An introduction to EECO2 - Energy Efficiency Consultancy Limited

GMP critical HVAC energy cost reduction in the
pharmaceutical & life science industry
Keith Beattie CEng MIET Chartered Energy Manager MEI
EECO2 - Head of Life Science Division

2014
Who are EECO2
Combined 100+ years experience of Design, Build & Operation
of Hi-tech, Life Sciences & Industrial Facilities
8 years providing global energy efficiency project
implementation and support

Sharing industry best practice solutions
Empowering & supporting sites to deliver locally
Capital avoidance approach – making best use of existing assets
Safely driving innovation within industries where product quality
is critical
70+ energy workshops delivered & supported globally
Clients we have worked with include: AstraZeneca, Camfil, DSM,
Eli Lilly, GSK, Ipsen, MedImmune, NHS, Novartis, Pfizer, Sanofi,

• benchmarking & modelling • capital project sustainability design reviews • energy engineering standards • energy project development & site
support • project management & turnkey delivery • pre & post project energy monitoring • laboratory energy reduction •
What do EECO2 offer?
1.

Single source of Global HVAC energy saving solutions.

2.

Ability to benefit from 12 years of experience, delivering Energy savings to critical HVAC Systems.

3.

Process from initial opportunity identification:
• Initial review of HVAC systems to identify potential opportunities = determine viability;
• Develop concept designs, scope & impact assessments;
• High level review of opportunities with key stakeholders e.g. QA, Production, EHS, Lab Owners, Maintenance Engineering etc;
• Risk based approach to define scope & potential savings;
• Develop projects to CapEx with costs/benefits/payback etc;

• Safety/compliance risk assessments and mitigation plan;
• Detailed design, support implementation, commissioning;
• Support development & completion of Regulatory documentation;
• Verify savings delivered;
• On going energy monitoring (continuous commissioning) support to sustain improvements.
EECO2 Support Global Pharma Clients In Best Practice HVAC Energy
Reduction
Step 1: Product
Quality Needs

• Temperature
• Humidity
• Area Classification
• Pressure Regimes

Step 2: People
Comfort/Safety
Needs

Our unique selling point:
Deep technical expertise in pharmaceutical HVAC regulated
environments combined with a thorough understanding of
QA and regulatory documentation requirements
(Risk Based Approach)

• Temperature
• Humidity
• Containment

Step 3: Deliver
Business Needs
with minimum
energy

• Model site performance
• Identify potential savings
• Quantify & Scope Deliverable Savings
• Agree ECC / Validation approach
• Deliver savings
• Monitor performance to prove savings
The Usual Suspects – typically, opportunities are found in….
Facility Type

Opportunity

Potential Reduction

All

Lower air change rates; fresh air reduction

30-45%

Laboratories

Reduce fume cupboard capture face velocity; introduce system diversity; convert CAV to
VAV

20-30%

All

Night/Weekend Setback

15-25%

Offices/non-GMP areas

Night/Weekend shutdown of non-GMP areas

12-18%

All

Chilled water temperature management and control upgrade

13-15%

All

Remove redundant plant no longer required due to product changes – redundant safe
change units, multi HEPA filtration layers, dehumidifiers, heating & cooling, etc

10-15%

Manufacturing/Packaging

Reduction of manufacturing spatial requirements i.e. enclose temperature/humidity
vulnerable product to reduce conditioned space volumes

10-15%

All

Improvement in BMS control strategy & set points control

8-12%

Manufacturing/Packaging

Improvement in dehumidifier heat recuperation

7-12%

All

Installation of high efficiency filtration – AHU, safe change & HEPA

5-7%

Warehouses

Air destratification; ventilation improvements; control linked to temperature mapping;
eliminate fresh air

5-7%
Air Change Rate / Set-Back
Flow Rate is directly proportional to rotational
speed of fan motor.
If Flow Rate is halved, then Power is reduced by
factor of 8;

and Pressure is reduced by factor of 4.
Air change rate reduction & set-back out of hours
is a powerful way to reduce energy consumption,
BUT it must only be implemented with a good
understanding of area cleanliness /
classification supported by robust data.
EECO2 can support sites to achieve substantial
reductions in ACPH and maintain product quality
requirements.
Current HVAC parameters across the industry
Company

Grade A

Grade B

Grade C

Grade D

CNC (OSD)

A

0.5 m/s

30 acph

20 acph

15 acph

12-20 acph

B

0.5 m/s

45 acph

25 acph

15 acph

15 acph

C

0.5 m/s

60 acph

40 acph

25 acph

15-20 acph

D

0.5 m/s

More than 20
acph

More than 20
acph

More than 10
acph

More than 10
acph

E

0.45 m/s

40 acph min

20 acph min

20 acph min

F

0.45 m/s

40 acph

25 acph

15 acph

15-20 acph

 Large variation in parameters between different companies and even between different sites of the same company.
 These parameters are often based of historical norms, with limited/no data to back it up
 EECO2 cleanroom trials demonstrate room classifications can be achieved at much reduced air change rate with no detrimental effect on quality
Common barriers to reducing energy / cost?
Lack of available site resource and expertise

QA issues - won’t agree to change
Lack of confidence in savings/cost predictions – can not prove benefits
Difficulties in finding the right expertise
No resources available
Can’t get the downtime / plant availability

Too busy dealing with other issues – its not a priority
EECO2 provide a unique approach to solving most of the issues above = HVAC Energy Intervention Rapid Improvement Workshop
The HVAC Energy Intervention Rapid Improvement Workshop (RIW)
The HVAC Energy Intervention Rapid
Improvement Workshop IS:

The HVAC Energy Intervention Rapid
Improvement Workshop IS NOT:

Highly collaborative:
• Close team working with site Engineering
• Involving all stakeholders – QA, Production, EHS,
SLT

• A Compliance Audit!

Challenging to existing practices:
• Air change rates
• Pressure regimes
• Temperature and Humidity
• Set back strategies
• Filter strategy – selection and maintenance

• Attempting to identify every possible
opportunity

Focussed on real product quality needs

Going to deliver a 100+ page report that is never
read
Differences between Standard Energy Audit & HVAC Energy Intervention RIW Approach
Standard Energy Audit

HVAC Intervention/Rapid Improvement Workshop

Experts evaluate site based on their prior experience
& sector knowledge

vs

Team based approach engages internal & external
experts to determine what actions are right for the site

Identified opportunities are determined by consultant
experience and sector knowledge

vs

Generates large amount of low/no cost actions &
opportunity investigations

Identifies opportunities at time of audit

vs

Draws in local site knowledge to take account of
historical problems

Consultant retains knowledge

vs

Learning opportunity for site teams

Report based

vs

Action focussed

Site sponsor has to “sell” findings & next steps to
other stakeholders

vs

Buy in to findings & next steps is inherent to
intervention process – stakeholders are involved in
decisions

Audit findings often have to be integrated into
existing site plans

vs

Output is one site plan that captures all opportunities

We are focussed on getting to action and demonstrating real results for clients in a safe, quality compliant way.
Global Energy Reduction – Case Studies

EECO2 has provided multinational support in over 20 countries over the last 8 years
Case Study - Pharma Tablet Manufacturing Suite (South Africa)
Unique Challenges:
• High volumes of fresh air requiring dehumidification in very challenging ambient
conditions

• Adapting HVAC system to meet current manufacturing requirements
• Reducing dust extraction system volume – installing VSD
• Initiating non-operational setbacks
• No impact on product quality or manufacturing output

EECO2 Solution:

• Install fresh air pre-treatment to eliminate dehumidification in AHU
• Rebalance area dust extraction system

• Install VSD to maintain dust extraction carrier velocity
• Reduce fresh air volume & rebalance air change rates to reflect area change of use
• Initiate non-operational air volume reduction
• Optimise Building Management System (BMS)
• Provide all necessary documentation, support validation and change control
Client Testimonial:
“Its going to be a tough year for all this year and to know that we have such a good team
supporting some of these changes makes the job a lot easier” Manufacturing Support Manager

Projected Energy Cost
Increase
Pharma Effervescent Product Manufacturing Plant (Argentina)
Project Challenge:
• Very high energy demand driven by the original HVAC design
• Unable to meet product critical relative humidity conditions during summer

Objective:

• Reduce site energy demand without compromising product quality

EECO2 Actions:

• Reduce air change rates and fresh air volumes
• Install VSD to supply fans
• Improve air distribution with new diffusers
• Upgrade of filtration and maintenance replacement of control valves
• Re-commission & balance the complete manufacturing HVAC systems
• Completed product risk assessments, Engineering Change Control documentation and all required Regulatory
documents.

Client Result:
◦
Energy saving delivered: 1,500 MWh per year (£58,000 GBP equivalent)
◦

Simple payback: 11 months

Client Testimonial:

“The savings delivered during phase 1 has exceeded our expectations and the quality team have supported the risk based
approach used to delivery the savings. We now have to move on to phase 2 upgrade which is much more demanding but the
confidence and structure knowledge we gained during phase 1 will help us deliver our target for 2011.” Site Director
Energy Management Programme – R&D Campus (UK)

reduction

17%
(+2%)
reduction

30%
(+13%)
reduction

32%
(+2%)
reduction

2012

15%

2011

Strategy
Development

with potential for further 20-25%

2010

Data
Validation

2009

aM&T
Implementation

32% Energy reduction over 6 years

2008

Opportunity
survey

2007

Initial

2006

 Implementation of energy management strategy aligned to ISO50001 EMS;
 Supported with data analysis and scoped/developed energy & water reduction projects;
 Performed Lab fume cupboard trials to demonstrate containment at lower face capture velocities.
Case Study - Wilton Centre Business & Science Park (UK-Laboratory)
Existing System:
• T Block Older style Face & Bypass cupboards. Over 100
• Individual booster fans serving upto 3 Cupboards (50No)

• Header system with 2 large run & standby fans
• 4 Large 100% FA systems

EECO2 Actions:

• 50 % diversity Engineered into the systems

• Remove individual booster fans
• Retrofit VAV valves & controls to every FC within ceilings
• Carried out while labs in use with 1 weeks downtime per lab
• FC controller fitted to every cupboard
• Pressure control to every lab

• Supply VSD & static pressure control fitted
• Extract header Bleed damper & static pressure control
• Weekend Commissioning to reduce disruption.
Client Result:
• Over 50% reduction in HVAC energy consumption, saving £205,000 GBP per year
•

Typical simple payback under 2 years
Summary
 HVAC is one of the most significant energy users in pharmaceutical & bio-pharmaceutical
manufacturing.
 A risk based approach founded on sound data can be used to challenge established company
norms. Large savings can be achieved at getting back to company standards.
 Technically, the reduction solutions exist and are well proven. Barriers to improvement are often
related more to people engagement – soft skills are important.
 The collaborative approach of the HVAC energy intervention rapid improvement workshop
engages all stakeholders and facilitates the site teams identifying the right solutions for their
sites.

 Simple payback of HVAC energy reduction projects is almost always under 3 yrs and often 2 yrs
or less.
Contact Details

For further information, contact:

Keith Beattie

Head of Life Science Division
Energy Efficiency Consultancy Ltd

email: info@eeco2.co.uk tel: +44 1625 660717
www.eeco2.co.uk

More Related Content

What's hot

Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designSustainableEnergyAut
 
Facility Design for Sustainable Global Compliance
Facility Design for Sustainable Global ComplianceFacility Design for Sustainable Global Compliance
Facility Design for Sustainable Global ComplianceBrian White
 
Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025quality_management
 
Water and Wastewater Flow Solutions by Badger Meter
Water and Wastewater Flow Solutions by Badger MeterWater and Wastewater Flow Solutions by Badger Meter
Water and Wastewater Flow Solutions by Badger MeterThompson Equipment Company
 
Final NJCP apprise overview 06 09 2015
Final NJCP apprise overview 06 09 2015Final NJCP apprise overview 06 09 2015
Final NJCP apprise overview 06 09 2015Danielle Amasia
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam Najmi
 
David J. Howe - Resume/CV - Lab Informatics Chemist - http://www.linkedin.c...
David J. Howe - Resume/CV - Lab Informatics Chemist  -  http://www.linkedin.c...David J. Howe - Resume/CV - Lab Informatics Chemist  -  http://www.linkedin.c...
David J. Howe - Resume/CV - Lab Informatics Chemist - http://www.linkedin.c...David Howe
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...Mark Mitchell
 
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Kevin Perry
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryAdvisian
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentationOMWOMA JACKSON
 
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenWebinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenStork
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineersAmanda Ribeiro
 
Calibration as a risk management strategy
Calibration as a risk management strategyCalibration as a risk management strategy
Calibration as a risk management strategyAlliance Calibration
 

What's hot (19)

Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 
Facility Design for Sustainable Global Compliance
Facility Design for Sustainable Global ComplianceFacility Design for Sustainable Global Compliance
Facility Design for Sustainable Global Compliance
 
change control
change controlchange control
change control
 
Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025
 
Water and Wastewater Flow Solutions by Badger Meter
Water and Wastewater Flow Solutions by Badger MeterWater and Wastewater Flow Solutions by Badger Meter
Water and Wastewater Flow Solutions by Badger Meter
 
Final NJCP apprise overview 06 09 2015
Final NJCP apprise overview 06 09 2015Final NJCP apprise overview 06 09 2015
Final NJCP apprise overview 06 09 2015
 
GLH resume 2016
GLH resume 2016GLH resume 2016
GLH resume 2016
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
 
David J. Howe - Resume/CV - Lab Informatics Chemist - http://www.linkedin.c...
David J. Howe - Resume/CV - Lab Informatics Chemist  -  http://www.linkedin.c...David J. Howe - Resume/CV - Lab Informatics Chemist  -  http://www.linkedin.c...
David J. Howe - Resume/CV - Lab Informatics Chemist - http://www.linkedin.c...
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
 
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
Tennelli_Cost of Quality
Tennelli_Cost of QualityTennelli_Cost of Quality
Tennelli_Cost of Quality
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentation
 
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenWebinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
 
Deck on consultancy, training and audits v0.1
Deck on consultancy, training and audits v0.1Deck on consultancy, training and audits v0.1
Deck on consultancy, training and audits v0.1
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
 
Pierson 06012016
Pierson 06012016Pierson 06012016
Pierson 06012016
 
Calibration as a risk management strategy
Calibration as a risk management strategyCalibration as a risk management strategy
Calibration as a risk management strategy
 

Similar to EECO2 GMP critical HVAC energy cost reduction

Enhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilityEnhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilitySimply Marcomms
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionEECO2
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazilsekkelww
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talkPhucPhamThanh
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016Dennis Cody
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentCenter for Energy and Environment
 
Energy management – leading by example
Energy management – leading by exampleEnergy management – leading by example
Energy management – leading by exampleTNenergy
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityDiana Nash
 
Anyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowAnyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowLeveragePoint Innovations
 
Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Michael Taranto
 

Similar to EECO2 GMP critical HVAC energy cost reduction (20)

Enhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilityEnhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainability
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reduction
 
Innovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy SavingsInnovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy Savings
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazil
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
Energy management – leading by example
Energy management – leading by exampleEnergy management – leading by example
Energy management – leading by example
 
ashrae 62.1
ashrae 62.1ashrae 62.1
ashrae 62.1
 
EnPC Presentation UK rev2
EnPC Presentation UK rev2EnPC Presentation UK rev2
EnPC Presentation UK rev2
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
 
Anyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowAnyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You How
 
Fmi plenaryv4
Fmi plenaryv4Fmi plenaryv4
Fmi plenaryv4
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Re con
Re conRe con
Re con
 
Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...
 
Best practices for food service applications
Best practices for food service applicationsBest practices for food service applications
Best practices for food service applications
 

Recently uploaded

Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 

Recently uploaded (20)

Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 

EECO2 GMP critical HVAC energy cost reduction

  • 1. An introduction to EECO2 - Energy Efficiency Consultancy Limited GMP critical HVAC energy cost reduction in the pharmaceutical & life science industry Keith Beattie CEng MIET Chartered Energy Manager MEI EECO2 - Head of Life Science Division 2014
  • 2. Who are EECO2 Combined 100+ years experience of Design, Build & Operation of Hi-tech, Life Sciences & Industrial Facilities 8 years providing global energy efficiency project implementation and support Sharing industry best practice solutions Empowering & supporting sites to deliver locally Capital avoidance approach – making best use of existing assets Safely driving innovation within industries where product quality is critical 70+ energy workshops delivered & supported globally Clients we have worked with include: AstraZeneca, Camfil, DSM, Eli Lilly, GSK, Ipsen, MedImmune, NHS, Novartis, Pfizer, Sanofi, • benchmarking & modelling • capital project sustainability design reviews • energy engineering standards • energy project development & site support • project management & turnkey delivery • pre & post project energy monitoring • laboratory energy reduction •
  • 3. What do EECO2 offer? 1. Single source of Global HVAC energy saving solutions. 2. Ability to benefit from 12 years of experience, delivering Energy savings to critical HVAC Systems. 3. Process from initial opportunity identification: • Initial review of HVAC systems to identify potential opportunities = determine viability; • Develop concept designs, scope & impact assessments; • High level review of opportunities with key stakeholders e.g. QA, Production, EHS, Lab Owners, Maintenance Engineering etc; • Risk based approach to define scope & potential savings; • Develop projects to CapEx with costs/benefits/payback etc; • Safety/compliance risk assessments and mitigation plan; • Detailed design, support implementation, commissioning; • Support development & completion of Regulatory documentation; • Verify savings delivered; • On going energy monitoring (continuous commissioning) support to sustain improvements.
  • 4. EECO2 Support Global Pharma Clients In Best Practice HVAC Energy Reduction Step 1: Product Quality Needs • Temperature • Humidity • Area Classification • Pressure Regimes Step 2: People Comfort/Safety Needs Our unique selling point: Deep technical expertise in pharmaceutical HVAC regulated environments combined with a thorough understanding of QA and regulatory documentation requirements (Risk Based Approach) • Temperature • Humidity • Containment Step 3: Deliver Business Needs with minimum energy • Model site performance • Identify potential savings • Quantify & Scope Deliverable Savings • Agree ECC / Validation approach • Deliver savings • Monitor performance to prove savings
  • 5. The Usual Suspects – typically, opportunities are found in…. Facility Type Opportunity Potential Reduction All Lower air change rates; fresh air reduction 30-45% Laboratories Reduce fume cupboard capture face velocity; introduce system diversity; convert CAV to VAV 20-30% All Night/Weekend Setback 15-25% Offices/non-GMP areas Night/Weekend shutdown of non-GMP areas 12-18% All Chilled water temperature management and control upgrade 13-15% All Remove redundant plant no longer required due to product changes – redundant safe change units, multi HEPA filtration layers, dehumidifiers, heating & cooling, etc 10-15% Manufacturing/Packaging Reduction of manufacturing spatial requirements i.e. enclose temperature/humidity vulnerable product to reduce conditioned space volumes 10-15% All Improvement in BMS control strategy & set points control 8-12% Manufacturing/Packaging Improvement in dehumidifier heat recuperation 7-12% All Installation of high efficiency filtration – AHU, safe change & HEPA 5-7% Warehouses Air destratification; ventilation improvements; control linked to temperature mapping; eliminate fresh air 5-7%
  • 6. Air Change Rate / Set-Back Flow Rate is directly proportional to rotational speed of fan motor. If Flow Rate is halved, then Power is reduced by factor of 8; and Pressure is reduced by factor of 4. Air change rate reduction & set-back out of hours is a powerful way to reduce energy consumption, BUT it must only be implemented with a good understanding of area cleanliness / classification supported by robust data. EECO2 can support sites to achieve substantial reductions in ACPH and maintain product quality requirements.
  • 7. Current HVAC parameters across the industry Company Grade A Grade B Grade C Grade D CNC (OSD) A 0.5 m/s 30 acph 20 acph 15 acph 12-20 acph B 0.5 m/s 45 acph 25 acph 15 acph 15 acph C 0.5 m/s 60 acph 40 acph 25 acph 15-20 acph D 0.5 m/s More than 20 acph More than 20 acph More than 10 acph More than 10 acph E 0.45 m/s 40 acph min 20 acph min 20 acph min F 0.45 m/s 40 acph 25 acph 15 acph 15-20 acph  Large variation in parameters between different companies and even between different sites of the same company.  These parameters are often based of historical norms, with limited/no data to back it up  EECO2 cleanroom trials demonstrate room classifications can be achieved at much reduced air change rate with no detrimental effect on quality
  • 8. Common barriers to reducing energy / cost? Lack of available site resource and expertise QA issues - won’t agree to change Lack of confidence in savings/cost predictions – can not prove benefits Difficulties in finding the right expertise No resources available Can’t get the downtime / plant availability Too busy dealing with other issues – its not a priority EECO2 provide a unique approach to solving most of the issues above = HVAC Energy Intervention Rapid Improvement Workshop
  • 9. The HVAC Energy Intervention Rapid Improvement Workshop (RIW) The HVAC Energy Intervention Rapid Improvement Workshop IS: The HVAC Energy Intervention Rapid Improvement Workshop IS NOT: Highly collaborative: • Close team working with site Engineering • Involving all stakeholders – QA, Production, EHS, SLT • A Compliance Audit! Challenging to existing practices: • Air change rates • Pressure regimes • Temperature and Humidity • Set back strategies • Filter strategy – selection and maintenance • Attempting to identify every possible opportunity Focussed on real product quality needs Going to deliver a 100+ page report that is never read
  • 10. Differences between Standard Energy Audit & HVAC Energy Intervention RIW Approach Standard Energy Audit HVAC Intervention/Rapid Improvement Workshop Experts evaluate site based on their prior experience & sector knowledge vs Team based approach engages internal & external experts to determine what actions are right for the site Identified opportunities are determined by consultant experience and sector knowledge vs Generates large amount of low/no cost actions & opportunity investigations Identifies opportunities at time of audit vs Draws in local site knowledge to take account of historical problems Consultant retains knowledge vs Learning opportunity for site teams Report based vs Action focussed Site sponsor has to “sell” findings & next steps to other stakeholders vs Buy in to findings & next steps is inherent to intervention process – stakeholders are involved in decisions Audit findings often have to be integrated into existing site plans vs Output is one site plan that captures all opportunities We are focussed on getting to action and demonstrating real results for clients in a safe, quality compliant way.
  • 11. Global Energy Reduction – Case Studies EECO2 has provided multinational support in over 20 countries over the last 8 years
  • 12. Case Study - Pharma Tablet Manufacturing Suite (South Africa) Unique Challenges: • High volumes of fresh air requiring dehumidification in very challenging ambient conditions • Adapting HVAC system to meet current manufacturing requirements • Reducing dust extraction system volume – installing VSD • Initiating non-operational setbacks • No impact on product quality or manufacturing output EECO2 Solution: • Install fresh air pre-treatment to eliminate dehumidification in AHU • Rebalance area dust extraction system • Install VSD to maintain dust extraction carrier velocity • Reduce fresh air volume & rebalance air change rates to reflect area change of use • Initiate non-operational air volume reduction • Optimise Building Management System (BMS) • Provide all necessary documentation, support validation and change control Client Testimonial: “Its going to be a tough year for all this year and to know that we have such a good team supporting some of these changes makes the job a lot easier” Manufacturing Support Manager Projected Energy Cost Increase
  • 13. Pharma Effervescent Product Manufacturing Plant (Argentina) Project Challenge: • Very high energy demand driven by the original HVAC design • Unable to meet product critical relative humidity conditions during summer Objective: • Reduce site energy demand without compromising product quality EECO2 Actions: • Reduce air change rates and fresh air volumes • Install VSD to supply fans • Improve air distribution with new diffusers • Upgrade of filtration and maintenance replacement of control valves • Re-commission & balance the complete manufacturing HVAC systems • Completed product risk assessments, Engineering Change Control documentation and all required Regulatory documents. Client Result: ◦ Energy saving delivered: 1,500 MWh per year (£58,000 GBP equivalent) ◦ Simple payback: 11 months Client Testimonial: “The savings delivered during phase 1 has exceeded our expectations and the quality team have supported the risk based approach used to delivery the savings. We now have to move on to phase 2 upgrade which is much more demanding but the confidence and structure knowledge we gained during phase 1 will help us deliver our target for 2011.” Site Director
  • 14. Energy Management Programme – R&D Campus (UK) reduction 17% (+2%) reduction 30% (+13%) reduction 32% (+2%) reduction 2012 15% 2011 Strategy Development with potential for further 20-25% 2010 Data Validation 2009 aM&T Implementation 32% Energy reduction over 6 years 2008 Opportunity survey 2007 Initial 2006  Implementation of energy management strategy aligned to ISO50001 EMS;  Supported with data analysis and scoped/developed energy & water reduction projects;  Performed Lab fume cupboard trials to demonstrate containment at lower face capture velocities.
  • 15. Case Study - Wilton Centre Business & Science Park (UK-Laboratory) Existing System: • T Block Older style Face & Bypass cupboards. Over 100 • Individual booster fans serving upto 3 Cupboards (50No) • Header system with 2 large run & standby fans • 4 Large 100% FA systems EECO2 Actions: • 50 % diversity Engineered into the systems • Remove individual booster fans • Retrofit VAV valves & controls to every FC within ceilings • Carried out while labs in use with 1 weeks downtime per lab • FC controller fitted to every cupboard • Pressure control to every lab • Supply VSD & static pressure control fitted • Extract header Bleed damper & static pressure control • Weekend Commissioning to reduce disruption. Client Result: • Over 50% reduction in HVAC energy consumption, saving £205,000 GBP per year • Typical simple payback under 2 years
  • 16. Summary  HVAC is one of the most significant energy users in pharmaceutical & bio-pharmaceutical manufacturing.  A risk based approach founded on sound data can be used to challenge established company norms. Large savings can be achieved at getting back to company standards.  Technically, the reduction solutions exist and are well proven. Barriers to improvement are often related more to people engagement – soft skills are important.  The collaborative approach of the HVAC energy intervention rapid improvement workshop engages all stakeholders and facilitates the site teams identifying the right solutions for their sites.  Simple payback of HVAC energy reduction projects is almost always under 3 yrs and often 2 yrs or less.
  • 17. Contact Details For further information, contact: Keith Beattie Head of Life Science Division Energy Efficiency Consultancy Ltd email: info@eeco2.co.uk tel: +44 1625 660717 www.eeco2.co.uk