Instead of contractors, the completion of commissioning documents should be done by the commissioning authority (CxA) – and for good reason! Read More!
2. Typically the commissioning management
systems software company is in direct
contract with the owner of the building and it
acts as an independent, 3rd-party
representative who ensures that the entire
commissioning phase is completely unbiased
and follows best practices while working
towards achieving the project requirements
of the owner.
ABOUT US
Instead of contractors, the completion of
commissioning documents should be done by
the commissioning authority (CxA) – and for
good reason!
3. APPROPRIATE ROLE OF CONTRACTORS IN
THE COMMISSIONING PROCESS
• Contactors should give the required equipment and initial documents to the
commissioning management services agency. They should also ensure their
availability during PFC site visits and make the required repairs if the
installation of equipment is not in line with the design requirements while
meeting their general contract obligations.
• When the commissioning authority works on PFC documentation, issues can be
identified and fixed quickly, documentation offers more detail and the project team
can go into the acceptance phase confidently with unbiased quality control offered
by a good commissioning software authority.
CUSTOMERS
4. COMPLETING COMMISSIONING
DOCUMENTATION IS NO MEAN FEAT
• Completing commissioning documentation needs an exhaustive database of
mechanical equipment, including air handlers, boilers, expansion tanks,
cooling towers, and every imaginable piece of MEP equipment within a
commercial setting. For every equipment piece, the commissioning authority
requires to place the nameplate(s) to verify manufacturers’ data accurately.
• Reputed global commissioning firms make use of design details from contract
drawings and follow best installation practices for every piece of equipment.