1. Page 1 of 3
Om Jangid Mobile: +91-98106-39991, ~ Email: omjangid@gmail.com Seeking challenging assignments in hydropower as Project Manager with a high growth oriented organisation/ work related to Project Management, Project Planning, Hydrology, Hydraulics, power potential and components optimisation, Cost estimate, construction planning and client interaction in Feasibility stage, detailed project report, Tender design and detailed engineering stage.
Snapshot
M.Tech (Water resources engineering) from IIT Delhi, India.
B.Tech (Civil) from MBM College of Engineering Jodhpur, Rajasthan, India.
Presently working with AF Colenco Power Engineering Ltd, in a Hydro Power Consultancy in Noida.
Having an experience of 10.25 years after graduation including 2 years of research work during M. Tech.
Strong Managerial, communication, interpersonal, analytical & team building skills and utilising the same in a productive manner.
Strengths
Project Managerial skill to Handel a project with timely completion and proper co-ordination as team work.
Fundamentally strong in all designing concept.
An analytical mind with the ability to think clearly and logically.
Excellent knowledge of Civil engineering, water resources engineering and GIS (Geographical Information system).
Excellent spoken & written communication skills, problem solving skills.
Education
M.Tech (Water Resources Engineering) from IIT, Delhi in May 2004.
B.Tech (Civil) from MBM College of Engineering, Jodhpur in June 2002.
Knowledge Purview
HEC-RAS, AUTOCAD-Map, SPSS, CADAM, Phases-2, HAMMER, MS Office, MS Projects.
Hands on experience in GIS software Arc view, ARC GIS, Geo Media Professional
Operating system: DOS, Windows.
Languages: FORTRAN-90, 77 and C.
Organisational Experience
Present organisation
Organisation- Larsen and Tubro Ltd
(A leading engineering construction company of India)
Designation- Manager: Engineering design research center (EDRC)
Period of working- 14th May 2012 onwards
Work profile- Project Management, Coordination with the site team and design team, design approval, review of tender document, preparation of bid document, project Planning and optimisation, Hydraulic design, Construction Planning and schedule, Rate analysis, Cost estimation, Client interaction, for hydro-power projects.
Projects Details
Detailed engineering
Lata-Tapovan HEP (3 x 57 MW): Worked as Project Co-ordination and Team lead
Imarta HEP, Finland: Up gradation of dam and ancillary works; worked as Manager
Tender evaluation and project optimisation:
Polavaram Dam Project in Andhra Pradesh: Worked as Project Manager
Shahpur Kandi dam project, in Pathankot, Panjab: Worked as Project Manager
Due Diligence: GBC-Stage-II and LIS SHEP in Gurtur and Kurnool district of Andhra Pradesh.
2. Page 2 of 3
Previous organisation
Organisation- AF Colenco Ltd, Noida
(A leading Swiss engineering company)
Designation- Manager: Hydropower
Period of working- 20th Nov 2007 to 11th May 2012
Work profile- Project Management, Project Planning and optimisation, Hydrological study, Hydraulic design, Power potential studies, Hydraulic design of tunnel & penstock, transient analysis, Method statement for project components, Construction Planning and schedule, Rate analysis, Cost estimation, GIS studies, comments handling for DPR approval, Client interaction, for hydro-power projects.
Projects Details
Detailed Poject Report:
DPR of Ratle HEP (820 +30 MW) in Jammu & Kashmir: Worked as Manager
DPR of Seli HEP (400 MW) in Himachal Pradesh: Worked as Manager
DPR of Phudung HEP (24 MW) in Arunachal Pradesh: Worked as Manager
DPR of Lethang HEP (96 MW) in west Sikkim: Worked as Manager
DPR of Miyar HEP (120 MW) in Himachal Pradesh: Worked as Manager
DPR of Mori-Hanol HEP (70 MW) in Dehradun District, Uttrakhand: Worked as Dy Manager.
DPR of Rego HEP (141 MW) in west Siang district district Arunachal Pradesh: Worked as Dy Manager.
DPR of Devsari HEP (252 MW) in Chamori District, Uttrakhand: Worked as Sr. Design Engineer.
Tender design
Tender design of Ratle HEP (820 +30 MW) in Jammu & Kashmir: Worked as Manager
Tender design of Rangit-2 HEP (66 MW) HEP in North Sikkim: Worked as Dy Manager.
DPR review of Talong HEP (225 MW) in Kameng district Arunachal Pradesh: Worked as Sr. Design Engineer
Detailed design
Detail Engineering for Rangit-2 HEP (66 MW) HEP in North Sikkim: Worked as Manager.
Detail Engineering for Chuzachen HEP (110 MW) in east Sikkim: Worked as Sr Design Engineer.
Due diligence/ Cost vetting
Due diligence of Sigoli Bhatwari HEP for M/s Green infra Ltd; Worked as Manager
Cost vetting for Phata-Bhuyong HEP for M/s Lanco; Worked as Manager
Previous organisation
Organisation- Indo Canadian Consultancy Services (ICCS), Noida
(A 50-50 joint venture of RSW Canada and LNJ Bhilwara group)
Designation- Deputy Manager
Period of working- 15th Dec 2004 to 19th Nov 2007
Work profile- Hydrological study, Hydraulic design, Power potential studies, Preparation of Pre-feasibility reports, detailed project reports, detailed engineering and GIS studies for hydro-power projects in India and abroad.
Projects Details:
Detailed project report:
Tidong HEP (100 MW), Hanol Tiuni HEP (60 MW), Kut HEP (26 MW)
UBDC Stage-III HEP (75 MW) Canal based project in Gurdas pur district, Punjab.
Detailed engineering:
Taraila HEP (5 MW), Balsio HEP (5 MW), Upgradation of Baragran HEP (2 x1.5 + 1.9 x 1 MW)
Pre-Feasibility study & Assessment report:
Nyamjang Chu HEP’s (Stage-1 96MW, Stage-II 98MW, Stage-III 99MW) in Tawang Distt, Arunachal Pradesh.
Madi-1, Upper Madi and Lower Modi Khola (19 MW each), HEP’s in Pokhara district, Nepal.
Hydrological study of Ani and Behna HEP’s (5 MW each) in Rampur distt, Himachal Pradesh.
Rangit-IV (90 MW) Hydroelectric project in Sikkim state.
3. Page 3 of 3
Sanghani, and Kaithali small HEP’s in Chamba district, HP Himachal Pradesh.
Makkan HEP (5 MW) in Chamba district, Himachal Pradesh.
Organisation- RMSI, Noida
Designation- GIS Engineer
Period of working- 28th June 2004 to 14th Dec 2004
Work summary- Flood modelling and spatial modeling
Projects Details-
European flood model: First order and second order river network correction for the Germany, France, Poland, Netherlands, Chez Republic & Italy river network and Flood modeling using GIS.
Specific contribution
Introduced a modern concept of GIS at AF Colenco Power Engineering Ltd. & ICCS, Noida, for project planning, data capturing, Flood analysis etc in the pre-feasibility and detailed project report level.
Worked as Project Manager for Taraila HEP (5 MW), Project commissioned in September 2007.
Completion of Detailed Project Report of 820+30MW Ratle HEP in record 90 days time as per contract.
Timely completion of DPR of Mori Hanol, Lethang and Miyar HEP.
ACADEMIC PROJECT WORKS, TRAININGS AND CONFRENCES
M.Tech Project: “Environmental Impact Assessment of a Major Water Resources Project” – A Case Study of Indira Gandhi Canal; Awarded with best project in water resources group for year 2004.
Under Graduation Project: - Hydraulic Design of “Bandi Sandhara Irrigation Project”.
Paper Published and Presented: Jangid O.P and Prof. Devi Rema “Some Thoughts on Data Services, Composite Indices and a Case Study” National conference on environmental health and sustainable Development, New Delhi (India) Feb. 12-13, 2004 Pg(55-57) organized by International Development centre foundation (IDC Foundation) (Work on semi-variogram and time series techniques with remote sensing for ground water modeling in Indira Gandi Canal in Rajasthan).
Attended a training program on “Negotiation skills” on 23-24 June 2012 at corporate centre, L&T.
Attended a training program on “Hydraulic Modeling of Spillways and Water Conductor System” on 17-18 Nov 2011 at CWPRS, Pune.
International Summit on small hydropower, held at Dehradun, from 12-13 Oct 2006.
Delivered a lecture as faculty member on “Use of GIS and watershed management” at Govt collage Narnaul, Rohtak University, Haryana on Feb 2006.
Delivered a lecture as faculty member for engineers of Alstom India Ltd. and NTPC on “Hydraulic design of Penstock” at NTPC Power Management Institute, NOIDA on July 30th, 2007
GIS software training for 20 days at RMSI, Noida
45 days practical training in Quality control of highway construction by SMEC & Construction of N.H.8 by consortium of BSC-RBM-PATI.
30 days practical training in PMGSY project – Construction of village road by PWD.
Personal Details
Permanent Address : 4176, Indraprasth Extension-2, Sector 49, Faridabad, Haryana, India
Date of Birth : July 1st 1978
Marital status : Married
Language : English (Official Language), Hindi (Mother tongue) and Gujrati
Passport Details : Passport no: E7706349
(Om Jangid)