Levi Colte Baker
AWS/CWI # 12050071
ASNT ACCP Level II # 244510
765 Lee Road 11
Opelika, AL 36804
levibaker1982@yahoo.com
(334)703-1787
OBJECTIVE:
To obtain a position with a respectable organization with career advancements based on my
ability, experience and job performance.
STRENGTHS:
Highly motivated, professional outlook and approach, and career oriented. I have experience
working with ASME B31.1, B31.3, D1.1, ASME Section 1, 5, 8 & 9, API 1104 API 650, ACI.
EDUCATION:
2001 Graduate, Beauregard High School, Opelika, Alabama
2003 Graduate, Southern Union State Comm. College, Opelika, Alabama (Welding Technology)
AWS CWI (Certified Welding Inspector) 12050071
AWS Member 641234
EMPLOYMENT HISTORY:
Jacobs Field Services, Louisville, KY June 14-Present
QA/QC Manager, Performed surveillance inspection on contractor and vendor welds on
process piping systems per ASME B31.3. Used multiple computer skills to report all project
welds and NDE. Witnessed all auger casted piles, as well as witnessed concrete test per
truck, per pile. Assured that all vendor/fabricator NDE was in accordance with client
specifications. Also audited contractor installation of structural steel per AWS D1.1 &
AISC, and civil concrete and forms per ACI. During this time also performed receiving
inspection on piping, equipment, etc. Also responsible for assuring that contractor field
inspectors had the applicable information for the jobs being performed. Audited contractor
documentation packages for turnover.
Jacobs Field Services, Baton Rouge, LA July 13-June 14
QA/QC Manager/Inspector, inspected welds on process piping systems per
B31.1/B31.3. Put together multiple equipment packages for vessel re-rate as well as
vessel modifications. Used multiple computer skills to track all project welds and NDE.
Schedule and Coordinate all project NDE. Witnessed all auger casted piles, as well as
witnessed concrete test per truck, per pile. Assured that all vendor/fabricator NDE was in
accordance with client specifications. Also inspected structural steel per AWS D1.1, and
civil concrete and forms per ACI. During this time also performed receiving inspection
on piping, equipment, etc. Also responsible for assuring that other field inspectors had
the applicable information for the jobs being performed.
Jacobs Field Services, Jesup, GA July 12-July 13
Lead Inspector, Responsibilities included visual inspection of ASME coded
piping systems, AWS D1.1 structural steel, off-site inspections of vendor supplied
vessels, piping etc. Inspected all diesel driven piles for deep foundations on site. During
this time also performed project weld tracking, and scheduling of non-destructive
examination when needed as well as welder qualification. Also responsible for assuring
that other field inspectors had the applicable information for the jobs being performed.
Robins and Morton, Charleston, TN Aug 11 – July 12
Worked as a combination pipe welder in a Chlor-Alkali chemical plant making x-ray
quality welds on process piping systems. Moved to QA/QC, and inspected welds on
process piping systems per B31.3. Also inspected structural steel per D1.1, and civil
concrete and forms per ACI. During this time also performed receiving inspection on
piping, equipment, etc.
The Shaw Group Cliffside, NC Jun 10 – Aug 11
Worked as a combination pipe welder in a coal fired power plant making x-ray quality
welds on process piping systems per B31.1 and ASME Section 9.
Flour Maintenance Services, Smyrna, GA Feb 10 - Jun-10
Worked as a combination pipe welder in a combined cycle power plant making x-ray
quality welds on a variety of different alloy piping systems. Also worked as a piping
foreman, while working side by side with QA/QC to assure quality was performed.
BE&K Construction, Tuscaloosa, AL Jan 09 – Feb 10
Worked as a combination pipe welder in an oil refinery, made x-ray quality welds on a
variety of different alloy piping systems. Also obtained NCCER written and, NCCER
PLUS certification for pipe. Also worked with QA/QC, helping with weld tracking and
assurance of weld procedures and code ASME Section 9.
BE&K Construction, Macon, GA Aug 08 - Jan 09
Worked in QA/QC inspector in a coal fired power plant, performing quality inspection on
structural steel per D1.1 and process piping per B31.3 on a scrubber project for Southern
Company.
BE&K Construction, Marathon Oil, Ashland KY Mar 08 – Aug 08
Worked as a combination pipe welder in an oil refinery, made x-ray quality welds on
process piping systems. Also obtained level 2 visual inspection certification through
BE&K. Worked as QA/QC inspector inspecting welds on process piping systems per
B31.1 and B31.3, structural steel per D1.1.
PMSI Inc. Saint Mary’s, KS Oct 07 – Mar 08
Worked as a combination pipe welder/boiler tube welder in four different coal fired
power plants. During this time making x-ray quality welds on process piping systems and
boiler pressure parts. Worked hand and hand with QA/QC to assure all welding was
performed to B31.1, B31.3 and ASME Section 9.
BE&K Construction, Goat Rock/Smiths, AL Feb 07 – Oct 07
Worked as a heavy wall welder in a combined cycle power plant. Including making x-
ray welds on 9% Chrome piping and other process piping systems.
REFERENCES: Numerous references available upon request.

More Related Content

What's hot

What's hot (20)

gfrsm2015
gfrsm2015gfrsm2015
gfrsm2015
 
Resume Robert Able
Resume Robert AbleResume Robert Able
Resume Robert Able
 
Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16
 
Paul Lazarine Resume 10-24-2014
Paul Lazarine Resume 10-24-2014Paul Lazarine Resume 10-24-2014
Paul Lazarine Resume 10-24-2014
 
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
 
Randy Weathers resume
Randy Weathers resumeRandy Weathers resume
Randy Weathers resume
 
Michael Platt_CV_2016
Michael Platt_CV_2016Michael Platt_CV_2016
Michael Platt_CV_2016
 
Wilf's Resume
Wilf's ResumeWilf's Resume
Wilf's Resume
 
Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014
 
Resume' history
Resume' historyResume' history
Resume' history
 
EPGCONresume2015
EPGCONresume2015EPGCONresume2015
EPGCONresume2015
 
Chris potts resume; new
Chris potts resume; newChris potts resume; new
Chris potts resume; new
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
Resume 4
Resume 4Resume 4
Resume 4
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
Muhammad Khadim2013
Muhammad Khadim2013Muhammad Khadim2013
Muhammad Khadim2013
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016
 
CV CANADA JULY 2016
CV CANADA JULY 2016CV CANADA JULY 2016
CV CANADA JULY 2016
 

Viewers also liked

Modeling Water System Services and Seismic Resilience - Craig Davis
Modeling Water System Services and Seismic Resilience - Craig DavisModeling Water System Services and Seismic Resilience - Craig Davis
Modeling Water System Services and Seismic Resilience - Craig DavisEERI
 
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerPiping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerVarun Patel
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajanMadhur Mahajan
 
2. pipeline materials overview
2. pipeline materials overview2. pipeline materials overview
2. pipeline materials overviewWillam Le
 
Difference between code, standard & Specification
Difference between code, standard & SpecificationDifference between code, standard & Specification
Difference between code, standard & SpecificationVarun Patel
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
 
Piping training-course
Piping training-coursePiping training-course
Piping training-coursepdmsguy
 
Aranya Community Housing
Aranya Community HousingAranya Community Housing
Aranya Community HousingKhushboo Sood
 

Viewers also liked (13)

Modeling Water System Services and Seismic Resilience - Craig Davis
Modeling Water System Services and Seismic Resilience - Craig DavisModeling Water System Services and Seismic Resilience - Craig Davis
Modeling Water System Services and Seismic Resilience - Craig Davis
 
Piping ppt1
Piping ppt1Piping ppt1
Piping ppt1
 
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerPiping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
 
Rt Acceptance
Rt AcceptanceRt Acceptance
Rt Acceptance
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
Pipeline
PipelinePipeline
Pipeline
 
Film interpretation
Film interpretationFilm interpretation
Film interpretation
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajan
 
2. pipeline materials overview
2. pipeline materials overview2. pipeline materials overview
2. pipeline materials overview
 
Difference between code, standard & Specification
Difference between code, standard & SpecificationDifference between code, standard & Specification
Difference between code, standard & Specification
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
Piping training-course
Piping training-coursePiping training-course
Piping training-course
 
Aranya Community Housing
Aranya Community HousingAranya Community Housing
Aranya Community Housing
 

Similar to Levi Baker Resume QC

Similar to Levi Baker Resume QC (20)

Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson Resume 2015
Mitch Nelson Resume 2015
 
2016 Updated Resume Alex Timbrook
2016 Updated Resume Alex Timbrook2016 Updated Resume Alex Timbrook
2016 Updated Resume Alex Timbrook
 
AT RESUME
AT RESUMEAT RESUME
AT RESUME
 
Resume 2014
Resume 2014Resume 2014
Resume 2014
 
Matt 2014 resume
Matt 2014 resumeMatt 2014 resume
Matt 2014 resume
 
Charles_D_Green
Charles_D_GreenCharles_D_Green
Charles_D_Green
 
my resume Feb- 10th-2017
my resume  Feb- 10th-2017my resume  Feb- 10th-2017
my resume Feb- 10th-2017
 
Resume Frank Bianca
Resume  Frank Bianca Resume  Frank Bianca
Resume Frank Bianca
 
Matthews resume 2016
Matthews resume 2016Matthews resume 2016
Matthews resume 2016
 
Elpidio Gomez Cert Welder
Elpidio Gomez Cert WelderElpidio Gomez Cert Welder
Elpidio Gomez Cert Welder
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16
 
Almanza, Billy Resume 2.1
Almanza, Billy Resume 2.1Almanza, Billy Resume 2.1
Almanza, Billy Resume 2.1
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
Copy of HARDENBERGH JOBS
Copy of HARDENBERGH JOBSCopy of HARDENBERGH JOBS
Copy of HARDENBERGH JOBS
 
resume CIP 1
resume CIP 1resume CIP 1
resume CIP 1
 
wajid Alii gasco
wajid Alii gascowajid Alii gasco
wajid Alii gasco
 
Resume 12.5.16
Resume 12.5.16Resume 12.5.16
Resume 12.5.16
 
PUSPENDU UPDATED
PUSPENDU UPDATED PUSPENDU UPDATED
PUSPENDU UPDATED
 
Carroll's Resume 2
Carroll's Resume 2Carroll's Resume 2
Carroll's Resume 2
 

Levi Baker Resume QC

  • 1. Levi Colte Baker AWS/CWI # 12050071 ASNT ACCP Level II # 244510 765 Lee Road 11 Opelika, AL 36804 levibaker1982@yahoo.com (334)703-1787 OBJECTIVE: To obtain a position with a respectable organization with career advancements based on my ability, experience and job performance. STRENGTHS: Highly motivated, professional outlook and approach, and career oriented. I have experience working with ASME B31.1, B31.3, D1.1, ASME Section 1, 5, 8 & 9, API 1104 API 650, ACI. EDUCATION: 2001 Graduate, Beauregard High School, Opelika, Alabama 2003 Graduate, Southern Union State Comm. College, Opelika, Alabama (Welding Technology) AWS CWI (Certified Welding Inspector) 12050071 AWS Member 641234 EMPLOYMENT HISTORY: Jacobs Field Services, Louisville, KY June 14-Present QA/QC Manager, Performed surveillance inspection on contractor and vendor welds on process piping systems per ASME B31.3. Used multiple computer skills to report all project welds and NDE. Witnessed all auger casted piles, as well as witnessed concrete test per truck, per pile. Assured that all vendor/fabricator NDE was in accordance with client specifications. Also audited contractor installation of structural steel per AWS D1.1 & AISC, and civil concrete and forms per ACI. During this time also performed receiving inspection on piping, equipment, etc. Also responsible for assuring that contractor field inspectors had the applicable information for the jobs being performed. Audited contractor documentation packages for turnover. Jacobs Field Services, Baton Rouge, LA July 13-June 14 QA/QC Manager/Inspector, inspected welds on process piping systems per B31.1/B31.3. Put together multiple equipment packages for vessel re-rate as well as vessel modifications. Used multiple computer skills to track all project welds and NDE. Schedule and Coordinate all project NDE. Witnessed all auger casted piles, as well as witnessed concrete test per truck, per pile. Assured that all vendor/fabricator NDE was in accordance with client specifications. Also inspected structural steel per AWS D1.1, and
  • 2. civil concrete and forms per ACI. During this time also performed receiving inspection on piping, equipment, etc. Also responsible for assuring that other field inspectors had the applicable information for the jobs being performed. Jacobs Field Services, Jesup, GA July 12-July 13 Lead Inspector, Responsibilities included visual inspection of ASME coded piping systems, AWS D1.1 structural steel, off-site inspections of vendor supplied vessels, piping etc. Inspected all diesel driven piles for deep foundations on site. During this time also performed project weld tracking, and scheduling of non-destructive examination when needed as well as welder qualification. Also responsible for assuring that other field inspectors had the applicable information for the jobs being performed. Robins and Morton, Charleston, TN Aug 11 – July 12 Worked as a combination pipe welder in a Chlor-Alkali chemical plant making x-ray quality welds on process piping systems. Moved to QA/QC, and inspected welds on process piping systems per B31.3. Also inspected structural steel per D1.1, and civil concrete and forms per ACI. During this time also performed receiving inspection on piping, equipment, etc. The Shaw Group Cliffside, NC Jun 10 – Aug 11 Worked as a combination pipe welder in a coal fired power plant making x-ray quality welds on process piping systems per B31.1 and ASME Section 9. Flour Maintenance Services, Smyrna, GA Feb 10 - Jun-10 Worked as a combination pipe welder in a combined cycle power plant making x-ray quality welds on a variety of different alloy piping systems. Also worked as a piping foreman, while working side by side with QA/QC to assure quality was performed. BE&K Construction, Tuscaloosa, AL Jan 09 – Feb 10 Worked as a combination pipe welder in an oil refinery, made x-ray quality welds on a variety of different alloy piping systems. Also obtained NCCER written and, NCCER PLUS certification for pipe. Also worked with QA/QC, helping with weld tracking and assurance of weld procedures and code ASME Section 9. BE&K Construction, Macon, GA Aug 08 - Jan 09 Worked in QA/QC inspector in a coal fired power plant, performing quality inspection on structural steel per D1.1 and process piping per B31.3 on a scrubber project for Southern Company. BE&K Construction, Marathon Oil, Ashland KY Mar 08 – Aug 08 Worked as a combination pipe welder in an oil refinery, made x-ray quality welds on process piping systems. Also obtained level 2 visual inspection certification through BE&K. Worked as QA/QC inspector inspecting welds on process piping systems per B31.1 and B31.3, structural steel per D1.1.
  • 3. PMSI Inc. Saint Mary’s, KS Oct 07 – Mar 08 Worked as a combination pipe welder/boiler tube welder in four different coal fired power plants. During this time making x-ray quality welds on process piping systems and boiler pressure parts. Worked hand and hand with QA/QC to assure all welding was performed to B31.1, B31.3 and ASME Section 9. BE&K Construction, Goat Rock/Smiths, AL Feb 07 – Oct 07 Worked as a heavy wall welder in a combined cycle power plant. Including making x- ray welds on 9% Chrome piping and other process piping systems. REFERENCES: Numerous references available upon request.