This document contains details of several projects managed by the individual. It lists over 15 projects from 2004-2016 related to plant construction, power generation equipment installation, and industrial facility work. For each project, it provides information on clients, locations, roles, responsibilities and technical skills used. The individual specialized in engineering, cost estimation, planning and execution of large industrial projects mainly in India and the Middle East.
1. Projects Add Projects
Project Title: Plant Support Structure, Duct, Erection, Modification & Pipe Line ReroutingEdit | Delete
Client: Petro Chemical Chemical Conversion.
Employment Type: Full-Time Duration: Nov 2014 - Dec 2016
Project Location: Al Jubail, Saudi Arabia. Site: Onsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: RFQ received then Quotation preparation & forwarding to client.
Man Power Chart preparation (using AutoCAD, MSWord & Excel) for erection work.
MSProject – Project planning schedule for erection work.
Site execution & follow up for erection work.
Do
Project Details: RFQ received then Quotation preparation & forwarding to client.
Man Power Chart preparation (using AutoCAD, MSWord & Excel) for erection work.
MSProject Project planning schedule for erection work.
Site execution & follow up for erection work.
Documents controlling for erection work.
Erection work of Steam line piping rerouting.
Erection work of Pipe line rerouting of Portable & Service water line.
Erection work of Pipe line rerouting of Compressed air line.
Erection work of Duct line rerouting of Compressed air line.
Client of Petro chemical conversation company (PCC) related all rework & rerouting of Erection work.
Project Title: Dangote Fertilizer Project Ltd (Chemical)Edit |Delete
Client: Dangote Fertilizer Project Ltd (Chemical)
Employment Type: Full-Time Duration: Jan 2010 - Dec 2012
Project Location: Chennai Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified
format
• Understand and handle project from concept stage to planning to execution.
• Responsible for Government licensing work, site developmen
Project Details: Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified format
Understand and handle project from concept stage to planning to execution.
Responsible for Government licensing work, sitedevelopmen
Project Title: 600 MW Thermal Power - Balance of PlantEdit | Delete
Client: APGENCO - Rayalsema Thermal Power Generation Company.
2. Employment Type: Full-Time Duration: Jan 2010 - Nov 2014
Project Location: Kadapa, Andhra Pradesh Site: Onsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified
format
• Understand and handle project from concept stage to planning to execution.
• Responsible for Government licensing work, site developmen
Project Details: Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified format
Understand and handle project from concept stage to planning to execution.
Responsible for Government licensing work, sitedevelopmen
Project Title: 600 MW Thermal Power - Balance of PlantEdit | Delete
Client: APGENCO - Kakatiya Thermal Power Generation Company.
Employment Type: Full-Time Duration: Jan 2010 - Nov 2014
Project Location: Andhra Pradesh, India. Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: : • Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified
format
• Understand and handle project from concept stage to planning to execution.
• Responsible for Government licensing work, site developm
Project Details: : Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified
format
Understand and handle project from concept stage to planning to execution.
Responsible for Government licensing work, sitedevelopmen
Project Title: 500 MW Thermal Power - Balance of PlantEdit | Delete
Client: Chhattisgarh Thermal Power Generation Company.
Employment Type: Full-Time Duration: Jan 2010 - Dec 2013
Project Location: Chhattisgarh, India. Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified
format
• Understand and handle project from concept stage to planning to execution.
• Responsible for Government licensing work, site developmen
3. Project Details: Intimation to finance on cash flow and payments on agreed fortnightly or monthly as agreed in specified format
Understand and handle project from concept stage to planning to execution.
Responsible for Government licensing work, sitedevelopmen
Major Clients
Conveyor (CHP), Dust Extraction System & Dust Suppression System( DE & DS):
TataProjects Ltd
- 1 X 195 MWKotaTPP of RRVUNL.
- 2 X 800 MWKrishnapatnamTPP for APGENCO
Adani Power Ltd
- 4 X 300 MundhraTPP.
Adani Petronet Ltd
External coal handling systemat Dahej
Jindal India TPP- 2 X 600 MWAngul Orissa.
Karnataka Power Corporation Ltd: 250 MWat Raichur
and R&M
BHEL- Industrial Systems Group, Bangalore
- 2 X 600 MW-NCTPS, Chennai
- 3X 500 MW–NTECL, Vallur, Chennai (for NTPC-
TNEB JV)
- 2X 660 MWMejaTPS (for NTPC)
- 1 X 250 MW- TataPower Ltd, Trombay
- 2 X 120 MWNalco Angul
- 2 x 25 MWNalco, Damanjodi
Abhijeet Power Ltd- 2X 660 MW
· APPDCL- Pipeconveyor from Krishnapatnam Port to
Power Plant
TANGEDCO, Chennai- CHP for NCTPS, Chennai
BHEL, Bhopal, - Obra CHP- R&M
Madhucon Ltd- 2 X 135 MWat Krishnapatnam
Bajaj Infrastructure- CHP for Five plants
SAIL Ltd- Morethan 10 projects
· Bokaro Steel Plant,
· Bhilai Steel Plant,
· Rourkela Steel Plant,
· IISCo Burnpur,
· Bolani Ore Mines
CHP for various CaptivePower plants for Jaypee
Cement/ Chettinad Cement/ ACC Ltd/ UltraTech Ltd/
Thermax Ltd /ITC Ltd etc.
Reliance Energy Ltd
- 2 X 300 MWTPP- Yamunanagar
- 2 X 600 MWTPP- Hisar
- 2 X 300 MWTPP- Rosa
- 2 X 250 MWTPP- Parichha (Units 5&6)
NTPC Ltd
- 1 X 500 MWTPP at Korba
- 4 X 250 MWTPP at Nabinagar
- CHP for Pakri Barwadih Coal Mining Block
- 2X 660 MW, Mouda STPP (Stage-II) for Elecon
Engg.
Punj Lloyd Ltd
- 2 X 250 MWChhabbra TPP of RRVUNL.
- 2 X 250 mw Goindwal TPP of GVK Power
- 2X 300 MW, Dhariwal Power for CESC
- 2X 300 MW, Haldia TPP for CESC
Raj West Power Ltd - 8 X 135 MWTPP - Barmer.
Maithon Power Ltd (JV of Tata Power Co Ltd & DVC)
- 2 X 525 MWTPP- Maithon
Mecon Ltd- 2X250 MW- (for Neyveli Lignite Corpn.
Bina Power Supply Co Ltd- 2 X 250 MWat Bina
Lanco Infratech Ltd
- 2 X 300 MW, Lanco Amarkantak TPP, Korba
- External CHP for Udupipower plant
- 3 X 660 MWfor Koradi TPS.
Project Title: Conveyor, Support Structure & Pipe RackEdit | Delete
Client: Abu Dubai Refining Company (Oil & Gas).
Employment Type: Full-Time Duration: Jul 2008 - Nov 2014
Project Location: Abu Dubai Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: Monitor project progress and ensure progress reporting captures all relevant progress information;
continuously updateproject control systems.
To manage and engineer multi-discipline projects from front end, detail design, construction, commissi
Project Details: Conveyor Structure & PipeRack
Project Title: Coal Handling ConveyorEdit | Delete
Client: ACC Wadi.
4. Employment Type: Full-Time Duration: Jul 2008 - Nov 2014
Project Location: Karnataka Site: Onsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • MS project execution L1, L2, L3 Schedule Preparation, MDCC, Site Billing Submitted.
• Invoice Clearance, MS Projects, Primavera used for execution of projects.
• MOM, Engineering activity, Project activity letters preparation & Power Point Presenta
Project Details: MS project execution L1, L2, L3 Schedule Preparation, MDCC, Site Billing Submitted.
Invoice Clearance, MSProjects, Primavera used for execution of projects.
MOM, Engineering activity, Project activity letters preparation & Power Point Presentations.
Overall Site, Engineering & Project activity follow-up and Co-ordination.
Vendor activity, Site progress, Material supply, Billing & Invoice.
Civil, Mechanical, Electrical Check all Coordinates Points, Key Plan, Floor Level, Orientation.
Follow up for Submission & Commented all Drawings/ Documents (Civil, Mechanical, and Electrical. I&C) as per Schedule
by all CPs, Vendors.
Project Title: Controlling Damper, Fan, Dust Exhaustion system.Edit | Delete
Client: HyundaiLtd.
Employment Type: Full-Time Duration: Apr 2004 - Jul 2008
Project Location: Chennai, India. Site: Onsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Working closely with Project Manager, Sales Engineer, project design and planning are coordinated
appropriately.
• Contributing to obtain client approvalon technical documents.
• Engineering & Project Management - Documents Controlling: Soft Copie
Project Details: Working closely with Project Manager, Sales Engineer, project design and planning are coordinated
appropriately.
Contributing to obtain client approvalon technical documents.
Engineering & Project Management - Documents Controlling: Soft Copies & Hard Copies Submission, Comments, Approved
&
Factory Visit - As per theapproved drawings check the dimension & Orientation.
Minutes of Meeting, Engineering activity & Project activity letters preparation.
Vendor activity, Site progress, Material supply, Billing & Invoice.
Weekly & Monthly official Internal Meeting preparation.
Fabrication Vendor & Subcontract follow-up.
Project Title: Controlling Damper, Fan, Dust Exhaustion system.Edit | Delete
Client: Avant-garde Engr.&Cons. Pvt. Ltd
Employment Type: Full-Time Duration: Apr 2004 - Jul 2008
Project Location: Chennai, India. Site: Offsite
Role: Project Leader Team Size: 30
5. Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • 2D & 3D AutoCAD drafting work – Design Basis Report, Duct Layout, G.A, Detail drawings, BOM - Dust
Extraction System.
• 2D AutoCAD drafting work – G.A, Detail drawings, BOM, plant layout – I.D & FD Fan.
• 2D AutoCAD drafting work – G.A, Detail draw
Project Details: 2D & 3D AutoCAD drafting work Design Basis Report, Duct Layout, G.A, Detail drawings, BOM - Dust
Extraction System.
2D AutoCAD drafting work G.A, Detail drawings, BOM, plant layout I.D & FD Fan.
2D AutoCAD drafting work G.A, Detail drawings, BOM Multilouver & Guillotine Damper.
2D AutoCAD drafting work G.A, Detail drawings, BOM Bag filter.
2D AutoCAD drafting work G.A, Detail drawings, BOM Chimney.
Project Title: Windmill 1.5 MW & 2 MWEdit | Delete
Client: Suzlon Energy Pvt. Ltd.
Employment Type: Full-Time Duration: Apr 2004 - Apr 2005
Project Location: Chennai Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
• Arrange regular engineering review meeting among CPs / Vendors.
• As per the approved drawings check the dimension & orientation.
• Fabrication of Tubula
Project Details: Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
Arrange regular engineering review meeting among CPs / Vendors.
As per theapproved drawings check the dimension & orientation.
Fabrication of Tubular wind mill tower (2MW80 Mtrs.).
Fabrication of Lattice wind mill tower.
Fabrication of flue frame & external frame.
Project Title: Controlling Damper, Fan, Dust Exhaustion system.Edit | Delete
Client: ENMASPvt. Ltd.
Employment Type: Full-Time Duration: Apr 2004 - Jul 2008
Project Location: Chennai, India. Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Responsible for resources, budgeting for the projects, planning annual budget, preparation budget,
resources mobilization, sub-contractors, equipment, material, manpower with help of project coordinator, site mgmt., verify
bills etc.
• Directs, coo
6. Project Details: Responsible for resources, budgeting for the projects, planning annual budget, preparation budget, resources
mobilization, sub-contractors, equipment, material, manpower with help of project coordinator, site mgmt., verify bills etc.
Directs, coordinates and reviews theworks of Senior Discipline Engineers and outsidedesign consultants.
Project Title: Controlling Damper, Fan, Dust Exhaustion system.Edit | Delete
Client: Tecpro Systems Ltd.
Employment Type: Full-Time Duration: Apr 2004 - Jul 2008
Project Location: Chennai, India. Site: Onsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Solving problems within the budget, planning, technical specifications and quality requirements
• Continuously communicating and effectively resolving performance, scopeand schedule issues with customers and vendors
• Working closely with Project
Project Details: Solving problems within the budget, planning, technical specifications and quality requirements
Continuously communicating and effectively resolving performance, scope and schedule issues with customers and vendors
Working closely with Project Manager, Sales Engineer, project design and planning are coordinated appropriately.
Contributing to obtain client approvalon technical documents.
Engineering & Project Management - Documents Controlling: Soft Copies & Hard Copies Submission, Comments, Approved
& Construction related Drawings /Documents (Civil, Mechanical, Electrical, Control&Instrumentation).
Project Title: Box Column, Plus Column, Boilersupport structureEdit | Delete
Client: Bharat Heavy Electrical Ltd.
Employment Type: Full-Time Duration: Apr 2003 - Apr 2004
Project Location: Chennai Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
• Arrange regular engineering review meeting among CPs / Vendors.
• As per the approved drawings check the dimension & orientation.
• Fabrication of Tubula
Project Details: Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
Arrange regular engineering review meeting among CPs / Vendors.
As per theapproved drawings check the dimension & orientation.
Fabrication of Tubular wind mill tower (2MW80 Mtrs.).
Fabrication of Lattice wind mill tower.
Fabrication of flue frame & external frame.
Project Title: Windmill 1.5 MW & 2 MWEdit | Delete
Client: Pioneer Wincon Pvt. Ltd.
Employment Type: Full-Time Duration: Apr 2003 - Apr 2004
7. Project Location: Chennai, India. Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
• Arrange regular engineering review meeting among CPs / Vendors.
• As per the approved drawings check the dimension & orientation.
Project Details: Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
Arrange regular engineering review meeting among CPs / Vendors.
As per theapproved drawings check the dimension & orientation.
Project Title: External Frame & Flue FrameEdit | Delete
Client: Fouress Engineering Pvt. Ltd.
Employment Type: Full-Time Duration: Apr 2003 - Apr 2004
Project Location: Chennai, India. Site: Offsite
Role: Project Leader Team Size: 30
Skill Used: Cost Estimation, Project Engineering, Site Engineering, AutoCAD, Mechanical Design, MS Project, Project
Control, Documentation, PipeLine Erection, Manpower Planning, Manpower Handling, man power chart, Proposal
Preparation,
Role Description: • Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
• Arrange regular engineering review meeting among CPs / Vendors.
• As per the approved drawings check the dimension & orientation.
• Fabrication of Tubula
Project Details: Cutting plan & marking plan preparation, fabrication item as per marking plan vice checking.
Arrange regular engineering review meeting among CPs / Vendors.
As per theapproved drawings check the dimension & orientation.
Fabrication of Tubula