SlideShare a Scribd company logo
1 of 3
Download to read offline
mylearnings.in
CIVIL ENGINEERING BASICS
For all competitive exams and for practicing engineers
What are Civil Engineering Basics ?
Civil Engineering basics are the basic parameters related to different Structures which all the
engineers should know.
Sub-structure :- Part of structure which is below the ground level is called substructure
Super-structure :- Part of structure which is above ground level is super structure.
Elevation – It’s the view which we can see when we stand right in front of the structure on any of
the sides.
Plastering – A cement, sand and water mix applied on brick wall for smooth surface for painting.
Plinth level – The level on which the actual structure stands on.
Riser – The vertical height of single step.
Tread – The horizontal portion where we put our foot on which going on steps.
Going – The inclined portion of stairs.
Footing – The bottom most part of structure. These are categorized as Isolated footing,
combined footing, Raft etc.
Columns – The vertical members of structure .
Clear cover – It’s the clear distance maintained from concrete face up to face of the
reinforcement steel.
Effective depth – It is the distance from top of the concrete face upto the CG of reinforcement.
Singly reinforced section – A section of concrete member with reinforcement at only on tension
face.
Doubly reinforced section – A section of concrete member with reinforcement on both tension
and compression side.
mylearnings.in
Stirrups –Steel bent in closed shape of either Rectangular of circular shape. These are generally
to hold column bars in position and also effective in shear carrying capacity.
Cantilever beam – A beam with fixed support on one side and the other end is free.
Propped cantilever – A beam with fixed support on one side and other end is with pinned
support.
Pedestal – When Length of the member is less than 3 times in width then its called pedestal.
One way slab – When ratio of length to width is more than 2 its one way slab
Two way slab – When ration of length to width is less than or equal to 2 , its two way slab.
Slender column – when length to width ratio of column is more than 12 , then its slender
column
Plain cement concrete (PCC) – The cement concrete mix provided on the ground level over
which foundations, beams are constructed. This is simply a levelling surface.
Pile foundation – The foundation system with Pile i.e cylinder shaped reinforced concrete.
Generally preferred when soil is very weak.
Frog – A small Depression on top of brick. This is for proper bonding with other bricks.
Scaffolding – A temporary structure constructed during the construction when work needs to be
carried out at higher elevations.
Retaining wall – A wall constructed to retain earth.
Tension – A force acting on member and in the direction away from the structure. Imagine
pulling the rubber band with two fingers.
Compression – A force acting on member in the direction towards the structure. This is simple
download load acting on structure.
Stress – Ratio of force applied to its sectional area.
Strain – This is the ratio of change in length to its original length.
Hooke’s Law – With in elastic limit stress is directly proportional to strain.
Poisson’s Ratio – It is the ratio of lateral strain to longitudinal strain.
Strut – A compression member in a truss.
Flab slab – A structural component supported only by columns and no beam arrangement.
Piers – The column types structures for supporting bridge slabs along the length.
mylearnings.in
Abutment – The end supports of bridge are abutments.
Lintel – A structural member just above the door or window or rolling shutter.
Cement :- Cement is basically obtained by grinding the stones containing lime and clay. Cement
is the binder which helps in the bonding of cement, sand along with water.
Some of the very important types of cement are
1. Low Heat cement used generally in construction of dams.
2. Sulphate resisting cement used in corrosive type environment. Ex. Sewage contact
surfaces
3. Rapid hardening cement
4. Quick setting cement
Aggregates : - Aggregates are generally of two Types 1) Fine Aggregate and 2) Coarse
Aggregate
Fine aggregate is the one that passes through 4.75 mm sieve and retained on 0.075 mm sieve
Coarse aggregate is the one that retains on 4.75 mm sieve.
Example of Fine aggregate – Sand
Example of Coarse aggregate – Gravel
Concrete :- Concrete is obtained by mixing cement, aggregate and water as per desired mix.
Here water to cement ratio plays important role. Strength of concrete is inversely proportional
to water cement ratio.
Concrete is represented by design mix as M-25.
M is Mix and 25 means compression strength at the end of 28 days considering concrete cubes
of 15 cm cube.
Concrete has Two setting types
a) Initial Setting time - 30 min
b) Final Setting time – 10 hrs
The test for setting time is done using Vicats apparatus.
Concrete setting time can be reduced or increased depending on climatic conditions by using
admixtures.
Admixture for increasing the setting time is called retarder and for reducing the setting time is
called accelerator.

More Related Content

What's hot

Science Project
Science ProjectScience Project
Science Project
TabelTop
 

What's hot (20)

Lec03 Earthquake Force Using Response Specturum Method (1) (Earthquake Engine...
Lec03 Earthquake Force Using Response Specturum Method (1) (Earthquake Engine...Lec03 Earthquake Force Using Response Specturum Method (1) (Earthquake Engine...
Lec03 Earthquake Force Using Response Specturum Method (1) (Earthquake Engine...
 
PRAKASH PPT
PRAKASH PPTPRAKASH PPT
PRAKASH PPT
 
Design and analysis of cantilever beam
Design and analysis of cantilever beamDesign and analysis of cantilever beam
Design and analysis of cantilever beam
 
Beam ,Loads,Supports , trusses
Beam ,Loads,Supports , trusses Beam ,Loads,Supports , trusses
Beam ,Loads,Supports , trusses
 
Mechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IMechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-I
 
Chapter 7 DESIGN OF FOOTING
Chapter 7 DESIGN OF FOOTINGChapter 7 DESIGN OF FOOTING
Chapter 7 DESIGN OF FOOTING
 
Science Project
Science ProjectScience Project
Science Project
 
Slab.beam.stair.ppt
Slab.beam.stair.pptSlab.beam.stair.ppt
Slab.beam.stair.ppt
 
Project report on beams
Project report on beamsProject report on beams
Project report on beams
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
Beams
Beams Beams
Beams
 
Columns and Their Types
Columns and Their TypesColumns and Their Types
Columns and Their Types
 
Footing
FootingFooting
Footing
 
Structural system of Buildings(sub-structure+ super structure)
Structural system of Buildings(sub-structure+ super structure)Structural system of Buildings(sub-structure+ super structure)
Structural system of Buildings(sub-structure+ super structure)
 
BRACED STEEL FRAMES IN EARTHQUAKE
BRACED STEEL FRAMES IN EARTHQUAKEBRACED STEEL FRAMES IN EARTHQUAKE
BRACED STEEL FRAMES IN EARTHQUAKE
 
Lintel,roof,beam,striar (by sonani jemish).pptx
Lintel,roof,beam,striar (by sonani jemish).pptxLintel,roof,beam,striar (by sonani jemish).pptx
Lintel,roof,beam,striar (by sonani jemish).pptx
 
Beam and its types
Beam and its typesBeam and its types
Beam and its types
 
Simply supported beams
Simply supported beamsSimply supported beams
Simply supported beams
 
Beam
BeamBeam
Beam
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 

Similar to Civil engineering basics

Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
toddr4
 

Similar to Civil engineering basics (20)

Ishfaq Rashid.pptx
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptx
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructure
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
 
Wall materials
Wall materialsWall materials
Wall materials
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Concrete & Masonry Construction
Concrete & Masonry ConstructionConcrete & Masonry Construction
Concrete & Masonry Construction
 
Brick masonry
Brick masonryBrick masonry
Brick masonry
 
Basic structure
Basic structureBasic structure
Basic structure
 
Design highrise
Design highriseDesign highrise
Design highrise
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Civil engineering basics

  • 1. mylearnings.in CIVIL ENGINEERING BASICS For all competitive exams and for practicing engineers What are Civil Engineering Basics ? Civil Engineering basics are the basic parameters related to different Structures which all the engineers should know. Sub-structure :- Part of structure which is below the ground level is called substructure Super-structure :- Part of structure which is above ground level is super structure. Elevation – It’s the view which we can see when we stand right in front of the structure on any of the sides. Plastering – A cement, sand and water mix applied on brick wall for smooth surface for painting. Plinth level – The level on which the actual structure stands on. Riser – The vertical height of single step. Tread – The horizontal portion where we put our foot on which going on steps. Going – The inclined portion of stairs. Footing – The bottom most part of structure. These are categorized as Isolated footing, combined footing, Raft etc. Columns – The vertical members of structure . Clear cover – It’s the clear distance maintained from concrete face up to face of the reinforcement steel. Effective depth – It is the distance from top of the concrete face upto the CG of reinforcement. Singly reinforced section – A section of concrete member with reinforcement at only on tension face. Doubly reinforced section – A section of concrete member with reinforcement on both tension and compression side.
  • 2. mylearnings.in Stirrups –Steel bent in closed shape of either Rectangular of circular shape. These are generally to hold column bars in position and also effective in shear carrying capacity. Cantilever beam – A beam with fixed support on one side and the other end is free. Propped cantilever – A beam with fixed support on one side and other end is with pinned support. Pedestal – When Length of the member is less than 3 times in width then its called pedestal. One way slab – When ratio of length to width is more than 2 its one way slab Two way slab – When ration of length to width is less than or equal to 2 , its two way slab. Slender column – when length to width ratio of column is more than 12 , then its slender column Plain cement concrete (PCC) – The cement concrete mix provided on the ground level over which foundations, beams are constructed. This is simply a levelling surface. Pile foundation – The foundation system with Pile i.e cylinder shaped reinforced concrete. Generally preferred when soil is very weak. Frog – A small Depression on top of brick. This is for proper bonding with other bricks. Scaffolding – A temporary structure constructed during the construction when work needs to be carried out at higher elevations. Retaining wall – A wall constructed to retain earth. Tension – A force acting on member and in the direction away from the structure. Imagine pulling the rubber band with two fingers. Compression – A force acting on member in the direction towards the structure. This is simple download load acting on structure. Stress – Ratio of force applied to its sectional area. Strain – This is the ratio of change in length to its original length. Hooke’s Law – With in elastic limit stress is directly proportional to strain. Poisson’s Ratio – It is the ratio of lateral strain to longitudinal strain. Strut – A compression member in a truss. Flab slab – A structural component supported only by columns and no beam arrangement. Piers – The column types structures for supporting bridge slabs along the length.
  • 3. mylearnings.in Abutment – The end supports of bridge are abutments. Lintel – A structural member just above the door or window or rolling shutter. Cement :- Cement is basically obtained by grinding the stones containing lime and clay. Cement is the binder which helps in the bonding of cement, sand along with water. Some of the very important types of cement are 1. Low Heat cement used generally in construction of dams. 2. Sulphate resisting cement used in corrosive type environment. Ex. Sewage contact surfaces 3. Rapid hardening cement 4. Quick setting cement Aggregates : - Aggregates are generally of two Types 1) Fine Aggregate and 2) Coarse Aggregate Fine aggregate is the one that passes through 4.75 mm sieve and retained on 0.075 mm sieve Coarse aggregate is the one that retains on 4.75 mm sieve. Example of Fine aggregate – Sand Example of Coarse aggregate – Gravel Concrete :- Concrete is obtained by mixing cement, aggregate and water as per desired mix. Here water to cement ratio plays important role. Strength of concrete is inversely proportional to water cement ratio. Concrete is represented by design mix as M-25. M is Mix and 25 means compression strength at the end of 28 days considering concrete cubes of 15 cm cube. Concrete has Two setting types a) Initial Setting time - 30 min b) Final Setting time – 10 hrs The test for setting time is done using Vicats apparatus. Concrete setting time can be reduced or increased depending on climatic conditions by using admixtures. Admixture for increasing the setting time is called retarder and for reducing the setting time is called accelerator.