SlideShare a Scribd company logo
1 of 27
Download to read offline
Presentation to ITP Wellington Forum
Presenter:
Paul Monk
Performance & Quality Assurance Manager
Fujitsu New Zealand
IT Change Management and Business
Continuity in a “as a Service” World
Introduction
Paul Monk
Performance and Quality Assurance Manager (NZ)
Fujitsu New Zealand
Paul.Monk@nz.fujitsu.com
www.linkedin.com/in/paul-monk-a666352
Citrix Innovation Award for Partners Winner 2017
2 Copyright Fujitsu NZ 2018
Summary
 Theory
 IT Change Management best practise
 Lessons from continuous improvement of Processes
 When should IT Change affect BC and DR plans?
 Keeping Production and DR/BC environments Synchronised
 What can go wrong
 Tips for DR Practitioners and Change Managers
 Possible interactions between Change and BCP processes
 IT Change Management function during DR
 Is your IT Change Management function resilient?
 Suggested Quality Measures
3 Copyright Fujitsu NZ 2018
Theory
 IT Change Management
(source: Wikipedia)
Change Management ensures that standardised methods and procedures are used
for efficient and prompt handling of all changes to control IT infrastructure, in order to
minimise the number and impact of any related incidents upon service.
Change Management
(source: ITILv3 – Service Transition)
Ensures that:
 Standardised methods and procedures are used for efficient and prompt handling of
all changes
 All changes to service assets and configuration items are recorded in the
Configuration Management System
 Overall business risk is optimised.
4 Copyright Fujitsu NZ 2018
Theory
 Business Continuity Planning
(source: Wikipedia)
Business continuity planning is the process of creating systems of prevention and
recovery to deal with potential threats to a company. BCP is a subset of Risk
Management.
 IT Service Continuity Management
(source: ITILv3 Service Design)
The goal of ITSCM is to support the overall Business Continuity Management process
by ensuring that the required IT technical and service facilities can be resumed within
required, and agreed, business timescales.
5 Copyright Fujitsu NZ 2018
Theory
 Disaster Recovery
(source: Wikipedia)
Disaster recovery (DR) involves a set of policies, tools and procedures to enable the
recovery or continuation of vital technology infrastructure and systems following a
natural or human-induced disaster.
Disaster recovery focuses on the IT or technology systems supporting critical business
functions, as opposed to business continuity, which involves keeping all essential
aspects of a business functioning despite significant disruptive events. Disaster
recovery is therefore a subset of business continuity.
6 Copyright Fujitsu NZ 2018
IT Change Management Best Practise
It is good practise to have the following KPIs for the IT Change Management process:
 < 5% failed changes per month
 > 20% Standard changes implemented per month
 Zero unauthorised changes per month
 < 4 business hours for the outcome of Changes
 Zero Change window extensions requested after the Change Window ends
 CAB panel that understand relevant risks from Technical and Business perspective
 Formal induction of staff and third parties who participate in the Change process
Source: Fujitsu NZ data and experience(2014 – 2017), supported by ISO20000 certified processes and Fujitsu
Oceania quality review of data.
7 Copyright Fujitsu NZ 2018
IT Change Management Best Practise
 The scope of the IT Change process must be easy to explain and enforce:
 O/S
 VM Guest or OVM
 Server Hardware
 SAN
 Chassis
 Switch
 Network
 Firewall
Test
(includes System Test, Pre-Prod)
Development
Production
(Includes Training, DR and
Production Data if not anonymised)
 Desktop Environment
 Application client side
 Application server side
 Middleware/Web Server
 Database
 O/S
 VM Guest or OVM
 Server Hardware
 SAN
 Chassis
 Switch
 Network
 Firewall
 O/S
 VM Guest or OVM
 Server Hardware
 SAN
 Chassis
 Switch
 Network
 Firewall
 Desktop Environment
 Application client side
 Application server side
 Middleware/Web Server
 Database
 Desktop Environment
 Application client side
 Application server side
 Middleware/Web Server
 Database
8 Copyright Fujitsu NZ 2018
IT Change Management Best Practise
 As-a-Service maintenance activity can be recorded as an “Advisory Change”
Contributing Infrastructure
CustomerProduct
ServiceVeil
Engineer
Underlying Infrastructure Revealed Service
! Advisory Change
!
Normal
Change
9 Copyright Fujitsu NZ 2018
IT Change Management Best Practise
 CAB meetings need the right inputs to make robust decisions
CAB Panel
Implementation
Plan
Approved
Design
Change
Owner
Supporting Information
Comms
Test Exit
report
Design and
Service Transition
panel
Forward
Schedule
10 Copyright Fujitsu NZ 2018
IT Change Management Best Practise
 Right amount of due diligence is applied to the type of ChangeChangeFailureRisk
Due Diligence
Standard
Emergency
Urgent/Expedited
Non-Standard
Advisory
Release Management
can add more value here
(Workflow steps before approval )
11 Copyright Fujitsu NZ 2018
Lessons from continuous improvement of processes
 Service Management processes need to evolve to meet new customer
requirements:
 Communication is always key
 Be curious about connected processes
 Lead the Process
 Shrinking to be Lean and Agile
 Educate those affected
 Remember the double-edged sword
 Cut too much away and you are left with risk-based decisions being made by unqualified or
unauthorised staff
 A controlled and auditable process will work with just enough paperwork and monitoring
Welcome the question Is
this in scope or not?
Improve throughput by 20% by running CAB
twice a week instead of once a week
Reduce admin by 20% by establishing
correct workflow size for the Change type
More Standard Changes means less deviation,
lowers risk and reduces CAB agenda
12 Copyright Fujitsu NZ 2018
When should IT Change affect BC and DR plans?
How does this IT Change affect BC and DR plans?
Example 1 – Upgrade to SharePoint
The DR plan should be tested to prove RTO is still feasible after the Change.
Example 2 – Setup of DR environment for Finance team
The DR plan should be tested to prove connectivity during DR from the secondary
location.
13 Copyright Fujitsu NZ 2018
Keeping Production and DR/BC synchronised
How should we keep Production and DR/BC environments synchronised?
Simple:
 Configuration Management process to put environments into the CMDB as a service.
 Maintain a Technical Service Catalogue that includes environment as an attribute.
 Update the IT Change Management process to include:
 Impact Assessment that confirms environments in scope
 Architecture team added as quorum member to CAB panel
 Implementation plan has validation steps that check both Prod and DR/BC environments
 Maintain supporting documentation (Recovery plans, DR plans)
Complemented with:
 Investment in automation that reports differences between Environments.
14 Copyright Fujitsu NZ 2018
What can go wrong
The consequence of lack of due diligence in our topic are many.
Here are some examples:
 Production and DR at same site. WAN risk.
 Recovery Plan not updated by Project. Not in scope.
 IT Change Management not considering BCP update as relevant.
 DR site firewall rules not updated Production upgrade. 3 week delay.
 Using USB sticks to build PCs at BC site. Delay risk.
 DR site not kept up to date. BCP will fail if tested.
15 Copyright Fujitsu NZ 2018
Tips for DR Practitioners
Some suggestions to start the conversation with your IT Change Manager:
 How much do you as Change Manager know about our BCP?
 What interaction exists between IT Change Management and BCP processes?
The common ground between IT Change Management and BCP/DR is:
 The need to capture and record the current production state
 BC/DR plans have similar information elements as an IT Change Implementation Plan.
Small steps to improve are always easier. Start small. 
16 Copyright Fujitsu NZ 2018
Tips for IT Change Managers
Some suggestions to start the conversation with your BC co-ordinator:
Where to start?
1. Read your Organisation’s BC, IT Service Continuity and DR Plans
2. Ask for an invite to the next BC planning meeting to observe.
3. Decide what interaction IT Change should have with the BC process
4. Confirm the data needed to support these interactions)
17 Copyright Fujitsu NZ 2018
Possible interaction between Change and BCP processes
Risk Management
Business Continuity
Planning
(with ITSCM)
DR
IT Change Management Requests IT Change to
mitigate risks
Trigger update
to BIA and BCP
Update DR technical
environment to align with
Production
BIA
DR test BCP test
Change
record
Notify
through IT Change
Process?
Triggers updates to
risk records (incl. new)
Add to IT Change
schedule as information
only
Yes
Proactive Activities
BCP
18 Copyright Fujitsu NZ 2018
Possible interaction between Change and BCP processes
Reactive Activities
19 Copyright Fujitsu NZ 2018
Risk Management
Business Continuity
Planning
(with ITSCM)
IT Incident Management
Incident
record
Activate BC/DR Plan after
attempts to restore service
through:
• Technical escalation to L2
and L3 support
• IT Change confirmed as
cause
• IT Change Rollback
attemptedChange
record
Caused
Incident Change
record
Technical steps
Post DR to resolve
residual issues
DR
Plan
BC
Plan
IT Change Management function during DR
IT Change Management usually takes a backseat during DR.
The value of including an experienced IT Change Manager in the BCP is:
 Process experience
 Key contacts they can draw from to get BCP activity done that was unforeseen
 Awareness of current Production state through observation.
 Holistic awareness about the IT environment and related processes.
Use that to your advantage!
20 Copyright Fujitsu NZ 2018
Is your IT Change Management function resilient?
 What is your BC / ITSCM plan if your IT Change Management tool is down?
 What happens when the IT Change Manager is on Annual Leave?
 Do you have a succession plan for your IT Change Manager?
 Are all your daily, weekly, monthly procedures documented?
21 Copyright Fujitsu NZ 2018
Quality Measure Checklist
If you answer “Yes” to the below questions this means your IT Change Management process is
adding value to your organisations BCP:
 Is the BCP/DR infrastructure treated as in scope for the IT Change process?
 Does your IT Change Management impact assessment check if:
 BC/DR Plans need to be updated?
 BCP/DR infrastructure need to be updated to align with Change to Production environment?
 Does the BCP/DR co-ordinator attending your CAB meeting?
 Does your template for Architecture Design cover a BCP/DR environment section?
 Does your Technical Service Catalogue and CMDB recognise infrastructure for BCP/DR?
22 Copyright Fujitsu NZ 2018
Quality Measure Checklist
Organisations can reduce some BCP and DR costs by building up resilience and
monitoring capacity growth using current technology:
Are your servers all now virtual and highly available?
Capacity monitored and proactive IT Change raised to ensure head-room?
Have you virtualised your databases?
Are your virtual servers and/or storage managed with built-in DR solution?
Is your data secured by a vendor with their Data Centre ISO Standard certified
ISO Standard Reference Description
ISO27001 Security Management System
ISO9001 Quality Management System
ISO20000 Service Management System
23 Copyright Fujitsu NZ 2018
Conclusion
IT Change Management is important to BCP and DR processes.
Other effective Service Management processes/disciplines needed to support IT
Change Management and BC/DR processes. Refer to ITIL v3 books for further details.
Start the discussion between IT Change Management and BCP process owners at
your organisation and I am confident you will find it very useful.
Ref: https://www.axelos.com/best-practice-solutions/itil/what-is-itil
24 Copyright Fujitsu NZ 2018
Questions
25 Copyright Fujitsu NZ 2018
26 Copyright Fujitsu NZ 2018
Document Control
Attribute Value
Document Name The importance of IT Change Management to DR and BCP process
Confidentiality Uncontrolled
Document Status Final
Version Number 1.7
Summary This presentation is for Government Sector IT DR Forum presentation
Author Monk, Paul
Owner Monk, Paul
Version Date 30/5/2018
Date of Next Review N/A
Target Audience Participants of GSITDR Forum
Distribution As required.
Internal Repository M:Improvements2018Change Management presentation to GSITDR forum
Customer Repository N/A
Version Date Name Comments
0.1 12/2/2018 Paul Monk Initial Draft
0.2 9/3/2018 Paul Monk After input from GSITDR stakeholders.
0.3 12/3/2018 Paul Monk Rearranged sequence of animation on slide 12.
0.4 14/3/2018 Paul Monk Updated slide 19 on suggestion from Steve M. Updated theme and added footer.
0.5 28/3/2018 Paul Monk After feedback from Fujitsu Oceania BCP Co-ordinator
0.6 4/4/2018 Paul Monk After feedback from Fujitsu NZ Change Management team leader.
1.0 11/4/2018 Paul Monk After review feedback from GSITDR forum representatives.
1.1 11/4/2018 Paul Monk Removed video and slide related to Stats NZ story at request by Katie.
1.2 12/4/2018 Paul Monk After input from Fujitsu architect.
1.3 16/4/2018 Paul Monk After input from Fujitsu internal presentation
1.4 18/4/2018 Paul Monk After input from Pradeep Navalker
1.5 3/5/2018 Paul Monk Added image credit for TaiChi Sword image, slide#12.
1.6 16/5/2018 Paul Monk Updated for ITP audience.
1.7 30/5/2018 Paul Monk After review from rehearsal and feedback from GSITDR forum session.
Document Control Table
Change History
27 Copyright Fujitsu NZ 2018

More Related Content

What's hot

Managed Services Support
Managed Services SupportManaged Services Support
Managed Services Supportjdivalerio
 
Integrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User AdoptionIntegrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User AdoptionCA Technologies
 
Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...Alan McSweeney
 
Staff Augmentation and Managed Services Model
Staff Augmentation and Managed Services ModelStaff Augmentation and Managed Services Model
Staff Augmentation and Managed Services ModelDenysys Corporation
 
The ROI of Problem Management
The ROI of Problem ManagementThe ROI of Problem Management
The ROI of Problem ManagementFrontRange
 
Making Problem Management Work for Your Organization
Making Problem Management Work for Your OrganizationMaking Problem Management Work for Your Organization
Making Problem Management Work for Your OrganizationAtlassian
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Jean Gehring
 
IT Service & Asset Management Better Together
IT Service & Asset Management Better TogetherIT Service & Asset Management Better Together
IT Service & Asset Management Better TogetherIvanti
 
Problem Management Overview
Problem Management OverviewProblem Management Overview
Problem Management OverviewMarval Software
 
Build a Center of Excellence
Build a Center of ExcellenceBuild a Center of Excellence
Build a Center of ExcellenceBonitasoft
 
Pink elephant webinar: how ITSM maturity enables or disables your transformat...
Pink elephant webinar: how ITSM maturity enables or disables your transformat...Pink elephant webinar: how ITSM maturity enables or disables your transformat...
Pink elephant webinar: how ITSM maturity enables or disables your transformat...Axios Systems
 
IT Change Control Process
IT Change Control  ProcessIT Change Control  Process
IT Change Control Processbenji00
 
How to invoke Disaster Recovery
How to invoke Disaster RecoveryHow to invoke Disaster Recovery
How to invoke Disaster RecoveryDatabarracks
 
Uberization of field service management
Uberization of field service managementUberization of field service management
Uberization of field service managementDista
 
Configuration Management
Configuration Management Configuration Management
Configuration Management hdicapitalarea
 
IT Service Catalog vs Service Portfolio
IT Service Catalog vs Service PortfolioIT Service Catalog vs Service Portfolio
IT Service Catalog vs Service PortfolioEvergreen Systems
 
ITSM and ITOM Coming Together
ITSM and ITOM Coming TogetherITSM and ITOM Coming Together
ITSM and ITOM Coming TogetherOpsRamp
 
ITIL Practical Guide - Service Operation
ITIL Practical Guide - Service OperationITIL Practical Guide - Service Operation
ITIL Practical Guide - Service OperationAxios Systems
 

What's hot (20)

Managed Services Support
Managed Services SupportManaged Services Support
Managed Services Support
 
Problem Management
Problem ManagementProblem Management
Problem Management
 
Integrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User AdoptionIntegrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User Adoption
 
Problem Management
Problem ManagementProblem Management
Problem Management
 
Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...
 
Staff Augmentation and Managed Services Model
Staff Augmentation and Managed Services ModelStaff Augmentation and Managed Services Model
Staff Augmentation and Managed Services Model
 
The ROI of Problem Management
The ROI of Problem ManagementThe ROI of Problem Management
The ROI of Problem Management
 
Making Problem Management Work for Your Organization
Making Problem Management Work for Your OrganizationMaking Problem Management Work for Your Organization
Making Problem Management Work for Your Organization
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2
 
IT Service & Asset Management Better Together
IT Service & Asset Management Better TogetherIT Service & Asset Management Better Together
IT Service & Asset Management Better Together
 
Problem Management Overview
Problem Management OverviewProblem Management Overview
Problem Management Overview
 
Build a Center of Excellence
Build a Center of ExcellenceBuild a Center of Excellence
Build a Center of Excellence
 
Pink elephant webinar: how ITSM maturity enables or disables your transformat...
Pink elephant webinar: how ITSM maturity enables or disables your transformat...Pink elephant webinar: how ITSM maturity enables or disables your transformat...
Pink elephant webinar: how ITSM maturity enables or disables your transformat...
 
IT Change Control Process
IT Change Control  ProcessIT Change Control  Process
IT Change Control Process
 
How to invoke Disaster Recovery
How to invoke Disaster RecoveryHow to invoke Disaster Recovery
How to invoke Disaster Recovery
 
Uberization of field service management
Uberization of field service managementUberization of field service management
Uberization of field service management
 
Configuration Management
Configuration Management Configuration Management
Configuration Management
 
IT Service Catalog vs Service Portfolio
IT Service Catalog vs Service PortfolioIT Service Catalog vs Service Portfolio
IT Service Catalog vs Service Portfolio
 
ITSM and ITOM Coming Together
ITSM and ITOM Coming TogetherITSM and ITOM Coming Together
ITSM and ITOM Coming Together
 
ITIL Practical Guide - Service Operation
ITIL Practical Guide - Service OperationITIL Practical Guide - Service Operation
ITIL Practical Guide - Service Operation
 

Similar to It Change Management and Business Continuity in a as-a-service world

The importance of IT Change Management to the DR and BCP process
The importance of IT Change Management to the DR and BCP processThe importance of IT Change Management to the DR and BCP process
The importance of IT Change Management to the DR and BCP processPaul Monk (CBCI)
 
Application Value Assessment
Application Value AssessmentApplication Value Assessment
Application Value AssessmentGerry Appeltants
 
Co Dig Gov Perf Mgmt 08
Co Dig Gov Perf Mgmt 08Co Dig Gov Perf Mgmt 08
Co Dig Gov Perf Mgmt 08James Lindauer
 
Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1Bill St. Arnaud
 
How to select the best business continuity strategy and solution?
How to select the best business continuity strategy and solution?How to select the best business continuity strategy and solution?
How to select the best business continuity strategy and solution?PECB
 
Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Brigitte Theuma
 
WS2_FINAL_MITOS_T03_v20151102
WS2_FINAL_MITOS_T03_v20151102WS2_FINAL_MITOS_T03_v20151102
WS2_FINAL_MITOS_T03_v20151102Arun Sankar
 
Roland berger managing-the-it-cost-challenge_20090522
Roland berger managing-the-it-cost-challenge_20090522Roland berger managing-the-it-cost-challenge_20090522
Roland berger managing-the-it-cost-challenge_20090522Karthik Arumugham
 
Iscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service ManagementIscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service ManagementIscope Digital
 
Strategies For IT Simplification PowerPoint Presentation Slides
Strategies For IT Simplification PowerPoint Presentation Slides Strategies For IT Simplification PowerPoint Presentation Slides
Strategies For IT Simplification PowerPoint Presentation Slides SlideTeam
 
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...ijait
 
Business Case4 Process Improvement
Business Case4 Process ImprovementBusiness Case4 Process Improvement
Business Case4 Process ImprovementAl Bennett
 
Epco itsm transformation_roadmap_v5_draft_063008
Epco itsm transformation_roadmap_v5_draft_063008Epco itsm transformation_roadmap_v5_draft_063008
Epco itsm transformation_roadmap_v5_draft_063008Accenture
 
Business Drivers For It Simplification PowerPoint Presentation Slides
Business Drivers For It Simplification PowerPoint Presentation SlidesBusiness Drivers For It Simplification PowerPoint Presentation Slides
Business Drivers For It Simplification PowerPoint Presentation SlidesSlideTeam
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)Mark Carlson
 
Gauge your speed
Gauge your speedGauge your speed
Gauge your speedNumerify
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)jimmcdonaldpmp
 
COBIT® Presentation Package.ppt
COBIT® Presentation Package.pptCOBIT® Presentation Package.ppt
COBIT® Presentation Package.pptEmmacuet
 

Similar to It Change Management and Business Continuity in a as-a-service world (20)

The importance of IT Change Management to the DR and BCP process
The importance of IT Change Management to the DR and BCP processThe importance of IT Change Management to the DR and BCP process
The importance of IT Change Management to the DR and BCP process
 
Application Value Assessment
Application Value AssessmentApplication Value Assessment
Application Value Assessment
 
Co Dig Gov Perf Mgmt 08
Co Dig Gov Perf Mgmt 08Co Dig Gov Perf Mgmt 08
Co Dig Gov Perf Mgmt 08
 
Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1
 
How to select the best business continuity strategy and solution?
How to select the best business continuity strategy and solution?How to select the best business continuity strategy and solution?
How to select the best business continuity strategy and solution?
 
Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009
 
WS2_FINAL_MITOS_T03_v20151102
WS2_FINAL_MITOS_T03_v20151102WS2_FINAL_MITOS_T03_v20151102
WS2_FINAL_MITOS_T03_v20151102
 
Roland berger managing-the-it-cost-challenge_20090522
Roland berger managing-the-it-cost-challenge_20090522Roland berger managing-the-it-cost-challenge_20090522
Roland berger managing-the-it-cost-challenge_20090522
 
Iscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service ManagementIscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service Management
 
Strategies For IT Simplification PowerPoint Presentation Slides
Strategies For IT Simplification PowerPoint Presentation Slides Strategies For IT Simplification PowerPoint Presentation Slides
Strategies For IT Simplification PowerPoint Presentation Slides
 
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
CHANGE MANAGEMENT: IMPLEMENTATION AND BENEFITS OF THE CHANGE CONTROL IN THE I...
 
Business Case4 Process Improvement
Business Case4 Process ImprovementBusiness Case4 Process Improvement
Business Case4 Process Improvement
 
Epco itsm transformation_roadmap_v5_draft_063008
Epco itsm transformation_roadmap_v5_draft_063008Epco itsm transformation_roadmap_v5_draft_063008
Epco itsm transformation_roadmap_v5_draft_063008
 
Business Drivers For It Simplification PowerPoint Presentation Slides
Business Drivers For It Simplification PowerPoint Presentation SlidesBusiness Drivers For It Simplification PowerPoint Presentation Slides
Business Drivers For It Simplification PowerPoint Presentation Slides
 
Optimize Change Management
Optimize Change ManagementOptimize Change Management
Optimize Change Management
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)
 
Gauge your speed
Gauge your speedGauge your speed
Gauge your speed
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 
COBIT® Presentation Package.ppt
COBIT® Presentation Package.pptCOBIT® Presentation Package.ppt
COBIT® Presentation Package.ppt
 
SampleDecPkg.ppt
SampleDecPkg.pptSampleDecPkg.ppt
SampleDecPkg.ppt
 

Recently uploaded

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 

Recently uploaded (20)

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 

It Change Management and Business Continuity in a as-a-service world

  • 1. Presentation to ITP Wellington Forum Presenter: Paul Monk Performance & Quality Assurance Manager Fujitsu New Zealand IT Change Management and Business Continuity in a “as a Service” World
  • 2. Introduction Paul Monk Performance and Quality Assurance Manager (NZ) Fujitsu New Zealand Paul.Monk@nz.fujitsu.com www.linkedin.com/in/paul-monk-a666352 Citrix Innovation Award for Partners Winner 2017 2 Copyright Fujitsu NZ 2018
  • 3. Summary  Theory  IT Change Management best practise  Lessons from continuous improvement of Processes  When should IT Change affect BC and DR plans?  Keeping Production and DR/BC environments Synchronised  What can go wrong  Tips for DR Practitioners and Change Managers  Possible interactions between Change and BCP processes  IT Change Management function during DR  Is your IT Change Management function resilient?  Suggested Quality Measures 3 Copyright Fujitsu NZ 2018
  • 4. Theory  IT Change Management (source: Wikipedia) Change Management ensures that standardised methods and procedures are used for efficient and prompt handling of all changes to control IT infrastructure, in order to minimise the number and impact of any related incidents upon service. Change Management (source: ITILv3 – Service Transition) Ensures that:  Standardised methods and procedures are used for efficient and prompt handling of all changes  All changes to service assets and configuration items are recorded in the Configuration Management System  Overall business risk is optimised. 4 Copyright Fujitsu NZ 2018
  • 5. Theory  Business Continuity Planning (source: Wikipedia) Business continuity planning is the process of creating systems of prevention and recovery to deal with potential threats to a company. BCP is a subset of Risk Management.  IT Service Continuity Management (source: ITILv3 Service Design) The goal of ITSCM is to support the overall Business Continuity Management process by ensuring that the required IT technical and service facilities can be resumed within required, and agreed, business timescales. 5 Copyright Fujitsu NZ 2018
  • 6. Theory  Disaster Recovery (source: Wikipedia) Disaster recovery (DR) involves a set of policies, tools and procedures to enable the recovery or continuation of vital technology infrastructure and systems following a natural or human-induced disaster. Disaster recovery focuses on the IT or technology systems supporting critical business functions, as opposed to business continuity, which involves keeping all essential aspects of a business functioning despite significant disruptive events. Disaster recovery is therefore a subset of business continuity. 6 Copyright Fujitsu NZ 2018
  • 7. IT Change Management Best Practise It is good practise to have the following KPIs for the IT Change Management process:  < 5% failed changes per month  > 20% Standard changes implemented per month  Zero unauthorised changes per month  < 4 business hours for the outcome of Changes  Zero Change window extensions requested after the Change Window ends  CAB panel that understand relevant risks from Technical and Business perspective  Formal induction of staff and third parties who participate in the Change process Source: Fujitsu NZ data and experience(2014 – 2017), supported by ISO20000 certified processes and Fujitsu Oceania quality review of data. 7 Copyright Fujitsu NZ 2018
  • 8. IT Change Management Best Practise  The scope of the IT Change process must be easy to explain and enforce:  O/S  VM Guest or OVM  Server Hardware  SAN  Chassis  Switch  Network  Firewall Test (includes System Test, Pre-Prod) Development Production (Includes Training, DR and Production Data if not anonymised)  Desktop Environment  Application client side  Application server side  Middleware/Web Server  Database  O/S  VM Guest or OVM  Server Hardware  SAN  Chassis  Switch  Network  Firewall  O/S  VM Guest or OVM  Server Hardware  SAN  Chassis  Switch  Network  Firewall  Desktop Environment  Application client side  Application server side  Middleware/Web Server  Database  Desktop Environment  Application client side  Application server side  Middleware/Web Server  Database 8 Copyright Fujitsu NZ 2018
  • 9. IT Change Management Best Practise  As-a-Service maintenance activity can be recorded as an “Advisory Change” Contributing Infrastructure CustomerProduct ServiceVeil Engineer Underlying Infrastructure Revealed Service ! Advisory Change ! Normal Change 9 Copyright Fujitsu NZ 2018
  • 10. IT Change Management Best Practise  CAB meetings need the right inputs to make robust decisions CAB Panel Implementation Plan Approved Design Change Owner Supporting Information Comms Test Exit report Design and Service Transition panel Forward Schedule 10 Copyright Fujitsu NZ 2018
  • 11. IT Change Management Best Practise  Right amount of due diligence is applied to the type of ChangeChangeFailureRisk Due Diligence Standard Emergency Urgent/Expedited Non-Standard Advisory Release Management can add more value here (Workflow steps before approval ) 11 Copyright Fujitsu NZ 2018
  • 12. Lessons from continuous improvement of processes  Service Management processes need to evolve to meet new customer requirements:  Communication is always key  Be curious about connected processes  Lead the Process  Shrinking to be Lean and Agile  Educate those affected  Remember the double-edged sword  Cut too much away and you are left with risk-based decisions being made by unqualified or unauthorised staff  A controlled and auditable process will work with just enough paperwork and monitoring Welcome the question Is this in scope or not? Improve throughput by 20% by running CAB twice a week instead of once a week Reduce admin by 20% by establishing correct workflow size for the Change type More Standard Changes means less deviation, lowers risk and reduces CAB agenda 12 Copyright Fujitsu NZ 2018
  • 13. When should IT Change affect BC and DR plans? How does this IT Change affect BC and DR plans? Example 1 – Upgrade to SharePoint The DR plan should be tested to prove RTO is still feasible after the Change. Example 2 – Setup of DR environment for Finance team The DR plan should be tested to prove connectivity during DR from the secondary location. 13 Copyright Fujitsu NZ 2018
  • 14. Keeping Production and DR/BC synchronised How should we keep Production and DR/BC environments synchronised? Simple:  Configuration Management process to put environments into the CMDB as a service.  Maintain a Technical Service Catalogue that includes environment as an attribute.  Update the IT Change Management process to include:  Impact Assessment that confirms environments in scope  Architecture team added as quorum member to CAB panel  Implementation plan has validation steps that check both Prod and DR/BC environments  Maintain supporting documentation (Recovery plans, DR plans) Complemented with:  Investment in automation that reports differences between Environments. 14 Copyright Fujitsu NZ 2018
  • 15. What can go wrong The consequence of lack of due diligence in our topic are many. Here are some examples:  Production and DR at same site. WAN risk.  Recovery Plan not updated by Project. Not in scope.  IT Change Management not considering BCP update as relevant.  DR site firewall rules not updated Production upgrade. 3 week delay.  Using USB sticks to build PCs at BC site. Delay risk.  DR site not kept up to date. BCP will fail if tested. 15 Copyright Fujitsu NZ 2018
  • 16. Tips for DR Practitioners Some suggestions to start the conversation with your IT Change Manager:  How much do you as Change Manager know about our BCP?  What interaction exists between IT Change Management and BCP processes? The common ground between IT Change Management and BCP/DR is:  The need to capture and record the current production state  BC/DR plans have similar information elements as an IT Change Implementation Plan. Small steps to improve are always easier. Start small.  16 Copyright Fujitsu NZ 2018
  • 17. Tips for IT Change Managers Some suggestions to start the conversation with your BC co-ordinator: Where to start? 1. Read your Organisation’s BC, IT Service Continuity and DR Plans 2. Ask for an invite to the next BC planning meeting to observe. 3. Decide what interaction IT Change should have with the BC process 4. Confirm the data needed to support these interactions) 17 Copyright Fujitsu NZ 2018
  • 18. Possible interaction between Change and BCP processes Risk Management Business Continuity Planning (with ITSCM) DR IT Change Management Requests IT Change to mitigate risks Trigger update to BIA and BCP Update DR technical environment to align with Production BIA DR test BCP test Change record Notify through IT Change Process? Triggers updates to risk records (incl. new) Add to IT Change schedule as information only Yes Proactive Activities BCP 18 Copyright Fujitsu NZ 2018
  • 19. Possible interaction between Change and BCP processes Reactive Activities 19 Copyright Fujitsu NZ 2018 Risk Management Business Continuity Planning (with ITSCM) IT Incident Management Incident record Activate BC/DR Plan after attempts to restore service through: • Technical escalation to L2 and L3 support • IT Change confirmed as cause • IT Change Rollback attemptedChange record Caused Incident Change record Technical steps Post DR to resolve residual issues DR Plan BC Plan
  • 20. IT Change Management function during DR IT Change Management usually takes a backseat during DR. The value of including an experienced IT Change Manager in the BCP is:  Process experience  Key contacts they can draw from to get BCP activity done that was unforeseen  Awareness of current Production state through observation.  Holistic awareness about the IT environment and related processes. Use that to your advantage! 20 Copyright Fujitsu NZ 2018
  • 21. Is your IT Change Management function resilient?  What is your BC / ITSCM plan if your IT Change Management tool is down?  What happens when the IT Change Manager is on Annual Leave?  Do you have a succession plan for your IT Change Manager?  Are all your daily, weekly, monthly procedures documented? 21 Copyright Fujitsu NZ 2018
  • 22. Quality Measure Checklist If you answer “Yes” to the below questions this means your IT Change Management process is adding value to your organisations BCP:  Is the BCP/DR infrastructure treated as in scope for the IT Change process?  Does your IT Change Management impact assessment check if:  BC/DR Plans need to be updated?  BCP/DR infrastructure need to be updated to align with Change to Production environment?  Does the BCP/DR co-ordinator attending your CAB meeting?  Does your template for Architecture Design cover a BCP/DR environment section?  Does your Technical Service Catalogue and CMDB recognise infrastructure for BCP/DR? 22 Copyright Fujitsu NZ 2018
  • 23. Quality Measure Checklist Organisations can reduce some BCP and DR costs by building up resilience and monitoring capacity growth using current technology: Are your servers all now virtual and highly available? Capacity monitored and proactive IT Change raised to ensure head-room? Have you virtualised your databases? Are your virtual servers and/or storage managed with built-in DR solution? Is your data secured by a vendor with their Data Centre ISO Standard certified ISO Standard Reference Description ISO27001 Security Management System ISO9001 Quality Management System ISO20000 Service Management System 23 Copyright Fujitsu NZ 2018
  • 24. Conclusion IT Change Management is important to BCP and DR processes. Other effective Service Management processes/disciplines needed to support IT Change Management and BC/DR processes. Refer to ITIL v3 books for further details. Start the discussion between IT Change Management and BCP process owners at your organisation and I am confident you will find it very useful. Ref: https://www.axelos.com/best-practice-solutions/itil/what-is-itil 24 Copyright Fujitsu NZ 2018
  • 27. Document Control Attribute Value Document Name The importance of IT Change Management to DR and BCP process Confidentiality Uncontrolled Document Status Final Version Number 1.7 Summary This presentation is for Government Sector IT DR Forum presentation Author Monk, Paul Owner Monk, Paul Version Date 30/5/2018 Date of Next Review N/A Target Audience Participants of GSITDR Forum Distribution As required. Internal Repository M:Improvements2018Change Management presentation to GSITDR forum Customer Repository N/A Version Date Name Comments 0.1 12/2/2018 Paul Monk Initial Draft 0.2 9/3/2018 Paul Monk After input from GSITDR stakeholders. 0.3 12/3/2018 Paul Monk Rearranged sequence of animation on slide 12. 0.4 14/3/2018 Paul Monk Updated slide 19 on suggestion from Steve M. Updated theme and added footer. 0.5 28/3/2018 Paul Monk After feedback from Fujitsu Oceania BCP Co-ordinator 0.6 4/4/2018 Paul Monk After feedback from Fujitsu NZ Change Management team leader. 1.0 11/4/2018 Paul Monk After review feedback from GSITDR forum representatives. 1.1 11/4/2018 Paul Monk Removed video and slide related to Stats NZ story at request by Katie. 1.2 12/4/2018 Paul Monk After input from Fujitsu architect. 1.3 16/4/2018 Paul Monk After input from Fujitsu internal presentation 1.4 18/4/2018 Paul Monk After input from Pradeep Navalker 1.5 3/5/2018 Paul Monk Added image credit for TaiChi Sword image, slide#12. 1.6 16/5/2018 Paul Monk Updated for ITP audience. 1.7 30/5/2018 Paul Monk After review from rehearsal and feedback from GSITDR forum session. Document Control Table Change History 27 Copyright Fujitsu NZ 2018