1. Russel RutaquioNava
Macapagal St. Brgy. Soledad Mauban, Quezon Philippines
Contact no.+966 564822663
Email adds.: russelnava@yahoo.com and nrussel82@yahoo.com
Objective:
To widen my knowledge by new experience and opportunities. Be a part of a company that I can also share my skills
and experience. To be a part of the company through its growth and success.
POSITION DESIRED:
Sr. Valve Technician / Sr. Pressure Relief Valve Technician
WORK EXPERIENCED
Saudi Kayan Petrochemical Complex
Sr. Valve technician
Central Services Department (Maintenance)
SAUDI KAYAN PETROCHEMICAL COMPLEX
Jubail Industrial City, Saudi Arabia
February 10, 2010 – November 26, 2016
Duties and Responsibilities:
Work Description:
Key Roles and Technical Skills:
Reporting to:
the supervisor and the manager
the inspector during inspection and valve testing
Responsible in preparing valve document reports (as found reports and as left reports)
Responsible in filing and keeping all valve document reports
Responsible in reporting daily progress reports
Knowledgeable inLapping of Disc,Nozzle,Wedge,etc.
Responsible in performingthe overhauling,calibrationandFinal testingacceptance of PSV,PRV,POV
togetherwiththe ResponsiblePlant inspector.
Responsible inreconditioningdifferentkindof valveslike SafetyRelief Valve,Pressure Relief Valve A(section
I and sectionVIII),PilotOperatedValve,Gate Valve,NonReturnValve,HandValve.
Knowledgeable inoperatingValve-relatedmachineries
2. Responsible inreconditioning overhauling,lappingandreplacementof new partsif itisneeded of lubricating
pumpFFL CH1 for 2nd
stage of highpressure packingcupandFFL C1 for 1st
stage packingcup equipmentin
LDPE Plant.
Responsible in reconditioning, overhauling, lapping, recommendation for machining and replacement of new
O-ring, packing element, pressure breaker and guide bush of High Pressure packing cup 1st stage and 2nd
stage equipment in LDPE plant
Responsible in reconditioning, overhauling, lapping, recommendation for machining and replacement of new
o-ring and packing element of Low Pressure packing cup 1st stage and 2nd stage Equipment in LDPE plant
Responsible in reconditioning, overhauling, lapping, recommendation for machining and replacement of
packing element and O-ring of booster compressor 1st stage equipment in LDPE Plant.
Responsible in reconditioning, overhauling, and lapping of Primary compressor 2nd stage equipment in LDPE
Plant.
Responsible in reconditioning overhauling lapping of lens valve seat and testing the suction discharge and
supply area of Peroxide Dosing Pump Double check valve at 4000 Barg in the suction, discharge and supply
area. And I am responsible for the replacement of new parts if it is needed. Equipment in LDPE plant.
Responsible for the reporting for all documents.
Creating the certification form in all equipment.
Creating the standard maintenance procedure for all related equipment.
Filing all the certification of all equipment in my related job responsibilities.
Sr. Technician and leader in High Pressure center specialized in all equipment in LDPE Plant in Saudi Kayan
Petrochemical Plant.
Trained on:
Course forlearningaboutEFCOTestbenchMachine PS-SV-50andPS-50 Operation,Usage,andPreventive
Maintenance,Course forlearningaboutEFCOLappingMachine SM450D/N and KS6.02 Operation,Usage and
PreventiveMaintenance.,EFCOMaschinenbauGmbH,Otto
Conducted in Al-JubailIndustrialCity31961 SaudiKayan PetrochemicalCompany Kingdomof SaudiArabia on
Oct 20, 2011- Oct 27, 2011
Course forlearningaboutFarrisEngineeringSafetyReliefValve,OperationandUsage as well ascodes
Cataloginterpretationof parts,Material andHandson coveringdisassembly,reassemblyandtesting.and
CURTISS WRIGHT FlowControl CompanyFarrisEngineering
Conducted in Dammam City, Kingdom of Saudi Arabia on Jul 26, 2010- Jul 28, 2010
Osa Industries Philippines Inc.
Valve Techinician, Mechanical Fitter, Jetter
Sta. Rosa Laguna, Philippines
October 2004 – October 2009
Company Background: Exporters and Suppliers of Valves. Contractor; Oil, Gas and Petroleum Company
Osa Projects includes:
Covanta Philippines Operating Inc. : Mauban, Quezon Philippines
Mirant Power Station : Pagbilao, Quezon Philippines
Mirant Power Station (SUAL) : Sual, Pangasinan Philippines
Pilipinas Shell Refinery : Batangas City Philippines
Petron Refinery Corporation : Limay Bataan Philippines
Japan Gas Corporation(Nickel Mining) : Rio Tuba Palawan Philippines
Pilipinas Shell Refinery : Batangas City, Philippinnes
Key Roles and Technical Skills:
Reporting to:
the supervisor and the manager
3. Responsible in reconditioningandcleaningof Exchanger(Internal andExternal),Transferline,Vessel,
Reactor andBoiler,etcby usinghighpressure jetting
Responsible inreconditioningandmechanical overhaulingandTestingof differentkindof valveslike Safety
Relief Valve, Gate Valve,NonReturnValve,MotorizedOperatingValve,HandValve,etc.
Monde Nissin Corp.
Maintenance
Sta. Rosa Laguna, Philippines
September 2003 – September 2004
August2005 to August2009
Duties and Responsibilities:
Key Rolesand Technical Skills:
Reportingto:
the managerand supervisorof Maintenance Department
Responsible incheckingandinspectingof machineriesneededinmanufacturingdifferentproducts.
Responsible inrepairof differentmachinerieslikeconveyors,tokiwamachine,coolingfun,steammachine
and rollersection.
ADDITION INFO:
- Good analytical skills
- Ability to travel as needed
- Ability to work with diverse group of people
- Ability to work as part of a team
- Problem solving abilities
- Experienced in complicated meeting holding
- Self-motivated and able to work independently
Diligent and orderly worker, good sociable character
EDUCATIONAL BACKGROUND
1999-2003: Bachelor of Science in Marine Transportation Philippine in Maritime Institute
Tertiary Quezon City
1995-1999: Central quezonAcademy Mauban, Quezon
Secondary
4. PERSONAL DATA
Date of birth : April 26, 1982
Place of birth : Mauban, Quezon
Civil Status : Married
Citizenship : Filipino
Religion : Catholic
Other Dialect Spoken : English
Russel Rutaquio Nava