CUF vs. PR
What is the difference?
Performance of
Solar-PV
Systems
What is
“CUF”?
What is
“PR”?
What is the
difference?
Why is PR
“better”
than CUF?
Benefit for
Developer
and Investor
Benefits for
EPCs
PR and CUF 3
)(
)(
8760)(
)(
kWhoutputlTheoretica
kWhOutputAchieved
PR
hkWCapacity
kWhOutput
CUF
What is CUF?
• CUF can be understood as real output of the plant
compared to theoretical maximum output of the plant
• Example: DG with 100kW that runs 12 hour per day:
4
%50
876000
438000
8760100
36510012
kWh
kWh
hkW
dkWh
CUFDG
What is PR?
• PR can be understood as the comparison of plant output
compared to the output the plant could have achieved
under certain frameconditions.
• Example: Solar PV system
5
%8,84
1650
1400
)(
)(
kWh
kWh
kWhoutputlTheoretica
kWhoutputAchieved
PR
What is the difference?
• PR takes into account:
• Irradiation
• Panel temperature
• Availability of grid
• Size of the aperture area
• Nominal power output
• Temperature correction values
6
Why is PR “better” than
CUF?
• CUF does not really fit to solar-PV because of the time
domain
• Solar-PV systems typically do not work at night
• Solar irradiation changes during the seasons
• Plant output depends on temperature, too
• PR fits well to the needs of developers, EPCs and project
owners
• PR can be calculated permanently
• Takes into account the climate conditions
• Gives a direct feedback on “what was achieved vs. what could
have been achieved” – quality control instrument
7
Benefits for Developers
and Investors
CUF PR
Comparison of different plants
independent from external factors
(climate, irradiation, grid availability, etc.)
No Yes
EarlyWarning System No Yes
Clear information on real performance of
plant
No Yes
Indicator on effectiveness of cleaning No Yes
Indicator on effectiveness of maintenance No Yes
Permanent comparison of performance No Yes
No additional cost for HW + SW Yes No
8
Benefits for EPCs
CUF
• Grid availability doesn’t
matter
• Solar irradiation doesn’t
matter
• Temperature of panels
doesn’t matter
• Climate conditions don’t
matter
PR
• Grid availability does
matter
• Solar irradiation does
matter
• Temperature of panels
does matter
• Climate conditions do
matter
9
Benefits for EPCs
CUF PR
Quality control possible by international
standards
No Yes
Monitoring of external factors (grid!)
possible
No Yes
Limit liability only on factors that are in
direct control
No Yes
Sales argument No Yes
Option for aftersales services (cleaning,
maintenance, etc.)
No Yes
10
Benefits for EPCs
• If you go for PR, almost all external factors are taken
into account (grid availability, climate, panel efficiency,
inverter efficiency, etc.)
• Result:You will not longer be liable for factors you can’t
control or can’t influence.
11
Additional Information
• Visit http://chrosis.com to download
• This presentation as PDF document
• The whitepaper about CUF vs. PR
• Get in touch with us
• Visit http://www.reach-solar.com
• To learn more about our services in India
• To learn more about our team and how we can help you to
improve your solar projects
Thank you!

More Related Content

What's hot

Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...Ashish Verma
 
A3 - Economics of a GeoMagma power plant
A3 - Economics of a GeoMagma power plantA3 - Economics of a GeoMagma power plant
A3 - Economics of a GeoMagma power plantIceland Geothermal
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentationsoltechindia
 
SolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expensesSolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expensesMachinePulse
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Nilam Shah
 
SolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesSolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesMachinePulse
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M IssuesNageswar Rao
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planningChirag Jain
 
Wind_energy_Program_FactSheet
Wind_energy_Program_FactSheetWind_energy_Program_FactSheet
Wind_energy_Program_FactSheetNicole Lundberg
 
Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...
Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...
Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...Alternergy
 
Renark technologies
Renark technologiesRenark technologies
Renark technologiesAmit Dubey
 

What's hot (20)

Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
 
A3 - Economics of a GeoMagma power plant
A3 - Economics of a GeoMagma power plantA3 - Economics of a GeoMagma power plant
A3 - Economics of a GeoMagma power plant
 
UAIPD 09-0035
UAIPD 09-0035UAIPD 09-0035
UAIPD 09-0035
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentation
 
SolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expensesSolarPulse helps PV plants reduce field expenses
SolarPulse helps PV plants reduce field expenses
 
Solar Parks - SSAEL
Solar Parks - SSAELSolar Parks - SSAEL
Solar Parks - SSAEL
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
 
SolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesSolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sites
 
The MBA of Solar O&M
The MBA of Solar O&MThe MBA of Solar O&M
The MBA of Solar O&M
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Solar PV DC Concepts
Solar PV DC ConceptsSolar PV DC Concepts
Solar PV DC Concepts
 
03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final
03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final
03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planning
 
EPQU reader survey
EPQU reader surveyEPQU reader survey
EPQU reader survey
 
Wind_energy_Program_FactSheet
Wind_energy_Program_FactSheetWind_energy_Program_FactSheet
Wind_energy_Program_FactSheet
 
02 stein intro_4th-pv_modeling_workshop_2015-10-22_sand2015-8571_c
02 stein intro_4th-pv_modeling_workshop_2015-10-22_sand2015-8571_c02 stein intro_4th-pv_modeling_workshop_2015-10-22_sand2015-8571_c
02 stein intro_4th-pv_modeling_workshop_2015-10-22_sand2015-8571_c
 
01 florian reil_introduction
01 florian reil_introduction01 florian reil_introduction
01 florian reil_introduction
 
Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...
Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...
Jonny Williams introduction to BRE National Solar Centre, Alternergy installe...
 
Renark technologies
Renark technologiesRenark technologies
Renark technologies
 

Similar to Cuf vs pr

2012 Critical Issues Summit Energy Panel, Part III
2012 Critical Issues Summit Energy Panel, Part III2012 Critical Issues Summit Energy Panel, Part III
2012 Critical Issues Summit Energy Panel, Part IIISFMI
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningAdvisian
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionEECO2
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketLeonardo ENERGY
 
Advanced energy design guides a blueprint for cutting your hospital buildin...
Advanced energy design guides   a blueprint for cutting your hospital buildin...Advanced energy design guides   a blueprint for cutting your hospital buildin...
Advanced energy design guides a blueprint for cutting your hospital buildin...TNenergy
 
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Leonardo ENERGY
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1Bhushan Velis
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Anu Solar Power - Photovoltaics Basics
Anu Solar Power - Photovoltaics BasicsAnu Solar Power - Photovoltaics Basics
Anu Solar Power - Photovoltaics BasicsChetankumar Morey
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2ZAINI ABDUL WAHAB
 
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015buildpulse
 
CSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance MethodsCSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance MethodsKlaus Pottler
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016Dennis Cody
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Lucia Shen
 

Similar to Cuf vs pr (20)

2012 Critical Issues Summit Energy Panel, Part III
2012 Critical Issues Summit Energy Panel, Part III2012 Critical Issues Summit Energy Panel, Part III
2012 Critical Issues Summit Energy Panel, Part III
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioning
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reduction
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
Advanced energy design guides a blueprint for cutting your hospital buildin...
Advanced energy design guides   a blueprint for cutting your hospital buildin...Advanced energy design guides   a blueprint for cutting your hospital buildin...
Advanced energy design guides a blueprint for cutting your hospital buildin...
 
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1
 
NAEE 2013 Trina solar Presentation
NAEE 2013  Trina solar Presentation NAEE 2013  Trina solar Presentation
NAEE 2013 Trina solar Presentation
 
The Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV EffectivenessThe Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV Effectiveness
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Anu Solar Power - Photovoltaics Basics
Anu Solar Power - Photovoltaics BasicsAnu Solar Power - Photovoltaics Basics
Anu Solar Power - Photovoltaics Basics
 
final design
final designfinal design
final design
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2
 
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
 
CSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance MethodsCSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance Methods
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015
 

Recently uploaded

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 

Recently uploaded (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 

Cuf vs pr

  • 1. CUF vs. PR What is the difference?
  • 2. Performance of Solar-PV Systems What is “CUF”? What is “PR”? What is the difference? Why is PR “better” than CUF? Benefit for Developer and Investor Benefits for EPCs
  • 3. PR and CUF 3 )( )( 8760)( )( kWhoutputlTheoretica kWhOutputAchieved PR hkWCapacity kWhOutput CUF
  • 4. What is CUF? • CUF can be understood as real output of the plant compared to theoretical maximum output of the plant • Example: DG with 100kW that runs 12 hour per day: 4 %50 876000 438000 8760100 36510012 kWh kWh hkW dkWh CUFDG
  • 5. What is PR? • PR can be understood as the comparison of plant output compared to the output the plant could have achieved under certain frameconditions. • Example: Solar PV system 5 %8,84 1650 1400 )( )( kWh kWh kWhoutputlTheoretica kWhoutputAchieved PR
  • 6. What is the difference? • PR takes into account: • Irradiation • Panel temperature • Availability of grid • Size of the aperture area • Nominal power output • Temperature correction values 6
  • 7. Why is PR “better” than CUF? • CUF does not really fit to solar-PV because of the time domain • Solar-PV systems typically do not work at night • Solar irradiation changes during the seasons • Plant output depends on temperature, too • PR fits well to the needs of developers, EPCs and project owners • PR can be calculated permanently • Takes into account the climate conditions • Gives a direct feedback on “what was achieved vs. what could have been achieved” – quality control instrument 7
  • 8. Benefits for Developers and Investors CUF PR Comparison of different plants independent from external factors (climate, irradiation, grid availability, etc.) No Yes EarlyWarning System No Yes Clear information on real performance of plant No Yes Indicator on effectiveness of cleaning No Yes Indicator on effectiveness of maintenance No Yes Permanent comparison of performance No Yes No additional cost for HW + SW Yes No 8
  • 9. Benefits for EPCs CUF • Grid availability doesn’t matter • Solar irradiation doesn’t matter • Temperature of panels doesn’t matter • Climate conditions don’t matter PR • Grid availability does matter • Solar irradiation does matter • Temperature of panels does matter • Climate conditions do matter 9
  • 10. Benefits for EPCs CUF PR Quality control possible by international standards No Yes Monitoring of external factors (grid!) possible No Yes Limit liability only on factors that are in direct control No Yes Sales argument No Yes Option for aftersales services (cleaning, maintenance, etc.) No Yes 10
  • 11. Benefits for EPCs • If you go for PR, almost all external factors are taken into account (grid availability, climate, panel efficiency, inverter efficiency, etc.) • Result:You will not longer be liable for factors you can’t control or can’t influence. 11
  • 12. Additional Information • Visit http://chrosis.com to download • This presentation as PDF document • The whitepaper about CUF vs. PR • Get in touch with us • Visit http://www.reach-solar.com • To learn more about our services in India • To learn more about our team and how we can help you to improve your solar projects