 Staying abreast of project updates and developing a rapport with all the
parties involved in the project are important aspects of the commissioning
process.
 Interestingly, there are handful of best practices that the best commissioning
management company in the UK can integrate into each stage of the
commissioning process to make it more effective.
 Keep reading to know about such practices that you can use during the
important phase of construction.
Commissioning Best Practices

 When conducted appropriately, the initial meeting should make the project team feel
quite confident that the commissioning management firm is available at all times to
ensure the project completes successfully.
 Scheduling the meeting mindfully. It should not be scheduled too early. Reason
being, contractors may forget about the commissioning process if too much time
passes by.
 It may appear obvious, but the initial meeting must include a complete review of the
commissioning authority process.
 Maintaining the momentum of the meeting is important. This can be done by visiting
the site soon after the meeting and interacting with contractors while showing
interest in their work to understand the project in a better way through keen
observation.
Conducting a Great Initial
Meeting

 Instead of depending on installation contractors, the commissioning authority should
take the responsibility to complete the documentation of pre-functional checklist.
 While acting as the most effective supporter of the project owner, the commission
authority can check appropriate installation early on in order to prevent systemic
problems from occurring in the first place.
Completing Pre-Functional
Checklists

 Project teams admire commissioning management companies that work
beyond generating lists of problems. That is to say, the commission authority
should put in efforts to be part of the solution.
 The commissioning deficiencies log is certainly a crucial communication tool
to track deficiencies that cannot be fixed immediately. Every deficiency is
assigned to a suitable member of the project team.
 This log should define every deficiency with clarity while offering suggestions
on how to resolve the issue.
Becoming Part of the Solution

 After the approval of submittals, Functional Performance Testing (FPT)
documentation must be completed.
 The documentation should describe any particular installation or operational
requirements from the manufacturer, along with test procedures developed
through years of commissioning experience.
 Specific control sequences should be used that are developed by the design
team to check the response of equipment to changes in the status, like
transition from heating to cooling or enabling the economizer mode.
Customising Functional
Performance Testing

 The true value of commissioning is achieved in the design phase – when
the impact is highest and the costs are lowest.
 As the project proceeds into the construction phase, avoiding costs
becomes tougher.
 The best practices discussed above will help ensure that members of the
project team are well informed, costly equipment failures are prevented
and the project is ready for successful acceptance and testing phases.
To Conclude

 Address: Global Commissioning Management and Software Ltd, Unit
2, Chestfield Business Park
Whitstable | Kent, CT5 3JB
 https://www.facebook.com/GlobalCxMLtd
 https://twitter.com/_globalltd
 https://www.instagram.com/global_cxm/
 https://www.linkedin.com/company/global-commissioning-
management-software-ltd
Contact Us


More Related Content

Similar to Commissioning-Specific Best Practices during the Construction Phase

Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.ppt
Mohan Late
 

Similar to Commissioning-Specific Best Practices during the Construction Phase (20)

5 project commissioning best practices for you to consider
5 project commissioning best practices for you to consider5 project commissioning best practices for you to consider
5 project commissioning best practices for you to consider
 
8 Best Practices for New Project Commissioning
8 Best Practices for New Project Commissioning8 Best Practices for New Project Commissioning
8 Best Practices for New Project Commissioning
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORS
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORS
 
Best practices for new project commissioning
Best practices for new project commissioningBest practices for new project commissioning
Best practices for new project commissioning
 
Best practices for new project commissioning
Best practices for new project commissioningBest practices for new project commissioning
Best practices for new project commissioning
 
Reconsidering the Potential of Commissioning and Startup
Reconsidering the Potential of Commissioning and StartupReconsidering the Potential of Commissioning and Startup
Reconsidering the Potential of Commissioning and Startup
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control process
 
Master transfer.pdf
Master transfer.pdfMaster transfer.pdf
Master transfer.pdf
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptx
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
Design Review Mini
Design Review MiniDesign Review Mini
Design Review Mini
 
Design Review Mini(2)
Design Review Mini(2)Design Review Mini(2)
Design Review Mini(2)
 
A Project Management-Based Approach to Commissioning
A Project Management-Based Approach to Commissioning A Project Management-Based Approach to Commissioning
A Project Management-Based Approach to Commissioning
 
Commissioning-Team-Role-Responsibilities-1.pdf
Commissioning-Team-Role-Responsibilities-1.pdfCommissioning-Team-Role-Responsibilities-1.pdf
Commissioning-Team-Role-Responsibilities-1.pdf
 
The Critical Importance of Task Management for General Contractors.pdf
The Critical Importance of Task Management for General Contractors.pdfThe Critical Importance of Task Management for General Contractors.pdf
The Critical Importance of Task Management for General Contractors.pdf
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Commissioning Management Organization | Building Commissioning Firms
Commissioning Management Organization | Building Commissioning FirmsCommissioning Management Organization | Building Commissioning Firms
Commissioning Management Organization | Building Commissioning Firms
 
Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.ppt
 
Project management
Project managementProject management
Project management
 

More from Olivia Wilson

More from Olivia Wilson (20)

Is a permit to work a safe system of work?
Is a permit to work a safe system of work?Is a permit to work a safe system of work?
Is a permit to work a safe system of work?
 
Is a permit to work a safe system of work.pptx
Is a permit to work a safe system of work.pptxIs a permit to work a safe system of work.pptx
Is a permit to work a safe system of work.pptx
 
Salient Features of Gecko Permits - Gecko Software
Salient Features of Gecko Permits - Gecko SoftwareSalient Features of Gecko Permits - Gecko Software
Salient Features of Gecko Permits - Gecko Software
 
Why Commissioning Authority Should Complete Commissioning Checklists?
Why Commissioning Authority Should Complete Commissioning Checklists?Why Commissioning Authority Should Complete Commissioning Checklists?
Why Commissioning Authority Should Complete Commissioning Checklists?
 
Benefits of Permit-to-Work Software – Gecko Software
Benefits of Permit-to-Work Software – Gecko SoftwareBenefits of Permit-to-Work Software – Gecko Software
Benefits of Permit-to-Work Software – Gecko Software
 
Best Practice Commissioning Factors - Gecko Software
Best Practice Commissioning Factors - Gecko SoftwareBest Practice Commissioning Factors - Gecko Software
Best Practice Commissioning Factors - Gecko Software
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdf
 
4 Key Advantages a Digitised Permit to Work System
4 Key Advantages a Digitised Permit to Work System 4 Key Advantages a Digitised Permit to Work System
4 Key Advantages a Digitised Permit to Work System
 
9 Tips to Improve Construction Site Inspection Checklists
9 Tips to Improve Construction Site Inspection Checklists9 Tips to Improve Construction Site Inspection Checklists
9 Tips to Improve Construction Site Inspection Checklists
 
Commissioning Management Software and its Importance.pdf
Commissioning Management Software and its Importance.pdfCommissioning Management Software and its Importance.pdf
Commissioning Management Software and its Importance.pdf
 
Commissioning Management Software and its Importance.pptx
Commissioning Management Software and its Importance.pptxCommissioning Management Software and its Importance.pptx
Commissioning Management Software and its Importance.pptx
 
5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning
 
5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning5 Common Misconceptions about Commissioning
5 Common Misconceptions about Commissioning
 
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTWHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
 
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANTWHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
WHY ARE PERMIT TO WORK SYSTEMS IMPORTANT
 
Importance of Permit to Work System
Importance of Permit to Work SystemImportance of Permit to Work System
Importance of Permit to Work System
 
Importance of Permit to Work System
Importance of Permit to Work SystemImportance of Permit to Work System
Importance of Permit to Work System
 
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UKBEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
 
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UKBEST COMMISSIONING MANAGEMENT SERVICES IN UK
BEST COMMISSIONING MANAGEMENT SERVICES IN UK
 
Important Factors of Commissioning, Qualification and Validation
Important Factors of Commissioning, Qualification and ValidationImportant Factors of Commissioning, Qualification and Validation
Important Factors of Commissioning, Qualification and Validation
 

Recently uploaded

Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Recently uploaded (20)

Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

Commissioning-Specific Best Practices during the Construction Phase

  • 1.
  • 2.   Staying abreast of project updates and developing a rapport with all the parties involved in the project are important aspects of the commissioning process.  Interestingly, there are handful of best practices that the best commissioning management company in the UK can integrate into each stage of the commissioning process to make it more effective.  Keep reading to know about such practices that you can use during the important phase of construction. Commissioning Best Practices
  • 3.   When conducted appropriately, the initial meeting should make the project team feel quite confident that the commissioning management firm is available at all times to ensure the project completes successfully.  Scheduling the meeting mindfully. It should not be scheduled too early. Reason being, contractors may forget about the commissioning process if too much time passes by.  It may appear obvious, but the initial meeting must include a complete review of the commissioning authority process.  Maintaining the momentum of the meeting is important. This can be done by visiting the site soon after the meeting and interacting with contractors while showing interest in their work to understand the project in a better way through keen observation. Conducting a Great Initial Meeting
  • 4.   Instead of depending on installation contractors, the commissioning authority should take the responsibility to complete the documentation of pre-functional checklist.  While acting as the most effective supporter of the project owner, the commission authority can check appropriate installation early on in order to prevent systemic problems from occurring in the first place. Completing Pre-Functional Checklists
  • 5.   Project teams admire commissioning management companies that work beyond generating lists of problems. That is to say, the commission authority should put in efforts to be part of the solution.  The commissioning deficiencies log is certainly a crucial communication tool to track deficiencies that cannot be fixed immediately. Every deficiency is assigned to a suitable member of the project team.  This log should define every deficiency with clarity while offering suggestions on how to resolve the issue. Becoming Part of the Solution
  • 6.   After the approval of submittals, Functional Performance Testing (FPT) documentation must be completed.  The documentation should describe any particular installation or operational requirements from the manufacturer, along with test procedures developed through years of commissioning experience.  Specific control sequences should be used that are developed by the design team to check the response of equipment to changes in the status, like transition from heating to cooling or enabling the economizer mode. Customising Functional Performance Testing
  • 7.   The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest.  As the project proceeds into the construction phase, avoiding costs becomes tougher.  The best practices discussed above will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases. To Conclude
  • 8.   Address: Global Commissioning Management and Software Ltd, Unit 2, Chestfield Business Park Whitstable | Kent, CT5 3JB  https://www.facebook.com/GlobalCxMLtd  https://twitter.com/_globalltd  https://www.instagram.com/global_cxm/  https://www.linkedin.com/company/global-commissioning- management-software-ltd Contact Us
  • 9.