Luriel Green Formwork System is an advance steel framing panel-prop formwork system which allows early striking operation. It provides a suitable formwork solution to most concrete structure and component and meets the general requirements of different construction methods and conditions.
With the increased emphasis on large infrastructure building and high-rise construction, the need for efficient formwork and shoring systems has grown manifold.
Today, formwork and shoring systems are integral parts in construction. It is also the foremost important trade in the reinforced concrete construction works implementation which leads and determines the smooth flow of all subsequence construction activities. With the increased emphasis on large infrastructure building and high-rise construction, the need for efficient formwork and shoring systems has grown manifold.
Luriel GREEN FORMWORK panelized slab formwork allows fast as well as safe forming operations with a systematic assembly sequence. The low weight of the panels, compact dimensions and practical design of the system components facilitate non-tiring and ergonomic working operations.
GREEN FORMWORK has been designed for standard use in constructing slabs with thicknesses up to 30 cm. GREEN FORMWORK 's range of applications extends from residential construction through to real estate construction projects.
The systematic assembly sequence and lightweight system components made of steel accelerate working operations. In addition, the possibility of early stripping with the drophead system reduces on-site material requirements.
With GREEN FORMWORK, infill areas are reduced to an absolute minimum. Furthermore, the system makes a convincing case with an extensive range of safety and logistical accessories.
A further advantage is the easy horizontal transportation of formwork materials as the small prop requirements ensure more freedom of movement under the slab formwork.
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
Green formwork system brochure.pdf
1. GREEN FORMWORK A SLAB FORMWORK
THE PROVEN STEEL PANELISED SLAB FORMWORK
WITH EARLY STRIPPING MECHANISM
Product Brochure
®
2. Content
2.In the focus
The main system components
5.System advantages
The proven steel panelised slab
formwork with early stripping
mechanism
Effortless working
Fast forming
Low on-site material requirements
12.System overview
Green Formwork at a glance
cantilever and beam details
Edition 07丨2021
Publisher
Yun Nan Luriel Shen Hien Trading Co.,Ltd.
Formwork engineering provider
Wanke feicui Binjiang phase I, Huanhu Road,
Guandu District, Kunming City, Yunnan
Province,China
Phone:+86 15166012761
lysh.nicksun@foxmail.com
http://luriel-shen-hien.com/
3. 18.Project examples
Reference projects with Green
formwork
26.Components
Green formwork system
components
Important information
All current safety regulations and guidelines
mustbe observed in those countries where our
products are used.
The photos shown in this brochure feature con-
struction sites in progress.For this reason,
safetyand anchor details in particular cannot
always beconsidered as conclusive or final.These
are subject to the risk assessment carried out by
the contractor.
In addition, computer graphics are used
which are to be understood as system
representations.Forensuring a better
understanding, these and the
detailed illustrations shown have been partially
reduced to certain aspects.The safety
installations which have possibly not been shown
in these detailed descriptions must nevertheless
still be available.The systems or items shown
might not be available in every country.
Safety instructions and load specifications are to
be strictly observed at all times.Separate
structural calculations are required for any
deviations fromthe standard design data.
The information contained herein is subject to
technical changes in the interests of
progress.Errors and typographical mistakes
reserved.
1
4. Panel Prop
The main system components
Only 3 elements for the use with early stripping
In the focus
The Green formwork panel
for standard fields measures 1.80 m x1.20 m.
The lightest weight steel frame is covered with 12 mm thick formlining.
The Prop with early stripping head
Q235 inner tube + Q345 outer tube with hot dip galvanized process on the
surface,tube thickness 3.2mm and 3mm
2
5. Infill beam
The infill beam
for standard fields is 1.80 m and 1.20m long,to provide possibility of the
compatibility for Green formwork and traditional formwork whose thick
formlining is 12mm.
3
7. 5
GREEN FORMWORK Panelized Slab Formwork
The proven steel panelized slab formwork with very
fast shuttering times
System advantages
GREEN FORMWORK panelized slab
formwork allows fast as well as safe
forming operations with a
systematic assembly sequence. The
low weight of the panels, compact
dimensions and practical design of
the system components facilitate
non-tiring and ergonomic working
operations.
With GREEN FORMWORK, infill areas
are reduced to an absolute minimum.
Furthermore, the system makes a
convincing case with an extensive
range of safety and logistical
accessories.
A further advantage is the easy hori-
zontal transportation of formwork
materials as the small prop
requirements ensure more freedom
of movement under the slab
formwork.
GREEN FORMWORK has been
designed for standard use in
constructing slabs with
thicknesses up to 30 cm. GREEN
FORMWORK 's range of
applications extends from
residential construction through to
real estate construction projects.
The systematic assembly sequence
and lightweight system components
made of steel accelerate working
operations. In addition, the possibility
of early stripping with the drophead
system reduces on-site material
requirements.
Effortless working
with light weight and easy
to handle components
Low on-site material
requirements
due to early striking with the
drophead and fast deployment
of the panels and beams in
the next storey
Easy cleaning
Through hot dip galvanized
elements, components made
of plastic, and glue sealed in
and on the gap
Fast forming
with a simple, systematic
assembly sequence and
fewer slab props
8. 6
Effortless working
Very light and easy-to-handle components
Low individual weights and
practical dimensions are distinct
advantages in daily formwork
operations with GREEN
FORMWORK . The low weight
clearly makes a noticeable
difference, among other things, in
the work performance.
With dimensions of only 180 cm x
120 cm, the panels can easily be
trans- ported on the construction site
e.g. also through door openings.
When carrying the panels, the
immediate work- ing area is always in
view which greatly reduces the risk of
tripping over.
Last but not least, as safety levels are
enhanced when working with GREEN
FORMWORK, site personnel do not
tire so quickly.
System advantages
GREEN FORMWORK heads
are equipped with a 6
directions self locking
system. Therefore, they can
be connected very quickly
and securely to the slab.
Removal of the panel is simply
a matter of hitting the early
stripping mechanism and then
taking the head down.
Panel MB1812 1800*1200
Weight: 45kg
ZB35 Prop
Weight: 23kg
9. Through the props the
workers could walk
quite easily without any
stops. Due to the no-
tripods & horizontal
brace design under this
height for most of areas. 7
10. 8
Fast forming
Simple, systematic assembly sequence with minimum slab
prop requirements
GREEN FORMWORK offers a
simple, systematic assembly
sequence and high degree of
installation safety. The
recurring procedures
accelerate work proce- dures
and handling is quickly mas-
tered even by personnel
unfamiliar with the system.
Forming of standard fields is
extremely simple with GREEN
FORMWORK : after erecting
the prop with gate brace, hang
the panels on the props and use
the erection tool to pull till the
surface of the panel is at a
horizontal position, then install
the remaining props under the
panel.
The panel is secured in position
during assemble, this means
that the GREEN FORMWORK
system provides a high level of
working safety also during
installation.
System Advantages
11. 9
System Advantages
The six directions self locking system
ensures that the stability and safety,
at the same time, the prop also
provide the room for infill beam to
meet the need of traditional
formwork users in 12mm.
And the gap between the panels
could be filled via tapes or T seam.
In this way, the one who stores the
traditional formwork could still
consume in the current or new
project instead of material waste.
9
12. 10
Low on-site material requirements
Early stripping with the drophead and fast
deployment of the panels in the next storey
The drophead facilitates early strip-
ping so that panels and main
beams are quickly made available
for sub- sequent concreting
sections.
Depending on the slab thickness and
strength of the concrete, stripping can
partly be carried out after the concrete
strength reaches 13MPa. One blow of
the hammer releases the drophead
and then remove the panels, leaving
the props to support the concrete.
Early striking minimizes on-site materi-
al requirements because many system
components can be used earlier for the
next cycle. In addition, work on the
construction site can also be better
compensated; for example, through
early stripping in bad weather or when
there is spare capacity.
System advantages
13. 11
System advantages
After early striking is finished, only the props with dropheads and
cover strips remain in place. GREEN FORMWORK panels are
available for use in the next cycle.
15. 13
System advantages
The drop panel and the area around the beam column and wall
We will use the infill beam and 12mm thickness
traditional plywood to full-fill the area.
16. 14
System overview
GREEN FORMWORK is also available with the ringlock
scaffoldings for the higher construction requirements,
Which can reach to max. 10m.
17. 15
System advantages
Project Name: Urban Village
2000 m2
Phnom Penh, Cambodia
GREEN FORMWORK is specially designed for PT slab, after at
least 200 projects all over the world, now it’s becoming the most
popular slab formwork system.
18. 16
System overview
Project Name: Urban Loft
2400 m2
Phnom Penh, Cambodia
All personals in the construction cite must obey the rules in the site
19. 17
System overview
STEP 1
Lay flat the first two props and fix the
gate braces.
Erect the props by turning the structure.
STEP 2
Hang the panel to the prop heads
swing the lower end of the panel
to position using erection tool.
STEP 3
Insert, push, strengthen
and lock in the other two props.
20. 18
Project examples
Project Name: Golden One
1000 m2
Phnom Penh, Cambodia
GREEN FORMWORK in use
Reference projects with the panelized slab formwork
30. GREEN FORMWORK Panel Slab Formwork
26
Largest size 1.8m x 1.2m,weighting 45 kg;
Bamboo plywood, duration 30 to 50 times ;
Q235 Steel frame, duration more than 5 years.
Plywood is replaceable.
With early stripping head.(B35)
Q235+Q345 steel material
Height 2.2m to 3.5m;
Inner & outerTube Thickness 3.2mm & 3mm;
With extensions, the prop can reach 5m;
For more than 5m height, high shoring system.
Hanged on the prop;
Available working with traditional formwork,
thickness 12mm;
Duration more than 3 years.
Wood is replaceable
32. Yun Nan Luriel Shen Hien Trading Co.,Ltd.
Formwork engineering provider
Wanke feicui Binjiang phase I, Huanhu Road, Guandu District,
Kunming City, Yunnan Province,China
Phone:+86 15166012761
lysh.nicksun@foxmail.com
http://luriel-shen-hien.com/
Yun Nan Luriel Shen Hien Trading Co.,Ltd. is located in Kunming, Yunnan Province, south of the
beautiful colorful clouds. It is a company that exports building formwork, scaffolding and other building
materials and chemical raw materials. Our products are mainly sold to Southeast Asia, the Middle East,
North America, all products are produced according as European and American industry standards, and
sell well overseas. At the same time, Yun Nan Luriel Shen Hien Trading Co.,Ltd. set branch offices in
Zibo, Rizhao and other places in Shandong, which can better serve the needs of customers. In line with
the spirit and concept of honesty, active development and high-quality service, our company will meet
every new opportunity with a professional attitude, obtain innovation in exploration and achieve win-
win results in practice.