COURSE & CODE: ELECTRICAL ESTIMATION AND COSTING (15EE54T)
UNIT - 06
TRANSMISSION LINES AND SUBSTATIONS
2
COURSE & CODE: ELECTRICAL ESTIMATION AND COSTING (15EE54T)
UNIT - 06
TRANSMISSION LINES AND SUBSTATIONS
6.0 Transmission line:
The line bringing electrical supply from generating stations to secondary substations is called
transmission lines.
Examples - 400KV, 220KV, 110KV, 66KV, etc.
6.1 Code of practice for Transmission lines:
1) Preliminary surveying is carried out with respect to the following aspects to plot the toposheet.
i) The transmission line is to be taken along the road as far as possible to facilitate easy
transportation, maintenance and repair.
ii) Transmission lines are not to be taken on hill top to avoiding lightning effect.
iii) Lines to be drawn in straight path as far as possible to avoid excess of materials.
2) Minimum clearance (6.096 Meter) from conductor to ground must be kept according to IE rules.
3) Double insulator strings and guarding are to be provided in case of road crossing crossings,
railway, telephone line, highway, canal and river crossings, etc.
4) Conductor should be having high tensile strength in order to withstand mechanical load.
5) Towers should be having high mechanical strength to withstand the weight of the conductor,
insulators and high velocity wind load.
6) Continuous wire should be run on top of the towers for earthing in order to protect the
transmission line against the lightning discharge.
7) Phase plates, number plates, anti-climbing devices and danger boards should be provided for
each tower.
6.2 Images of Transmission line materials
Armoring rods Vibration dampers
Phase Plate Jumpers Parallel groove clamps
Suspension clamps Tension clamps Anti-climbing devices Arching horns
3
6.3 Transmission line materials
1. Towers : Lattice steel or painted or galvanised steel materials used for fabrication of towers. The
height of the line voltage length of the span and legs of the towers are set in special concrete
foundations.
Mainly there are two types of towers - 1.Tangent , 2.Anchor Towers.
1.Tangent Towers (suspension towers) :
These are straight line towers and are called as A type towers or suspension towers. The angle
of deviation is zero degree. They are withstanding vertical load.
2.Anchoring towers:
These are the deviation towers, starting or dead end towers. They are also called as B, C and
D type towers. Which are installed at an angle of deviation from 0 to 30 degree, 30 to 60
degree and 60 to below 90 degree respectively. These towers are withstanding the horizontal
load. Four pole structures are used at an angle exactly 90 degree deviation.
Extension Piece : Extension piece of fabricated steel structure of 3 meter or 6 meter may be used in
order to achieve the minimum clearance to ground as per I.E. rule.
Span Length:
1. 66KV line – 220m to 260m
2. 110KV line – 260m to 330m
3. 220KV line – 330m to 360m
Approximate height and weight of towers:
Sl.No. Line
Voltage
Height in
meters
Weight in Tons
Tangent Tower Anchor Tower
1 66KV 24 2 tons 3 tons
2 110KV 24 3.5 tons 4.5 tons
3 220KV 26 4 tons 5 tons
No. of 15KV disc insulators and their breaking strength:
Sl.No. Line
Voltage
No. of 15KV disc insulators Breaking
strength
Tangent Tower Anchor Tower
1 66KV 4Nos. 5 Nos. 70 KN
2 110KV 7Nos. 8 Nos. 90 KN
3 220KV 14Nos. 15 Nos. 120 KN
2. Types of conductor and their size:
Sl. No. Type of conductor size Application
1 Coyote Conductor 26/2.54mm + 7/1.9mm 66KV Line
2 Lynx Conductor 30/7/2.79mm 110KV Line
3 Drake Conductor 30/7/4.27mm 220KV Line
3. Armouring rods:
They consist of aluminium round rods of short length. These are wrapped around A.C.S.R conductors
at the point of support. It protects the A.C.S.R conductors from possible damage from vibration of
conductors due to high velocity wind action and tightening the clamps at the point of support.
4. Vibration dampers:
These are used to prevent occurrence of resonant vibration due to high velocity wind action.
Occasionally it has been found resulting in breaking of conductor strands at the point of support.
4
5.Arching horns:
These are placed near the ends of the insulator strings and connected to earth. This regulates the
potential gradient across the strings and takes care of the arc of the flash over. These are provided for
protection of insulators.
6. Numbering plates:
All the towers are fixed with number plate to find out the faulted place(distance) by means of
toposheet.
7. Phase plates:
These are fixed to each tower for indication the red yellow and blue phases.
8. Bolt and Nuts:
Standard bolt and nuts are used, common in size from 25mm to 225mm length and 16mm thickness.
9. Bird guards:
To avoid sitting of birds on supports, a stick of ebonite plate with zig zag cutting on top. It is fixed near
the insulator on the cross arms to prevent flash over between cross arm and conductor.
10.Parallel groove clamps:
These clamps are used for electrical connections between two conductors.
11. Suspension clamps:
These are used with arcing horns for holding insulator discs for suspension type or A type Towers.
12. Tension clamps:
These are provided with all types of anchoring towers (B,C and D type) to hold the group of disc
insulators with arching horns.
13. Danger boards:
A danger plate is provided for each tower as a warning measure indicating the working voltage, the
word DANGER and also bone and skull symbols. It is provided at a height of 3m from the ground level.
14. Anti-climbing devices:
GI Barbed wire is wrapped around the tower legs at a height of 2.5m from the ground level for at least
1m length. This is to prevent climbing of unauthorized persons.
15. Other accessories:
Such as Al paint, twisting joints, tubular compression joints, repair sleeves, etc.
5
6.4 Single circuit and double circuit transmission lines.
In single circuit transmission line three conductors corresponding to three phases i.e., R Y B phases
are run on the transmission towers.
Where as in double circuit transmission line total six conductors are provided to make two different
transmission circuits. Each circuit consisting of three conductors corresponding to three phases. This
method of transmission enables the transfer of more power over a particular distance. It is cheaper
and requires less conductor materials less land.
Suspension type insulators Strain string insulators
6
6.5 Method of calculating the quantity of transmission line materials:
1. Number of spans =
length of proposed line in meters
span length in meters
2. Total number of four legged fabricated steel structures = No. of spans +1
3. Number of anchoring towers=
Total number of towers
10
(assuming every 10th
tower is to be an anchoring)
4. Number of suspension towers = Total number of towers – Number of anchoring towers
5.Total weight of the towers= ( Total no. of suspension towers X weight of each
suspension towers) + ( Total no. of anchoring towers X weight of each anchoring towers)
6. Number of 15KV disc insulators
i. At suspension string for tangent towers
= Number of suspension towers X No of suspension strings/ tower X No of insulator/ suspension
string.
ii. At tension string for anchoring towers
= Number of anchoring towers X Number of tension strings/ tower X No of insulator / tension
string.
Total no. of disc insulators = (i+ii)
Add 5% breakage on total
7. Length of ACSR conductor allowing 3% sag = (total length of the line X No.of conductor) X 1.03
8. Length of the GI ground wire of size 7/3.15mm allowing 3% sag
= ( Total length of the line X no of ground wire) X 1.03
9. No. of suspension clamps for suitable conductor with arcing horns
= Total no of towers × No. of suspension strings/tower.
10. No of tension clamps for suitable conductor with arcing horns
= Total no of anchoring towers X No of tension strings/tower.
11. Armouring rods for suitable conductor = No of suspension clamps + No of tension clamps
12. PG clamps for suitable conductor
= No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers
13. Vibration dampers for suitable conductor = Total no of towers x 6 ( for single circuit)
14. Grounding materials including accessories = Total no of towers
15. Cement concrete for tower erection = Total no of towers X 12m3
16. Miscellaneous materials such as conductor accessories, ant climbing devices, danger
boards, phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
7
6.6 Examples :
1. Prepare the quantity of materials required for running a 80km long 66kv single circuit
transmission line across a jungle terrain using four legged fabricated steel structures weighing
approximately 2 tones. Assume a span length of 300m. The conductor used is coyote ACSR.
Solution:
a) No. of spans =
length of proposed line in meters
span length in meters
=
80000
300
= 266.66 = 267 Nos.
b) Total no. of four legged fabricated steel structures = No. of spans +1
= 267+1=268 nos.
c) No. of anchoring towers, Assuming every 10th tower is to anchoring
=
Total No.of Towers
10
=
268
10
= 26.8 = 27 Nos.
Total No. of anchoring towers =27+1 at starting point = 28 nos.
d) No. of suspension towers = Total no. of towers – No. of anchoring towers
= 268-28 = 240 nos.
e) Total weight of the towers
= ( Total no. of suspension towers X weight of each suspension towers) + ( Total no. of
anchoring towers X weight of each anchoring towers)
= (240 X 2) + (28 X 2) = 536 Tones
f) No. of 15KV disc insulators, 70 KN grade,
i) At suspension string for tangent towers
= No.of suspension towers X No. of suspension strings/tower X No of insulator/suspension string.
= 240 X 3 X 4 = 2880 Nos.
ii) At tension string for anchoring towers
= No. of anchoring towers X No. of tension strings/tower X No of insulator/tension string.
= 28 X 6 X 5 = 840 nos.
Total no. of disc insulators= 2880+840 = 3720 nos.
Add 5% extra for breakage on total, i.e.,= 3720 X 0.05 = 186 nos.
Grand total = 3720 + 186 = 3906 nos.
g) Length of coyote ACSR conductor allowing 3% sag
= (Total length of the line in km X No. of conductor) X 1.03
= 80 X 3 X 1.03
= 247.2 = 248 kms
h) Length of the GI ground wire of size 7/3.15mm allowing 3% sag
= (Total length of the line in km X No.of ground wires) X 1.03
= 80 X 1 X 1.03 = 82.4 = 83 kms
i) Number of suspension clamps suitable for coyote conductor with arcing horns
= Total No. of suspension towers X No of suspension strings/tower.
= 240 X 3 = 720 sets
j) Number of tension clamps suitable for coyote conductor with arcing horns
8
= Total no of anchoring towers X No of tension strings/tower.
= 28 X 6 = 168 sets.
k) Armoring rods suitable for coyote conductor
= No of suspension clamps + No of tension clamps
= 720 + 168 = 888 sets.
l) PG clamps suitable for coyote conductor
= No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers
= 28 X 3 X 2 = 168 nos.
m) Vibration dampers suitable for coyote conductor
= Total no of towers x 6 (for single circuit)
= 268 X 6 = 1608 nos.
n) Grounding materials including accessories = Total no of towers = 268 sets
o) Cement concrete for tower erection( 1:2:4) = Total no of towers X 12m3
= 268 X 12 = 3216 m3
p) Miscellaneous materials such as conductor accessories, ant climbing devices, danger boards,
phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
2) Prepare a quantity of materials required for 60km, 110kv single circuit transmission line
across a jungle terrain using four legged fabricated steel structures.
Solution:
(Assuming Lynx ACSR conductor has to used and span length is 320m)
a) No. of spans=length of proposed line in meters/span length in meters = 60,000/320 = 188 nos
b) Total no. of four legged fabricated steel structures= No. of spans +1 = 188 + 1 = 189 nos.
c) No. of anchoring towers(Assuming every 10th tower is to be an anchoring)
= Total no.of towers /10
=189/10 = 19 nos
Total no of anchoring towers = 19 + 1 at starting point = 20 nos.
d) No. of suspension towers = total no. of towers – No. of anchoring towers
= 189 - 20 = 169 nos.
e) Total weight of the towers= ( Total no. of suspension towers X weight of each
suspension towers) + (Total no. of anchoring towers X weight of each anchoring towers)
= (169 X 3.5) +(20 X 4.5) = 682 Tons
f) No of 15KV disc insulators, 90 KN grade.
i) At suspension string for tangent towers=No of suspension towers X No of suspension
strings/tower X No of insulator / suspension string.
= 169 X 3 X 7 = 3549 nos.
ii) At tension string for anchoring towers=No of anchoring towers X No of
tension strings/ tower X No of insulator / tension string.
= 20 X 6 X 8 = 960 nos.
9
Total no. of disc insulators = 3549 + 960 = 4509 nos.
Add 5% extra for breakage on total i.e., = 4509 X 0.05 = 225nos
Grand total no. of disk insulator = 4509 + 225 = 4734 nos.
g) Length of lynx ACSR conductor allowing 3% sag = (total length of the line in km X
no of conductor) X 1.03
= 60 X 3 X 1.03 = 185.4 km = 186km
h) Length of the GI ground wire of size 7/3.15mm allowing 3% sag = (total length of the
line in km X no of ground wire) X 1.03
= 60 X 1 X 1.03 =61.8 = 62km
i) No of suspension clamps suitable for Lynx conductor with arcing horns = Total no of
suspension towers X No of suspension strings/tower.
= 169 X 3 = 507 sets
j) No of tension clamps suitable for Lynx conductor with arcing horns = Total no of
anchoring towers X No of tension strings/tower.
= 20 X 6 = 120 sets
k) Armoring rods suitable for Lynx conductor = No of suspension clamps + No of tension
clamps
= 507 + 120 = 627 sets
l) PG clamps suitable for Lynx conductor = No of anchoring towers X No of jumpers /
tower X No of PG clamps / jumpers
= 20 X 3 X 2 = 120
m) Vibration dampers suitable for Lynx conductor = Total no of towers x 6 ( for single
circuit)
= 189 X 6 = 1134 sets
n) Grounding materials including accessories = Total no of towers = 189 sets
o) Cement concrete for tower erection = Total no. of towers X 12m3
= 189 X 12 = 2268 m3
p) Miscellaneous materials such as conductor accessories, ant climbing devices, danger
boards, phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
10
3) Prepare a detailed quantity of materials required for running a 120km, 220kv single circuit
transmission line across a jungle terrain using four legged fabricated steel structures. Assuming
average span length of 330m and conductor used is Drake ACSR.
Solution:
a) No. of spans = length of proposed line in meters/span length in meters
=120,000/330 = 363.6 = 364 nos.
b) Total no. of four legged fabricated steel structures = No. of spans +1
= 364 + 1= 365 nos
c) No. of anchoring towers(assuming every 10th tower is to be an anchoring)
= Total no. of towers /10
= 365/10 =36.5 nos = 37 nos
Total no of anchoring towers = 37 + 1 at starting point = 38
d) No. of suspension towers = Total no. of towers – No. of anchoring towers
= 365 – 38 = 327 nos.
e) Total weight of the towers= ( Total no. of suspension towers X weight of each
suspension towers) + ( Total no. of anchoring towers X weight of each anchoring towers)
= (327 X 4) +(38 X 5) = 1308 + 190 = 1498 Tons
f) No of 15KV disc insulators
i) At suspension string for tangent towers
=No of suspension towers X No of suspension strings/ tower X No of insulator / suspension string.
= 327 X 3 X 14 = 13734 nos.
ii) At tension string for anchoring towers
= No of anchoring towers X No of tension strings/ tower X No of insulator / tension string.
= 38 X 6 X 15 = 3420 nos.
Total no. of disc insulators=(13734 + 3420) = 17154 nos.
Add 5% extra for breakage on total, i.e.,=17154 X 0.05 = 858 nos.
g) Length of ACSR conductor allowing 3% sag
= (Total length of the line in km X no of conductor) X 1.03
= 120 X 3 X 1.03 = 371 km.
h) Length of the GI ground wire of size 7/3.15mm allowing 3% sag
= (Total length of the line in km X no of ground wire) X 1.03
= 120 X 1 X 1.03 = 124 km.
i) No. of suspension clamps suitable for Drake conductor with arcing horns
= Total no of suspension towers X No of suspension strings/tower.
= 327 X 3 = 981 sets.
j) No. of tension clamps suitable for Drake conductor with arcing horns
= Total no of anchoring towers X No of tension strings/tower.
= 38 X 6 = 228 sets.
11
k) Armoring rods suitable for Drake conductor
= No of suspension clamps + No of tension clamps
= 981+228= 1209 sets.
l) PG clamps suitable for Drake conductor
= No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers
= 38 X 3 X 2 = 22 nos.
m) Vibration dampers suitable for Drake conductor
= Total no of towers x 6 ( for single circuit)
= 365 x 6 = 2190 sets.
n) Grounding materials including accessories = Total no of towers = 365 sets.
o) Cement concrete for tower erection = Total no of towers X 12m3
= 365 X 12 = 4380 m3
p) Miscellaneous materials such as conductor accessories, ant climbing devices, danger boards,
phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
12
6.7 SUB STATION:
A substation receives electrical power from generating stations through incoming transmission
lines and delivers electrical power through outgoing transmission lines. The electrical substation
is the part of a power system in which the voltage is transformed from high to low or low to high
for transmission, distribution, transformation and switching. The power transformer, circuit
breaker, bus-bar, insulator, lightning arrester are the main components of an electrical
substation.
6.7.1 - Single line diagram of 66/11KV, 5 MVA substation:
6.7.2 - Materials required for 66/11kV, 5MVA substations with specifications:
Example : Prepare a quantity of materials required for establishing a substation of capacity
5MVA, 66/11kv transformer. Assuming current market rates and as per K.P.T.C.L procedure.
Solution:
(Assuming two incoming lines as in above single line diagram)
Equipment’s on primary (66kv) side:
a) Lightning arresters metal oxide type, 66kv class
= 4 sets ( 2 for bus coupler and 2 for transformer)
b) Potential transformers 66kv class = 4 sets ( 2 for line and 2 for Bus bars)
c) Current transformers 800:1 ratio = 5 sets ( 2 for i/c line, 2 for o/g line, 1 for bus coupler) &
Current transformers 200:1 ratio = 2 sets ( 1 for each transformer)
d) Upright Isolators (G.O.S) double blade 800A, 66kv class with earth switch
= 4 sets (2 for i/c and 2 for o/g line)
13
e) Upright Isolators (G.O.S) double blade 800A, 66kv class without earth switch
= 14 sets (2 for bus coupler and 12 for bus bars)
f) Circuit breakers SF6 type, 66kv class
= 7 sets (2 for i/c line, 2 for o/g line, 2 for Transformers and 1 for bus coupler)
g) Bus bars expansion type using ACSR conductor = 2 sets.
h) Transformers 5MVA, 66/11kv, with OLTC and all accessories = 2 sets
i) Control and Relay panels for 66kv lines = 4 sets ( 2 for i/c line and 2 for o/g line)
j) Control and Relay panels for Transformers = 2 sets ( 1set for each transformer)
k) Control and Relay panels for bus coupler = 1 set.
l) Power and control cables in between different equipment’s and control and relay panels
= lump sum in meters
m) G.I mounting structures for mounting different equipment’s = lump sum in metric tonnes
Equipment’s on secondary side (11kv):
a) 11kv , 1200A outdoor switch gear with breaker, CT, PT etc., = 6 sets
b) G.O.S 11kv, 400A double blade = 6 sets (for outgoing 11kv lines)
c) Lightning arresters 11kv, thyrite type = 6 sets (for outgoing 11kv lines)
d) Distribution transformer for station auxiliary supply 100 KVA, 11KV / 440V = 1 set
e) Underground cable of size 1X1000mm2 from transformer to 11kv switch gear
= lumpsum in meters
f) Underground cable of size 3X250mm2 from outdoor switch gear take off structure
= lumpsum in meters
g) Take off structures 9m long double pole structure = 6 sets
h) 110V, 60AH, batteries with batteries charger = 2 sets
i) Earth mat including pipe earthing and plate earthing = lump sum
j) LT AC panel board indoor type =1 set
k) Outdoor type AC distribution boards = lumpsum
l) DC distribution board indoor type = 1 set
m) Miscellaneous materials such as ACSR conductors, 15kv disc insulators, stain insulators,
different types of clamps, bolt nuts, fire extinguishers, name plates, danger boards and other
unfortunate items.

More Related Content

What's hot

UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREPremanandDesai
 
Transmission tower
Transmission towerTransmission tower
Transmission towerKiran Hadiya
 
Electric power system
Electric power systemElectric power system
Electric power systemvishalmahar3
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmissionprasantakcs
 
Electrical power transmission system
Electrical power transmission systemElectrical power transmission system
Electrical power transmission systemAbdul Wahab Malik
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission LineSURESH GOPAL
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical powerpriyanka1432
 
Overhead railway traction
Overhead railway tractionOverhead railway traction
Overhead railway tractionProbodh Mallick
 
Transmission lines of Electrical powe
Transmission lines of Electrical poweTransmission lines of Electrical powe
Transmission lines of Electrical poweDarya khan
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
Presentation1
Presentation1Presentation1
Presentation1darshanaf
 

What's hot (20)

33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Electric power system
Electric power systemElectric power system
Electric power system
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmission
 
Electrical power transmission system
Electrical power transmission systemElectrical power transmission system
Electrical power transmission system
 
33kv substation
33kv substation33kv substation
33kv substation
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical power
 
Overhead railway traction
Overhead railway tractionOverhead railway traction
Overhead railway traction
 
Transmission lines of Electrical powe
Transmission lines of Electrical poweTransmission lines of Electrical powe
Transmission lines of Electrical powe
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Substation design-guideliness
Substation design-guidelinessSubstation design-guideliness
Substation design-guideliness
 
Transmission line Project
Transmission line ProjectTransmission line Project
Transmission line Project
 
IEEE substation design
IEEE substation designIEEE substation design
IEEE substation design
 
Effect of grounding
Effect of groundingEffect of grounding
Effect of grounding
 
Poles and towers
Poles and towersPoles and towers
Poles and towers
 
Presentation1
Presentation1Presentation1
Presentation1
 

Similar to UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS

Electrical Transmission Tower: Types, Design and Parts
Electrical Transmission Tower: Types, Design and  PartsElectrical Transmission Tower: Types, Design and  Parts
Electrical Transmission Tower: Types, Design and PartsDr.Raja R
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 
Sonali ppt.pptx
Sonali ppt.pptxSonali ppt.pptx
Sonali ppt.pptxRBTV1
 
Analysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docxAnalysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docxAdnan Lazem
 
Electrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.pptElectrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.pptAkdDeshmukh
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.pptssuserc3b807
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend gripHarish Agarwal
 
SERVICE MAINS.pdf
SERVICE MAINS.pdfSERVICE MAINS.pdf
SERVICE MAINS.pdfvaasuchetu
 
transmission line
transmission line transmission line
transmission line singh1515
 
main content
main contentmain content
main contentRaj Kumar
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Basics of electrical engineering
Basics of electrical engineeringBasics of electrical engineering
Basics of electrical engineeringNishkam Dhiman
 
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...Deepak Saxena
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 

Similar to UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS (20)

Electrical Transmission Tower: Types, Design and Parts
Electrical Transmission Tower: Types, Design and  PartsElectrical Transmission Tower: Types, Design and  Parts
Electrical Transmission Tower: Types, Design and Parts
 
2581
25812581
2581
 
SOUMADIP-FACT.pptx
SOUMADIP-FACT.pptxSOUMADIP-FACT.pptx
SOUMADIP-FACT.pptx
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Sonali ppt.pptx
Sonali ppt.pptxSonali ppt.pptx
Sonali ppt.pptx
 
Analysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docxAnalysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docx
 
Electrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.pptElectrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.ppt
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.ppt
 
Akt tl design01
Akt tl design01Akt tl design01
Akt tl design01
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend grip
 
SERVICE MAINS.pdf
SERVICE MAINS.pdfSERVICE MAINS.pdf
SERVICE MAINS.pdf
 
transmission line
transmission line transmission line
transmission line
 
main content
main contentmain content
main content
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Basics of electrical engineering
Basics of electrical engineeringBasics of electrical engineering
Basics of electrical engineering
 
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
Analysis-And-Design-Of-220kv-Transmission-Line-Tower-In-Different-Zones-I-&-V...
 
Supports of overhead line
Supports of overhead lineSupports of overhead line
Supports of overhead line
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 

More from PremanandDesai

Week-11 - Assembly drawing - Synchronous Motor
Week-11 - Assembly drawing -  Synchronous Motor Week-11 - Assembly drawing -  Synchronous Motor
Week-11 - Assembly drawing - Synchronous Motor PremanandDesai
 
Week-10 - Assembly drawing - Alternators
Week-10 - Assembly drawing - AlternatorsWeek-10 - Assembly drawing - Alternators
Week-10 - Assembly drawing - AlternatorsPremanandDesai
 
Week-09 - Assembly drawing-Induction Motor
Week-09 - Assembly drawing-Induction Motor Week-09 - Assembly drawing-Induction Motor
Week-09 - Assembly drawing-Induction Motor PremanandDesai
 
Week-08 - Transformer Assembly-Threephase
Week-08 - Transformer Assembly-ThreephaseWeek-08 - Transformer Assembly-Threephase
Week-08 - Transformer Assembly-ThreephasePremanandDesai
 
Week-07- Developed Winding Diagrams - 1 phase--.pptx
Week-07- Developed Winding Diagrams - 1 phase--.pptxWeek-07- Developed Winding Diagrams - 1 phase--.pptx
Week-07- Developed Winding Diagrams - 1 phase--.pptxPremanandDesai
 
Week-06 - Developed Winding Diagrams - 3 phase--.pptx
Week-06 - Developed Winding Diagrams - 3 phase--.pptxWeek-06 - Developed Winding Diagrams - 3 phase--.pptx
Week-06 - Developed Winding Diagrams - 3 phase--.pptxPremanandDesai
 
Week-05 -Design a GA LT panel wiring--.pptx
Week-05 -Design a GA LT panel wiring--.pptxWeek-05 -Design a GA LT panel wiring--.pptx
Week-05 -Design a GA LT panel wiring--.pptxPremanandDesai
 
Week-04 -Motor control Panel board
Week-04 -Motor control Panel boardWeek-04 -Motor control Panel board
Week-04 -Motor control Panel boardPremanandDesai
 
Week-03 - Electrical wiring of Residential, Hospital , small workshop
Week-03 - Electrical wiring of  Residential, Hospital , small workshopWeek-03 - Electrical wiring of  Residential, Hospital , small workshop
Week-03 - Electrical wiring of Residential, Hospital , small workshopPremanandDesai
 
Week-02 - Single line diagram of Substations
Week-02 - Single line diagram of SubstationsWeek-02 - Single line diagram of Substations
Week-02 - Single line diagram of SubstationsPremanandDesai
 
Week-01 - INTRODUCTION to CAD
Week-01  - INTRODUCTION to CADWeek-01  - INTRODUCTION to CAD
Week-01 - INTRODUCTION to CADPremanandDesai
 
Week- 13 - APFC , AMF & STP
Week- 13 - APFC , AMF & STP Week- 13 - APFC , AMF & STP
Week- 13 - APFC , AMF & STP PremanandDesai
 
Week - 12 - Motor control centre (MCC)
Week - 12 - Motor control centre (MCC) Week - 12 - Motor control centre (MCC)
Week - 12 - Motor control centre (MCC) PremanandDesai
 
Week - 11 - Metering section and Auxiliary Relays
Week  - 11 - Metering section  and Auxiliary RelaysWeek  - 11 - Metering section  and Auxiliary Relays
Week - 11 - Metering section and Auxiliary RelaysPremanandDesai
 
Week 10 - Control Panel & Power gears
Week  10 - Control Panel &  Power gearsWeek  10 - Control Panel &  Power gears
Week 10 - Control Panel & Power gearsPremanandDesai
 
Switchgear and protection - lab
Switchgear and protection - labSwitchgear and protection - lab
Switchgear and protection - labPremanandDesai
 
Week - 09 - Testing of CB & Substation Earthing
Week - 09 - Testing of CB & Substation Earthing Week - 09 - Testing of CB & Substation Earthing
Week - 09 - Testing of CB & Substation Earthing PremanandDesai
 
Week- 08 - Feeder protection and Bus–Bar Protection.
Week- 08 - Feeder protection and  Bus–Bar Protection.Week- 08 - Feeder protection and  Bus–Bar Protection.
Week- 08 - Feeder protection and Bus–Bar Protection.PremanandDesai
 
Week 07 - Alternator Protection
Week   07 - Alternator Protection Week   07 - Alternator Protection
Week 07 - Alternator Protection PremanandDesai
 
WEEK- 06/ UNIT – 06 Transformer Protection
WEEK- 06/ UNIT – 06 Transformer Protection WEEK- 06/ UNIT – 06 Transformer Protection
WEEK- 06/ UNIT – 06 Transformer Protection PremanandDesai
 

More from PremanandDesai (20)

Week-11 - Assembly drawing - Synchronous Motor
Week-11 - Assembly drawing -  Synchronous Motor Week-11 - Assembly drawing -  Synchronous Motor
Week-11 - Assembly drawing - Synchronous Motor
 
Week-10 - Assembly drawing - Alternators
Week-10 - Assembly drawing - AlternatorsWeek-10 - Assembly drawing - Alternators
Week-10 - Assembly drawing - Alternators
 
Week-09 - Assembly drawing-Induction Motor
Week-09 - Assembly drawing-Induction Motor Week-09 - Assembly drawing-Induction Motor
Week-09 - Assembly drawing-Induction Motor
 
Week-08 - Transformer Assembly-Threephase
Week-08 - Transformer Assembly-ThreephaseWeek-08 - Transformer Assembly-Threephase
Week-08 - Transformer Assembly-Threephase
 
Week-07- Developed Winding Diagrams - 1 phase--.pptx
Week-07- Developed Winding Diagrams - 1 phase--.pptxWeek-07- Developed Winding Diagrams - 1 phase--.pptx
Week-07- Developed Winding Diagrams - 1 phase--.pptx
 
Week-06 - Developed Winding Diagrams - 3 phase--.pptx
Week-06 - Developed Winding Diagrams - 3 phase--.pptxWeek-06 - Developed Winding Diagrams - 3 phase--.pptx
Week-06 - Developed Winding Diagrams - 3 phase--.pptx
 
Week-05 -Design a GA LT panel wiring--.pptx
Week-05 -Design a GA LT panel wiring--.pptxWeek-05 -Design a GA LT panel wiring--.pptx
Week-05 -Design a GA LT panel wiring--.pptx
 
Week-04 -Motor control Panel board
Week-04 -Motor control Panel boardWeek-04 -Motor control Panel board
Week-04 -Motor control Panel board
 
Week-03 - Electrical wiring of Residential, Hospital , small workshop
Week-03 - Electrical wiring of  Residential, Hospital , small workshopWeek-03 - Electrical wiring of  Residential, Hospital , small workshop
Week-03 - Electrical wiring of Residential, Hospital , small workshop
 
Week-02 - Single line diagram of Substations
Week-02 - Single line diagram of SubstationsWeek-02 - Single line diagram of Substations
Week-02 - Single line diagram of Substations
 
Week-01 - INTRODUCTION to CAD
Week-01  - INTRODUCTION to CADWeek-01  - INTRODUCTION to CAD
Week-01 - INTRODUCTION to CAD
 
Week- 13 - APFC , AMF & STP
Week- 13 - APFC , AMF & STP Week- 13 - APFC , AMF & STP
Week- 13 - APFC , AMF & STP
 
Week - 12 - Motor control centre (MCC)
Week - 12 - Motor control centre (MCC) Week - 12 - Motor control centre (MCC)
Week - 12 - Motor control centre (MCC)
 
Week - 11 - Metering section and Auxiliary Relays
Week  - 11 - Metering section  and Auxiliary RelaysWeek  - 11 - Metering section  and Auxiliary Relays
Week - 11 - Metering section and Auxiliary Relays
 
Week 10 - Control Panel & Power gears
Week  10 - Control Panel &  Power gearsWeek  10 - Control Panel &  Power gears
Week 10 - Control Panel & Power gears
 
Switchgear and protection - lab
Switchgear and protection - labSwitchgear and protection - lab
Switchgear and protection - lab
 
Week - 09 - Testing of CB & Substation Earthing
Week - 09 - Testing of CB & Substation Earthing Week - 09 - Testing of CB & Substation Earthing
Week - 09 - Testing of CB & Substation Earthing
 
Week- 08 - Feeder protection and Bus–Bar Protection.
Week- 08 - Feeder protection and  Bus–Bar Protection.Week- 08 - Feeder protection and  Bus–Bar Protection.
Week- 08 - Feeder protection and Bus–Bar Protection.
 
Week 07 - Alternator Protection
Week   07 - Alternator Protection Week   07 - Alternator Protection
Week 07 - Alternator Protection
 
WEEK- 06/ UNIT – 06 Transformer Protection
WEEK- 06/ UNIT – 06 Transformer Protection WEEK- 06/ UNIT – 06 Transformer Protection
WEEK- 06/ UNIT – 06 Transformer Protection
 

Recently uploaded

Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 

Recently uploaded (20)

Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 

UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS

  • 1. 1 Prepared By: Mr.Premanand Desai L/EE B.L.D.E.A’s SHREE SANGANABASAVA MAHA SWAMIJI POLYTECHNIC, VIJAYAPUR-03 E-mail ID:ssmp.premananddesai@bldea.org cell no : +91 7892881829 COURSE & CODE: ELECTRICAL ESTIMATION AND COSTING (15EE54T) UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
  • 2. 2 COURSE & CODE: ELECTRICAL ESTIMATION AND COSTING (15EE54T) UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS 6.0 Transmission line: The line bringing electrical supply from generating stations to secondary substations is called transmission lines. Examples - 400KV, 220KV, 110KV, 66KV, etc. 6.1 Code of practice for Transmission lines: 1) Preliminary surveying is carried out with respect to the following aspects to plot the toposheet. i) The transmission line is to be taken along the road as far as possible to facilitate easy transportation, maintenance and repair. ii) Transmission lines are not to be taken on hill top to avoiding lightning effect. iii) Lines to be drawn in straight path as far as possible to avoid excess of materials. 2) Minimum clearance (6.096 Meter) from conductor to ground must be kept according to IE rules. 3) Double insulator strings and guarding are to be provided in case of road crossing crossings, railway, telephone line, highway, canal and river crossings, etc. 4) Conductor should be having high tensile strength in order to withstand mechanical load. 5) Towers should be having high mechanical strength to withstand the weight of the conductor, insulators and high velocity wind load. 6) Continuous wire should be run on top of the towers for earthing in order to protect the transmission line against the lightning discharge. 7) Phase plates, number plates, anti-climbing devices and danger boards should be provided for each tower. 6.2 Images of Transmission line materials Armoring rods Vibration dampers Phase Plate Jumpers Parallel groove clamps Suspension clamps Tension clamps Anti-climbing devices Arching horns
  • 3. 3 6.3 Transmission line materials 1. Towers : Lattice steel or painted or galvanised steel materials used for fabrication of towers. The height of the line voltage length of the span and legs of the towers are set in special concrete foundations. Mainly there are two types of towers - 1.Tangent , 2.Anchor Towers. 1.Tangent Towers (suspension towers) : These are straight line towers and are called as A type towers or suspension towers. The angle of deviation is zero degree. They are withstanding vertical load. 2.Anchoring towers: These are the deviation towers, starting or dead end towers. They are also called as B, C and D type towers. Which are installed at an angle of deviation from 0 to 30 degree, 30 to 60 degree and 60 to below 90 degree respectively. These towers are withstanding the horizontal load. Four pole structures are used at an angle exactly 90 degree deviation. Extension Piece : Extension piece of fabricated steel structure of 3 meter or 6 meter may be used in order to achieve the minimum clearance to ground as per I.E. rule. Span Length: 1. 66KV line – 220m to 260m 2. 110KV line – 260m to 330m 3. 220KV line – 330m to 360m Approximate height and weight of towers: Sl.No. Line Voltage Height in meters Weight in Tons Tangent Tower Anchor Tower 1 66KV 24 2 tons 3 tons 2 110KV 24 3.5 tons 4.5 tons 3 220KV 26 4 tons 5 tons No. of 15KV disc insulators and their breaking strength: Sl.No. Line Voltage No. of 15KV disc insulators Breaking strength Tangent Tower Anchor Tower 1 66KV 4Nos. 5 Nos. 70 KN 2 110KV 7Nos. 8 Nos. 90 KN 3 220KV 14Nos. 15 Nos. 120 KN 2. Types of conductor and their size: Sl. No. Type of conductor size Application 1 Coyote Conductor 26/2.54mm + 7/1.9mm 66KV Line 2 Lynx Conductor 30/7/2.79mm 110KV Line 3 Drake Conductor 30/7/4.27mm 220KV Line 3. Armouring rods: They consist of aluminium round rods of short length. These are wrapped around A.C.S.R conductors at the point of support. It protects the A.C.S.R conductors from possible damage from vibration of conductors due to high velocity wind action and tightening the clamps at the point of support. 4. Vibration dampers: These are used to prevent occurrence of resonant vibration due to high velocity wind action. Occasionally it has been found resulting in breaking of conductor strands at the point of support.
  • 4. 4 5.Arching horns: These are placed near the ends of the insulator strings and connected to earth. This regulates the potential gradient across the strings and takes care of the arc of the flash over. These are provided for protection of insulators. 6. Numbering plates: All the towers are fixed with number plate to find out the faulted place(distance) by means of toposheet. 7. Phase plates: These are fixed to each tower for indication the red yellow and blue phases. 8. Bolt and Nuts: Standard bolt and nuts are used, common in size from 25mm to 225mm length and 16mm thickness. 9. Bird guards: To avoid sitting of birds on supports, a stick of ebonite plate with zig zag cutting on top. It is fixed near the insulator on the cross arms to prevent flash over between cross arm and conductor. 10.Parallel groove clamps: These clamps are used for electrical connections between two conductors. 11. Suspension clamps: These are used with arcing horns for holding insulator discs for suspension type or A type Towers. 12. Tension clamps: These are provided with all types of anchoring towers (B,C and D type) to hold the group of disc insulators with arching horns. 13. Danger boards: A danger plate is provided for each tower as a warning measure indicating the working voltage, the word DANGER and also bone and skull symbols. It is provided at a height of 3m from the ground level. 14. Anti-climbing devices: GI Barbed wire is wrapped around the tower legs at a height of 2.5m from the ground level for at least 1m length. This is to prevent climbing of unauthorized persons. 15. Other accessories: Such as Al paint, twisting joints, tubular compression joints, repair sleeves, etc.
  • 5. 5 6.4 Single circuit and double circuit transmission lines. In single circuit transmission line three conductors corresponding to three phases i.e., R Y B phases are run on the transmission towers. Where as in double circuit transmission line total six conductors are provided to make two different transmission circuits. Each circuit consisting of three conductors corresponding to three phases. This method of transmission enables the transfer of more power over a particular distance. It is cheaper and requires less conductor materials less land. Suspension type insulators Strain string insulators
  • 6. 6 6.5 Method of calculating the quantity of transmission line materials: 1. Number of spans = length of proposed line in meters span length in meters 2. Total number of four legged fabricated steel structures = No. of spans +1 3. Number of anchoring towers= Total number of towers 10 (assuming every 10th tower is to be an anchoring) 4. Number of suspension towers = Total number of towers – Number of anchoring towers 5.Total weight of the towers= ( Total no. of suspension towers X weight of each suspension towers) + ( Total no. of anchoring towers X weight of each anchoring towers) 6. Number of 15KV disc insulators i. At suspension string for tangent towers = Number of suspension towers X No of suspension strings/ tower X No of insulator/ suspension string. ii. At tension string for anchoring towers = Number of anchoring towers X Number of tension strings/ tower X No of insulator / tension string. Total no. of disc insulators = (i+ii) Add 5% breakage on total 7. Length of ACSR conductor allowing 3% sag = (total length of the line X No.of conductor) X 1.03 8. Length of the GI ground wire of size 7/3.15mm allowing 3% sag = ( Total length of the line X no of ground wire) X 1.03 9. No. of suspension clamps for suitable conductor with arcing horns = Total no of towers × No. of suspension strings/tower. 10. No of tension clamps for suitable conductor with arcing horns = Total no of anchoring towers X No of tension strings/tower. 11. Armouring rods for suitable conductor = No of suspension clamps + No of tension clamps 12. PG clamps for suitable conductor = No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers 13. Vibration dampers for suitable conductor = Total no of towers x 6 ( for single circuit) 14. Grounding materials including accessories = Total no of towers 15. Cement concrete for tower erection = Total no of towers X 12m3 16. Miscellaneous materials such as conductor accessories, ant climbing devices, danger boards, phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
  • 7. 7 6.6 Examples : 1. Prepare the quantity of materials required for running a 80km long 66kv single circuit transmission line across a jungle terrain using four legged fabricated steel structures weighing approximately 2 tones. Assume a span length of 300m. The conductor used is coyote ACSR. Solution: a) No. of spans = length of proposed line in meters span length in meters = 80000 300 = 266.66 = 267 Nos. b) Total no. of four legged fabricated steel structures = No. of spans +1 = 267+1=268 nos. c) No. of anchoring towers, Assuming every 10th tower is to anchoring = Total No.of Towers 10 = 268 10 = 26.8 = 27 Nos. Total No. of anchoring towers =27+1 at starting point = 28 nos. d) No. of suspension towers = Total no. of towers – No. of anchoring towers = 268-28 = 240 nos. e) Total weight of the towers = ( Total no. of suspension towers X weight of each suspension towers) + ( Total no. of anchoring towers X weight of each anchoring towers) = (240 X 2) + (28 X 2) = 536 Tones f) No. of 15KV disc insulators, 70 KN grade, i) At suspension string for tangent towers = No.of suspension towers X No. of suspension strings/tower X No of insulator/suspension string. = 240 X 3 X 4 = 2880 Nos. ii) At tension string for anchoring towers = No. of anchoring towers X No. of tension strings/tower X No of insulator/tension string. = 28 X 6 X 5 = 840 nos. Total no. of disc insulators= 2880+840 = 3720 nos. Add 5% extra for breakage on total, i.e.,= 3720 X 0.05 = 186 nos. Grand total = 3720 + 186 = 3906 nos. g) Length of coyote ACSR conductor allowing 3% sag = (Total length of the line in km X No. of conductor) X 1.03 = 80 X 3 X 1.03 = 247.2 = 248 kms h) Length of the GI ground wire of size 7/3.15mm allowing 3% sag = (Total length of the line in km X No.of ground wires) X 1.03 = 80 X 1 X 1.03 = 82.4 = 83 kms i) Number of suspension clamps suitable for coyote conductor with arcing horns = Total No. of suspension towers X No of suspension strings/tower. = 240 X 3 = 720 sets j) Number of tension clamps suitable for coyote conductor with arcing horns
  • 8. 8 = Total no of anchoring towers X No of tension strings/tower. = 28 X 6 = 168 sets. k) Armoring rods suitable for coyote conductor = No of suspension clamps + No of tension clamps = 720 + 168 = 888 sets. l) PG clamps suitable for coyote conductor = No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers = 28 X 3 X 2 = 168 nos. m) Vibration dampers suitable for coyote conductor = Total no of towers x 6 (for single circuit) = 268 X 6 = 1608 nos. n) Grounding materials including accessories = Total no of towers = 268 sets o) Cement concrete for tower erection( 1:2:4) = Total no of towers X 12m3 = 268 X 12 = 3216 m3 p) Miscellaneous materials such as conductor accessories, ant climbing devices, danger boards, phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items. 2) Prepare a quantity of materials required for 60km, 110kv single circuit transmission line across a jungle terrain using four legged fabricated steel structures. Solution: (Assuming Lynx ACSR conductor has to used and span length is 320m) a) No. of spans=length of proposed line in meters/span length in meters = 60,000/320 = 188 nos b) Total no. of four legged fabricated steel structures= No. of spans +1 = 188 + 1 = 189 nos. c) No. of anchoring towers(Assuming every 10th tower is to be an anchoring) = Total no.of towers /10 =189/10 = 19 nos Total no of anchoring towers = 19 + 1 at starting point = 20 nos. d) No. of suspension towers = total no. of towers – No. of anchoring towers = 189 - 20 = 169 nos. e) Total weight of the towers= ( Total no. of suspension towers X weight of each suspension towers) + (Total no. of anchoring towers X weight of each anchoring towers) = (169 X 3.5) +(20 X 4.5) = 682 Tons f) No of 15KV disc insulators, 90 KN grade. i) At suspension string for tangent towers=No of suspension towers X No of suspension strings/tower X No of insulator / suspension string. = 169 X 3 X 7 = 3549 nos. ii) At tension string for anchoring towers=No of anchoring towers X No of tension strings/ tower X No of insulator / tension string. = 20 X 6 X 8 = 960 nos.
  • 9. 9 Total no. of disc insulators = 3549 + 960 = 4509 nos. Add 5% extra for breakage on total i.e., = 4509 X 0.05 = 225nos Grand total no. of disk insulator = 4509 + 225 = 4734 nos. g) Length of lynx ACSR conductor allowing 3% sag = (total length of the line in km X no of conductor) X 1.03 = 60 X 3 X 1.03 = 185.4 km = 186km h) Length of the GI ground wire of size 7/3.15mm allowing 3% sag = (total length of the line in km X no of ground wire) X 1.03 = 60 X 1 X 1.03 =61.8 = 62km i) No of suspension clamps suitable for Lynx conductor with arcing horns = Total no of suspension towers X No of suspension strings/tower. = 169 X 3 = 507 sets j) No of tension clamps suitable for Lynx conductor with arcing horns = Total no of anchoring towers X No of tension strings/tower. = 20 X 6 = 120 sets k) Armoring rods suitable for Lynx conductor = No of suspension clamps + No of tension clamps = 507 + 120 = 627 sets l) PG clamps suitable for Lynx conductor = No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers = 20 X 3 X 2 = 120 m) Vibration dampers suitable for Lynx conductor = Total no of towers x 6 ( for single circuit) = 189 X 6 = 1134 sets n) Grounding materials including accessories = Total no of towers = 189 sets o) Cement concrete for tower erection = Total no. of towers X 12m3 = 189 X 12 = 2268 m3 p) Miscellaneous materials such as conductor accessories, ant climbing devices, danger boards, phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
  • 10. 10 3) Prepare a detailed quantity of materials required for running a 120km, 220kv single circuit transmission line across a jungle terrain using four legged fabricated steel structures. Assuming average span length of 330m and conductor used is Drake ACSR. Solution: a) No. of spans = length of proposed line in meters/span length in meters =120,000/330 = 363.6 = 364 nos. b) Total no. of four legged fabricated steel structures = No. of spans +1 = 364 + 1= 365 nos c) No. of anchoring towers(assuming every 10th tower is to be an anchoring) = Total no. of towers /10 = 365/10 =36.5 nos = 37 nos Total no of anchoring towers = 37 + 1 at starting point = 38 d) No. of suspension towers = Total no. of towers – No. of anchoring towers = 365 – 38 = 327 nos. e) Total weight of the towers= ( Total no. of suspension towers X weight of each suspension towers) + ( Total no. of anchoring towers X weight of each anchoring towers) = (327 X 4) +(38 X 5) = 1308 + 190 = 1498 Tons f) No of 15KV disc insulators i) At suspension string for tangent towers =No of suspension towers X No of suspension strings/ tower X No of insulator / suspension string. = 327 X 3 X 14 = 13734 nos. ii) At tension string for anchoring towers = No of anchoring towers X No of tension strings/ tower X No of insulator / tension string. = 38 X 6 X 15 = 3420 nos. Total no. of disc insulators=(13734 + 3420) = 17154 nos. Add 5% extra for breakage on total, i.e.,=17154 X 0.05 = 858 nos. g) Length of ACSR conductor allowing 3% sag = (Total length of the line in km X no of conductor) X 1.03 = 120 X 3 X 1.03 = 371 km. h) Length of the GI ground wire of size 7/3.15mm allowing 3% sag = (Total length of the line in km X no of ground wire) X 1.03 = 120 X 1 X 1.03 = 124 km. i) No. of suspension clamps suitable for Drake conductor with arcing horns = Total no of suspension towers X No of suspension strings/tower. = 327 X 3 = 981 sets. j) No. of tension clamps suitable for Drake conductor with arcing horns = Total no of anchoring towers X No of tension strings/tower. = 38 X 6 = 228 sets.
  • 11. 11 k) Armoring rods suitable for Drake conductor = No of suspension clamps + No of tension clamps = 981+228= 1209 sets. l) PG clamps suitable for Drake conductor = No of anchoring towers X No of jumpers / tower X No of PG clamps / jumpers = 38 X 3 X 2 = 22 nos. m) Vibration dampers suitable for Drake conductor = Total no of towers x 6 ( for single circuit) = 365 x 6 = 2190 sets. n) Grounding materials including accessories = Total no of towers = 365 sets. o) Cement concrete for tower erection = Total no of towers X 12m3 = 365 X 12 = 4380 m3 p) Miscellaneous materials such as conductor accessories, ant climbing devices, danger boards, phase plates, no. plates, bird guards, bolt nuts, and other unfortunate items.
  • 12. 12 6.7 SUB STATION: A substation receives electrical power from generating stations through incoming transmission lines and delivers electrical power through outgoing transmission lines. The electrical substation is the part of a power system in which the voltage is transformed from high to low or low to high for transmission, distribution, transformation and switching. The power transformer, circuit breaker, bus-bar, insulator, lightning arrester are the main components of an electrical substation. 6.7.1 - Single line diagram of 66/11KV, 5 MVA substation: 6.7.2 - Materials required for 66/11kV, 5MVA substations with specifications: Example : Prepare a quantity of materials required for establishing a substation of capacity 5MVA, 66/11kv transformer. Assuming current market rates and as per K.P.T.C.L procedure. Solution: (Assuming two incoming lines as in above single line diagram) Equipment’s on primary (66kv) side: a) Lightning arresters metal oxide type, 66kv class = 4 sets ( 2 for bus coupler and 2 for transformer) b) Potential transformers 66kv class = 4 sets ( 2 for line and 2 for Bus bars) c) Current transformers 800:1 ratio = 5 sets ( 2 for i/c line, 2 for o/g line, 1 for bus coupler) & Current transformers 200:1 ratio = 2 sets ( 1 for each transformer) d) Upright Isolators (G.O.S) double blade 800A, 66kv class with earth switch = 4 sets (2 for i/c and 2 for o/g line)
  • 13. 13 e) Upright Isolators (G.O.S) double blade 800A, 66kv class without earth switch = 14 sets (2 for bus coupler and 12 for bus bars) f) Circuit breakers SF6 type, 66kv class = 7 sets (2 for i/c line, 2 for o/g line, 2 for Transformers and 1 for bus coupler) g) Bus bars expansion type using ACSR conductor = 2 sets. h) Transformers 5MVA, 66/11kv, with OLTC and all accessories = 2 sets i) Control and Relay panels for 66kv lines = 4 sets ( 2 for i/c line and 2 for o/g line) j) Control and Relay panels for Transformers = 2 sets ( 1set for each transformer) k) Control and Relay panels for bus coupler = 1 set. l) Power and control cables in between different equipment’s and control and relay panels = lump sum in meters m) G.I mounting structures for mounting different equipment’s = lump sum in metric tonnes Equipment’s on secondary side (11kv): a) 11kv , 1200A outdoor switch gear with breaker, CT, PT etc., = 6 sets b) G.O.S 11kv, 400A double blade = 6 sets (for outgoing 11kv lines) c) Lightning arresters 11kv, thyrite type = 6 sets (for outgoing 11kv lines) d) Distribution transformer for station auxiliary supply 100 KVA, 11KV / 440V = 1 set e) Underground cable of size 1X1000mm2 from transformer to 11kv switch gear = lumpsum in meters f) Underground cable of size 3X250mm2 from outdoor switch gear take off structure = lumpsum in meters g) Take off structures 9m long double pole structure = 6 sets h) 110V, 60AH, batteries with batteries charger = 2 sets i) Earth mat including pipe earthing and plate earthing = lump sum j) LT AC panel board indoor type =1 set k) Outdoor type AC distribution boards = lumpsum l) DC distribution board indoor type = 1 set m) Miscellaneous materials such as ACSR conductors, 15kv disc insulators, stain insulators, different types of clamps, bolt nuts, fire extinguishers, name plates, danger boards and other unfortunate items.