4. Purpose of the Project
To produce a steel gate which must be made and developed based by the commercial and accurate standards
Working Hours: Total Hours: ?
Tools and Equipment to be Used:
Materials/Tools/Equipment Descrip
tion
Quantity Unit Cost Materials/Tools/Equipment
Description
Quantity Unit Cost
1. 4.
2. 5.
3. 6.
OVERALL COST
PROCEDURE
1
2.
3.
4.
5.
6.
5. PROJECT CRITERIA
PROJECT PLANNING RUBRIC
CRITERION
Area 10- EXCELLENT 9- GOOD 8- FAIR
Cleanliness/ Quality Able to exhibit excellent understa
nding on standard design
Able to exhibit somehow an underst
anding in creating design
Able to show minor/minimal under
standing in developing design
Materials/ Usage Able to fully use the tools prop
erly
Somehow get to manipulate/use
tools
Wasn’t able to use some of the t
ools
Appropriate/
PPE
Fully and well dressed according t
o safety standard
Safely dressed with P.P.E somehow Minimal safety equipment which ar
e worn
Design/ Quality Able to understand how to excelle
ntly exhibit design
Able to understand somehow how
to excellently exhibit design
Minimally exhibit an understanding
in technical drawing
Accuracy The output submitted is accuratel
y welded according to standards
The out put is somehow done on po
ints according to standards
The submitted output is not accura
tely done