Commissioning - Best Practices
During the Construction Phase
www.global-cxm.com
Commissioning Best Practices
• Staying abreast of project updates and developing a rapport with all the
parties involved in the project are important aspects of the commissioning
process.
• Interestingly, there are handful of best practices that the best commissioning
management company in the UK can integrate into each stage of the
commissioning process to make it more effective.
• Keep reading to know about such practices that you can use during the
important phase of construction.
www.global-cxm.com
Conducting a Great Initial Meeting
• When conducted appropriately, the initial meeting should make the project team feel
quite confident that the commissioning management firm is available at all times to
ensure the project completes successfully.
• Scheduling the meeting mindfully. It should not be scheduled too early. Reason being,
contractors may forget about the commissioning process if too much time passes by.
• It may appear obvious, but the initial meeting must include a complete review of the
commissioning authority process.
• Maintaining the momentum of the meeting is important. This can be done by visiting
the site soon after the meeting and interacting with contractors while showing
interest in their work to understand the project in a better way through keen
observation.
www.global-cxm.com
Completing Pre-Functional Checklists
• Instead of depending on installation contractors, the commissioning authority should
take the responsibility to complete the documentation of pre-functional checklist.
• While acting as the most effective supporter of the project owner, the commission
authority can check appropriate installation early on in order to prevent systemic
problems from occurring in the first place.
www.global-cxm.com
Becoming Part of the Solution
• Project teams admire commissioning management companies that work
beyond generating lists of problems. That is to say, the commission authority
should put in efforts to be part of the solution.
• The commissioning deficiencies log is certainly a crucial communication tool
to track deficiencies that cannot be fixed immediately. Every deficiency is
assigned to a suitable member of the project team.
• This log should define every deficiency with clarity while offering suggestions
on how to resolve the issue.
www.global-cxm.com
Customising Functional Performance
Testing
• After the approval of submittals, Functional Performance Testing (FPT)
documentation must be completed.
• The documentation should describe any particular installation or operational
requirements from the manufacturer, along with test procedures developed
through years of commissioning experience.
• Specific control sequences should be used that are developed by the design
team to check the response of equipment to changes in the status, like
transition from heating to cooling or enabling the economizer mode.
www.global-cxm.com
To Conclude
• The true value of commissioning is achieved in the design phase – when
the impact is highest and the costs are lowest.
• As the project proceeds into the construction phase, avoiding costs
becomes tougher.
• The best practices discussed above will help ensure that members of the
project team are well informed, costly equipment failures are prevented
and the project is ready for successful acceptance and testing phases.
www.global-cxm.com
Contact Us
• Address: Global Commissioning Management and Software Ltd, Unit
2, Chestfield Business Park
Whitstable | Kent, CT5 3JB
www.global-cxm.com

More Related Content

Similar to Commissioning - Best Practices During the Construction Phase

Commissioning-Best-Practices
Commissioning-Best-PracticesCommissioning-Best-Practices
Commissioning-Best-PracticesOlivia Wilson
 
Best Practices of Commissioning to Follow During the Turnover Phase
Best Practices of Commissioning to Follow During the Turnover PhaseBest Practices of Commissioning to Follow During the Turnover Phase
Best Practices of Commissioning to Follow During the Turnover PhaseOlivia Wilson
 
Commissioning Management and Validation Services
Commissioning Management and Validation ServicesCommissioning Management and Validation Services
Commissioning Management and Validation ServicesOlivia Wilson
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSOlivia Wilson
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSOlivia Wilson
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementationTerry Bunio
 
Project integration management
Project integration managementProject integration management
Project integration managementSaad Al Jabri
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseOlivia Wilson
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGProf.Mayur Modi
 
How to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionHow to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionOlivia Wilson
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...Olivia Wilson
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studiesmeritweb
 
Agile best practices
Agile best practicesAgile best practices
Agile best practicesAreeba jabeen
 
Construction planning.ppt
Construction planning.pptConstruction planning.ppt
Construction planning.pptVinayakNaik80
 
Point ofview devops
Point ofview devopsPoint ofview devops
Point ofview devopsReshmi Nandy
 

Similar to Commissioning - Best Practices During the Construction Phase (20)

Commissioning-Best-Practices
Commissioning-Best-PracticesCommissioning-Best-Practices
Commissioning-Best-Practices
 
Best Practices of Commissioning to Follow During the Turnover Phase
Best Practices of Commissioning to Follow During the Turnover PhaseBest Practices of Commissioning to Follow During the Turnover Phase
Best Practices of Commissioning to Follow During the Turnover Phase
 
Commissioning Management and Validation Services
Commissioning Management and Validation ServicesCommissioning Management and Validation Services
Commissioning Management and Validation Services
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORS
 
BEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORSBEST PRACTICE COMMISSIONING FACTORS
BEST PRACTICE COMMISSIONING FACTORS
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
How to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionHow to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-Construction
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...
 
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENTPROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
Essentialsof Project Management
Essentialsof Project ManagementEssentialsof Project Management
Essentialsof Project Management
 
Agile best practices
Agile best practicesAgile best practices
Agile best practices
 
UNIT 1
UNIT 1UNIT 1
UNIT 1
 
project management
project managementproject management
project management
 
Construction planning.ppt
Construction planning.pptConstruction planning.ppt
Construction planning.ppt
 
Point ofview devops
Point ofview devopsPoint ofview devops
Point ofview devops
 

More from Harry George

Construction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during TurnoverConstruction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during TurnoverHarry George
 
Key Features of an Effective Permit to Work.pdf
Key Features of an Effective Permit to Work.pdfKey Features of an Effective Permit to Work.pdf
Key Features of an Effective Permit to Work.pdfHarry George
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsHarry George
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsHarry George
 
Key Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work SystemKey Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work SystemHarry George
 
Commissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction PhaseCommissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction PhaseHarry George
 
Advantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfAdvantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfHarry George
 
Commissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction PhaseCommissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction PhaseHarry George
 
5 Common Misconceptions A About Commissioning
5 Common Misconceptions    A    About Commissioning5 Common Misconceptions    A    About Commissioning
5 Common Misconceptions A About CommissioningHarry George
 
5 Common Misconceptions about Commissioning.pptx
5 Common Misconceptions about Commissioning.pptx5 Common Misconceptions about Commissioning.pptx
5 Common Misconceptions about Commissioning.pptxHarry George
 

More from Harry George (10)

Construction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during TurnoverConstruction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during Turnover
 
Key Features of an Effective Permit to Work.pdf
Key Features of an Effective Permit to Work.pdfKey Features of an Effective Permit to Work.pdf
Key Features of an Effective Permit to Work.pdf
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
 
Key Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work SystemKey Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work System
 
Commissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction PhaseCommissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction Phase
 
Advantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfAdvantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdf
 
Commissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction PhaseCommissioning - Best Practices During the Construction Phase
Commissioning - Best Practices During the Construction Phase
 
5 Common Misconceptions A About Commissioning
5 Common Misconceptions    A    About Commissioning5 Common Misconceptions    A    About Commissioning
5 Common Misconceptions A About Commissioning
 
5 Common Misconceptions about Commissioning.pptx
5 Common Misconceptions about Commissioning.pptx5 Common Misconceptions about Commissioning.pptx
5 Common Misconceptions about Commissioning.pptx
 

Recently uploaded

The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfbelieveminhh
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.htj82vpw
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...bleessingsbender
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...ssuserf63bd7
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Holger Mueller
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacovaimostorept
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312LR1709MUSIC
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxseemajojo02
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
JHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDE
JHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDEJHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDE
JHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDEkajalroy875762
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfHolger Mueller
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTSPALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTSkajalroy875762
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 

Recently uploaded (20)

The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
JHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDE
JHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDEJHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDE
JHANSI CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JHANSI ESCORTS SERVICE PROVIDE
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTSPALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 

Commissioning - Best Practices During the Construction Phase

  • 1. Commissioning - Best Practices During the Construction Phase www.global-cxm.com
  • 2. Commissioning Best Practices • Staying abreast of project updates and developing a rapport with all the parties involved in the project are important aspects of the commissioning process. • Interestingly, there are handful of best practices that the best commissioning management company in the UK can integrate into each stage of the commissioning process to make it more effective. • Keep reading to know about such practices that you can use during the important phase of construction. www.global-cxm.com
  • 3. Conducting a Great Initial Meeting • When conducted appropriately, the initial meeting should make the project team feel quite confident that the commissioning management firm is available at all times to ensure the project completes successfully. • Scheduling the meeting mindfully. It should not be scheduled too early. Reason being, contractors may forget about the commissioning process if too much time passes by. • It may appear obvious, but the initial meeting must include a complete review of the commissioning authority process. • Maintaining the momentum of the meeting is important. This can be done by visiting the site soon after the meeting and interacting with contractors while showing interest in their work to understand the project in a better way through keen observation. www.global-cxm.com
  • 4. Completing Pre-Functional Checklists • Instead of depending on installation contractors, the commissioning authority should take the responsibility to complete the documentation of pre-functional checklist. • While acting as the most effective supporter of the project owner, the commission authority can check appropriate installation early on in order to prevent systemic problems from occurring in the first place. www.global-cxm.com
  • 5. Becoming Part of the Solution • Project teams admire commissioning management companies that work beyond generating lists of problems. That is to say, the commission authority should put in efforts to be part of the solution. • The commissioning deficiencies log is certainly a crucial communication tool to track deficiencies that cannot be fixed immediately. Every deficiency is assigned to a suitable member of the project team. • This log should define every deficiency with clarity while offering suggestions on how to resolve the issue. www.global-cxm.com
  • 6. Customising Functional Performance Testing • After the approval of submittals, Functional Performance Testing (FPT) documentation must be completed. • The documentation should describe any particular installation or operational requirements from the manufacturer, along with test procedures developed through years of commissioning experience. • Specific control sequences should be used that are developed by the design team to check the response of equipment to changes in the status, like transition from heating to cooling or enabling the economizer mode. www.global-cxm.com
  • 7. To Conclude • The true value of commissioning is achieved in the design phase – when the impact is highest and the costs are lowest. • As the project proceeds into the construction phase, avoiding costs becomes tougher. • The best practices discussed above will help ensure that members of the project team are well informed, costly equipment failures are prevented and the project is ready for successful acceptance and testing phases. www.global-cxm.com
  • 8. Contact Us • Address: Global Commissioning Management and Software Ltd, Unit 2, Chestfield Business Park Whitstable | Kent, CT5 3JB www.global-cxm.com