SlideShare a Scribd company logo
1 of 4
Download to read offline
NAME: Randy Lee Orum DATE: February 10th
2017
POSITION TITLE: Civil / structural / Welding—Field
Engineer
ORGANIZATION Civil
LOCATION Riyadh Saudi Arabia
CITIZENSHIP USA
CONTINUOUS SERVICE 9 years
SPOUSE'S NAME Rene A Orum
CHILDREN'S DETAILS N/A
PROFESSIONAL LICENSES AND SOCIETIES
AWS—ICC--ACI
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS
Degree, Certificate, etc. School Major (or Subject) Date
Industrial-- Construction
Inspection—Q/A Q/C
Wilrick Institute of Technology
International Code Council
Industrial/Commercial Q/A—
Q/C
1990
Structural / Concrete Wilrick Institute of Technology Re-enforced ICC/UBC 1991
Pre-Stressed Concrete Wilrick Institute of Technology Pre-stressed and Post Ten
ICC/ UBC
1992
High strength Bolting Wilrick Institute of Technology A-490 A-325 Bolted Conn:
AISC/ICC
1991
Structural Masonry Wilrick Institute of Technology DSA / ICC 1991
Sprayed-Applied Fireproofing Wilrick Institute of Technology ICC / UBC 1990
Underground Tank Decomm: Wilrick Institute of Technology ICC / UBC 1991
Certified Welding Inspector American Welding Society AWS Cert # 95030251 1995
Level—2--UT In house certification ASNT—Level --2 1996
Level---2--MT In house certification ASNT—Level --2 1996
Level---2--PT In house certification ASNT—Level --2 1996
Bechtel Level 2 VT In house VT-welding inspection 2008
Testing Technician level 1 American Concrete institute Concrete testing--ACI 1991
Soils Technician Troxler—Nuclear Gauge Soils sampling and Testing 1991
OTHER SIGNIFICANT INFORMATION
PERSONAL:
LANGUAGES: Proficient in English
CAPABILITY:
MEMBERSHIPS: American Welding Society ( AWS )
International Code Council ( ICC )
OTHER: American Concrete Institute ( ACI )
DATES WORK HISTORY
FROM TO COMPANY, DIVISION,
DEPARTMENT
LOCATION AND SUPERIOR
POSITION HELD, SUMMARY OF RESPONSIBILITIES AND
SIGNIFICANT ACCOMPLISHMENTS
July—
2014
Present
Bechtel Corporation
Civil
The Riyadh Metro rail
Project
Tim Wombles
Dan Dust
Senior Lead Welding Engineer
I am currently performing Welder
qualifications as the lead welding Engineer to the
D1.1, D1.5 D1.6 ASME IX and 1104 welding
codes. I will be observing fit up and welding to the
project specifications. And reviewing 3rd party NDE
reports PQR and WPS for code compliance for the
Riyadh metro rail project. Performing quality
audits for several welding shops in the Middle
east. I have also established a high strength
bolting program. For the assembly and
disassembly of the 5 Gantry Cranes being used for
the superstructures. I over saw the welding of the
5 TBM ( tunnel boring machines ) cutting heads.
Also very active in the project with Civil and
structural activities. Performing final inspections on
the rebar placement and grounding grids for the
1200 footings and piers for the viaducts.
July--
2012
June—
2014
Bechtel OG&C
Keystone Pipeline
Cushing OK
Bobby Dewhurst / Ben
Viseur
Senior Civil, structural, welding inspector
I am currently performing field engineering
duties on civil / structural activities. For the mass
excavation and compaction of the onsite soils. 1300
Drilled concrete piers, and pier caps. Concrete
foundations for seven 350,000 (barrel) oil tanks.
Monitoring high strength bolting and welding.
Observing coating for the pipe lines. Reviewing the
constructability with the management team for the
underground foundations—oil pipe lines and electrical
ECT :
DATES WORK HISTORY
FROM TO COMPANY, DIVISION,
DEPARTMENT
LOCATION AND SUPERIOR
POSITION HELD, SUMMARY OF RESPONSIBILITIES AND
SIGNIFICANT ACCOMPLISHMENTS
April--
2011
July--
2012
Bechtel Mining and
Metals
Aluminum smelter
project
Kitimat, BC
Jeff James
Field engineer / Superintendent
I performed field Engineering duties on Civil/Structural
Activities for cleaning and demolition of the existing pot
lines. And for all the supporting buildings. I am involved
with the Welding, Civil & Structural works of the new
NRSB building, recycle building and the IT building.
July
2008
April
2011
Bechtel OG&C
Keystone Pipeline
Project,
Missouri- Illinois,
Kansas, Oklahoma
Brain Dempsey
Ben Viseur
Xavier Brito
Senior Civil & Welding Inspector / Lead
Inspector
Worked on the Cushing Delivery Station as the
onsite lead civil and welding inspector. I have been
involved with ten pump stations and three delivery
stations. My responsibilities are monitoring and
verification of compacted soils; rebar placement,
concrete, high strength grouting, bolting, pump
alignment, welding, and hydro testing. Working with
a safety first attitude and being proactive to prevent
rework and non-conformance report (NCR).
Jan--
1999
July
2008
Signet Incorporated
Bay Area California,
Sacramento California
Senior Civil & Welding Inspector I Lead
Inspector
I have worked on several different major construction
projects in California and Nevada. Some of my
accomplishments include the following:
 Three 750-megawatt combined natural gas and
steam turbine facilities. Performed special
inspections on reinforced concrete and structural
steel. Also performed welding and ultrasonic (UT)
inspections.
 A new hydrocracker project at a Conoco-Phillips
Refinery in Rodeo, California. I performed high
strength bolting and welding inspections on this
project.
 Two airport additions including runways and a three
story concourse at the McCarran International
airport in Las Vegas, Nevada.
 I have provided lead inspection roles on several
high rise buildings from five to forty stories. Also
performed inspection on site and shop fabrication
activities. Duties included inspection of soil,
reinforced concrete, masonry, bolting verification,
post tension slabs, VT, UT and MT welding
inspection.
 I performed VT and PT inspections on three steel
bridges located on Interstate Five (I-5) for the state
of California.
DATES WORK HISTORY
FROM TO COMPANY, DIVISION,
DEPARTMENT
LOCATION AND SUPERIOR
POSITION HELD, SUMMARY OF RESPONSIBILITIES AND
SIGNIFICANT ACCOMPLISHMENTS
Dec--
1991
Jan--
1999
Kleinfelder Labs
Incorporated
Reno Nevada,
Sacramento California
Welding and Civil Inspector
Provided special inspections on several large projects.
Some of these include the following.
 Genentech's Cell Culture Building that consists of
three stories of 10,000 tons of steel. Duties include
inspection and testing of concrete, structural steel,
high strength bolting, fireproofing, and NDE
inspections.
 Capitol East End project that consisted of 1.4
million square feet. At the time was the largest
office building project every built by the state of
California. I performed special inspections on soils,
masonry, reinforced concrete, fireproofing,
structural steel, bolting, NDE, UT and MT.
 Interstate Five (I-5) provided nuclear density testing
on sub-grade material, asphalt sampling and
testing.
 Provided special inspections on four(4) California
hospitals. These inspections were being performed
under strict requirements of OHSPOD and
California Title 24.
 Provided post tensioning, rebar, and concrete
inspection on a twelve (12) story parking garage in
Reno Nevada.
May--
1985
Sep--
1990
Merit Tank and Body
Bay Area California,
Berkeley California
Certified Welder (Aluminum and Steel)
Certified Welder in aluminum and steel. Duties included
fabrication and repair of gasoline tankers.
Jan--
1980
Apr--
1985
Redding Tank
Redding, California
Certified Welder -Structural Steel and Aluminum
Jobs included welding of above ground tank supports
and storage tanks.
May--
1976
Jan--
1980
Digmore Construction
Redding, California
Pipe Layer
Installation of underground utilities, water, sewer, storm
drain, and electrical. Scope was for residential and
commercial structures.

More Related Content

What's hot

CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016Shaun Fagan
 
CV CANADA JULY 2016
CV CANADA JULY 2016CV CANADA JULY 2016
CV CANADA JULY 2016Shaun Fagan
 
Rory James 2015 Resume
Rory James 2015 ResumeRory James 2015 Resume
Rory James 2015 ResumeRory James
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)Danny Kilpatrick
 
Kawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linkedKawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linkedCasey Kawahira
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan KilpatrickDanny Kilpatrick
 
7-8-15 Caltech_Statement_of_Qualification (3)
7-8-15 Caltech_Statement_of_Qualification (3)7-8-15 Caltech_Statement_of_Qualification (3)
7-8-15 Caltech_Statement_of_Qualification (3)Lisa Shelter
 
Joseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTPJoseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTPJOSEPH HART
 
Stuart simmons portfolio rev a
Stuart simmons portfolio rev aStuart simmons portfolio rev a
Stuart simmons portfolio rev aStuart Simmons
 
Project Profile Metalbuilding
Project Profile MetalbuildingProject Profile Metalbuilding
Project Profile Metalbuildingmusahossein
 
Project Description
Project DescriptionProject Description
Project DescriptionTed Webb
 
Allen Campbell_NR (003) - Copy
Allen Campbell_NR (003) - CopyAllen Campbell_NR (003) - Copy
Allen Campbell_NR (003) - CopyAllen Campbell
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 

What's hot (20)

cv 2017 feb
cv 2017 feb cv 2017 feb
cv 2017 feb
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016
 
CV CANADA JULY 2016
CV CANADA JULY 2016CV CANADA JULY 2016
CV CANADA JULY 2016
 
Rory James 2015 Resume
Rory James 2015 ResumeRory James 2015 Resume
Rory James 2015 Resume
 
resume_2015
resume_2015resume_2015
resume_2015
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)
 
CV 3
CV 3CV 3
CV 3
 
Kawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linkedKawahira, Casey - Portfolio,linked
Kawahira, Casey - Portfolio,linked
 
gfrsm2015
gfrsm2015gfrsm2015
gfrsm2015
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 
7-8-15 Caltech_Statement_of_Qualification (3)
7-8-15 Caltech_Statement_of_Qualification (3)7-8-15 Caltech_Statement_of_Qualification (3)
7-8-15 Caltech_Statement_of_Qualification (3)
 
Joseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTPJoseph+Mark+Hart+TRTP
Joseph+Mark+Hart+TRTP
 
resume CIP 1
resume CIP 1resume CIP 1
resume CIP 1
 
Stuart simmons portfolio rev a
Stuart simmons portfolio rev aStuart simmons portfolio rev a
Stuart simmons portfolio rev a
 
Resume Eng
Resume EngResume Eng
Resume Eng
 
Project Profile Metalbuilding
Project Profile MetalbuildingProject Profile Metalbuilding
Project Profile Metalbuilding
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
Project Description
Project DescriptionProject Description
Project Description
 
Allen Campbell_NR (003) - Copy
Allen Campbell_NR (003) - CopyAllen Campbell_NR (003) - Copy
Allen Campbell_NR (003) - Copy
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 

Viewers also liked

Viljelyohjelmalla lisää puhtia, Juho Urkko K-Maatalous
Viljelyohjelmalla lisää puhtia, Juho Urkko K-MaatalousViljelyohjelmalla lisää puhtia, Juho Urkko K-Maatalous
Viljelyohjelmalla lisää puhtia, Juho Urkko K-MaatalousYara Suomi
 
Software Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen ProyekSoftware Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen ProyekDudy Ali
 
Web Programming Syaria - PHP
Web Programming Syaria - PHPWeb Programming Syaria - PHP
Web Programming Syaria - PHPDudy Ali
 
Software Project Management - Proses Manajemen Proyek
Software Project Management - Proses Manajemen ProyekSoftware Project Management - Proses Manajemen Proyek
Software Project Management - Proses Manajemen ProyekDudy Ali
 
How to remove search.searchwfaa.com
How to remove search.searchwfaa.comHow to remove search.searchwfaa.com
How to remove search.searchwfaa.comjesicasruma
 
7. Investor September 2013
7. Investor September 20137. Investor September 2013
7. Investor September 2013Zowie Murray
 
Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...
Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...
Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...DRA NORMA ANGÉLICA TORRES SALGADO
 
2 tenerario excel yadira j.
2 tenerario excel yadira j.2 tenerario excel yadira j.
2 tenerario excel yadira j.Viviand Jiménez
 
Web Programming Syaria - Pengenalan Halaman Web
Web Programming Syaria - Pengenalan Halaman WebWeb Programming Syaria - Pengenalan Halaman Web
Web Programming Syaria - Pengenalan Halaman WebDudy Ali
 

Viewers also liked (17)

Viljelyohjelmalla lisää puhtia, Juho Urkko K-Maatalous
Viljelyohjelmalla lisää puhtia, Juho Urkko K-MaatalousViljelyohjelmalla lisää puhtia, Juho Urkko K-Maatalous
Viljelyohjelmalla lisää puhtia, Juho Urkko K-Maatalous
 
Software Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen ProyekSoftware Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen Proyek
 
Web Programming Syaria - PHP
Web Programming Syaria - PHPWeb Programming Syaria - PHP
Web Programming Syaria - PHP
 
Software Project Management - Proses Manajemen Proyek
Software Project Management - Proses Manajemen ProyekSoftware Project Management - Proses Manajemen Proyek
Software Project Management - Proses Manajemen Proyek
 
Aminoácidos
Aminoácidos Aminoácidos
Aminoácidos
 
How to remove search.searchwfaa.com
How to remove search.searchwfaa.comHow to remove search.searchwfaa.com
How to remove search.searchwfaa.com
 
pak suzuki report
pak suzuki reportpak suzuki report
pak suzuki report
 
sairam resume
sairam resumesairam resume
sairam resume
 
7. Investor September 2013
7. Investor September 20137. Investor September 2013
7. Investor September 2013
 
Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...
Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...
Procedimiento de warren urgente en sangrado masivo en paciente con hipertensi...
 
1 word
1 word1 word
1 word
 
2 tenerario excel yadira j.
2 tenerario excel yadira j.2 tenerario excel yadira j.
2 tenerario excel yadira j.
 
3 Power Point
3 Power Point3 Power Point
3 Power Point
 
2 trabajo internet
2 trabajo internet2 trabajo internet
2 trabajo internet
 
La educacion ambiental
La educacion ambientalLa educacion ambiental
La educacion ambiental
 
Reconstrucción del segmento infrarrenal de la vena cava
Reconstrucción del segmento infrarrenal de la vena cavaReconstrucción del segmento infrarrenal de la vena cava
Reconstrucción del segmento infrarrenal de la vena cava
 
Web Programming Syaria - Pengenalan Halaman Web
Web Programming Syaria - Pengenalan Halaman WebWeb Programming Syaria - Pengenalan Halaman Web
Web Programming Syaria - Pengenalan Halaman Web
 

Similar to Civil Engineer Resume Summary for Randy Lee Orum

Similar to Civil Engineer Resume Summary for Randy Lee Orum (20)

SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
 
Resume' history
Resume' historyResume' history
Resume' history
 
David_Wanless_CV
David_Wanless_CVDavid_Wanless_CV
David_Wanless_CV
 
Tom Donaghe Resume 2016
Tom Donaghe Resume 2016Tom Donaghe Resume 2016
Tom Donaghe Resume 2016
 
Resume Robert Able
Resume Robert AbleResume Robert Able
Resume Robert Able
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Keith Martin Resume
Keith Martin ResumeKeith Martin Resume
Keith Martin Resume
 
Resume Frank Bianca
Resume  Frank Bianca Resume  Frank Bianca
Resume Frank Bianca
 
WArmesResume
WArmesResumeWArmesResume
WArmesResume
 
A.Lusher C.V
A.Lusher C.VA.Lusher C.V
A.Lusher C.V
 
Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16
 
Levi Baker Resume QC
Levi Baker Resume QCLevi Baker Resume QC
Levi Baker Resume QC
 
Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson Resume 2015
Mitch Nelson Resume 2015
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
James Stafford's resume
James Stafford's resumeJames Stafford's resume
James Stafford's resume
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
res 2
res 2res 2
res 2
 

Civil Engineer Resume Summary for Randy Lee Orum

  • 1. NAME: Randy Lee Orum DATE: February 10th 2017 POSITION TITLE: Civil / structural / Welding—Field Engineer ORGANIZATION Civil LOCATION Riyadh Saudi Arabia CITIZENSHIP USA CONTINUOUS SERVICE 9 years SPOUSE'S NAME Rene A Orum CHILDREN'S DETAILS N/A PROFESSIONAL LICENSES AND SOCIETIES AWS—ICC--ACI EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS Degree, Certificate, etc. School Major (or Subject) Date Industrial-- Construction Inspection—Q/A Q/C Wilrick Institute of Technology International Code Council Industrial/Commercial Q/A— Q/C 1990 Structural / Concrete Wilrick Institute of Technology Re-enforced ICC/UBC 1991 Pre-Stressed Concrete Wilrick Institute of Technology Pre-stressed and Post Ten ICC/ UBC 1992 High strength Bolting Wilrick Institute of Technology A-490 A-325 Bolted Conn: AISC/ICC 1991 Structural Masonry Wilrick Institute of Technology DSA / ICC 1991 Sprayed-Applied Fireproofing Wilrick Institute of Technology ICC / UBC 1990 Underground Tank Decomm: Wilrick Institute of Technology ICC / UBC 1991 Certified Welding Inspector American Welding Society AWS Cert # 95030251 1995 Level—2--UT In house certification ASNT—Level --2 1996 Level---2--MT In house certification ASNT—Level --2 1996 Level---2--PT In house certification ASNT—Level --2 1996 Bechtel Level 2 VT In house VT-welding inspection 2008 Testing Technician level 1 American Concrete institute Concrete testing--ACI 1991 Soils Technician Troxler—Nuclear Gauge Soils sampling and Testing 1991
  • 2. OTHER SIGNIFICANT INFORMATION PERSONAL: LANGUAGES: Proficient in English CAPABILITY: MEMBERSHIPS: American Welding Society ( AWS ) International Code Council ( ICC ) OTHER: American Concrete Institute ( ACI ) DATES WORK HISTORY FROM TO COMPANY, DIVISION, DEPARTMENT LOCATION AND SUPERIOR POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS July— 2014 Present Bechtel Corporation Civil The Riyadh Metro rail Project Tim Wombles Dan Dust Senior Lead Welding Engineer I am currently performing Welder qualifications as the lead welding Engineer to the D1.1, D1.5 D1.6 ASME IX and 1104 welding codes. I will be observing fit up and welding to the project specifications. And reviewing 3rd party NDE reports PQR and WPS for code compliance for the Riyadh metro rail project. Performing quality audits for several welding shops in the Middle east. I have also established a high strength bolting program. For the assembly and disassembly of the 5 Gantry Cranes being used for the superstructures. I over saw the welding of the 5 TBM ( tunnel boring machines ) cutting heads. Also very active in the project with Civil and structural activities. Performing final inspections on the rebar placement and grounding grids for the 1200 footings and piers for the viaducts. July-- 2012 June— 2014 Bechtel OG&C Keystone Pipeline Cushing OK Bobby Dewhurst / Ben Viseur Senior Civil, structural, welding inspector I am currently performing field engineering duties on civil / structural activities. For the mass excavation and compaction of the onsite soils. 1300 Drilled concrete piers, and pier caps. Concrete foundations for seven 350,000 (barrel) oil tanks. Monitoring high strength bolting and welding. Observing coating for the pipe lines. Reviewing the constructability with the management team for the underground foundations—oil pipe lines and electrical ECT :
  • 3. DATES WORK HISTORY FROM TO COMPANY, DIVISION, DEPARTMENT LOCATION AND SUPERIOR POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS April-- 2011 July-- 2012 Bechtel Mining and Metals Aluminum smelter project Kitimat, BC Jeff James Field engineer / Superintendent I performed field Engineering duties on Civil/Structural Activities for cleaning and demolition of the existing pot lines. And for all the supporting buildings. I am involved with the Welding, Civil & Structural works of the new NRSB building, recycle building and the IT building. July 2008 April 2011 Bechtel OG&C Keystone Pipeline Project, Missouri- Illinois, Kansas, Oklahoma Brain Dempsey Ben Viseur Xavier Brito Senior Civil & Welding Inspector / Lead Inspector Worked on the Cushing Delivery Station as the onsite lead civil and welding inspector. I have been involved with ten pump stations and three delivery stations. My responsibilities are monitoring and verification of compacted soils; rebar placement, concrete, high strength grouting, bolting, pump alignment, welding, and hydro testing. Working with a safety first attitude and being proactive to prevent rework and non-conformance report (NCR). Jan-- 1999 July 2008 Signet Incorporated Bay Area California, Sacramento California Senior Civil & Welding Inspector I Lead Inspector I have worked on several different major construction projects in California and Nevada. Some of my accomplishments include the following:  Three 750-megawatt combined natural gas and steam turbine facilities. Performed special inspections on reinforced concrete and structural steel. Also performed welding and ultrasonic (UT) inspections.  A new hydrocracker project at a Conoco-Phillips Refinery in Rodeo, California. I performed high strength bolting and welding inspections on this project.  Two airport additions including runways and a three story concourse at the McCarran International airport in Las Vegas, Nevada.  I have provided lead inspection roles on several high rise buildings from five to forty stories. Also performed inspection on site and shop fabrication activities. Duties included inspection of soil, reinforced concrete, masonry, bolting verification, post tension slabs, VT, UT and MT welding inspection.  I performed VT and PT inspections on three steel bridges located on Interstate Five (I-5) for the state of California.
  • 4. DATES WORK HISTORY FROM TO COMPANY, DIVISION, DEPARTMENT LOCATION AND SUPERIOR POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS Dec-- 1991 Jan-- 1999 Kleinfelder Labs Incorporated Reno Nevada, Sacramento California Welding and Civil Inspector Provided special inspections on several large projects. Some of these include the following.  Genentech's Cell Culture Building that consists of three stories of 10,000 tons of steel. Duties include inspection and testing of concrete, structural steel, high strength bolting, fireproofing, and NDE inspections.  Capitol East End project that consisted of 1.4 million square feet. At the time was the largest office building project every built by the state of California. I performed special inspections on soils, masonry, reinforced concrete, fireproofing, structural steel, bolting, NDE, UT and MT.  Interstate Five (I-5) provided nuclear density testing on sub-grade material, asphalt sampling and testing.  Provided special inspections on four(4) California hospitals. These inspections were being performed under strict requirements of OHSPOD and California Title 24.  Provided post tensioning, rebar, and concrete inspection on a twelve (12) story parking garage in Reno Nevada. May-- 1985 Sep-- 1990 Merit Tank and Body Bay Area California, Berkeley California Certified Welder (Aluminum and Steel) Certified Welder in aluminum and steel. Duties included fabrication and repair of gasoline tankers. Jan-- 1980 Apr-- 1985 Redding Tank Redding, California Certified Welder -Structural Steel and Aluminum Jobs included welding of above ground tank supports and storage tanks. May-- 1976 Jan-- 1980 Digmore Construction Redding, California Pipe Layer Installation of underground utilities, water, sewer, storm drain, and electrical. Scope was for residential and commercial structures.