SlideShare a Scribd company logo
1 of 32
GREEN FORMWORK A SLAB FORMWORK
THE PROVEN STEEL PANELISED SLAB FORMWORK
WITH EARLY STRIPPING MECHANISM
Product Brochure
®
Content
2.In the focus
The main system components
5.System advantages
The proven steel panelised slab
formwork with early stripping
mechanism
Effortless working
Fast forming
Low on-site material requirements
12.System overview
Green Formwork at a glance
cantilever and beam details
Edition 07丨2021
Publisher
Yun Nan Luriel Shen Hien Trading Co.,Ltd.
Formwork engineering provider
Wanke feicui Binjiang phase I, Huanhu Road,
Guandu District, Kunming City, Yunnan
Province,China
Phone:+86 15166012761
lysh.nicksun@foxmail.com
http://luriel-shen-hien.com/
18.Project examples
Reference projects with Green
formwork
26.Components
Green formwork system
components
Important information
All current safety regulations and guidelines
mustbe observed in those countries where our
products are used.
The photos shown in this brochure feature con-
struction sites in progress.For this reason,
safetyand anchor details in particular cannot
always beconsidered as conclusive or final.These
are subject to the risk assessment carried out by
the contractor.
In addition, computer graphics are used
which are to be understood as system
representations.Forensuring a better
understanding, these and the
detailed illustrations shown have been partially
reduced to certain aspects.The safety
installations which have possibly not been shown
in these detailed descriptions must nevertheless
still be available.The systems or items shown
might not be available in every country.
Safety instructions and load specifications are to
be strictly observed at all times.Separate
structural calculations are required for any
deviations fromthe standard design data.
The information contained herein is subject to
technical changes in the interests of
progress.Errors and typographical mistakes
reserved.
1
Panel Prop
The main system components
Only 3 elements for the use with early stripping
In the focus
The Green formwork panel
for standard fields measures 1.80 m x1.20 m.
The lightest weight steel frame is covered with 12 mm thick formlining.
The Prop with early stripping head
Q235 inner tube + Q345 outer tube with hot dip galvanized process on the
surface,tube thickness 3.2mm and 3mm
2
Infill beam
The infill beam
for standard fields is 1.80 m and 1.20m long,to provide possibility of the
compatibility for Green formwork and traditional formwork whose thick
formlining is 12mm.
3
4
5
GREEN FORMWORK Panelized Slab Formwork
The proven steel panelized slab formwork with very
fast shuttering times
System advantages
GREEN FORMWORK panelized slab
formwork allows fast as well as safe
forming operations with a
systematic assembly sequence. The
low weight of the panels, compact
dimensions and practical design of
the system components facilitate
non-tiring and ergonomic working
operations.
With GREEN FORMWORK, infill areas
are reduced to an absolute minimum.
Furthermore, the system makes a
convincing case with an extensive
range of safety and logistical
accessories.
A further advantage is the easy hori-
zontal transportation of formwork
materials as the small prop
requirements ensure more freedom
of movement under the slab
formwork.
GREEN FORMWORK has been
designed for standard use in
constructing slabs with
thicknesses up to 30 cm. GREEN
FORMWORK 's range of
applications extends from
residential construction through to
real estate construction projects.
The systematic assembly sequence
and lightweight system components
made of steel accelerate working
operations. In addition, the possibility
of early stripping with the drophead
system reduces on-site material
requirements.
Effortless working
with light weight and easy
to handle components
Low on-site material
requirements
due to early striking with the
drophead and fast deployment
of the panels and beams in
the next storey
Easy cleaning
Through hot dip galvanized
elements, components made
of plastic, and glue sealed in
and on the gap
Fast forming
with a simple, systematic
assembly sequence and
fewer slab props
6
Effortless working
Very light and easy-to-handle components
Low individual weights and
practical dimensions are distinct
advantages in daily formwork
operations with GREEN
FORMWORK . The low weight
clearly makes a noticeable
difference, among other things, in
the work performance.
With dimensions of only 180 cm x
120 cm, the panels can easily be
trans- ported on the construction site
e.g. also through door openings.
When carrying the panels, the
immediate work- ing area is always in
view which greatly reduces the risk of
tripping over.
Last but not least, as safety levels are
enhanced when working with GREEN
FORMWORK, site personnel do not
tire so quickly.
System advantages
GREEN FORMWORK heads
are equipped with a 6
directions self locking
system. Therefore, they can
be connected very quickly
and securely to the slab.
Removal of the panel is simply
a matter of hitting the early
stripping mechanism and then
taking the head down.
Panel MB1812 1800*1200
Weight: 45kg
ZB35 Prop
Weight: 23kg
Through the props the
workers could walk
quite easily without any
stops. Due to the no-
tripods & horizontal
brace design under this
height for most of areas. 7
8
Fast forming
Simple, systematic assembly sequence with minimum slab
prop requirements
GREEN FORMWORK offers a
simple, systematic assembly
sequence and high degree of
installation safety. The
recurring procedures
accelerate work proce- dures
and handling is quickly mas-
tered even by personnel
unfamiliar with the system.
Forming of standard fields is
extremely simple with GREEN
FORMWORK : after erecting
the prop with gate brace, hang
the panels on the props and use
the erection tool to pull till the
surface of the panel is at a
horizontal position, then install
the remaining props under the
panel.
The panel is secured in position
during assemble, this means
that the GREEN FORMWORK
system provides a high level of
working safety also during
installation.
System Advantages
9
System Advantages
The six directions self locking system
ensures that the stability and safety,
at the same time, the prop also
provide the room for infill beam to
meet the need of traditional
formwork users in 12mm.
And the gap between the panels
could be filled via tapes or T seam.
In this way, the one who stores the
traditional formwork could still
consume in the current or new
project instead of material waste.
9
10
Low on-site material requirements
Early stripping with the drophead and fast
deployment of the panels in the next storey
The drophead facilitates early strip-
ping so that panels and main
beams are quickly made available
for sub- sequent concreting
sections.
Depending on the slab thickness and
strength of the concrete, stripping can
partly be carried out after the concrete
strength reaches 13MPa. One blow of
the hammer releases the drophead
and then remove the panels, leaving
the props to support the concrete.
Early striking minimizes on-site materi-
al requirements because many system
components can be used earlier for the
next cycle. In addition, work on the
construction site can also be better
compensated; for example, through
early stripping in bad weather or when
there is spare capacity.
System advantages
11
System advantages
After early striking is finished, only the props with dropheads and
cover strips remain in place. GREEN FORMWORK panels are
available for use in the next cycle.
12
System overview
GREEN FORMWORK at a glance
Cantilever and beam details
13
System advantages
The drop panel and the area around the beam column and wall
We will use the infill beam and 12mm thickness
traditional plywood to full-fill the area.
14
System overview
GREEN FORMWORK is also available with the ringlock
scaffoldings for the higher construction requirements,
Which can reach to max. 10m.
15
System advantages
Project Name: Urban Village
2000 m2
Phnom Penh, Cambodia
GREEN FORMWORK is specially designed for PT slab, after at
least 200 projects all over the world, now it’s becoming the most
popular slab formwork system.
16
System overview
Project Name: Urban Loft
2400 m2
Phnom Penh, Cambodia
All personals in the construction cite must obey the rules in the site
17
System overview
STEP 1
Lay flat the first two props and fix the
gate braces.
Erect the props by turning the structure.
STEP 2
Hang the panel to the prop heads
swing the lower end of the panel
to position using erection tool.
STEP 3
Insert, push, strengthen
and lock in the other two props.
18
Project examples
Project Name: Golden One
1000 m2
Phnom Penh, Cambodia
GREEN FORMWORK in use
Reference projects with the panelized slab formwork
19
Project examples
Project Name: Peninsula Hotel
1000 m2
Phnom Penh, Cambodia
Project examples
Project Name: Chip Mong Norodom Mall
1700 m2
Phnom Penh, Cambodia
20
21
Project examples
Project Name: Penhthouse
1000 m2
Phnom Penh, Cambodia
Project examples
Project Name: East Sensok Condo
1000 m2
Sihanoukville, Cambodia
22
23
Project examples
Project Name: PG dream residence
2700 m2
Phnom Penh, Cambodia
24
Project examples
Project Name: Chip Mong Tower
3000 m2
Phnom Penh, Cambodia
25
Project examples
Project Name: Kompot Hotel
1000 m2
Kompot Province, Cambodia
GREEN FORMWORK Panel Slab Formwork
26
Largest size 1.8m x 1.2m,weighting 45 kg;
Bamboo plywood, duration 30 to 50 times ;
Q235 Steel frame, duration more than 5 years.
Plywood is replaceable.
With early stripping head.(B35)
Q235+Q345 steel material
Height 2.2m to 3.5m;
Inner & outerTube Thickness 3.2mm & 3mm;
With extensions, the prop can reach 5m;
For more than 5m height, high shoring system.
Hanged on the prop;
Available working with traditional formwork,
thickness 12mm;
Duration more than 3 years.
Wood is replaceable
27
Gate Brace
QSMJ1800
QSMJ1500
QSMJ1200
QSMJ900
QSMJ600
Cantilever Components
Cantilever Connector-1
Cantilever Connector-2
Adjust Tube
Cantilever Corner Connector
Edge mounting shoe
Safety Pin
Cantilever inner & outer tube
Erection Tool
Hammer
Yun Nan Luriel Shen Hien Trading Co.,Ltd.
Formwork engineering provider
Wanke feicui Binjiang phase I, Huanhu Road, Guandu District,
Kunming City, Yunnan Province,China
Phone:+86 15166012761
lysh.nicksun@foxmail.com
http://luriel-shen-hien.com/
Yun Nan Luriel Shen Hien Trading Co.,Ltd. is located in Kunming, Yunnan Province, south of the
beautiful colorful clouds. It is a company that exports building formwork, scaffolding and other building
materials and chemical raw materials. Our products are mainly sold to Southeast Asia, the Middle East,
North America, all products are produced according as European and American industry standards, and
sell well overseas. At the same time, Yun Nan Luriel Shen Hien Trading Co.,Ltd. set branch offices in
Zibo, Rizhao and other places in Shandong, which can better serve the needs of customers. In line with
the spirit and concept of honesty, active development and high-quality service, our company will meet
every new opportunity with a professional attitude, obtain innovation in exploration and achieve win-
win results in practice.

More Related Content

What's hot

Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Mrinal -
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
CASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOME
CASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOMECASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOME
CASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOMEAIT Solutions
 
BUILDING MATERIALS AS A STEEL
BUILDING MATERIALS AS  A STEELBUILDING MATERIALS AS  A STEEL
BUILDING MATERIALS AS A STEELAbhishek Mewada
 
WOOD PLASTIC COMPOSITE (WPC)
WOOD PLASTIC COMPOSITE (WPC)WOOD PLASTIC COMPOSITE (WPC)
WOOD PLASTIC COMPOSITE (WPC)Sisubalan Selvan
 
04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...
04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...
04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...Faculty of fine arts -Cairo. Egypt.
 
ALUMINUM COMPOSITE PANELS
ALUMINUM COMPOSITE PANELSALUMINUM COMPOSITE PANELS
ALUMINUM COMPOSITE PANELSArchDuty
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel strutureEst
 
ALUMINUM COMPOSITE PANEL
ALUMINUM COMPOSITE PANELALUMINUM COMPOSITE PANEL
ALUMINUM COMPOSITE PANEL4MANNGROUP
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazingDanishPathan7
 
POST-TENSIONING SYSTEM
POST-TENSIONING SYSTEMPOST-TENSIONING SYSTEM
POST-TENSIONING SYSTEMis_web
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list Jeanne Hoo
 

What's hot (20)

Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
CASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOME
CASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOMECASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOME
CASE STUDY: CHALLENGES OF A SINGLE-LAYER RETICULATED DOME
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
BUILDING MATERIALS AS A STEEL
BUILDING MATERIALS AS  A STEELBUILDING MATERIALS AS  A STEEL
BUILDING MATERIALS AS A STEEL
 
WOOD PLASTIC COMPOSITE (WPC)
WOOD PLASTIC COMPOSITE (WPC)WOOD PLASTIC COMPOSITE (WPC)
WOOD PLASTIC COMPOSITE (WPC)
 
07 Opening - Doors & Windows.pdf
07 Opening - Doors & Windows.pdf07 Opening - Doors & Windows.pdf
07 Opening - Doors & Windows.pdf
 
04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...
04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...
04-Working details-cladding-Glass curtain walls guide-by Prof Dr. Ehab Ezzat ...
 
Aluminium composite panel
Aluminium composite panelAluminium composite panel
Aluminium composite panel
 
Structural glazing details
Structural glazing detailsStructural glazing details
Structural glazing details
 
Gypsum Board
Gypsum BoardGypsum Board
Gypsum Board
 
ALUMINUM COMPOSITE PANELS
ALUMINUM COMPOSITE PANELSALUMINUM COMPOSITE PANELS
ALUMINUM COMPOSITE PANELS
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 
ALUMINUM COMPOSITE PANEL
ALUMINUM COMPOSITE PANELALUMINUM COMPOSITE PANEL
ALUMINUM COMPOSITE PANEL
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazing
 
POST-TENSIONING SYSTEM
POST-TENSIONING SYSTEMPOST-TENSIONING SYSTEM
POST-TENSIONING SYSTEM
 
Green concrete
Green concreteGreen concrete
Green concrete
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
 

Similar to Green formwork system brochure.pdf

Production of composites
Production of compositesProduction of composites
Production of compositesGulfam Hussain
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.WorldHaus
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report AssignmentHaziq1511
 
Prefabricated panels
Prefabricated panelsPrefabricated panels
Prefabricated panelsMoldtech SL
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemRajdeep Chowdhury
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazingaduiti
 
Greenflex presentation 0117
Greenflex presentation 0117Greenflex presentation 0117
Greenflex presentation 0117Giulio Zanelli
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+ Sun Systems
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ Est
 
Mivan aluminium formwork
Mivan aluminium formworkMivan aluminium formwork
Mivan aluminium formworkMumtaz Alam
 
corruge pipe report.pdf
corruge pipe report.pdfcorruge pipe report.pdf
corruge pipe report.pdfgokul rungta
 
New developments in construction technology
New developments in construction technologyNew developments in construction technology
New developments in construction technologyGAW Consultants
 

Similar to Green formwork system brochure.pdf (20)

Production of composites
Production of compositesProduction of composites
Production of composites
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 
Prefabricated panels
Prefabricated panelsPrefabricated panels
Prefabricated panels
 
CONFORTO
CONFORTOCONFORTO
CONFORTO
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building System
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
BPA GmbH English 2014
BPA GmbH English 2014BPA GmbH English 2014
BPA GmbH English 2014
 
Greenflex presentation 0117
Greenflex presentation 0117Greenflex presentation 0117
Greenflex presentation 0117
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile Structures
 
Crabtree PVC trunking
Crabtree PVC trunkingCrabtree PVC trunking
Crabtree PVC trunking
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
SIPS panel price.pdf
SIPS panel price.pdfSIPS panel price.pdf
SIPS panel price.pdf
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
 
Mivan aluminium formwork
Mivan aluminium formworkMivan aluminium formwork
Mivan aluminium formwork
 
corruge pipe report.pdf
corruge pipe report.pdfcorruge pipe report.pdf
corruge pipe report.pdf
 
New developments in construction technology
New developments in construction technologyNew developments in construction technology
New developments in construction technology
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Green formwork system brochure.pdf

  • 1. GREEN FORMWORK A SLAB FORMWORK THE PROVEN STEEL PANELISED SLAB FORMWORK WITH EARLY STRIPPING MECHANISM Product Brochure ®
  • 2. Content 2.In the focus The main system components 5.System advantages The proven steel panelised slab formwork with early stripping mechanism Effortless working Fast forming Low on-site material requirements 12.System overview Green Formwork at a glance cantilever and beam details Edition 07丨2021 Publisher Yun Nan Luriel Shen Hien Trading Co.,Ltd. Formwork engineering provider Wanke feicui Binjiang phase I, Huanhu Road, Guandu District, Kunming City, Yunnan Province,China Phone:+86 15166012761 lysh.nicksun@foxmail.com http://luriel-shen-hien.com/
  • 3. 18.Project examples Reference projects with Green formwork 26.Components Green formwork system components Important information All current safety regulations and guidelines mustbe observed in those countries where our products are used. The photos shown in this brochure feature con- struction sites in progress.For this reason, safetyand anchor details in particular cannot always beconsidered as conclusive or final.These are subject to the risk assessment carried out by the contractor. In addition, computer graphics are used which are to be understood as system representations.Forensuring a better understanding, these and the detailed illustrations shown have been partially reduced to certain aspects.The safety installations which have possibly not been shown in these detailed descriptions must nevertheless still be available.The systems or items shown might not be available in every country. Safety instructions and load specifications are to be strictly observed at all times.Separate structural calculations are required for any deviations fromthe standard design data. The information contained herein is subject to technical changes in the interests of progress.Errors and typographical mistakes reserved. 1
  • 4. Panel Prop The main system components Only 3 elements for the use with early stripping In the focus The Green formwork panel for standard fields measures 1.80 m x1.20 m. The lightest weight steel frame is covered with 12 mm thick formlining. The Prop with early stripping head Q235 inner tube + Q345 outer tube with hot dip galvanized process on the surface,tube thickness 3.2mm and 3mm 2
  • 5. Infill beam The infill beam for standard fields is 1.80 m and 1.20m long,to provide possibility of the compatibility for Green formwork and traditional formwork whose thick formlining is 12mm. 3
  • 6. 4
  • 7. 5 GREEN FORMWORK Panelized Slab Formwork The proven steel panelized slab formwork with very fast shuttering times System advantages GREEN FORMWORK panelized slab formwork allows fast as well as safe forming operations with a systematic assembly sequence. The low weight of the panels, compact dimensions and practical design of the system components facilitate non-tiring and ergonomic working operations. With GREEN FORMWORK, infill areas are reduced to an absolute minimum. Furthermore, the system makes a convincing case with an extensive range of safety and logistical accessories. A further advantage is the easy hori- zontal transportation of formwork materials as the small prop requirements ensure more freedom of movement under the slab formwork. GREEN FORMWORK has been designed for standard use in constructing slabs with thicknesses up to 30 cm. GREEN FORMWORK 's range of applications extends from residential construction through to real estate construction projects. The systematic assembly sequence and lightweight system components made of steel accelerate working operations. In addition, the possibility of early stripping with the drophead system reduces on-site material requirements. Effortless working with light weight and easy to handle components Low on-site material requirements due to early striking with the drophead and fast deployment of the panels and beams in the next storey Easy cleaning Through hot dip galvanized elements, components made of plastic, and glue sealed in and on the gap Fast forming with a simple, systematic assembly sequence and fewer slab props
  • 8. 6 Effortless working Very light and easy-to-handle components Low individual weights and practical dimensions are distinct advantages in daily formwork operations with GREEN FORMWORK . The low weight clearly makes a noticeable difference, among other things, in the work performance. With dimensions of only 180 cm x 120 cm, the panels can easily be trans- ported on the construction site e.g. also through door openings. When carrying the panels, the immediate work- ing area is always in view which greatly reduces the risk of tripping over. Last but not least, as safety levels are enhanced when working with GREEN FORMWORK, site personnel do not tire so quickly. System advantages GREEN FORMWORK heads are equipped with a 6 directions self locking system. Therefore, they can be connected very quickly and securely to the slab. Removal of the panel is simply a matter of hitting the early stripping mechanism and then taking the head down. Panel MB1812 1800*1200 Weight: 45kg ZB35 Prop Weight: 23kg
  • 9. Through the props the workers could walk quite easily without any stops. Due to the no- tripods & horizontal brace design under this height for most of areas. 7
  • 10. 8 Fast forming Simple, systematic assembly sequence with minimum slab prop requirements GREEN FORMWORK offers a simple, systematic assembly sequence and high degree of installation safety. The recurring procedures accelerate work proce- dures and handling is quickly mas- tered even by personnel unfamiliar with the system. Forming of standard fields is extremely simple with GREEN FORMWORK : after erecting the prop with gate brace, hang the panels on the props and use the erection tool to pull till the surface of the panel is at a horizontal position, then install the remaining props under the panel. The panel is secured in position during assemble, this means that the GREEN FORMWORK system provides a high level of working safety also during installation. System Advantages
  • 11. 9 System Advantages The six directions self locking system ensures that the stability and safety, at the same time, the prop also provide the room for infill beam to meet the need of traditional formwork users in 12mm. And the gap between the panels could be filled via tapes or T seam. In this way, the one who stores the traditional formwork could still consume in the current or new project instead of material waste. 9
  • 12. 10 Low on-site material requirements Early stripping with the drophead and fast deployment of the panels in the next storey The drophead facilitates early strip- ping so that panels and main beams are quickly made available for sub- sequent concreting sections. Depending on the slab thickness and strength of the concrete, stripping can partly be carried out after the concrete strength reaches 13MPa. One blow of the hammer releases the drophead and then remove the panels, leaving the props to support the concrete. Early striking minimizes on-site materi- al requirements because many system components can be used earlier for the next cycle. In addition, work on the construction site can also be better compensated; for example, through early stripping in bad weather or when there is spare capacity. System advantages
  • 13. 11 System advantages After early striking is finished, only the props with dropheads and cover strips remain in place. GREEN FORMWORK panels are available for use in the next cycle.
  • 14. 12 System overview GREEN FORMWORK at a glance Cantilever and beam details
  • 15. 13 System advantages The drop panel and the area around the beam column and wall We will use the infill beam and 12mm thickness traditional plywood to full-fill the area.
  • 16. 14 System overview GREEN FORMWORK is also available with the ringlock scaffoldings for the higher construction requirements, Which can reach to max. 10m.
  • 17. 15 System advantages Project Name: Urban Village 2000 m2 Phnom Penh, Cambodia GREEN FORMWORK is specially designed for PT slab, after at least 200 projects all over the world, now it’s becoming the most popular slab formwork system.
  • 18. 16 System overview Project Name: Urban Loft 2400 m2 Phnom Penh, Cambodia All personals in the construction cite must obey the rules in the site
  • 19. 17 System overview STEP 1 Lay flat the first two props and fix the gate braces. Erect the props by turning the structure. STEP 2 Hang the panel to the prop heads swing the lower end of the panel to position using erection tool. STEP 3 Insert, push, strengthen and lock in the other two props.
  • 20. 18 Project examples Project Name: Golden One 1000 m2 Phnom Penh, Cambodia GREEN FORMWORK in use Reference projects with the panelized slab formwork
  • 21. 19 Project examples Project Name: Peninsula Hotel 1000 m2 Phnom Penh, Cambodia
  • 22. Project examples Project Name: Chip Mong Norodom Mall 1700 m2 Phnom Penh, Cambodia 20
  • 23. 21 Project examples Project Name: Penhthouse 1000 m2 Phnom Penh, Cambodia
  • 24. Project examples Project Name: East Sensok Condo 1000 m2 Sihanoukville, Cambodia 22
  • 25. 23 Project examples Project Name: PG dream residence 2700 m2 Phnom Penh, Cambodia
  • 26. 24 Project examples Project Name: Chip Mong Tower 3000 m2 Phnom Penh, Cambodia
  • 27. 25 Project examples Project Name: Kompot Hotel 1000 m2 Kompot Province, Cambodia
  • 28.
  • 29.
  • 30. GREEN FORMWORK Panel Slab Formwork 26 Largest size 1.8m x 1.2m,weighting 45 kg; Bamboo plywood, duration 30 to 50 times ; Q235 Steel frame, duration more than 5 years. Plywood is replaceable. With early stripping head.(B35) Q235+Q345 steel material Height 2.2m to 3.5m; Inner & outerTube Thickness 3.2mm & 3mm; With extensions, the prop can reach 5m; For more than 5m height, high shoring system. Hanged on the prop; Available working with traditional formwork, thickness 12mm; Duration more than 3 years. Wood is replaceable
  • 31. 27 Gate Brace QSMJ1800 QSMJ1500 QSMJ1200 QSMJ900 QSMJ600 Cantilever Components Cantilever Connector-1 Cantilever Connector-2 Adjust Tube Cantilever Corner Connector Edge mounting shoe Safety Pin Cantilever inner & outer tube Erection Tool Hammer
  • 32. Yun Nan Luriel Shen Hien Trading Co.,Ltd. Formwork engineering provider Wanke feicui Binjiang phase I, Huanhu Road, Guandu District, Kunming City, Yunnan Province,China Phone:+86 15166012761 lysh.nicksun@foxmail.com http://luriel-shen-hien.com/ Yun Nan Luriel Shen Hien Trading Co.,Ltd. is located in Kunming, Yunnan Province, south of the beautiful colorful clouds. It is a company that exports building formwork, scaffolding and other building materials and chemical raw materials. Our products are mainly sold to Southeast Asia, the Middle East, North America, all products are produced according as European and American industry standards, and sell well overseas. At the same time, Yun Nan Luriel Shen Hien Trading Co.,Ltd. set branch offices in Zibo, Rizhao and other places in Shandong, which can better serve the needs of customers. In line with the spirit and concept of honesty, active development and high-quality service, our company will meet every new opportunity with a professional attitude, obtain innovation in exploration and achieve win- win results in practice.