Richard Stoisits has over 42 years of experience in reservoir, production, operations and facility engineering. He currently works as a Senior Engineering Advisor for ExxonMobil, where he leads flow assurance studies for offshore developments and troubleshoots production problems for worldwide assets. Previously, he has held engineering roles at Raytheon Corporation, ARCO Exploration and Production Technology, and ARCO Oil & Gas. He has developed new technologies in areas such as multiphase flow, reservoir modeling, and production optimization.