SlideShare a Scribd company logo
1 of 6
Page - 1 - of 6
Mohammed Ali Abdelghafar Sakr
Jeddah – El-Faysalya – Saudi Arabia
+966 59764 2785
+966 542986955
civilengmasa@gmail.com
civilengmasa@aol.com
Personal Details:-
-Nationality: Egyptian.
-Marital Status: Married.
-Date of Birth: 05, Sep 1985
Education:-
 Tanta University – Faculty of Engineering - Egypt
B. Sc. in CivilEngineering – 2003: 2008
 American University in Cairo (AUC) - Faculty of Engineering – Egypt
Diplomain PROJECTMANAGEMENT
Graduation Project: Steel Design Project (aircraft hunger + office building),
(Very good)
Courses:-
American Universityin Cairo (AUC)
 PROJECT RISK MANAGEMENT.
 PROJECT BUDGETING AND FINANCIAL CONTROL.
 PROJECT BIDS AND CONTRACTS.
 PROJECT PLANNING & CONTROL TECHNIQUES.
 MANAGEMENT OF PROJECT RESOURSES.
 PROJECT FEASIBILITY STUDIES.
--------------------------------------------------
 PMP preparation course (fourth edition).
Software:-
 AutoCAD up to V. 2015. (excellent)
 Primavera P6. (very good)
 ICDL. (excellent)
Page - 2 - of 6
Languages:-
 Arabic: Native Language.
 English: Writing & Reading (Excellent), Talking (V. good).
Detailed Experience:-
 1- Site Engineer - From Mar2011 to present
Dongho Korean Saudi LTD Co. Contracting and maintenance. KSA.
-FIRSTPROJECT
* AL FAYSALYA [4 concrete tanks] (1 million m3) biggest tanks in the world (Jeddah)
(BUDGET 580 million SR ) from (NATIONAL WATER COMPANY)NWC to present…….
Project elements:-
-4 concrete tanks ( 250,000*4) m3
-piping works
-Utilities BLDG
-soil improvement (dynamiccompaction,stonecolumns)
Experience:-
-Area engineer of civil works during mobilization works to present
-Design and drawings of concrete tanks
- Quantity surveying for steel reinforcement, shuttering work & required tools
-Mobilization works concrete batch plan and ather utilities
-Soil improvement.
-construction work for tank
- Document control
-procurement
Page - 3 - of 6
- secondPROJECT
*AL BUWAIB Water Treatment Plant 40,000 m3 (4 GLS tanks) and 6 wells – a 280
Million RS Project (Riyadh)
Project elements:-
-6 wells
-WTP(cooling tower, generatorBLDG, transformerBLDG,RO BLDG, chemical storageBLDG,
guard room BLDG & 4 GLStanks 40,000 m3)
-pipe line works and chambers
Experience:-
-Site engineer
-Design and drawings of WTP
- Quantity Surveying for steel reinforcement, shuttering work & requiredtools
- Document control
- Contribute in all civil works
----------------------------------------------------------------------------
--------------------------------------------------------------------
- ThirdPROJECT
*PROJECT 16 NORTH RIYADH
Project elements:-
-Pipe line works and chambers
Experience:-
-Site engineer
-Design and drawings
- Document control
- Quantity Surveying for excavation andpipe lines
Page - 4 - of 6
 2- Site Engineer - From Apr 2010 to Jan 2011 (9 months)
- Fourth PROJECT
El Shams company – Contracting - Kafr El-Sheikh – Egypt
*The construction of Faculty of Arts at Kafr El-Sheikh University
Project elements:-
-Piles (1178 piles)
-8 floors area (80*120)m
Experience:-
 Follow up projects` progress and take corrective decisions
 Contribute in Supervision of Civil & Architect works.
 Quantity Surveying
 Prepare required shop drawings
 3- Site Engineer - From Nov 2008 to Apr 2010 (1 year, 5 months)
- Fifth PROJECT
Rowad Modern Engineer (RME)
Sub-contractor from main contractor Consortium Japonais pour l’Autoroute Algerienne
(COJAAL) – Setif – Algeria.
*Road (East - West) project The construction of foundations, walls & slabs of Bridges and
Page - 5 - of 6
tunnels.
Project elements:
-small bridges (constructionfoundations, walls & slab) height 10m width (from 8 to 15)
-huge bridges (construction foundations, walls & slab) using sliding form method
Experience:-
 Follow up projects` progress and take corrective decisions.
 Contribute of all civil activities.
 Document control (RFI, Material Receiving Inspection,man power estimate & material estimation)
4- From summer 2006 to 2007 : Training in Arab contractor company
as site engineer in kafr elzayat bridge .
(Egypt,kafr elzayat).
Interpersonal Skills:-
 People & Time Management Skills.
 Able to identify, analyze and solve problems.
 Good oral and written communication skills.
 Aptitude for computing and design.
 Able to work without supervisor.
 Able to work as part of a team
Hobbies:-
-Reading (Engineering books)
-Hunting & Social activities,
-Fundamentals of the stock market and stock exchange.
-Trading in financial stocks
Note:-
I have transferable saudi eqama it will finish in 1-may-2016
Page - 6 - of 6
Looking forward to join your team

More Related Content

What's hot (20)

CV101
CV101CV101
CV101
 
CV-ARCHITECT-kariim
CV-ARCHITECT-kariimCV-ARCHITECT-kariim
CV-ARCHITECT-kariim
 
Sobeih CV - ( latest -2015)
Sobeih CV - ( latest -2015)Sobeih CV - ( latest -2015)
Sobeih CV - ( latest -2015)
 
Resume (in English)
Resume (in English)Resume (in English)
Resume (in English)
 
My cv (en.)
My cv (en.)My cv (en.)
My cv (en.)
 
CV Pawel CV New(land)
CV Pawel CV New(land)CV Pawel CV New(land)
CV Pawel CV New(land)
 
Hays Highways CV
Hays Highways CVHays Highways CV
Hays Highways CV
 
CV Eng. Shehab Alaa
CV Eng. Shehab AlaaCV Eng. Shehab Alaa
CV Eng. Shehab Alaa
 
Modified C.V 2015-R02
Modified C.V 2015-R02Modified C.V 2015-R02
Modified C.V 2015-R02
 
Cv rebbouche bilal en
Cv rebbouche bilal enCv rebbouche bilal en
Cv rebbouche bilal en
 
CV e
CV eCV e
CV e
 
CV
CVCV
CV
 
Eng.Yasser Adel 2009 (CV)
Eng.Yasser Adel 2009 (CV)Eng.Yasser Adel 2009 (CV)
Eng.Yasser Adel 2009 (CV)
 
Damien JANSSENS de BISTHOVEN - Civil Engineer
Damien JANSSENS de BISTHOVEN - Civil EngineerDamien JANSSENS de BISTHOVEN - Civil Engineer
Damien JANSSENS de BISTHOVEN - Civil Engineer
 
Resume - Nick Fuentes
Resume - Nick FuentesResume - Nick Fuentes
Resume - Nick Fuentes
 
Barton_Resume
Barton_ResumeBarton_Resume
Barton_Resume
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Summery
SummerySummery
Summery
 
Ezzat Ali Mourcy Ali
Ezzat Ali Mourcy AliEzzat Ali Mourcy Ali
Ezzat Ali Mourcy Ali
 

Similar to eng sakr cv (20)

CV - 2017
CV - 2017CV - 2017
CV - 2017
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
M Kamal
M Kamal M Kamal
M Kamal
 
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbEng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
Mohamed Kamal CV.pdf
Mohamed Kamal CV.pdfMohamed Kamal CV.pdf
Mohamed Kamal CV.pdf
 
CV update
CV updateCV update
CV update
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CV
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
RCV JUN16
RCV JUN16RCV JUN16
RCV JUN16
 
Mohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitaeMohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitae
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
CV
CVCV
CV
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 

eng sakr cv

  • 1. Page - 1 - of 6 Mohammed Ali Abdelghafar Sakr Jeddah – El-Faysalya – Saudi Arabia +966 59764 2785 +966 542986955 civilengmasa@gmail.com civilengmasa@aol.com Personal Details:- -Nationality: Egyptian. -Marital Status: Married. -Date of Birth: 05, Sep 1985 Education:-  Tanta University – Faculty of Engineering - Egypt B. Sc. in CivilEngineering – 2003: 2008  American University in Cairo (AUC) - Faculty of Engineering – Egypt Diplomain PROJECTMANAGEMENT Graduation Project: Steel Design Project (aircraft hunger + office building), (Very good) Courses:- American Universityin Cairo (AUC)  PROJECT RISK MANAGEMENT.  PROJECT BUDGETING AND FINANCIAL CONTROL.  PROJECT BIDS AND CONTRACTS.  PROJECT PLANNING & CONTROL TECHNIQUES.  MANAGEMENT OF PROJECT RESOURSES.  PROJECT FEASIBILITY STUDIES. --------------------------------------------------  PMP preparation course (fourth edition). Software:-  AutoCAD up to V. 2015. (excellent)  Primavera P6. (very good)  ICDL. (excellent)
  • 2. Page - 2 - of 6 Languages:-  Arabic: Native Language.  English: Writing & Reading (Excellent), Talking (V. good). Detailed Experience:-  1- Site Engineer - From Mar2011 to present Dongho Korean Saudi LTD Co. Contracting and maintenance. KSA. -FIRSTPROJECT * AL FAYSALYA [4 concrete tanks] (1 million m3) biggest tanks in the world (Jeddah) (BUDGET 580 million SR ) from (NATIONAL WATER COMPANY)NWC to present……. Project elements:- -4 concrete tanks ( 250,000*4) m3 -piping works -Utilities BLDG -soil improvement (dynamiccompaction,stonecolumns) Experience:- -Area engineer of civil works during mobilization works to present -Design and drawings of concrete tanks - Quantity surveying for steel reinforcement, shuttering work & required tools -Mobilization works concrete batch plan and ather utilities -Soil improvement. -construction work for tank - Document control -procurement
  • 3. Page - 3 - of 6 - secondPROJECT *AL BUWAIB Water Treatment Plant 40,000 m3 (4 GLS tanks) and 6 wells – a 280 Million RS Project (Riyadh) Project elements:- -6 wells -WTP(cooling tower, generatorBLDG, transformerBLDG,RO BLDG, chemical storageBLDG, guard room BLDG & 4 GLStanks 40,000 m3) -pipe line works and chambers Experience:- -Site engineer -Design and drawings of WTP - Quantity Surveying for steel reinforcement, shuttering work & requiredtools - Document control - Contribute in all civil works ---------------------------------------------------------------------------- -------------------------------------------------------------------- - ThirdPROJECT *PROJECT 16 NORTH RIYADH Project elements:- -Pipe line works and chambers Experience:- -Site engineer -Design and drawings - Document control - Quantity Surveying for excavation andpipe lines
  • 4. Page - 4 - of 6  2- Site Engineer - From Apr 2010 to Jan 2011 (9 months) - Fourth PROJECT El Shams company – Contracting - Kafr El-Sheikh – Egypt *The construction of Faculty of Arts at Kafr El-Sheikh University Project elements:- -Piles (1178 piles) -8 floors area (80*120)m Experience:-  Follow up projects` progress and take corrective decisions  Contribute in Supervision of Civil & Architect works.  Quantity Surveying  Prepare required shop drawings  3- Site Engineer - From Nov 2008 to Apr 2010 (1 year, 5 months) - Fifth PROJECT Rowad Modern Engineer (RME) Sub-contractor from main contractor Consortium Japonais pour l’Autoroute Algerienne (COJAAL) – Setif – Algeria. *Road (East - West) project The construction of foundations, walls & slabs of Bridges and
  • 5. Page - 5 - of 6 tunnels. Project elements: -small bridges (constructionfoundations, walls & slab) height 10m width (from 8 to 15) -huge bridges (construction foundations, walls & slab) using sliding form method Experience:-  Follow up projects` progress and take corrective decisions.  Contribute of all civil activities.  Document control (RFI, Material Receiving Inspection,man power estimate & material estimation) 4- From summer 2006 to 2007 : Training in Arab contractor company as site engineer in kafr elzayat bridge . (Egypt,kafr elzayat). Interpersonal Skills:-  People & Time Management Skills.  Able to identify, analyze and solve problems.  Good oral and written communication skills.  Aptitude for computing and design.  Able to work without supervisor.  Able to work as part of a team Hobbies:- -Reading (Engineering books) -Hunting & Social activities, -Fundamentals of the stock market and stock exchange. -Trading in financial stocks Note:- I have transferable saudi eqama it will finish in 1-may-2016
  • 6. Page - 6 - of 6 Looking forward to join your team