Staying abreast of project updates and developing a rapport with all the parties involved in the project are important aspects of the commissioning process.
Interestingly, there are handful of best practices that the best commissioning management company in the UK can integrate into each stage of the commissioning process to make it more effective.
Keep reading to know about such practices that you can use during the important phase of construction.
Commissioning-Specific Best Practices during the Construction PhaseOlivia Wilson
The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. As the project proceeds into the construction phase, avoiding costs becomes tougher. The best practices discussed above will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases.
Commissioning-Specific Best Practices during the Construction PhaseOlivia Wilson
The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. As the project proceeds into the construction phase, avoiding costs becomes tougher. The best practices discussed above will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases.
Commissioning-Specific Best Practices during the Construction PhaseOlivia Wilson
The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. As the project proceeds into the construction phase, avoiding costs becomes tougher. The best practices discussed will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases. Click to know more: https://www.global-cxm.com/commissioning/
How to Navigate the Commissioning Process From Planning to Post-Constructi...Olivia Wilson
From the initial planning to continuous monitoring and maintenance, there’s more to building commissioning than you could think initially. By starting with the project completion in mind, ensuring proper communication across teams, and keeping a detailed record of documents and future planning, a commissioning management system can ensure that your building systems are efficient and safe at all times, eventually allowing project owners to make sustainable and prudent investments. Click to know more: https://www.global-cxm.com/commissioning/
A Project Management-Based Approach to Commissioning Olivia Wilson
Commissioning or startup of an industrial facility is more than just detailed testing of every piece of equipment. The commissioning program needs a project management-based approach to plan and implement all phases of commissioning in a proper manner. Find here how the project management-based approach to commissioning can ensure the success of every step of detailed equipment testing. For more information, click now: https://www.global-cxm.com/commissioning/
5 project commissioning best practices for you to considerOlivia Wilson
During the commissioning phase, functional testing procedures are performed, interoperability problems are resolved, and energy usage is optimised for enhanced performance and efficiency. Here are five project commissioning best practices for you to consider, including planning, factory acceptance testing (FAT), mechanical completions, construction quality and schedule management. Click to know more: https://www.global-cxm.com/commissioning/
Commissioning-Specific Best Practices during the Construction PhaseOlivia Wilson
The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. As the project proceeds into the construction phase, avoiding costs becomes tougher. The best practices discussed above will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases.
Commissioning-Specific Best Practices during the Construction PhaseOlivia Wilson
The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. As the project proceeds into the construction phase, avoiding costs becomes tougher. The best practices discussed above will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases.
Commissioning-Specific Best Practices during the Construction PhaseOlivia Wilson
The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. As the project proceeds into the construction phase, avoiding costs becomes tougher. The best practices discussed will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases. Click to know more: https://www.global-cxm.com/commissioning/
How to Navigate the Commissioning Process From Planning to Post-Constructi...Olivia Wilson
From the initial planning to continuous monitoring and maintenance, there’s more to building commissioning than you could think initially. By starting with the project completion in mind, ensuring proper communication across teams, and keeping a detailed record of documents and future planning, a commissioning management system can ensure that your building systems are efficient and safe at all times, eventually allowing project owners to make sustainable and prudent investments. Click to know more: https://www.global-cxm.com/commissioning/
A Project Management-Based Approach to Commissioning Olivia Wilson
Commissioning or startup of an industrial facility is more than just detailed testing of every piece of equipment. The commissioning program needs a project management-based approach to plan and implement all phases of commissioning in a proper manner. Find here how the project management-based approach to commissioning can ensure the success of every step of detailed equipment testing. For more information, click now: https://www.global-cxm.com/commissioning/
5 project commissioning best practices for you to considerOlivia Wilson
During the commissioning phase, functional testing procedures are performed, interoperability problems are resolved, and energy usage is optimised for enhanced performance and efficiency. Here are five project commissioning best practices for you to consider, including planning, factory acceptance testing (FAT), mechanical completions, construction quality and schedule management. Click to know more: https://www.global-cxm.com/commissioning/
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Best Practices of Commissioning to Follow During the Turnover PhaseOlivia Wilson
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Commissioning Management and Validation ServicesOlivia Wilson
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Commissioning Best Practices to Follow during the Turnover PhaseOlivia Wilson
Commissioning is a complex process but if we follow the best practices and maintain documents properly then we come up successfully. A successful transition is said to occur when the commissioning-specific documentation is complete, fully organised, building systems are operable as per the design and O&M personnel are trained appropriately to operate the systems. Click to know everything about the commissioning process: https://www.global-cxm.com/commissioning/
How to Navigate the Commissioning Process: From Planning to Post-ConstructionOlivia Wilson
While the commissioning process means an up-front cost to construction project owners, it can be well-compensated by savings in the long run through reduced repairs, enhanced energy efficiency, higher occupant satisfaction and increased safety.
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
While the commissioning process means an up-front cost to construction project owners, it can be well-compensated by savings in the long run through reduced repairs, enhanced energy efficiency, higher occupant satisfaction and increased safety.
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
While the commissioning process means an up-front cost to construction project owners, it can be well-compensated by savings in the long run through reduced repairs, enhanced energy efficiency, higher occupant satisfaction and increased safety.
Training Slides of PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT, discussing the importance of Project Management.
Some Key-Points:
- The Project Management Context
- Project Life Cycle
- Work Breakdown Structure
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Microsoft Dynamics AX Implementation Stabilization Case Studiesmeritweb
Learn about the risks, challenges, and best practices for implementing Microsoft Dynamics AX in enterprise manufacturing and supply chain environments. Hear about a couple of our Microsoft Dynamics AX implementation stabilization case studies.
it is an overview of project management. concept of project management, scope of project management with example, types of project management, generation and screening, difficulties and its importance.
Construction planning is the specific process a construction manager uses to lay out how they will manage and execute a construction project, from design to building completion.
I have seen many customers come to the vendor to digitize their delivery process on the cloud. And then they realize what is the pain underneath and how long it takes to change the culture. Delivery automation is one of the messiest transformations possible. It is a zendo process which only gives pain in the short run for the long term greater goal. The first challenge is to get the as-is view as the stakeholders do not agree on how the system working at present. I have put together a viewpoint from my various deal shaping experiences.
Construction Commissioning Best Practices during TurnoverHarry George
The work of a commissioning authority doesn’t get over until building turnover is successfully achieved. Here are some key practices and deliverables that help make sure that the turnover process remains in line with the expectations of the owner.
Key Features of an Effective Permit to Work.pdfHarry George
Salient Features Of A Permit To Work System
To understand how a permit to work system functions in a work environment, we need to know what this system does and why it is necessary. Here are some key features of a health and safety permit system you should know about:
1. Never Begin Without One
2. Understand How the Permit Works
3. Keep Everyone Informed
4. Pay Special Attention at Temporary Suspension/Shift Handovers
5. The Workforce Must Have Relevant Skills
6. Work With a “What If” Mindset
7. Stop As Soon As the Situation Changes or Appears Suspicious
For more info visit: geckosoftware.co/gecko-permits
More Related Content
Similar to Commissioning - Best Practices During the Construction Phase
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Best Practices of Commissioning to Follow During the Turnover PhaseOlivia Wilson
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Commissioning Management and Validation ServicesOlivia Wilson
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Global Commissioning is a client focused international company providing Commissioning Agent, Commissioning Management, MEP Validation & Specialist Electrical Management Services to the construction industry Globally.
Commissioning Best Practices to Follow during the Turnover PhaseOlivia Wilson
Commissioning is a complex process but if we follow the best practices and maintain documents properly then we come up successfully. A successful transition is said to occur when the commissioning-specific documentation is complete, fully organised, building systems are operable as per the design and O&M personnel are trained appropriately to operate the systems. Click to know everything about the commissioning process: https://www.global-cxm.com/commissioning/
How to Navigate the Commissioning Process: From Planning to Post-ConstructionOlivia Wilson
While the commissioning process means an up-front cost to construction project owners, it can be well-compensated by savings in the long run through reduced repairs, enhanced energy efficiency, higher occupant satisfaction and increased safety.
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
While the commissioning process means an up-front cost to construction project owners, it can be well-compensated by savings in the long run through reduced repairs, enhanced energy efficiency, higher occupant satisfaction and increased safety.
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
While the commissioning process means an up-front cost to construction project owners, it can be well-compensated by savings in the long run through reduced repairs, enhanced energy efficiency, higher occupant satisfaction and increased safety.
Training Slides of PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT, discussing the importance of Project Management.
Some Key-Points:
- The Project Management Context
- Project Life Cycle
- Work Breakdown Structure
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Microsoft Dynamics AX Implementation Stabilization Case Studiesmeritweb
Learn about the risks, challenges, and best practices for implementing Microsoft Dynamics AX in enterprise manufacturing and supply chain environments. Hear about a couple of our Microsoft Dynamics AX implementation stabilization case studies.
it is an overview of project management. concept of project management, scope of project management with example, types of project management, generation and screening, difficulties and its importance.
Construction planning is the specific process a construction manager uses to lay out how they will manage and execute a construction project, from design to building completion.
I have seen many customers come to the vendor to digitize their delivery process on the cloud. And then they realize what is the pain underneath and how long it takes to change the culture. Delivery automation is one of the messiest transformations possible. It is a zendo process which only gives pain in the short run for the long term greater goal. The first challenge is to get the as-is view as the stakeholders do not agree on how the system working at present. I have put together a viewpoint from my various deal shaping experiences.
Similar to Commissioning - Best Practices During the Construction Phase (20)
Construction Commissioning Best Practices during TurnoverHarry George
The work of a commissioning authority doesn’t get over until building turnover is successfully achieved. Here are some key practices and deliverables that help make sure that the turnover process remains in line with the expectations of the owner.
Key Features of an Effective Permit to Work.pdfHarry George
Salient Features Of A Permit To Work System
To understand how a permit to work system functions in a work environment, we need to know what this system does and why it is necessary. Here are some key features of a health and safety permit system you should know about:
1. Never Begin Without One
2. Understand How the Permit Works
3. Keep Everyone Informed
4. Pay Special Attention at Temporary Suspension/Shift Handovers
5. The Workforce Must Have Relevant Skills
6. Work With a “What If” Mindset
7. Stop As Soon As the Situation Changes or Appears Suspicious
For more info visit: geckosoftware.co/gecko-permits
A Permit to Work (PTW) System is basically a standardised operational procedure, used by organisations and companies to grant recorded permission to carry out some specific tasks that are either non-routine or deemed hazardous. A permit to work form comprises particular instructions specific to the nature of the job in focus, the place and time, along with detailed information on key safety measures to be taken while performing the tasks.
A Permit to Work (PTW) System is basically a standardised operational procedure, used by organisations and companies to grant recorded permission to carry out some specific tasks that are either non-routine or deemed hazardous. A permit to work form comprises particular instructions specific to the nature of the job in focus, the place and time, along with detailed information on key safety measures to be taken while performing the tasks.
Key Features of an Effective Permit to Work SystemHarry George
A permit to work system is the system, which ensures that work is performed efficiently and safely. It typically finds application in skilled jobs in risky sectors.
Commissioning - Best Practices During the Construction PhaseHarry George
Staying abreast of project updates and developing a rapport with all the parties involved in the project are important aspects of the commissioning process.
Commissioning - Best Practices During the Construction PhaseHarry George
Staying abreast of project updates and developing a rapport with all the parties involved in the project are important aspects of the commissioning process.
Advantages of Electronic Permit System.pdfHarry George
An electronic permit to work system can be implemented across multiple areas of operations to boost safety, maintenance and overall performance at the worksite. All such areas are backed by a software solution and oftentimes, they aren’t integrated.
5 Common Misconceptions A About CommissioningHarry George
High-quality commissioning goes a long way when it comes to ensuring that every system is operating in accordance with construction documents and specifications. Right from reducing costs to making sure that the building meets all quality requirements and standards, commissioning offers significant advantages that make it vital for the success of every construction project. To know more read our website.
5 Common Misconceptions about Commissioning.pptxHarry George
High-quality commissioning goes a long way when it comes to ensuring that every system is operating in accordance with construction documents and specifications.
All Trophies at Trophy-World Malaysia | Custom Trophies & Plaques Supplier. Come to our Trophy Shop today and check out all our variety of Trophies available. We have the widest range of Trophies in Malaysia. Our team is always ready to greet your needs and discuss with you on your custom Trophy for your event. Rest assured, you will be with the best Trophy Supplier in Malaysia. The official Trophy Malaysia. Thank you for your support.
Best steel industrial company LLC in UAEalafnanmetals
AL Afnan Steel Industrial Company LLC is a distinguished steel manufacturer and supplier, celebrated for its high-quality products and outstanding customer service. With a diverse portfolio that includes structural steel, and custom fabrications, AL Afnan meets a wide array of industrial demands. We are dedicated to using advanced technologies and sustainable methods to ensure excellence and reliability in every product, serving both local and international markets with efficiency.
In the competitive realm of online business, visibility is key, and search engine optimization (SEO) serves as the cornerstone of digital prominence. As the demand for effective SEO solutions continues to soar, finding the best SEO company in Perth becomes imperative. Enter Simba Squad – a dynamic force dedicated to propelling your business to new heights of success.
Comprehensive Water Damage Restoration Serviceskleenupdisaster
Find out how Disaster Kleenup's professional water damage restoration services can quickly and efficiently restore your property. Find more about our advanced techniques and quick action plans. Visit here: https://iddk.com/disaster-cleanup-services/flood-damage/
Colors of Wall Paint and Their Mentally Properties.pptxBrendon Jonathan
Discover how different wall paint colors can influence your mood and mental well-being. Learn the psychological effects of colors and find the perfect hue for every room in your home.
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...RNayak3
Explore how a risk-based approach to Enhanced Due Diligence can deliver effective Anti-Money Laundering (AML) compliance and monitoring in banking and financial services.
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...gitapress3
TOP No AsTro 1 black magic SpecialiSt UK baba ji +91-9463629203 VashIkaRan blaCk maGiC specialist in uSA Uk England Luxembourg CanAdA America BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem solution Uk USA america england LonDon Divorce problem solution astroloGer
Office Business Furnishings | Office EquipmentOFWD
OFWD is Edmonton’s Newest and most cost-effective source for Office Furnishings. Conveniently located on 170 street and 114 Avenue in Edmonton’s West End. We take pride in servicing a client base of over 500 corporations throughout the Edmonton and Alberta area. OFWD is in the business of satisfying the home or corporate office environment needs of our clients, from individual pieces of furniture for the home user to the implementation of complete turn-key projects on much larger scales. We supply only quality products from reputable manufacturers. It is our intention to continue to earn the trust of our clients by dealing with honesty and integrity and by providing service and after sales follow-up second to none.
A Bulgarian work permit is valid for up to one year, after which it can be renewed as long as the conditions of employment have not changed. After obtaining a work permit, the employee will need to apply for a Type D visa at the Bulgarian embassy or consulate in their country. Urgent requirement for Bulgaria 🇧🇬🇧🇬work D Category National Permit Visa ( Indian /Nepali Nationality only) Visa Validity - 3 to 6 months on renewables basis. Job category - General worker/ Helper Salary - 800 Euro @ 8 hrs.+ Over time extra Age- 20- 40 years Total processing time -4-5 Months
SMS2ORBIT | launched in 2022 in Mumbai's Andheri area, aims to be the most reliable Bulk SMS Service Provider in Mumbai.
If More Information About The SMS Service Provided By SMS2ORBIT Is Desired, Please Don’t Hesitate To Contact The Business Team. They Can Be Reached At
business@sms2orbit.com Or By Calling 97248 55877.
Blessed Marine Automation offers cutting-edge marine automation solutions tailored to enhance vessel efficiency and safety. From advanced control systems to remote monitoring, our services empower maritime operations worldwide. Explore our comprehensive range of products and services to optimize your vessel's performance. https://www.blessedmarineautomation.com/
Earth moving equipment refers to heavy-duty machines used in construction, mining, agriculture, and other industries to move large amounts of earth, soil, and other materials. These machines include excavators, bulldozers, loaders, and backhoes, which are essential for tasks such as digging, grading, and leveling land.
Earthmovers is a leading brand in the industry, known for providing reliable and high-performance earth moving equipment. Their machines are designed to handle the toughest jobs with efficiency and precision, ensuring optimal productivity on any project.
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...Landscape Express
Create a harmonious blend of luxury and sustainability in your outdoor living space with eco-friendly kitchens, enchanting water features, and lush plant landscaping. Embrace energy-efficient appliances, solar lighting, rainwater harvesting, and native plants to enhance beauty while reducing environmental impact. Transform your space into a glamorous, eco-conscious retreat for relaxation and social gatherings.
Experience the breathtaking beauty of a Waikiki sunset aboard the MAITAI Catamaran. Sail along the stunning coastline as the sun dips below the horizon, casting vibrant hues across the sky. Enjoy the gentle ocean breeze, refreshing drinks, and a relaxed atmosphere. This unforgettable voyage offers panoramic views of Diamond Head and the Waikiki skyline, making it the perfect way to end your day in paradise. Join us for a memorable sunset cruise you won't forget. Please visit our website: https://www.maitaicatamaran.net/ and call us at 808-922-5665 for additional information.
Looking for the Reliable Logistics Solutions in India? Discover unparalleled efficiency and reliability with our top-rated logistics services. We specialize in streamlining supply chains, ensuring timely deliveries, and providing cutting-edge tracking solutions. Our platform caters to businesses of all sizes, offering customizable logistics solutions to meet your unique needs. With a focus on innovation and customer satisfaction, we are your trusted partner in navigating the complexities of logistics in India. Choose us for seamless, cost-effective, and scalable logistics solutions. Experience the best in Indian logistics with our expert team by your side.
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia ...gitapress3
Top Best Astrologer +91-9463629203 LoVe Problem SolUtion specialist In InDia Love ProBlem asTroloGer +91-9463629203 love problem solution astrologer
best love problem solution astrologer
online love problem solution astrologer
love problem solution astrologer in india
love problem solution astrologer in kolkata
love problem solution astrologer near me
love problem solution astrologer in ludhiana
love problem solution astrologer acharya ji
love problem solution astrologer in delhi
love problem solution astrologer amritsar
astrologer love problem solution
astrologer for love problem
astrology love problem solution
love solution astrologer
love problem solution specialist astrologer
love problem solution by astrologer
astrology love problem solution baba ji
love problem solve astrologer
love problem solution usa
love problem solution expert astrologer
astrologer for love marriage problem solution
love problem solution astrologer in mumbai
love problem solution muslim astrologer
love marriage specialist astrologer problem solution
famous love astrologer
love problem solution astrologer specialist
love problem solution astrologer baba ji
Elevate Your Brand with Digital Marketing for Fashion IndustryMatebiz Pvt. Ltd
Matebiz Pvt. Ltd. specializes in providing cutting-edge digital marketing for Fashion Industry. Our comprehensive strategies ensure that your brand stands out in the competitive fashion landscape. From targeted social media campaigns to search engine optimization tailored for fashion keywords, we cover it all. With a deep understanding of industry trends and consumer behavior, we craft compelling content and engaging visuals to enhance your online presence. Trust Matebiz Pvt. Ltd. to elevate your fashion brand through strategic digital marketing initiatives.
2. Commissioning Best Practices
• Staying abreast of project updates and developing a rapport with all the
parties involved in the project are important aspects of the commissioning
process.
• Interestingly, there are handful of best practices that the best commissioning
management company in the UK can integrate into each stage of the
commissioning process to make it more effective.
• Keep reading to know about such practices that you can use during the
important phase of construction.
www.global-cxm.com
3. Conducting a Great Initial Meeting
• When conducted appropriately, the initial meeting should make the project team feel
quite confident that the commissioning management firm is available at all times to
ensure the project completes successfully.
• Scheduling the meeting mindfully. It should not be scheduled too early. Reason being,
contractors may forget about the commissioning process if too much time passes by.
• It may appear obvious, but the initial meeting must include a complete review of the
commissioning authority process.
• Maintaining the momentum of the meeting is important. This can be done by visiting
the site soon after the meeting and interacting with contractors while showing
interest in their work to understand the project in a better way through keen
observation.
www.global-cxm.com
4. Completing Pre-Functional Checklists
• Instead of depending on installation contractors, the commissioning authority should
take the responsibility to complete the documentation of pre-functional checklist.
• While acting as the most effective supporter of the project owner, the commission
authority can check appropriate installation early on in order to prevent systemic
problems from occurring in the first place.
www.global-cxm.com
5. Becoming Part of the Solution
• Project teams admire commissioning management companies that work
beyond generating lists of problems. That is to say, the commission authority
should put in efforts to be part of the solution.
• The commissioning deficiencies log is certainly a crucial communication tool
to track deficiencies that cannot be fixed immediately. Every deficiency is
assigned to a suitable member of the project team.
• This log should define every deficiency with clarity while offering suggestions
on how to resolve the issue.
www.global-cxm.com
6. Customising Functional Performance
Testing
• After the approval of submittals, Functional Performance Testing (FPT)
documentation must be completed.
• The documentation should describe any particular installation or operational
requirements from the manufacturer, along with test procedures developed
through years of commissioning experience.
• Specific control sequences should be used that are developed by the design
team to check the response of equipment to changes in the status, like
transition from heating to cooling or enabling the economizer mode.
www.global-cxm.com
7. To Conclude
• The true value of commissioning is achieved in the design phase – when
the impact is highest and the costs are lowest.
• As the project proceeds into the construction phase, avoiding costs
becomes tougher.
• The best practices discussed above will help ensure that members of the
project team are well informed, costly equipment failures are prevented
and the project is ready for successful acceptance and testing phases.
www.global-cxm.com