Naranpura Sports Complex
MCEM | CEPT University 1
Topic name
Site Layout Critics
Naranpura Sports Complex
MCEM | CEPT University
Work Distribution
2
Sr. No. Work distribution Name
1 Site Quality Control Laboratory Layout (AutoCAD), Quality Management Plan at site, Areas of improvement Jaivik Gandhi
2 Quality Organization structure, List of equipments at Quality Lab, Areas of improvement Niyati Shah
3
Calibration Schedule of Equipment, Document Management at Quality Control Laboratory, Proposed Site Quality
Control Laboratory Layout (AutoCAD), Areas of improvement
Nisarg Patel
4
Clauses in Tender Document related to Quality Control Laboratory, List of Tests to be performed (Name of Test,
Areas of improvement Process, Frequency, Relevant IS code)
Vishal Pandey
Naranpura Sports Complex
MCEM | CEPT University 3
Name Designation Company
Anant Maralkar Quality Manager PSP Projects Pvt. Ltd.
Hasmukh Patel Project Manager PSP Projects Pvt. Ltd.
Krishna Gopi Shetty Deputy Planning Manager PSP Projects Pvt. Ltd.
Abhimanyu Tiwari Project Manager
HCP Design, Planning, and Management
Pvt. Ltd.
References
Naranpura Sports Complex
MCEM | CEPT University
Location of the QC lab
QC Lab
Batching
Plant
Naranpura Sports Complex
MCEM | CEPT University
Layout of the QC lab
Naranpura Sports Complex
MCEM | CEPT University
Photos of QC lab
Naranpura Sports Complex
MCEM | CEPT University
Photos of QC lab
Sieve Shaker Aggregate Impact Test
Apparatus
Weighing Balance
Slump Cone Test Apparatus
Naranpura Sports Complex
MCEM | CEPT University
Quality Management Plan
 Before the execution phase, a quality management plan is created by the
contractor as per the requirements of the client and it is reviewed by the
PMC.
Quality Management Plan
 Quality Planning
 Quality Control
 Quality Assurance
 Quality Improvement
 All activities of the overall management function set the quality policy,
quality standards, and responsibilities and implement them through
activities like quality planning, quality control, quality assurance, and
quality improvement.
Naranpura Sports Complex
MCEM | CEPT University
As per the contract, 85 % of the test will be performed onsite lab, 13tesof
tests will be performed in the third-party lab, and 2 % of the tests will be
performed in GERI.
Quality Management Plan
Quality Assurance Plan
Objectives
• Understanding the project requirements
• Assignment of responsibilities with absolute clarity
• Establishing documentation processes and
systems
Naranpura Sports Complex
MCEM | CEPT University
Quality Management Plan
PSP PROJECTS LTD.
ITEM CIVIL WORKS CLIENT: AHMEDABAD MUNICIPAL CORPORATION
NAME OF WORK:
CONSTRUCTION OF SPORTS COMPLEX AT
NARANPURA, AHMEDABAD
CONSULTANT:
HCP DESIGN, PLANNING AND MANAGEMENT PVT.
LTD.
Doc. No. : PSP/QAP/01 Revision: 02
Dated: 21-06-2022
CONTRACTOR: PSP PROJECTS LTD.
Sr.
No.
Activity Nature of check Type of check
Quantum of
check
Reference
Doc
Acceptance
Standard
Formate of
record
Inspection Authority
Remar
ks
Perfor
mer
PSP
Client/Coun
sultant
1
Coarse
Aggregate
Specific gravity Lab test Once per
sources/Chang
es of sources
IS 2386(P-3),
IS 4926
Mix design
report
Report
Bulk density Lab test
IS 2386(P-3),
IS 4926
Mix design
report
Report
Moisture Content Lab test Daily once
IS 2386(P-3),
IS 4926
IS 2386(P-3) Report
Acid and alkali reactivity Lab test
Once per
source
IS 2386(P-7),
IS 4926
IS 456 Report
Soundness Lab test
Once per
source
IS 2386(P-5),
IS 4926
IS 383 Report
water absorption Lab test
Once per
source
IS 2386(P-3),
IS 4926
IS 456 Report
2 Water
Ensure that water from all sources is
potable as per the standard before use.
The following tests should be checked:
PH, Chlorides, Organic: matter,
Inorganic matter, Sulphate(mg/l, TDS)
Lab test
Once per
source
Tech
spec/IS-456
Report
3 Handover
Ensure that all the works as per the
contract scope is completed
Inspection All
Tech
spec/Drgs
Drgs Report
Naranpura Sports Complex
MCEM | CEPT University
Organization Structure
11
Designation Quality Engineer
Nos 2
Work Experience 8 years
Salary (INR) 60,000/-
Contractual Requirements Organization Structure
Naranpura Sports Complex
MCEM | CEPT University
Roles and Responsibilities
12
• Preparation of Quality Management Plan.
• Preparation of a Quality Assurance Plan for the
project.
• Ensuring the work is carried out as per the quality
plan prepared in accordance with ISO: 9001-2015.
Gives final approval for setting up a QA/QC lab at
the site along with ensuring equipment is
calibrated on a regular basis
• Establishing a proper documentation system.
• Ensuring quality control on construction activities.
• Ensuring that all the test results for the
construction material are properly recorded.
• Ensuring that all the tests are carried out in
accordance with relevant IS codes.
• Closing NCR with corrective measures and
carrying out the root cause analysis for the NCR.
• ─Preparation of monthly quality report
Senior Quality Engineer
Quality Manager
• Setting up of QA/QC Lab
• To witness or review external and onsite material
testing.
• To inspect ongoing construction site activities at
the site.
• Maintaining the test records.
Technician
• Collection of sample and test specimen preparation
• Conducting laboratory as well as field tests under
the supervision of a senior engineer.
• Maintaining records as per the guidance of the
senior engineer.
T1-Document controller, T2-Concrete cube test
specimen preparation as well as conducting test, T3-
Field Test ,T4-Technician (night shift)
Naranpura Sports Complex
MCEM | CEPT University
List of Equipment
13
Sr.No Items
Quantity as per
contractual
requirements
Actual
Quantity
Aggregate Testing
1 Standard Sieves 2 set 1 set
a
Set of coarse sieves 30 cm dia (GI sheet
frames) with
aperture size. (40 mm, 25 mm, 20 mm, 16
mm, 17.5mm, 10 mm, 4.75 mm all with lid
and pan)
2 Nos.
1 No.
b Motorised sieve shaker for the above sieves 2 set 1 No.
b-1
Set of fine sieves 20 cm dia of brass with
aperture size (4.75 mm, 2.36 mm, 1.18
mm,600 mic, 300 mic,150 mic, 75 mic all with
lid and Pan)
2 Nos.
1 No.
2 Flakiness & Elongation index screen 2 Nos. 1 No.
3 Riffle sample divider slot width 25mm 2 Nos. ─
4 Los Angeles abrasion Testing Machine 1 Nos. ─
5
Bulk Density and voids of Aggregates
cylindrical metal measures with capacity (3
ltr, 10 ltr, 15 ltr or 20 ltr)
2 Nos. each 1 Nos. each
6
Density basket of galvanized wire height 20
cm
2 Nos. ─
7 Pycnometer 1000 ml capacity with Brass 2 Nos. 1 No.
8
Aggregate impact value apparatus with
automatic blow counter
2 Nos.
1 No (Manual
10
Hot – plate 1000 to 2000 wells with regulator
cum switch
2 Nos.
1 No.
11 Drying pans (Frying pans) 4 Nos. 2 Nos..
12 China clay dishes with dia 10 cm & 15 cm 2 Nos./each 2 Nos./each
13 Watch glasses for above 10 cm & 15 cm 4 Nos./each 2 Nos./each
Concrete Testing
1. Sieve Brushes 4 Nos. 1 Nos
2. Concrete cube moulds 15x15x15cm Min. 100nos 300 Nos
3. Ultrasonic Test Equipment 2 Nos. ─
4. Pruning Rods 2 Kg weight length 40 cm and
ramming face 25 mm2
8 Nos. 4 Nos.
5. Extra Bottom plates for 15 cm cube mould 3 Nos. 6 Nos.
6. Standard Vibration Table for gauging the cubes 1 Nos. ─
7. Compression Testing Machine with Electricity
cum manually operated tamping unit with
pressure guage preferable 30 cm dia, 0-150
tonne in 1
tonne divisions. Sensitivity 0.5 tonne.
2 Nos. 1 No.
8. 1 Air content measuring apparatus 2 Nos. ─
9. Slump test Apparatus complete 4 Nos. 4 Nos.
10. Pocket concrete penetrometer 0 to 50kg/
sq.cm
2 Nos. ─
11. Baby Mixer Machine 2 Nos. ─
12. G.I. Tray approx 1mx1m with sides 10 cm high
for hand mixing of concrete
4 Nos. ─
13. Concrete temperature measuring thermometer
with Brass protection sheath 0-100 degree
centigrade
6 Nos. 2 Nos.
Cement Testing
1. Mortar Cube Moulds 7.07x7.07x7.07 cm 20 Nos. 15 Nos.
2. Standard sand Grade I,II,III 50 kgs./each 50 kgs./each
3. Mortar Cube vibrator 2 Nos. 1 No.
4. Vicate needle apparatus Computer 2 Nos. ─
5. Blaine’s Apparatus 2 Nos. ─
Sr.No Items
Quantity as per
contractual
requirements
Actual Quantity
Naranpura Sports Complex
MCEM | CEPT University
List of Equipments
14
Weighting Equipments
1. Physical Balance Capacity 200 gms with weight
pony
2 Nos.
1 No.
2. Dial type spring balance preferable with zero
correction knob capacity 100 kgs reading to ½
kg.
3 Nos.
2 Nos.
3. Counter scale capacity 1 kg and 10 kg 1 Nos./ each 1 No
4. Weighing platform capacity 100 kg 1 No ─
5. Iron Weight of 5 kg, 2 kg, 1 kg, 500 gm, 200 gm,
100 gm
2 Nos./each
2 No./each
6. Brass Weight of 50 gm, 20 gm, 10 gm, 5 gm, 2
gm, 1 gm
2 Nos./each ─
Water Measuring
1. 5 litres, 2 litres, 1 litre, ½ litre 5 Nos./each 2 Nos./each
Glass and Plastic Ware
1. Measuring cylinder TPX or Poly propylene
capacity 100 ml, 500 ml, 250 ml, 100 ml 6 Nos./each
2 Nos./each
2. Pyrex, corning or Borosil beakers with cover
capacity 500 ml, 200 ml, 50 ml 6 Nos./each
2 Nos./each
3. Wash Bottles capacity 500 ml 6 Nos./each 2 No.
4. Thermometers 1-100 degree centigrades/ max.
and Min/ Dry and wet with table 2 Nos.
-
Laboratory Tools
1. Hammer 1lb 2 Nos. 2 Nos.
2. Rubber Hammer 2 Nos. 2 Nos.
3. Hacksaw with 6 blades 2 Nos. 1 Nos.
4. Measuring tape 2 mtr 4 Nos. 3 Nos.
5. Depth gauge 20cm 2 Nos. 1 Nos.
6. Steel Foot Plate 2 Nos. 1 Nos.
7. Vernier Calliper 2 Nos. 1 Nos.
Miscellaneous Items
1. Trowels made from saw blade, 3 mm thick
16x10cm wooden handle
6 Nos.
10 Nos.
2. Showels & Spade 6 Nos./each 5 Nos./each
3. Steel plates 5 mm thick 75x75 cm 3 Nos. 2 Nos.
4. Plastic or G.I. Buckets 15 ltr, 10 ltr, 5 ltr 3 Nos. 7 Nos.
5. Wheel Barrow 3 Nos. 5 Nos.
Naranpura Sports Complex
MCEM | CEPT University
Comparison
15
CPWD Requirements PSP Projects Ltd
Weighing Balance
50 kg capacity electronic type ─
5 to 20 kg capacity electronic type √
5 kg capacity electronic type ─
2 kg capacity electronic type ─
500 kg capacity electronic type √
Chemical Balance 100 gm capacity √
Oven Electrically operated, thermostatically controlled
(including thermometer)
√
G.I IS Sieves : as per IS 460 (Part-I )
I.S. Sieves- 450 mm internal dia, of size sieve sets – 100mm,
80mm, 63mm, 40mm,
20mm, 16mm, 12.5mm, 10mm, 4.75mm, 2.36mm
complete with lid and pan.
√
I.S. Sieves- 450 mm internal dia, of size sieve sets – 100mm,
80mm, 63mm, 40mm,
20mm, 16mm, 12.5mm, 10mm, 4.75mm, 2.36mm
complete with lid and pan.
√
Sieve shaker capable of shaking 200mm and 300mm,
450mm dia sieves, electrically operated
with timer (time switch) assembly.
√
Stop watches 1/5 sec accuracy √
Graduated measuring cylinders √
Gauging Trowel
√
CPWD Requirements PSP Projects Ltd
High frequency mortar cube Vibrator for cement testing √
Cement mortar moulds sizes ( 70.6 x 70.6 x 70.6 mm) √
Soundness testing apparatus for cement (Le-Chatelier) ─
Vicat needle apparatus with plunger for cement setting time testing
as per IS 269
─
Mortar cube testing machine
√
Flakiness and Elongation index test apparatus √
Aggregate impact test apparatus √
Apparatus for determination of specific gravity of fine and coarse
aggregate
√
3 liter, 15 liter and 30 litercylinder as per IS 2386 (Part-3) for
checking bulk density of aggregate with tamping rod.
√
Apparatus for slump test - Slump cone, Steel plate, Tamping rod,
Steel scale and Scoop.
√
1000 – 2000 KN capacity Compression and Flexural strength testing
machine, electrically
cum manually operated with additional dial for Flexural strength
testing.
─
Concrete mixer power driven – 1 cuft capacity ─
Steel cubes / molds √
Le-Chatelier flask ─
Variable frequency and amplitude Vibrating table size 1meter x
1meter as per relevant Standard.
─
Thermometers √
Naranpura Sports Complex
MCEM | CEPT University
• There is no separate area for the laboratory. The laboratory and QA/QC
staff office are in the same place.
• Due to a lack of necessary equipment as per the client’s requirement, a
few tests which could have been done on-site have to be done at third-
party laboratories.
• Lack of temperature-controlled conditions.
• Lack of quality control personnel on-site.
Areas of Improvement
16

More Related Content

Similar to MCEM-S23-JT-EX03-GD (1).pptx

Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineIEI GSC
 
InspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdfInspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdfRiSovannaphumi
 
Stack Monitoring Kit.pdf
Stack Monitoring Kit.pdfStack Monitoring Kit.pdf
Stack Monitoring Kit.pdfKDMGlobal
 
Focus on Materials and Testing
Focus on Materials and TestingFocus on Materials and Testing
Focus on Materials and TestingEWI
 
Nabl certificate for calibration
Nabl certificate for calibrationNabl certificate for calibration
Nabl certificate for calibrationmianagpur
 
Quality Control- Timber & Structural Steel
Quality Control- Timber & Structural SteelQuality Control- Timber & Structural Steel
Quality Control- Timber & Structural SteelPawan Kumar
 
Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...
Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...
Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...Presto Group
 
Design and development of lateral flow assays for field use
Design and development of lateral flow assays for field useDesign and development of lateral flow assays for field use
Design and development of lateral flow assays for field useBrendan O'Farrell
 
PET Technologies Presentation 2018
PET Technologies Presentation 2018PET Technologies Presentation 2018
PET Technologies Presentation 2018PET Technologies
 
Ed presntation
Ed presntationEd presntation
Ed presntationAnsh Saini
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jayant Singh
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jayant Singh
 
karthick resume
karthick resumekarthick resume
karthick resumekarthick N
 
Aim condition assessment (2)
Aim condition assessment (2)Aim condition assessment (2)
Aim condition assessment (2)Akshay Gottlieb
 

Similar to MCEM-S23-JT-EX03-GD (1).pptx (20)

Tecnología del Concreto
Tecnología del ConcretoTecnología del Concreto
Tecnología del Concreto
 
Alliage Casting
Alliage CastingAlliage Casting
Alliage Casting
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
InspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdfInspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdf
 
Stack Monitoring Kit.pdf
Stack Monitoring Kit.pdfStack Monitoring Kit.pdf
Stack Monitoring Kit.pdf
 
Focus on Materials and Testing
Focus on Materials and TestingFocus on Materials and Testing
Focus on Materials and Testing
 
Nabl certificate for calibration
Nabl certificate for calibrationNabl certificate for calibration
Nabl certificate for calibration
 
Quality Control- Timber & Structural Steel
Quality Control- Timber & Structural SteelQuality Control- Timber & Structural Steel
Quality Control- Timber & Structural Steel
 
Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...
Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...
Melt Flow Index Tester, Melt Flow Index Tester Manufacturers and Suppliers In...
 
UM docs2016
UM docs2016UM docs2016
UM docs2016
 
Salehuddin case study procurement and contract management
Salehuddin case study procurement and contract managementSalehuddin case study procurement and contract management
Salehuddin case study procurement and contract management
 
About us
About usAbout us
About us
 
Design and development of lateral flow assays for field use
Design and development of lateral flow assays for field useDesign and development of lateral flow assays for field use
Design and development of lateral flow assays for field use
 
PET Technologies Presentation 2018
PET Technologies Presentation 2018PET Technologies Presentation 2018
PET Technologies Presentation 2018
 
Ed presntation
Ed presntationEd presntation
Ed presntation
 
Nookaraju - CV
Nookaraju - CVNookaraju - CV
Nookaraju - CV
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
karthick resume
karthick resumekarthick resume
karthick resume
 
Aim condition assessment (2)
Aim condition assessment (2)Aim condition assessment (2)
Aim condition assessment (2)
 

Recently uploaded

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 

Recently uploaded (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 

MCEM-S23-JT-EX03-GD (1).pptx

  • 1. Naranpura Sports Complex MCEM | CEPT University 1 Topic name Site Layout Critics
  • 2. Naranpura Sports Complex MCEM | CEPT University Work Distribution 2 Sr. No. Work distribution Name 1 Site Quality Control Laboratory Layout (AutoCAD), Quality Management Plan at site, Areas of improvement Jaivik Gandhi 2 Quality Organization structure, List of equipments at Quality Lab, Areas of improvement Niyati Shah 3 Calibration Schedule of Equipment, Document Management at Quality Control Laboratory, Proposed Site Quality Control Laboratory Layout (AutoCAD), Areas of improvement Nisarg Patel 4 Clauses in Tender Document related to Quality Control Laboratory, List of Tests to be performed (Name of Test, Areas of improvement Process, Frequency, Relevant IS code) Vishal Pandey
  • 3. Naranpura Sports Complex MCEM | CEPT University 3 Name Designation Company Anant Maralkar Quality Manager PSP Projects Pvt. Ltd. Hasmukh Patel Project Manager PSP Projects Pvt. Ltd. Krishna Gopi Shetty Deputy Planning Manager PSP Projects Pvt. Ltd. Abhimanyu Tiwari Project Manager HCP Design, Planning, and Management Pvt. Ltd. References
  • 4. Naranpura Sports Complex MCEM | CEPT University Location of the QC lab QC Lab Batching Plant
  • 5. Naranpura Sports Complex MCEM | CEPT University Layout of the QC lab
  • 6. Naranpura Sports Complex MCEM | CEPT University Photos of QC lab
  • 7. Naranpura Sports Complex MCEM | CEPT University Photos of QC lab Sieve Shaker Aggregate Impact Test Apparatus Weighing Balance Slump Cone Test Apparatus
  • 8. Naranpura Sports Complex MCEM | CEPT University Quality Management Plan  Before the execution phase, a quality management plan is created by the contractor as per the requirements of the client and it is reviewed by the PMC. Quality Management Plan  Quality Planning  Quality Control  Quality Assurance  Quality Improvement  All activities of the overall management function set the quality policy, quality standards, and responsibilities and implement them through activities like quality planning, quality control, quality assurance, and quality improvement.
  • 9. Naranpura Sports Complex MCEM | CEPT University As per the contract, 85 % of the test will be performed onsite lab, 13tesof tests will be performed in the third-party lab, and 2 % of the tests will be performed in GERI. Quality Management Plan Quality Assurance Plan Objectives • Understanding the project requirements • Assignment of responsibilities with absolute clarity • Establishing documentation processes and systems
  • 10. Naranpura Sports Complex MCEM | CEPT University Quality Management Plan PSP PROJECTS LTD. ITEM CIVIL WORKS CLIENT: AHMEDABAD MUNICIPAL CORPORATION NAME OF WORK: CONSTRUCTION OF SPORTS COMPLEX AT NARANPURA, AHMEDABAD CONSULTANT: HCP DESIGN, PLANNING AND MANAGEMENT PVT. LTD. Doc. No. : PSP/QAP/01 Revision: 02 Dated: 21-06-2022 CONTRACTOR: PSP PROJECTS LTD. Sr. No. Activity Nature of check Type of check Quantum of check Reference Doc Acceptance Standard Formate of record Inspection Authority Remar ks Perfor mer PSP Client/Coun sultant 1 Coarse Aggregate Specific gravity Lab test Once per sources/Chang es of sources IS 2386(P-3), IS 4926 Mix design report Report Bulk density Lab test IS 2386(P-3), IS 4926 Mix design report Report Moisture Content Lab test Daily once IS 2386(P-3), IS 4926 IS 2386(P-3) Report Acid and alkali reactivity Lab test Once per source IS 2386(P-7), IS 4926 IS 456 Report Soundness Lab test Once per source IS 2386(P-5), IS 4926 IS 383 Report water absorption Lab test Once per source IS 2386(P-3), IS 4926 IS 456 Report 2 Water Ensure that water from all sources is potable as per the standard before use. The following tests should be checked: PH, Chlorides, Organic: matter, Inorganic matter, Sulphate(mg/l, TDS) Lab test Once per source Tech spec/IS-456 Report 3 Handover Ensure that all the works as per the contract scope is completed Inspection All Tech spec/Drgs Drgs Report
  • 11. Naranpura Sports Complex MCEM | CEPT University Organization Structure 11 Designation Quality Engineer Nos 2 Work Experience 8 years Salary (INR) 60,000/- Contractual Requirements Organization Structure
  • 12. Naranpura Sports Complex MCEM | CEPT University Roles and Responsibilities 12 • Preparation of Quality Management Plan. • Preparation of a Quality Assurance Plan for the project. • Ensuring the work is carried out as per the quality plan prepared in accordance with ISO: 9001-2015. Gives final approval for setting up a QA/QC lab at the site along with ensuring equipment is calibrated on a regular basis • Establishing a proper documentation system. • Ensuring quality control on construction activities. • Ensuring that all the test results for the construction material are properly recorded. • Ensuring that all the tests are carried out in accordance with relevant IS codes. • Closing NCR with corrective measures and carrying out the root cause analysis for the NCR. • ─Preparation of monthly quality report Senior Quality Engineer Quality Manager • Setting up of QA/QC Lab • To witness or review external and onsite material testing. • To inspect ongoing construction site activities at the site. • Maintaining the test records. Technician • Collection of sample and test specimen preparation • Conducting laboratory as well as field tests under the supervision of a senior engineer. • Maintaining records as per the guidance of the senior engineer. T1-Document controller, T2-Concrete cube test specimen preparation as well as conducting test, T3- Field Test ,T4-Technician (night shift)
  • 13. Naranpura Sports Complex MCEM | CEPT University List of Equipment 13 Sr.No Items Quantity as per contractual requirements Actual Quantity Aggregate Testing 1 Standard Sieves 2 set 1 set a Set of coarse sieves 30 cm dia (GI sheet frames) with aperture size. (40 mm, 25 mm, 20 mm, 16 mm, 17.5mm, 10 mm, 4.75 mm all with lid and pan) 2 Nos. 1 No. b Motorised sieve shaker for the above sieves 2 set 1 No. b-1 Set of fine sieves 20 cm dia of brass with aperture size (4.75 mm, 2.36 mm, 1.18 mm,600 mic, 300 mic,150 mic, 75 mic all with lid and Pan) 2 Nos. 1 No. 2 Flakiness & Elongation index screen 2 Nos. 1 No. 3 Riffle sample divider slot width 25mm 2 Nos. ─ 4 Los Angeles abrasion Testing Machine 1 Nos. ─ 5 Bulk Density and voids of Aggregates cylindrical metal measures with capacity (3 ltr, 10 ltr, 15 ltr or 20 ltr) 2 Nos. each 1 Nos. each 6 Density basket of galvanized wire height 20 cm 2 Nos. ─ 7 Pycnometer 1000 ml capacity with Brass 2 Nos. 1 No. 8 Aggregate impact value apparatus with automatic blow counter 2 Nos. 1 No (Manual 10 Hot – plate 1000 to 2000 wells with regulator cum switch 2 Nos. 1 No. 11 Drying pans (Frying pans) 4 Nos. 2 Nos.. 12 China clay dishes with dia 10 cm & 15 cm 2 Nos./each 2 Nos./each 13 Watch glasses for above 10 cm & 15 cm 4 Nos./each 2 Nos./each Concrete Testing 1. Sieve Brushes 4 Nos. 1 Nos 2. Concrete cube moulds 15x15x15cm Min. 100nos 300 Nos 3. Ultrasonic Test Equipment 2 Nos. ─ 4. Pruning Rods 2 Kg weight length 40 cm and ramming face 25 mm2 8 Nos. 4 Nos. 5. Extra Bottom plates for 15 cm cube mould 3 Nos. 6 Nos. 6. Standard Vibration Table for gauging the cubes 1 Nos. ─ 7. Compression Testing Machine with Electricity cum manually operated tamping unit with pressure guage preferable 30 cm dia, 0-150 tonne in 1 tonne divisions. Sensitivity 0.5 tonne. 2 Nos. 1 No. 8. 1 Air content measuring apparatus 2 Nos. ─ 9. Slump test Apparatus complete 4 Nos. 4 Nos. 10. Pocket concrete penetrometer 0 to 50kg/ sq.cm 2 Nos. ─ 11. Baby Mixer Machine 2 Nos. ─ 12. G.I. Tray approx 1mx1m with sides 10 cm high for hand mixing of concrete 4 Nos. ─ 13. Concrete temperature measuring thermometer with Brass protection sheath 0-100 degree centigrade 6 Nos. 2 Nos. Cement Testing 1. Mortar Cube Moulds 7.07x7.07x7.07 cm 20 Nos. 15 Nos. 2. Standard sand Grade I,II,III 50 kgs./each 50 kgs./each 3. Mortar Cube vibrator 2 Nos. 1 No. 4. Vicate needle apparatus Computer 2 Nos. ─ 5. Blaine’s Apparatus 2 Nos. ─ Sr.No Items Quantity as per contractual requirements Actual Quantity
  • 14. Naranpura Sports Complex MCEM | CEPT University List of Equipments 14 Weighting Equipments 1. Physical Balance Capacity 200 gms with weight pony 2 Nos. 1 No. 2. Dial type spring balance preferable with zero correction knob capacity 100 kgs reading to ½ kg. 3 Nos. 2 Nos. 3. Counter scale capacity 1 kg and 10 kg 1 Nos./ each 1 No 4. Weighing platform capacity 100 kg 1 No ─ 5. Iron Weight of 5 kg, 2 kg, 1 kg, 500 gm, 200 gm, 100 gm 2 Nos./each 2 No./each 6. Brass Weight of 50 gm, 20 gm, 10 gm, 5 gm, 2 gm, 1 gm 2 Nos./each ─ Water Measuring 1. 5 litres, 2 litres, 1 litre, ½ litre 5 Nos./each 2 Nos./each Glass and Plastic Ware 1. Measuring cylinder TPX or Poly propylene capacity 100 ml, 500 ml, 250 ml, 100 ml 6 Nos./each 2 Nos./each 2. Pyrex, corning or Borosil beakers with cover capacity 500 ml, 200 ml, 50 ml 6 Nos./each 2 Nos./each 3. Wash Bottles capacity 500 ml 6 Nos./each 2 No. 4. Thermometers 1-100 degree centigrades/ max. and Min/ Dry and wet with table 2 Nos. - Laboratory Tools 1. Hammer 1lb 2 Nos. 2 Nos. 2. Rubber Hammer 2 Nos. 2 Nos. 3. Hacksaw with 6 blades 2 Nos. 1 Nos. 4. Measuring tape 2 mtr 4 Nos. 3 Nos. 5. Depth gauge 20cm 2 Nos. 1 Nos. 6. Steel Foot Plate 2 Nos. 1 Nos. 7. Vernier Calliper 2 Nos. 1 Nos. Miscellaneous Items 1. Trowels made from saw blade, 3 mm thick 16x10cm wooden handle 6 Nos. 10 Nos. 2. Showels & Spade 6 Nos./each 5 Nos./each 3. Steel plates 5 mm thick 75x75 cm 3 Nos. 2 Nos. 4. Plastic or G.I. Buckets 15 ltr, 10 ltr, 5 ltr 3 Nos. 7 Nos. 5. Wheel Barrow 3 Nos. 5 Nos.
  • 15. Naranpura Sports Complex MCEM | CEPT University Comparison 15 CPWD Requirements PSP Projects Ltd Weighing Balance 50 kg capacity electronic type ─ 5 to 20 kg capacity electronic type √ 5 kg capacity electronic type ─ 2 kg capacity electronic type ─ 500 kg capacity electronic type √ Chemical Balance 100 gm capacity √ Oven Electrically operated, thermostatically controlled (including thermometer) √ G.I IS Sieves : as per IS 460 (Part-I ) I.S. Sieves- 450 mm internal dia, of size sieve sets – 100mm, 80mm, 63mm, 40mm, 20mm, 16mm, 12.5mm, 10mm, 4.75mm, 2.36mm complete with lid and pan. √ I.S. Sieves- 450 mm internal dia, of size sieve sets – 100mm, 80mm, 63mm, 40mm, 20mm, 16mm, 12.5mm, 10mm, 4.75mm, 2.36mm complete with lid and pan. √ Sieve shaker capable of shaking 200mm and 300mm, 450mm dia sieves, electrically operated with timer (time switch) assembly. √ Stop watches 1/5 sec accuracy √ Graduated measuring cylinders √ Gauging Trowel √ CPWD Requirements PSP Projects Ltd High frequency mortar cube Vibrator for cement testing √ Cement mortar moulds sizes ( 70.6 x 70.6 x 70.6 mm) √ Soundness testing apparatus for cement (Le-Chatelier) ─ Vicat needle apparatus with plunger for cement setting time testing as per IS 269 ─ Mortar cube testing machine √ Flakiness and Elongation index test apparatus √ Aggregate impact test apparatus √ Apparatus for determination of specific gravity of fine and coarse aggregate √ 3 liter, 15 liter and 30 litercylinder as per IS 2386 (Part-3) for checking bulk density of aggregate with tamping rod. √ Apparatus for slump test - Slump cone, Steel plate, Tamping rod, Steel scale and Scoop. √ 1000 – 2000 KN capacity Compression and Flexural strength testing machine, electrically cum manually operated with additional dial for Flexural strength testing. ─ Concrete mixer power driven – 1 cuft capacity ─ Steel cubes / molds √ Le-Chatelier flask ─ Variable frequency and amplitude Vibrating table size 1meter x 1meter as per relevant Standard. ─ Thermometers √
  • 16. Naranpura Sports Complex MCEM | CEPT University • There is no separate area for the laboratory. The laboratory and QA/QC staff office are in the same place. • Due to a lack of necessary equipment as per the client’s requirement, a few tests which could have been done on-site have to be done at third- party laboratories. • Lack of temperature-controlled conditions. • Lack of quality control personnel on-site. Areas of Improvement 16