AHU System and
interfacting with Low Voltage complete with Power Distribution
System
o Building Management System with interfaing of low voltage
and complete with Power Distribution System
o Capacitor Bank and Auto Transfer Switch System of respective
Substation complete with Power Distribution.
Period: April 4th
1996 – Oct 14th
1999
Position: Project Manager
Company & Location: UB Engineering Company , India
Projects Accomplishments:
o Major Project Accomplishments
o Electrical Heat Tracing System for the Pipe Line complete with
Power Distribution and Feeder
o Upgradation of Motor Actuators ( Motor Operated Valves ) for
the Plant complete with Power Distribution System
o Upgradation of Plant Lighting and Public Address System of
complete facility complete with power distribution
o Fire Protection / CCTV / Access Control / Public Address system.
o UPS Power Distribution System with Auto Transfer Switch ( ATS
) for the Electronic Loads complete with Feeder.
o Ring Main Units and Power Distribution system for the
respective facilities complete with Feeder
o Installation / Erection of Oil and Dry Type Transformers of
respective facilities complete with feeder
o Upgradation of Substation Switchgear /Switchboard / MCC /
Circuit Breaker / Protection Relays and cubicle.
o Chiller / HVAC / AHU System for Building and Interfacing with
Low Voltage System complete with Power Distribution System
o Electrical Heat Tracing / Grounding / Lightening Protection
System of the Plant complete with Feeder
o Elevator and EOT Crane for the Plant complete with Power
Distribution System
o Access Control and Public address system for the Building
facilities
o Installation and Commissioning of Gas Insulated Switchgear ,
Air Circuit Breaker , Disconnent Switches.
o Capacitor Bank and Auto Transfer Switch System of respective
Substation complete with Power Distribution
Period: Jan 5th
1992 – Feb 6th
1996
Position: Electrical Project Engineer
Company & Location: ECC Engineering Company , India
Projects Accomplishments:
7. o Major Project Accomplishments
o Ring Main Units and Power Distribution system for the
respective facilities complete with feeder network.
o Upgradation of Grounding & Lightening Protection System
o Lighting , Power Outlets , Power Distribution Board and Public
Address System of complete facility with power distribution
system.
o Fire Protection / CCTV / Access Control and Data Center
complete with Power Distribution System for the UPS Power
o Installation / Erection of Oil and Dry Type Transformers of
respective facilities complete with feeder network.
o Upgradation of Substation Switchgear , MCC , Circuit Breaker
and Protection Relays.
o Chiller / HVAC / AHU System for Building and Interfacing with
Low Voltage System complete with Power Distribution System
o Elevator and EOT Crane for the Plant complete with Power
Distribution System
o Building Management System complete with interfaing of low
voltage and Power Distribution System
o Capacitor Bank and Auto Transfer Switch System of respective
Substation complete with Power Distribution
Education
Academic
o Bachelor of Electrical Engineering ( B.E )
o Master of Business Administration ( M.B.A ) Specialised in Finance & Marketing
o Chartered Engineer ( C.Engg )
o Member Saudi Council of Engineers
o Diploma in Industrial Safety
Training
o Medical First Aid ( M.F.A )
o Personal Safety & Social Responsibility ( PSSR )
o Fire Fighting & Fire Prevention ( FF & FP )
o Personal Survival Technique ( PST )
o Diploma in Computer Application , etc.