Special focus on the lessons from the Great East Japan Earthquake and Tsunami 
Yuichi Ono 
Assistant Director and Professor, 
International Research Institute of Disaster Science (IRIDeS) 
Tohoku University, Sendai, Japan
Thank OECD countries for providing warm support to disaster victims and affected areas in Tohoku
Introduction It has been more than three and a half years since the 11 March 2001 Japan Earthquake and Tsunami Focus: Review policies and changes
In 1896, 22,000 people were killed by tsunami in Tohoku (Death rate: 40%) In 2011, nearly 20,000 people were killed by tsunami in Tohoku (Death rate: 4%)
Significant decrease in the death rate: 40 to 4 % in 100 years Positive factors: - Increased capacity to cope with the disaster (both structural and non-structural measures) Negative factors: - Memory loss, more exposure to the risk with increased population - Dependency on modern technology
Changes in DRR related policy 〔Basic Acts〕 1. Disaster Countermeasures Basic Act (1961) 2. Act on Prevention of Marine Pollution and Maritime Disaster (1970) 3. Act on Disaster Prevention in Petroleum Industrial Complexes and other Petroleum Facilities (1975) 4. Act on Special Measures for Large-scale Earthquakes (1978) 5. Act on Special Measures for Nuclear Disasters (1999) 6. Act on Special Measures for Promotion of Tonankai and Nankai Earthquake Disaster Management (2002) 7. Act on Special Measures for Promotion of Disaster Management for Trench- type Earthquakes in the Vicinity of the Japan and Chishima Trenches (2004) Disaster Countermeasures Basic Act was revised (June 2013)
7 
 
Capacity building for quickly responding to a large-scale disaster which affects large areas 
 
Smooth and safe evacuation of the residents 
 
An improvement in protecting disaster victims 
 
Strengthening of the measure for the disaster prevention from ordinal time 
Key points in revision of the Disaster Countermeasures Basic Act
8
9 
The Reconstruction Agency officially debuted on February 10, 2012, following the previous Headquarters of Reconstruction, which was set up in June 2011. The Reconstruction Agency was created under the Act Establishing the Reconstruction Agency and is planned to operate for 10 years. This agency is primarily responsible for coordinating various ministries’ budgetary and reconstruction procedures so that reconstruction efforts in all localities can proceed in a timely manner.
〔Disaster Prevention and Preparedness〕 1. Erosion Control Act (1897) 2. Building Standard Law (1950) 3. Forest Act (1951) 4. Act on Temporary Measures for Disaster Prevention and Development of Special Land Areas (1952) 5. Meteorological Services Act (1952) 6. Seashore Act (1956) 7. Landslide Prevention Act (1958) 8. Act on Special Measures for Disaster Prevention in Typhoon-prone Areas (1958) 9. Act on Special Measures for Heavy Snowfall Areas (1962) 10. River Act (1964) 11. Act on Prevention of Steep Slope Collapse Disaster (1969) 12. Act on Special Measures for Active Volcanoes (1973) 13. Act on Special Financial Measures for Urgent Earthquake Countermeasure Improvement Projects in Areas for Intensified Measures (1980) 14. Act on Special Measures for Earthquake Disaster Countermeasures (1995) 15. Act on Promotion of the Earthquake-proof Retrofit of Buildings (1995) 16. Act on Promotion of Disaster Resilience Improvement in Densely Inhabited Areas (1997) 17. Act on Promotion of Sediment Disaster Countermeasures for Sediment Disaster Prone Areas (2000) 18. Specified Urban River Inundation Countermeasures Act (2003)
11 
After the GEJE, the Japanese government actively established the new acts and amended existing acts. 
- Two new acts for tsunami disaster management (June and December 2011) 
- A revision of the Act on Special Measures concerning Urban Regeneration (April 2012) 
- A revision of the Disaster Countermeasures Basic Act (June 2012 and June 2013) 
- A new act concerning the reconstruction from major disasters (June 2013) 
- A new act of countermeasures for the Tokyo Inland Earthquake (November 2013) 
-A fundamental revision of an act for promotion of countermeasures for the Nankai Trough Earthquake (November 2013) 
- A new basic act of national resilience for disaster
12 
Dedicated and Adequate Resources 
for Disaster Management in Japan 
Helping each other: Nation-wide assistance
13 
BCP
14 
Why earthquake damages were reduced during the 11 March 2011 Disaster?
15 
Accommodation issues of disaster victims for a long time
16 
Relocation Regional Urban Recovery Types Proposed after the 2011 Great East Japan Earthquake and Tsunami
17
18
19
20
21 
Change of Housing Location in Hongo, Touni Village, Iwate Pref. (1948–2010) 
After the 1933 Killer Tsunami, most people relocated to higher ground, but 
they gradually returned --- Exposure to tsunami risks
22 
Do not build houses in lower areas (a stone monument in Rikuzentakata built in 1935) 
Photo: Yuichi Ono
23 
The Education Sector 
Education + self-action with flexible thoughts
24 
Frequent drills at school and communities
25 
Ancient Japanese words have might have hidden meanings: 
Kama-: tsunami eaten beaches 
e.g. Kamaishi, Shiogama, Kamakura 
Nami-/Namiita 
Wata/watari- 
Ona 
Suka 
Aka/Ake: Water
26 
Name of places 
- 
e.g. funakoshi (boat crossing over to the other beach): two neighboring beaches became one by tsunami 
Funakoshi, Yamada-machi, Iwate Pref
Efforts in the 19th century 27 
Tsunami Recovery in Wakayama 
A great leader 
Education and awareness 
First tsunami levee in the world?
28 
He saved the lives of many of his fellow villagers of Hiro, Kii Province (current Hirogawa, Wakayama), when a massive tsunami struck the Kii Peninsula in 1854. He set fire to stacks of rice sheaves as landmarks to guide villagers to safety. Lafcadio Hearn wrote a story about him in Gleanings in Buddha-Fields: Studies of Hand and Soul in the Far East (1897), called "Inamura no Hi: The burning rice fields". The story chronicled Goryo's heroism and accounts of his efforts were also introduced into Japanese textbooks. Hamaguchi participated in various recovery efforts in Hiro, including the construction of a sea wall more than 600m long, 20m wide and 5 m high, which minimized damage from tsunamis in later years. He spent his own money on the project the equivalent of 1,572 ryō (gold coins) and hired a total of 56,736 villagers to work on it. In 2012, a private housing firm, Ichijo Co., Ltd.(Ichijo Komuten) --- offered USD 300M to construct a sea wall in Hamamatsu, Shizuoka Pref. (17.5 km) 
Goryo Hamaguchi, 1820-1885 Inamuranohi museum Photo taken by Yuichi Ono 
Historical tsunami warning and recovery efforts
29 
Historical tsunami warning and recovery efforts 
1854 Ansei Tsunami – description of Hiromura Village 
Inamuranohi museum Photo taken by Yuichi Ono
30 
Historical tsunami warning and recovery efforts 
Hiromura sea wall built by Hamaguchi, 1855-58 (3 years and 10 months) Height 5 m, width 20 m, length 600 m 
Photo: Yuichi Ono 
Photo: Yuichi Ono
31 
Tsunami Warning System 
First of all, tsunami warning system operated by JMA saved many lives on the occasion of the 11 March 2011 Japan Tsunami. If no EWS, the number of deaths would have been recorded with one more digit.
32 
Tsunami Warning System 
The JMA’s already sophisticated TWS was further revised in March 2013 after 
a series of consultations 
What happened on tsunami EWS on the day?
33 
Tsunami Warning System 
It is easy to criticize things after they occur. 
-Initial estimated tsunami heights based on the early evaluations of earthquake magnitude were significantly underestimated. --- The EQ rapturing continued for 3 minutes and the actual magnitude had not been observed. Lessons: Do not depend only on the initial magnitude of EQ as a large one has significant duration Technical modifications in observation: 
A new method to evaluate a large EQ magnitude 
Based on the analysis on the EQ wave length 
Pay more respect on the Ocean bottom tsunamimeters da 
and GPS wave gauges data 
Source: JMA 
Source: JMA
34 
Tsunami Warning System 
Issuance of tsunami warning 
Before 
Now (after March 2013) 
Source: JMA 
Source: JMA
35 
Tsunami Warning System 
Issuance of tsunami warning 
If not technically sure on the estimated tsunami heights, JMA would not use numerical 
values but words such as enormous/gigantic (higher than 3m), high (1-3 meters), or 
none if less than 1 meter. 
If confident, JMA will use the 
above-displayed categorized 
tsunami heights 
Note that the announcement 
will be made at the maximum 
value in each category 
Source: JMA
36 
Tsunami Warning System 
Dissemination of warning 
Estimated time of tsunami arrival with estimated height per location will be announced by JMA, 
Source JMA
Local FM Radio Station at Rikuzentakata 37 
Photo: Yuichi Ono
38 
- 
Only 30% of people evacuated quickly. Why not others? 
- 
The initial estimate of tsunami height announced by JMA was not high enough 
- 
The corrected information soon after did not reach people due to electric failures 
- 
The magnitude of the earthquake (9.0) was beyond imagination even for seismologists 
- 
The earthquake made a gigantic electronic failures and most people depended tsunami warning on TV 
- 
Many elderly people and disabled people could/did not evacuate on time. 
- 
Some of the designated evacuation sites became under water (tsunami risk map) 
- 
Past tsunami experiences might have hindered a decision making process 
- 
New comers to the coastal area did not think of tsunami risk 
- 
Some people took risks to reach their family members, friends, colleagues, and neighbors 
Why so many people were killed?
39 
Population data in Minami-sanriku as of February 2011 
17,666 940 5.3% 
789 112 14.0% 
What are these numbers? 
Source: 障がい者制度改革推進会議
40 
Casualties, by Age, due to the 2011Great East Japan Earthquake and Tsunami and the 1995 Great Kobe Earthquake
41 
Hazard mapping
42 
Evacuation
43 
Evacuation 
Evacuation by cars? GPS records analysis to identify what happened on 11 March 2011 Always some people are left out from evacuation practices How can we motivate those? Disabled people? Supporters take high Risks too. Critical infra and vulnerable people to be located in safer area as much as possible Structural measures would help especially immediately near the coast (e.g. Shizuoka Pref. Where tsunami might come less than 1 minute after the EQ)
Early warning system and evacuation would save lives but not protect properties 
 
Structural measures
45 
A sea wall in Ohtanaba, Fudai-village, Iwate Pref. Length 155 m, height 15.5 m, Approx. USD 0.6M Right side: beach Built by Iwate Pref. but strong call by the Village Mayor in 1967 
Photo: Yuichi Ono
46 
Kotoku Wamura, 1909-1997 Mayor of Fudai Village 
- 
Insisted on building 15m high sea wall because he heard that th 1896 Tsunami was with 14m high - Iwate Pref. supported 
100 people working in the port area were all saved during the 11 March 2011 Tsunami
47 
Photo: Yuichi Ono
Source: Takahashi, Port and Airport Research Institute of Japan 
Level 1 Tsunami 
Level 2 Tsunami
Investment in research – Japanese tradition (planting a tree with proper cares) The trees would produce many fruits later for a long time 49
50
51 
IRIDeS created in the process of Build Back Better 
- Established in April 2012 as a response to the disaster 
- 36 areas of research under 7 divisions 
- More than 70 full-time researchers (total more than 100) 
- One of the largest and most comprehensive DRM research institutes in the world 
- Secured 10-year budget by the Government with USD 100 Million 
Research institutes, Governments, and International Organizations such as UN 
Private Sector 
Affected local governments 
International Research Institute of Disaster Science(IRIDS) 
Reconstruction of disaster prevention and reduction technologies based on reality of the 2011 off the Pacific coast of Tohoku earthquake and tsunami disaster 
Construction of “Disaster area supportology” in the event of a disaster 
Advancement of anti-hazard performance and upgrading for multiple-fail-safe in urban areas as disaster recovery projects 
Establishment of disaster medical relief service system of responding appropriately to wide area massive disaster 
Rehabilitation regional and urban and creating disaster digital archive pass for the next generation 
Major Research Issues 
Research on mechanism of mega earthquake and tsunami generation and developing of next-generation of early detection technology of tsunamis
Use of science for policy making in disaster recovery in case of Sendai City 
Prof. Shunichi Koshimura’s work
Damage in Sendai city 
53 
In Sendai 
Exposed population 29,962 
Death Toll 
704 (2.4% of exposed population) 
Missing 
32 
Injured 
2,269 
Completely collapsed 
29,469 
Severely damaged 
26,064 
Partial damaged 
78,086 
Minor damaged 
115,949 
Fatality/Missing/Insured 
Structural damage
The 2011 Tsunami in Sendai 
54
55 
Mapping of flow depth
56 
Mapping of building damage
Structural vulnerability Tsunami fragility curve 
57
Structural vulnerability 
Over 2 m tsunami flow depth potentially causes severe damage on houses or may devastate. Over 6 m tsunami flow depth will cause total devastation. Implication to land use management and tsunami risk evaluation. 
58
Sendai city’s reconstruction plan Multiple protection to minimize losses 
59 
Nature (2012)
Elevated prefectural road 
+6m 
Coastal Levee 
7.2 m 
Final plan in Sendai city 
60 
Coastal Levee 
4.4 m
How the multiple protection works … 
61
The prefectural road (10 km) to be elevated Height : 6m, Width 30 m 12 billion JPY (120 million $) 62
Sendai city’s reconstruction plan 
Tide : MHW Sea wall : 7.2 m Road level : 6 m 
Flow depth 
Flow depth of less than 2 m at the west of the raised road. 
The sea wall and raised road increase the area of more surviving possibility. 
63
64 
A special way to support recovery efforts By hosting the Third UN World Conference on Disaster Risk Reduction, 14-18 March 2015 (Sendai) - Parts of our campus will be used as a venue Our key messages to the Post-HFA are: 
- 
Build back better (for resilient recovery) to increase DRR capacity for not to repeat the same disaster 
- 
Importance of constant investment on DRR (Japan: 1% of GDP since the late 1950s) 
- 
Governance, including the development of national disaster statistics by NDMOs 
- 
Support the proposed numerical targets in DRR in conjunction with the SDGs 
- 
Integration of DRR science into national and local level policy
65 
Slide show: 
photos from tsunami-affected areas
66 
Photo: Yuichi Ono
67 
Photo: Yuichi Ono
68 
Photo: Yuichi Ono
69 
Photo: Yuichi Ono
70 
Photo: Yuichi Ono
71 
Photo: Yuichi Ono
72 
Photo: Yuichi Ono
73 
Photo: Yuichi Ono
74 
Photo: Yuichi Ono
75 
Photo: Yuichi Ono
76 
Disaster at Disaster Management Center of Minamisanriku, Miyagi Pref. 
Photo: Yuichi Ono
77 
Minamisanriku Temporal City Office and Evacuation Center 
Photo: Yuichi Ono
78 
Photo: Yuichi Ono
79 
Photo: Yuichi Ono
80 
A first restaurant built after the tsunami in Minami-sanriku 
Recovery of local shops and restaurants does matter 
Photo: Yuichi Ono
81 
A volunteer center combined with a local shop in Rikuzentakata 
Photo: Yuichi Ono
82 
Aid Takata , an NPO in Rikuzentakata is having a meeting to support affected communi 
NGOs, NPOs, and local organizations do matter 
Photo: Yuichi Ono
83 
Public (prefectural) hospital in Rikuzentakata 
Photo: Yuichi Ono
84 
Temporally relocated but operational now 
Photo: Yuichi Ono
85 
‘Capital Hotel 1000’ a 7-story building hotel near the coast in Rikuzentakata was damag 
up to the 4th floor --- to be moved to 700m inland on the top of the hill supported by 
Government ’s assistance and a private recovery fund (USD 8.6M) 
Public accommodation does matter 
Photo: Yuichi Ono
86 
A bridge near the coast, Minamisanriku, Miyagi Pref. 
Photo: Yuichi Ono
87 
Sendai Port 
Photo: Yuichi Ono
88 
A railroad track and its bridge 
Photo: Yuichi Ono
89 
JR Rikuzentakata Station (operated by the East Japan Railway Company) 
Public Transportation does matter 
Photo: Yuichi Ono
90 
--- recovered as the Bus Rapid Transit (BRT) for now
91 
Photo: Yuichi Ono
92 
Education Sector 
Elementary school in Arahama, Sendai 
Photo: Yuichi Ono
93 
Education Sector 
Elementary school in Arahama, Sendai 
Photo: Yuichi Ono
94 
Recovery at Tohoku University 
Photo: Yuichi Ono
95 
Demolishing the damaged building of the Civil Engineer’s Department at Tohoku Unive - Nobody was hurt from the quake itself 
Photo: Yuichi Ono
96 
We welcome you to the 3rd World Conference on Disaster Reduction in Japan, 2015 
Photo: Yuichi Ono
97 
http://irides.tohoku.ac.jp/media/files/HFA_IRIDeS_ReviewReport_Web_20140612(1).pdf 
Or just google it: IRIDeS HFA Review

More Related Content

Viewers also liked

OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Governance
 
Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...
Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...
Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...OECD Governance
 
Anticipating the risks from global illicit trafficking
Anticipating the risks from global illicit traffickingAnticipating the risks from global illicit trafficking
Anticipating the risks from global illicit traffickingOECD Governance
 
Communicating emerging threats and potential crises to leaders
Communicating emerging threats and potential crises to leadersCommunicating emerging threats and potential crises to leaders
Communicating emerging threats and potential crises to leadersOECD Governance
 
Global Risks, Trends and Water Implications for Climate Change
Global Risks, Trends and Water  Implications for Climate ChangeGlobal Risks, Trends and Water  Implications for Climate Change
Global Risks, Trends and Water Implications for Climate ChangeOECD Governance
 
Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...
Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...
Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...OECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement...
 OECD Workshop: Learning from crises and fostering the continuous improvement... OECD Workshop: Learning from crises and fostering the continuous improvement...
OECD Workshop: Learning from crises and fostering the continuous improvement...OECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement...
 OECD Workshop: Learning from crises and fostering the continuous improvement... OECD Workshop: Learning from crises and fostering the continuous improvement...
OECD Workshop: Learning from crises and fostering the continuous improvement...OECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Governance
 
Risk Communication 7 themes
Risk Communication 7 themesRisk Communication 7 themes
Risk Communication 7 themesOECD Governance
 
Improving the evidence base on the costs of disasters
Improving the evidence base on the costs of disastersImproving the evidence base on the costs of disasters
Improving the evidence base on the costs of disastersOECD Governance
 
Detecting Threats and Warning Leaders
Detecting Threats and Warning LeadersDetecting Threats and Warning Leaders
Detecting Threats and Warning LeadersOECD Governance
 
The Deeping Crisis of Governance and the Refugee Challenge
The Deeping Crisis of Governance and the Refugee ChallengeThe Deeping Crisis of Governance and the Refugee Challenge
The Deeping Crisis of Governance and the Refugee ChallengeOECD Governance
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Governance
 
Pandora Cell. Danish emergency management agency
Pandora Cell.  Danish emergency management agency Pandora Cell.  Danish emergency management agency
Pandora Cell. Danish emergency management agency OECD Governance
 
Risk Communication Policies and Practices
Risk Communication Policies and PracticesRisk Communication Policies and Practices
Risk Communication Policies and PracticesOECD Governance
 

Viewers also liked (20)

OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...
 
Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...
Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...
Presentation by Nicolas Mueller at 5th Workshop on Strategic Crisis Managemen...
 
Anticipating the risks from global illicit trafficking
Anticipating the risks from global illicit traffickingAnticipating the risks from global illicit trafficking
Anticipating the risks from global illicit trafficking
 
Communicating emerging threats and potential crises to leaders
Communicating emerging threats and potential crises to leadersCommunicating emerging threats and potential crises to leaders
Communicating emerging threats and potential crises to leaders
 
Global Risks, Trends and Water Implications for Climate Change
Global Risks, Trends and Water  Implications for Climate ChangeGlobal Risks, Trends and Water  Implications for Climate Change
Global Risks, Trends and Water Implications for Climate Change
 
Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...
Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...
Presentation by Kelvin Berryman at 5th Workshop on Strategic Crisis Managemen...
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...
 
OECD Workshop: Learning from crises and fostering the continuous improvement...
 OECD Workshop: Learning from crises and fostering the continuous improvement... OECD Workshop: Learning from crises and fostering the continuous improvement...
OECD Workshop: Learning from crises and fostering the continuous improvement...
 
10 ireland
10 ireland10 ireland
10 ireland
 
OECD Workshop: Learning from crises and fostering the continuous improvement...
 OECD Workshop: Learning from crises and fostering the continuous improvement... OECD Workshop: Learning from crises and fostering the continuous improvement...
OECD Workshop: Learning from crises and fostering the continuous improvement...
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...
 
Risk Communication 7 themes
Risk Communication 7 themesRisk Communication 7 themes
Risk Communication 7 themes
 
Improving the evidence base on the costs of disasters
Improving the evidence base on the costs of disastersImproving the evidence base on the costs of disasters
Improving the evidence base on the costs of disasters
 
Detecting Threats and Warning Leaders
Detecting Threats and Warning LeadersDetecting Threats and Warning Leaders
Detecting Threats and Warning Leaders
 
The Deeping Crisis of Governance and the Refugee Challenge
The Deeping Crisis of Governance and the Refugee ChallengeThe Deeping Crisis of Governance and the Refugee Challenge
The Deeping Crisis of Governance and the Refugee Challenge
 
OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...OECD Workshop: Learning from crises and fostering the continuous improvement ...
OECD Workshop: Learning from crises and fostering the continuous improvement ...
 
Pandora Cell. Danish emergency management agency
Pandora Cell.  Danish emergency management agency Pandora Cell.  Danish emergency management agency
Pandora Cell. Danish emergency management agency
 
Risk Communication Policies and Practices
Risk Communication Policies and PracticesRisk Communication Policies and Practices
Risk Communication Policies and Practices
 

Similar to OECD Workshop: Learning from crises and fostering the continuous improvement of risk governance and management - Prof. Yoichi Ono

Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx
 Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx
Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docxMARRY7
 
The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...
The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...
The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...kazisumaiya
 
Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...
Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...
Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...Yasuhiro Kawasoe
 
2011 Tohoku Earthquake and Tsunami Japan
2011 Tohoku Earthquake and Tsunami Japan2011 Tohoku Earthquake and Tsunami Japan
2011 Tohoku Earthquake and Tsunami JapanNoorUlAin984033
 
3. ERAKV 2nd Seminar-Investment
3. ERAKV 2nd Seminar-Investment 3. ERAKV 2nd Seminar-Investment
3. ERAKV 2nd Seminar-Investment Subhechha Sharma
 
UHS DRRMO Awareness program 2015
UHS DRRMO Awareness program 2015UHS DRRMO Awareness program 2015
UHS DRRMO Awareness program 2015Edmund Villareal
 
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...ISCRAM Events
 
Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.YuriOki
 
Satoru Nishikawa - Evidence informed policy making - 26 June 2017
Satoru Nishikawa - Evidence informed policy making - 26 June 2017Satoru Nishikawa - Evidence informed policy making - 26 June 2017
Satoru Nishikawa - Evidence informed policy making - 26 June 2017OECD Governance
 
History ppt on tsunami
History ppt on tsunami History ppt on tsunami
History ppt on tsunami mudit1102
 
Role of JMA issuing warning and role of broadcasters in wellness messaging
Role of JMA issuing warning and role of broadcasters in wellness messagingRole of JMA issuing warning and role of broadcasters in wellness messaging
Role of JMA issuing warning and role of broadcasters in wellness messagingABU_DRRGroup
 
TsunamiStudent’s NameCourseInstructorDate.docx
TsunamiStudent’s NameCourseInstructorDate.docxTsunamiStudent’s NameCourseInstructorDate.docx
TsunamiStudent’s NameCourseInstructorDate.docxwillcoxjanay
 
2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni
2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni
2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi niK 38
 

Similar to OECD Workshop: Learning from crises and fostering the continuous improvement of risk governance and management - Prof. Yoichi Ono (20)

Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx
 Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx
Iranian J Publ Health, Vol. 41, No.6, Jun 2012, pp.12-20 .docx
 
The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...
The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...
The Realistic Evacuation Behavior from Tsunami and Fire in the Great East Jap...
 
Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...
Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...
Towards Implementation of Disaster Reduction Measures to Build Disaster Resi...
 
2011 Tohoku Earthquake and Tsunami Japan
2011 Tohoku Earthquake and Tsunami Japan2011 Tohoku Earthquake and Tsunami Japan
2011 Tohoku Earthquake and Tsunami Japan
 
3. ERAKV 2nd Seminar-Investment
3. ERAKV 2nd Seminar-Investment 3. ERAKV 2nd Seminar-Investment
3. ERAKV 2nd Seminar-Investment
 
UHS DRRMO Awareness program 2015
UHS DRRMO Awareness program 2015UHS DRRMO Awareness program 2015
UHS DRRMO Awareness program 2015
 
Disaster Mitigation Social Resilience: From Humans to Infrastructure
Disaster Mitigation Social Resilience: From Humans to InfrastructureDisaster Mitigation Social Resilience: From Humans to Infrastructure
Disaster Mitigation Social Resilience: From Humans to Infrastructure
 
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
ISCRAM 2013: Lessons Learnt from the 2011 Great East Japan Earthquake and Tsu...
 
Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.Day 2 for 2018 copyright ver.
Day 2 for 2018 copyright ver.
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Tsunami
Tsunami Tsunami
Tsunami
 
Satoru Nishikawa - Evidence informed policy making - 26 June 2017
Satoru Nishikawa - Evidence informed policy making - 26 June 2017Satoru Nishikawa - Evidence informed policy making - 26 June 2017
Satoru Nishikawa - Evidence informed policy making - 26 June 2017
 
History ppt on tsunami
History ppt on tsunami History ppt on tsunami
History ppt on tsunami
 
Earthquakes [autosaved]
Earthquakes [autosaved]Earthquakes [autosaved]
Earthquakes [autosaved]
 
Role of JMA issuing warning and role of broadcasters in wellness messaging
Role of JMA issuing warning and role of broadcasters in wellness messagingRole of JMA issuing warning and role of broadcasters in wellness messaging
Role of JMA issuing warning and role of broadcasters in wellness messaging
 
TsunamiStudent’s NameCourseInstructorDate.docx
TsunamiStudent’s NameCourseInstructorDate.docxTsunamiStudent’s NameCourseInstructorDate.docx
TsunamiStudent’s NameCourseInstructorDate.docx
 
Indian ocean tsunami ,2004
Indian ocean tsunami ,2004Indian ocean tsunami ,2004
Indian ocean tsunami ,2004
 
Indian ocean tsunami
Indian ocean tsunamiIndian ocean tsunami
Indian ocean tsunami
 
2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni
2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni
2011 tōhoku earthquake and tsunami rwc work 東日本大震災 higashi ni
 
D045071825
D045071825D045071825
D045071825
 

More from OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators SlidesOECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmOECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsOECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfOECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxOECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxOECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxOECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxOECD Governance
 

More from OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Recently uploaded

Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.ppt13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.pptsilvialandin2
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 

Recently uploaded (20)

Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Model Town (Delhi)  9953330565 Escorts, Call Girls ServicesModel Town (Delhi)  9953330565 Escorts, Call Girls Services
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.ppt13875446-Ballistic Missile Trajectories.ppt
13875446-Ballistic Missile Trajectories.ppt
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 

OECD Workshop: Learning from crises and fostering the continuous improvement of risk governance and management - Prof. Yoichi Ono

  • 1. 1 Special focus on the lessons from the Great East Japan Earthquake and Tsunami Yuichi Ono Assistant Director and Professor, International Research Institute of Disaster Science (IRIDeS) Tohoku University, Sendai, Japan
  • 2. Thank OECD countries for providing warm support to disaster victims and affected areas in Tohoku
  • 3. Introduction It has been more than three and a half years since the 11 March 2001 Japan Earthquake and Tsunami Focus: Review policies and changes
  • 4. In 1896, 22,000 people were killed by tsunami in Tohoku (Death rate: 40%) In 2011, nearly 20,000 people were killed by tsunami in Tohoku (Death rate: 4%)
  • 5. Significant decrease in the death rate: 40 to 4 % in 100 years Positive factors: - Increased capacity to cope with the disaster (both structural and non-structural measures) Negative factors: - Memory loss, more exposure to the risk with increased population - Dependency on modern technology
  • 6. Changes in DRR related policy 〔Basic Acts〕 1. Disaster Countermeasures Basic Act (1961) 2. Act on Prevention of Marine Pollution and Maritime Disaster (1970) 3. Act on Disaster Prevention in Petroleum Industrial Complexes and other Petroleum Facilities (1975) 4. Act on Special Measures for Large-scale Earthquakes (1978) 5. Act on Special Measures for Nuclear Disasters (1999) 6. Act on Special Measures for Promotion of Tonankai and Nankai Earthquake Disaster Management (2002) 7. Act on Special Measures for Promotion of Disaster Management for Trench- type Earthquakes in the Vicinity of the Japan and Chishima Trenches (2004) Disaster Countermeasures Basic Act was revised (June 2013)
  • 7. 7  Capacity building for quickly responding to a large-scale disaster which affects large areas  Smooth and safe evacuation of the residents  An improvement in protecting disaster victims  Strengthening of the measure for the disaster prevention from ordinal time Key points in revision of the Disaster Countermeasures Basic Act
  • 8. 8
  • 9. 9 The Reconstruction Agency officially debuted on February 10, 2012, following the previous Headquarters of Reconstruction, which was set up in June 2011. The Reconstruction Agency was created under the Act Establishing the Reconstruction Agency and is planned to operate for 10 years. This agency is primarily responsible for coordinating various ministries’ budgetary and reconstruction procedures so that reconstruction efforts in all localities can proceed in a timely manner.
  • 10. 〔Disaster Prevention and Preparedness〕 1. Erosion Control Act (1897) 2. Building Standard Law (1950) 3. Forest Act (1951) 4. Act on Temporary Measures for Disaster Prevention and Development of Special Land Areas (1952) 5. Meteorological Services Act (1952) 6. Seashore Act (1956) 7. Landslide Prevention Act (1958) 8. Act on Special Measures for Disaster Prevention in Typhoon-prone Areas (1958) 9. Act on Special Measures for Heavy Snowfall Areas (1962) 10. River Act (1964) 11. Act on Prevention of Steep Slope Collapse Disaster (1969) 12. Act on Special Measures for Active Volcanoes (1973) 13. Act on Special Financial Measures for Urgent Earthquake Countermeasure Improvement Projects in Areas for Intensified Measures (1980) 14. Act on Special Measures for Earthquake Disaster Countermeasures (1995) 15. Act on Promotion of the Earthquake-proof Retrofit of Buildings (1995) 16. Act on Promotion of Disaster Resilience Improvement in Densely Inhabited Areas (1997) 17. Act on Promotion of Sediment Disaster Countermeasures for Sediment Disaster Prone Areas (2000) 18. Specified Urban River Inundation Countermeasures Act (2003)
  • 11. 11 After the GEJE, the Japanese government actively established the new acts and amended existing acts. - Two new acts for tsunami disaster management (June and December 2011) - A revision of the Act on Special Measures concerning Urban Regeneration (April 2012) - A revision of the Disaster Countermeasures Basic Act (June 2012 and June 2013) - A new act concerning the reconstruction from major disasters (June 2013) - A new act of countermeasures for the Tokyo Inland Earthquake (November 2013) -A fundamental revision of an act for promotion of countermeasures for the Nankai Trough Earthquake (November 2013) - A new basic act of national resilience for disaster
  • 12. 12 Dedicated and Adequate Resources for Disaster Management in Japan Helping each other: Nation-wide assistance
  • 14. 14 Why earthquake damages were reduced during the 11 March 2011 Disaster?
  • 15. 15 Accommodation issues of disaster victims for a long time
  • 16. 16 Relocation Regional Urban Recovery Types Proposed after the 2011 Great East Japan Earthquake and Tsunami
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21 Change of Housing Location in Hongo, Touni Village, Iwate Pref. (1948–2010) After the 1933 Killer Tsunami, most people relocated to higher ground, but they gradually returned --- Exposure to tsunami risks
  • 22. 22 Do not build houses in lower areas (a stone monument in Rikuzentakata built in 1935) Photo: Yuichi Ono
  • 23. 23 The Education Sector Education + self-action with flexible thoughts
  • 24. 24 Frequent drills at school and communities
  • 25. 25 Ancient Japanese words have might have hidden meanings: Kama-: tsunami eaten beaches e.g. Kamaishi, Shiogama, Kamakura Nami-/Namiita Wata/watari- Ona Suka Aka/Ake: Water
  • 26. 26 Name of places - e.g. funakoshi (boat crossing over to the other beach): two neighboring beaches became one by tsunami Funakoshi, Yamada-machi, Iwate Pref
  • 27. Efforts in the 19th century 27 Tsunami Recovery in Wakayama A great leader Education and awareness First tsunami levee in the world?
  • 28. 28 He saved the lives of many of his fellow villagers of Hiro, Kii Province (current Hirogawa, Wakayama), when a massive tsunami struck the Kii Peninsula in 1854. He set fire to stacks of rice sheaves as landmarks to guide villagers to safety. Lafcadio Hearn wrote a story about him in Gleanings in Buddha-Fields: Studies of Hand and Soul in the Far East (1897), called "Inamura no Hi: The burning rice fields". The story chronicled Goryo's heroism and accounts of his efforts were also introduced into Japanese textbooks. Hamaguchi participated in various recovery efforts in Hiro, including the construction of a sea wall more than 600m long, 20m wide and 5 m high, which minimized damage from tsunamis in later years. He spent his own money on the project the equivalent of 1,572 ryō (gold coins) and hired a total of 56,736 villagers to work on it. In 2012, a private housing firm, Ichijo Co., Ltd.(Ichijo Komuten) --- offered USD 300M to construct a sea wall in Hamamatsu, Shizuoka Pref. (17.5 km) Goryo Hamaguchi, 1820-1885 Inamuranohi museum Photo taken by Yuichi Ono Historical tsunami warning and recovery efforts
  • 29. 29 Historical tsunami warning and recovery efforts 1854 Ansei Tsunami – description of Hiromura Village Inamuranohi museum Photo taken by Yuichi Ono
  • 30. 30 Historical tsunami warning and recovery efforts Hiromura sea wall built by Hamaguchi, 1855-58 (3 years and 10 months) Height 5 m, width 20 m, length 600 m Photo: Yuichi Ono Photo: Yuichi Ono
  • 31. 31 Tsunami Warning System First of all, tsunami warning system operated by JMA saved many lives on the occasion of the 11 March 2011 Japan Tsunami. If no EWS, the number of deaths would have been recorded with one more digit.
  • 32. 32 Tsunami Warning System The JMA’s already sophisticated TWS was further revised in March 2013 after a series of consultations What happened on tsunami EWS on the day?
  • 33. 33 Tsunami Warning System It is easy to criticize things after they occur. -Initial estimated tsunami heights based on the early evaluations of earthquake magnitude were significantly underestimated. --- The EQ rapturing continued for 3 minutes and the actual magnitude had not been observed. Lessons: Do not depend only on the initial magnitude of EQ as a large one has significant duration Technical modifications in observation: A new method to evaluate a large EQ magnitude Based on the analysis on the EQ wave length Pay more respect on the Ocean bottom tsunamimeters da and GPS wave gauges data Source: JMA Source: JMA
  • 34. 34 Tsunami Warning System Issuance of tsunami warning Before Now (after March 2013) Source: JMA Source: JMA
  • 35. 35 Tsunami Warning System Issuance of tsunami warning If not technically sure on the estimated tsunami heights, JMA would not use numerical values but words such as enormous/gigantic (higher than 3m), high (1-3 meters), or none if less than 1 meter. If confident, JMA will use the above-displayed categorized tsunami heights Note that the announcement will be made at the maximum value in each category Source: JMA
  • 36. 36 Tsunami Warning System Dissemination of warning Estimated time of tsunami arrival with estimated height per location will be announced by JMA, Source JMA
  • 37. Local FM Radio Station at Rikuzentakata 37 Photo: Yuichi Ono
  • 38. 38 - Only 30% of people evacuated quickly. Why not others? - The initial estimate of tsunami height announced by JMA was not high enough - The corrected information soon after did not reach people due to electric failures - The magnitude of the earthquake (9.0) was beyond imagination even for seismologists - The earthquake made a gigantic electronic failures and most people depended tsunami warning on TV - Many elderly people and disabled people could/did not evacuate on time. - Some of the designated evacuation sites became under water (tsunami risk map) - Past tsunami experiences might have hindered a decision making process - New comers to the coastal area did not think of tsunami risk - Some people took risks to reach their family members, friends, colleagues, and neighbors Why so many people were killed?
  • 39. 39 Population data in Minami-sanriku as of February 2011 17,666 940 5.3% 789 112 14.0% What are these numbers? Source: 障がい者制度改革推進会議
  • 40. 40 Casualties, by Age, due to the 2011Great East Japan Earthquake and Tsunami and the 1995 Great Kobe Earthquake
  • 43. 43 Evacuation Evacuation by cars? GPS records analysis to identify what happened on 11 March 2011 Always some people are left out from evacuation practices How can we motivate those? Disabled people? Supporters take high Risks too. Critical infra and vulnerable people to be located in safer area as much as possible Structural measures would help especially immediately near the coast (e.g. Shizuoka Pref. Where tsunami might come less than 1 minute after the EQ)
  • 44. Early warning system and evacuation would save lives but not protect properties  Structural measures
  • 45. 45 A sea wall in Ohtanaba, Fudai-village, Iwate Pref. Length 155 m, height 15.5 m, Approx. USD 0.6M Right side: beach Built by Iwate Pref. but strong call by the Village Mayor in 1967 Photo: Yuichi Ono
  • 46. 46 Kotoku Wamura, 1909-1997 Mayor of Fudai Village - Insisted on building 15m high sea wall because he heard that th 1896 Tsunami was with 14m high - Iwate Pref. supported 100 people working in the port area were all saved during the 11 March 2011 Tsunami
  • 48. Source: Takahashi, Port and Airport Research Institute of Japan Level 1 Tsunami Level 2 Tsunami
  • 49. Investment in research – Japanese tradition (planting a tree with proper cares) The trees would produce many fruits later for a long time 49
  • 50. 50
  • 51. 51 IRIDeS created in the process of Build Back Better - Established in April 2012 as a response to the disaster - 36 areas of research under 7 divisions - More than 70 full-time researchers (total more than 100) - One of the largest and most comprehensive DRM research institutes in the world - Secured 10-year budget by the Government with USD 100 Million Research institutes, Governments, and International Organizations such as UN Private Sector Affected local governments International Research Institute of Disaster Science(IRIDS) Reconstruction of disaster prevention and reduction technologies based on reality of the 2011 off the Pacific coast of Tohoku earthquake and tsunami disaster Construction of “Disaster area supportology” in the event of a disaster Advancement of anti-hazard performance and upgrading for multiple-fail-safe in urban areas as disaster recovery projects Establishment of disaster medical relief service system of responding appropriately to wide area massive disaster Rehabilitation regional and urban and creating disaster digital archive pass for the next generation Major Research Issues Research on mechanism of mega earthquake and tsunami generation and developing of next-generation of early detection technology of tsunamis
  • 52. Use of science for policy making in disaster recovery in case of Sendai City Prof. Shunichi Koshimura’s work
  • 53. Damage in Sendai city 53 In Sendai Exposed population 29,962 Death Toll 704 (2.4% of exposed population) Missing 32 Injured 2,269 Completely collapsed 29,469 Severely damaged 26,064 Partial damaged 78,086 Minor damaged 115,949 Fatality/Missing/Insured Structural damage
  • 54. The 2011 Tsunami in Sendai 54
  • 55. 55 Mapping of flow depth
  • 56. 56 Mapping of building damage
  • 57. Structural vulnerability Tsunami fragility curve 57
  • 58. Structural vulnerability Over 2 m tsunami flow depth potentially causes severe damage on houses or may devastate. Over 6 m tsunami flow depth will cause total devastation. Implication to land use management and tsunami risk evaluation. 58
  • 59. Sendai city’s reconstruction plan Multiple protection to minimize losses 59 Nature (2012)
  • 60. Elevated prefectural road +6m Coastal Levee 7.2 m Final plan in Sendai city 60 Coastal Levee 4.4 m
  • 61. How the multiple protection works … 61
  • 62. The prefectural road (10 km) to be elevated Height : 6m, Width 30 m 12 billion JPY (120 million $) 62
  • 63. Sendai city’s reconstruction plan Tide : MHW Sea wall : 7.2 m Road level : 6 m Flow depth Flow depth of less than 2 m at the west of the raised road. The sea wall and raised road increase the area of more surviving possibility. 63
  • 64. 64 A special way to support recovery efforts By hosting the Third UN World Conference on Disaster Risk Reduction, 14-18 March 2015 (Sendai) - Parts of our campus will be used as a venue Our key messages to the Post-HFA are: - Build back better (for resilient recovery) to increase DRR capacity for not to repeat the same disaster - Importance of constant investment on DRR (Japan: 1% of GDP since the late 1950s) - Governance, including the development of national disaster statistics by NDMOs - Support the proposed numerical targets in DRR in conjunction with the SDGs - Integration of DRR science into national and local level policy
  • 65. 65 Slide show: photos from tsunami-affected areas
  • 76. 76 Disaster at Disaster Management Center of Minamisanriku, Miyagi Pref. Photo: Yuichi Ono
  • 77. 77 Minamisanriku Temporal City Office and Evacuation Center Photo: Yuichi Ono
  • 80. 80 A first restaurant built after the tsunami in Minami-sanriku Recovery of local shops and restaurants does matter Photo: Yuichi Ono
  • 81. 81 A volunteer center combined with a local shop in Rikuzentakata Photo: Yuichi Ono
  • 82. 82 Aid Takata , an NPO in Rikuzentakata is having a meeting to support affected communi NGOs, NPOs, and local organizations do matter Photo: Yuichi Ono
  • 83. 83 Public (prefectural) hospital in Rikuzentakata Photo: Yuichi Ono
  • 84. 84 Temporally relocated but operational now Photo: Yuichi Ono
  • 85. 85 ‘Capital Hotel 1000’ a 7-story building hotel near the coast in Rikuzentakata was damag up to the 4th floor --- to be moved to 700m inland on the top of the hill supported by Government ’s assistance and a private recovery fund (USD 8.6M) Public accommodation does matter Photo: Yuichi Ono
  • 86. 86 A bridge near the coast, Minamisanriku, Miyagi Pref. Photo: Yuichi Ono
  • 87. 87 Sendai Port Photo: Yuichi Ono
  • 88. 88 A railroad track and its bridge Photo: Yuichi Ono
  • 89. 89 JR Rikuzentakata Station (operated by the East Japan Railway Company) Public Transportation does matter Photo: Yuichi Ono
  • 90. 90 --- recovered as the Bus Rapid Transit (BRT) for now
  • 92. 92 Education Sector Elementary school in Arahama, Sendai Photo: Yuichi Ono
  • 93. 93 Education Sector Elementary school in Arahama, Sendai Photo: Yuichi Ono
  • 94. 94 Recovery at Tohoku University Photo: Yuichi Ono
  • 95. 95 Demolishing the damaged building of the Civil Engineer’s Department at Tohoku Unive - Nobody was hurt from the quake itself Photo: Yuichi Ono
  • 96. 96 We welcome you to the 3rd World Conference on Disaster Reduction in Japan, 2015 Photo: Yuichi Ono