7120.5d
Integrated Baseline Review (IBR)
     Implementation Strategy


                 M. Gonzales
          Jet Propulsion Laboratory
          Project Business Manager
                818-354-3629
IBR Mission Statement


Add value to the project management team by:

Gaining additional insight into the cost, schedule and
technical plans established at each project phase gate
and satisfy the requirements of the NASA prime
contract.




                                                         Page 1
IBR Goals

•   Assist the project management team in understanding the viability of
    the cost and schedule plan to meet the project technical goals and
    statement of work.

•   Provide confidence in the Earned Value information that is reported
    and as a predictor of future performance.

•   Discern additional risks to project reserves

•   Comply with prime contract requirements to gain highest possible
    award fee scores



                                                                    Page 2
IBR Assumptions
•   An IBR is a tool utilized by the project office

     – Project office manages the IBR implementation, but is supported by
        institution EV experts.

     – Project elements (subcontractors and major in-house builds) are treated
        the same and the project surveys these elements

•   This implementation approach models the ‘design review’ concepts

     – Multiple reviews that ‘feed forward’ to the next review
          • Conduct ‘Process’ focused reviews early and address EVM system ‘design’
            problems in Requirements and Preliminary Design Phases (Phases A and B)

          • Conduct ‘Content’ (Scope of Work and EAC’s) focused reviews in Detail
            Design/Build and Test Phases (Phases C and D)


                                                                                    Page 3
IBR Strategy
•   Based on 7120.5d Requirements

•   Not a one time event, but a series of reviews that coincide with Project
    Phase Milestones or Key Decision Points

•   Review focus evolves with project life cycle

     – Pre-Phase A – System description and EV compliance

     – Phase A – Test of planning, controls, reports

     – Phase B – Validate preliminary baseline, test system

     – Phase C - Validate baseline, validate reports, test EAC process

     – Phase D – Validate baseline, validate reports, test EAC process




                                                                               Page 4
IBR Strategy ‘Pyramid of Success’

                                                                        Successful EVM
                                                                         system yields
                        Phase D emphasizes                               desired results
                         use of EVM and the
                          validity of EAC to                              Time spent
                                                                          managing
                           complete work                                  content of
                                                                          SOW and
                                                                          EAC’s, not
                Phase C emphasizes use of EVM and                            fixing
                 the validity of EAC to complete work                       process

                                                                            High
            Phase B emphasizes the validity of baseline to                Confidence
                         complete work                                    Baseline at
                                                                            PDR

     Phase A emphasizes the EV Process and Initial Baseline Plan          Establish a
                                                                            strong
                                                                         foundation in
Pre-Phase A emphasizes the contractors and projects readiness for EVM    Early Phases



                                                                                       Page 5
Reviews are Scalable
Each review in each phase should be ‘sized’ appropriate to the application
    • Review ‘sizing’ is number of reviewer’s involved, number of CAM’s interviewed, size of
      data sampling, number of days and level of formality
      • ‘Risk Scale’ represents level of visibility into EVM plans and processes.
             • Low risk – Low visibility required – Review size ‘small’
             • High Risk – High visibility required – Review size ‘large’
                          Low Risk           Medium Low Risk           Medium High Risk               High Risk

 EVM              Validated EVM System    EVM Experience -          Immature EVM System        No EVM Capability
 Considerations                           System not Validated

 Technological    Build to Print          Medium to High            Little Design Heritage     New Hardware/New
 Considerations                           Design Heritage                                      Technology

 Programmatic     Above Design Principle At Design Principle Cost   At Design Principle Cost   Below Design Principles
 Considerations   Cost and Schedule       and Schedule Margins -    and Schedule Margins -     for Cost and Schedule
                  Margins No Risk to Cost Attrition managable       Attrition rate puts Cost   Margins. Attrition rate
                  Cap                                               Cap at Risk                unsustainable. Will
                                                                                               overrun Cost Cap


 Contractual      Meets minimum dollar    Exceeds minimum dollar    Exceeds minimum dollar     Exceeds minimum dollar
 Considerations   threshold               threshold                 threshold by xxx%          threshold by xxx%
                  Single Instrument       More complex H/W or       Complex Subsystem or       System Provider
                  C/SSR Reporting         Subsystem                 Segment Provider           CPR Reporting
                                          CPR Reporting             CPR Reporting              (All formats)
                                           (format 1)               (All formats)


                                                                                                                         Page 6
Implementation Pre-Phase A
                         4.3.2.c.1.iii - An assessment of potential infrastructure and workforce needs versus current plans, as well as opportunities to
                         use infrastructure and workforce in other government agencies, industry, academia, and international organizations;
7120.5d Requirements
                         4.3.2.c.1.v - Identification of conceptual acquisition strategies for proposed major procurements.


                         Request for Proposals written and let with the EVM/IBR Strategy requirements
                         Contractors submit EVM Plans with proposals
Pre- Review activities   EVM Implementation Team Defined
                         Proposal reviewed for EVM Readiness
                         EVM Team reports level of readiness


    Review Level                            Review Description                                                   Review Criteria
                                                                                     Contractor deemed ready and has full EVM capability
                         No formal review held. Analysis of submitted plans and
   Review Level 1                                                                     - Existing Validated System
                         other documents by Earned Value Implementation team
   'Paper Review'
                         deemed acceptable to retire EVM implementation risks.        - Successful track record of EVM Implementation
                                                                                      - Complete and comprehensive EVM descrption in Proposal
                                                                                     Contractor described capability requires additional investigation
  Review Level 2         1/2 day review by Project Office Representatives and EV
                                                                                      - No Validated System, but EVM principles implemented
On-Sight Contractor      Implementation Team at contractor site. Contractor
  Demonstration          demonstrates ability to meet EVM objectives.                 - Minimal or no track record of EVM Implementation
                                                                                      - Additional insight required
                    Two to three day visit by Project Office Representatives      Contractor needs validated system and does not have one
   Review Level 3   and EV Implementation Team. Contractor presents an
                                                                                  - Validated System Description required
Progress Assessment overview of the system it intends to use. Review team gives
     Visit (PAV)    a critique. Bi-laterally determine tentative schedule for IBR - Formal Progress Assessments Required
                    and Validation /sefl evalutation
                                                                                  - Local DCMA involved in system validation


                                                                                                                                                 Page 7
IBR Roles
                                Project office is responsible for planning and
     Project Office             executing Integrated Baseline Reviews
    Project Manager
                                     • Authority delegated to Project Business Manager
Project Business Manager
                                     to coordinate and ensure reviews are conducted on
                                     all appropriate project elements


       System Provider and
      Subcontractors with EV         • Project Business Manager coordinates with CPAG
              DRDs                   and JPL EV Surveillance and Contractors counter
    PBM/CPAG/JPL Surveillance        parts to conduct on-site IBRs


       In-house Measurable
          Control Accounts           • Project Business Manager coordinate with JPL EV
                                     Surveillance and PEMs to conduct IBRs on in-
      PBM/JPL Surveillance           house measurable Control Accounts.




                                                                                    Page 8
IBR Requirements (7120.5D)
               Project      Project     Project       Project Phase Requirement            Project      Project        Project Planning Events       Requirment ID/
               Phase        Phase       Rqmnt                                              Gates       Planning                                      EVM Milestones
                          Description   Number                                                         Rqmnt Id


              Pre-Phase    Concept       4.3.1    Purpose: During Pre-Phase A, a pre-      * Mission 4.3.2.c.1.i      A high-level Work             * Progress
                  A        Studies                project team studies a broad range of    Concept                    Breakdown Structure (WBS) Assessment Visit
                                                  mission concepts that contribute to       Review                    consistent with the NASA      (PAV)
                                                  program and Mission Directorate                                     standard space flight project * Validation
                                                  goals and objectives. These                                         WBS (Appendix G), a           Review (VR)
                                                  advanced studies, along with                                        schedule, and a rough-order-
                                                  interactions with customers and other                               of-magnitude cost estimate
                                                  potential stakeholders, help the team                               and cost range
                                                  to identify promising mission                       4.3.2.c.1.iii   An assessment of potential
Formulation




                                                  concept(s) and draft project-level                                  infrastructure and workforce
                                                  requirements. The team also                                         needs versus current plans,
                                                  identifies potential technology needs                               as well as opportunities to
                                                  (based on the best mission concepts)                                use infrastructure and
                                                  and assesses the gaps between such                                  workforce in other
                                                  needs and current and planned                                       government agencies,
                                                  technology readiness levels. These                                  industry, academia, and
                                                  activities are focused toward a                                     international organizations;
                                                  Mission Concept Review and KDP A.
                                                                                                      4.3.2.c.1.v     Identification of conceptual
                                                  A summary of the required gate
                                                                                                                      acquisition strategies for
                                                  products for this phase is provided in
                                                                                                                      proposed major
                                                  Table 4-3.
                                                                                                                      procurements.




                                                                                                                                                      Page 9
Pre-Phase A - Strategy

Project Emphasis: - System Definition
                  - Identify potential contractors and teammates
                  - Identify contractors above $20M



EVM Emphasis:      - EVM implementation team defined
                   - Contractors develop EVM plan
                   - Progress Assessment Visit (PAV); Contractor presents EVM plan
                   - EVM team evaluates
                   - If Validation Review is required, EVM teams works with local DCMA
                   - Conduct follow-up PAV
                   - Support KDP A




     Pre-Phase A emphasizes the contractors and projects readiness for EVM

                                                                                  Page 10
IBR Requirements (7120.5D)
              Project     Project     Project       Project Phase Requirement               Project      Project     Project Planning Events         Requirment ID/
              Phase       Phase       Rqmnt                                                 Gates       Planning                                     EVM Milestones
                        Description   Number                                                            Rqmnt Id


              Phase A   Concept &      4.4.1    Purpose: During Phase A, a project        * System   4.4.2.c.5.ii   The project's preliminary         4.4.2.c.3
                        Tech Dev                team is formed to fully develop a         Requireme                 Integrated Baseline includes    * Integrated
                                                baseline mission concept and begin        nts Review                a preliminary integrated      Baseline Review
                                                or assume responsibility for the          * System                  master schedule, preliminary        (IBR)
                                                development of needed technologies.       Design                    life-cycle cost estimate,
                                                This work, along with interactions with   Review                    workforce estimates, and the
                                                customers and other potential                                       project's technical
                                                stakeholders, helps with the                                        baseline/mission concept, all
                                                baselining of a mission concept and                                 consistent with the program
Formulation




                                                the program requirements on the                                     requirements levied on the
                                                project. These activities are focused                               project.
                                                toward System Requirements Review
                                                (SRR) and System Definition Review                    4.4.2.c.5.v   The preliminary life-cycle
                                                (SDR/PNAR) (or Mission Definition                                   cost estimate includes
                                                Review (MDR/PNAR)). The SRR and                                     reserves, along with the level
                                                SDR/PNAR (or MDR/PNAR) process                                      of confidence estimate
                                                culminates in KDP B. A summary of                                   provided by the reserves
                                                the required gate products for this                                 based on a cost-risk
                                                phase is provided in Table 4-3.                                     analysis.




                                                                                                                                                      Page 11
Phase A - Strategy

Project Emphasis: - Complete System Definition
                  - Establish Requirements
                  - Select Contractors
                  - Award Contracts with EVM DRDs


EVM Emphasis:    - Contractor teams develop initial project cost and schedule baseline
                 - Contractors submit EV reports per DRDs
                 - Project Office conducts IBR with emphasis on Process
                      - Compliance to EV Process
                      - Data Quality
                      - CAM Knowledge
                      - Change Control
                      - Validity of Baseline relative to Scope of Work
                 - Support KDP B


       Phase A emphasizes the EV Process and Initial Baseline Plan

                                                                                   Page 12
IBR Requirements (7120.5D)
                 Project     Project     Project       Project Phase Requirement              Project      Project        Project Planning Events        Requirment ID/
                 Phase       Phase       Rqmnt                                                Gates       Planning                                       EVM Milestones
                           Description   Number                                                           Rqmnt Id


                 Phase B   Preliminary    4.5.1    Purpose: During Phase B, the project     *           4.5.2.c.5.ii     The project's Integrated            4.5.2.c.2
                            Design &               team completes its preliminary design    Preliminary                  Baseline includes the             * Integrated
                           Technology              and technology development. These        Design                       integrated master schedule,     Baseline Review
                           Completion              activities are focused toward            Review                       baseline life-cycle cost              (IBR)
                                                   completing the Project Plan and                                       estimate, workforce
                                                   Preliminary Design Review (PDR)                                       estimates, and the PDR-
                                                   /Non Advocate Review (NAR). The                                       technical baseline, all
                                                   PDR/NAR process culminates in KDP                                     consistent with the program
                                                   C. A summary of the required gate                                     requirements levied on the
                                                   products for this phase is provided in                                project.
                                                   Table 4-3.
                                                                                                         4.5.2.c.5.iii   The baseline life-cycle cost
                                                                                                                         estimate is based on the
                                                                                                                         PDR-technical baseline and
                                                                                                                         integrated master schedule
Implementation




                                                                                                                         and is expected to include a
                                                                                                                         review of the entire scope of
                                                                                                                         work with a series of in-
                                                                                                                         depth assessments of
                                                                                                                         selected critical work
                                                                                                                         elements of the WBS prior to
                                                                                                                         and following the project's
                                                                                                                         PDR/NAR preceding KDP C.
                                                                                                                         (Note: The CADRe is
                                                                                                                         updated to reflect changes.)

                                                                                                         4.5.2.c.5.v     The baseline life-cycle cost
                                                                                                                         estimate includes reserves,
                                                                                                                         along with the level of
                                                                                                                         confidence estimate
                                                                                                                         provided by the reserves
                                                                                                                         based on a cost-risk
                                                                                                                         analysis.




                                                                                                                                                               Page 13
Phase B - Strategy

Project Emphasis: - Project Requirements Baselined
                  - Preliminary Design Established
                  - LL Procurements Let

EVM Emphasis:     - EV System is mature
                       - Reports Submitted
                       - Logs Established
                       - Change Control Exercised
                  - Project Office conducts IBR with emphasis on Risk to Reserves
                       - Project Plan content
                       - Completeness of Planning
                       - Change control process
                       - Basis of Estimate for Cost and Schedule
                       - Can design be built with planned resources
                       - Overall robustness of EVM system
                       - Reconciliation to Phase A Baseline
                  - Support KDP C
       Phase B emphasizes the validity of baseline to complete work

                                                                                    Page 14
IBR Requirements (7120.5D)
                 Project     Project      Project       Project Phase Requirement              Project       Project    Project Planning Events        Requirment ID/
                 Phase       Phase        Rqmnt                                                Gates        Planning                                   EVM Milestones
                           Description    Number                                                            Rqmnt Id


                 Phase C   Final Design    4.6.1    Purpose: During Phase C, the project     * Critical    4.6.2.c.1   Implement Earned Value              4.6.2.c.2
                                 &                  completes the design that meets the      Design                    Management (EVM) as               * Integrated
                           Fabrication              detailed requirements and begins         Review                    documented in the Project       Baseline Review
                                                    fabrication of test and flight article   *                         Plan.                                 (IBR)
                                                    components, assemblies, and              Production
                                                    subsystems. These activities focus on    Readiness     4.6.2.c.3   Provide immediate written
                                                    preparing for the Critical Design        Review                    notice and a recovery plan to
                                                    Review (CDR) and the System              * System                  the Program Manager and
                                                    Integration Review (SIR). This phase     Integration               the MDAA, if the latest
                                                    culminates in KDP D. A summary of        Review                    Phase C through D
                                                    the required gate products for this                                Estimate at Completion
                                                    phase is provided in Table 4-3.                                    (EAC) of the project
                                                                                                                       exceeds by 15% or more the
                                                                                                                       KDP C-approved Integrated
                                                                                                                       Baseline cost for Phases C
Implementation




                                                                                                                       through D. (Note: Since the
                                                                                                                       Integrated Baseline cost
                                                                                                                       contains project reserves, an
                                                                                                                       EAC exceeding the
                                                                                                                       Integrated Baseline cost
                                                                                                                       presumes that these
                                                                                                                       reserves will be exhausted.)

                                                                                                           4.6.2.c.4   Provide immediate written
                                                                                                                       notice and a recovery plan to
                                                                                                                       the Program Manager and
                                                                                                                       the MDAA, if a milestone
                                                                                                                       listed for Phases C and D on
                                                                                                                       the project life-cycle chart
                                                                                                                       (Figure 2-4) is estimated to
                                                                                                                       be delayed in excess of six
                                                                                                                       months from the date
                                                                                                                       scheduled in the KDP C-
                                                                                                                       approved Integrated
                                                                                                                       Baseline.



                                                                                                                                                               Page 15
Phase C - Strategy
Project Emphasis: - Complete Flight and Ground Designs
                  - Conduct component and SS CDRs
                  - Build BB and EMs
                  - Initiate Acceptance Test Program for Flight HW
EVM Emphasis:     - Implement EV
                  - Project Office conducts IBR with emphasis on Risk to Reserves
                       - Does Project Plan support detail design
                       - Is EV data reliable as a predictor
                       - Quality of VARs
                       - Is the project using EVM data to manage
                       - Test EAC process
                       - Quality BOEs
                       - Can HW be built for estimated cost
                       - Is there sufficient schedule
                       - Are Risks known and mitigated
                       - Reliable reporting
                  - Support KDP D
    Phase C emphasizes use of EVM and the validity of EAC to complete work

                                                                                    Page 16
IBR Requirements (7120.5D)
                 Project     Project       Project       Project Phase Requirement               Project     Project    Project Planning Events        Requirment ID/
                 Phase       Phase         Rqmnt                                                 Gates      Planning                                   EVM Milestones
                           Description     Number                                                           Rqmnt Id


                 Phase D      System        4.7.1    Purpose: During Phase D, the project      * System    4.7.2.b.1   Implement Earned Value              4.7.2.b.2
                            Assembly,                performs system assembly,                 Acceptance              Management (EVM) as               * Integrated
                           Integration &             integration, and test. These activities   Review                  documented in the Project       Baseline Review
                           Test, Launch              focus on preparing for the Flight         * Operation             Plan                                  (IBR)
                                                     Readiness Review (FRR). This phase        Readiness 4.7.2.c.1     Provide immediate written
                                                     culminates in KDP E. A summary of         Review                  notice and a recovery plan to
                                                     the required gate products for this       * Flight                the Program Manager and
                                                     phase is provided in Table 4-3.           Readiness               the MDAA if the latest Phase
                                                                                               Review                  C through D Estimate at
                                                                                                                       Completion (EAC) of the
                                                                                                                       project exceeds by 15% or
                                                                                                                       more the KDP C-approved
                                                                                                                       Integrated Baseline cost for
                                                                                                                       Phases C through D. (Note:
                                                                                                                       Since the Integrated
      entation




                                                                                                                       Baseline cost contains
                                                                                                                       project reserves, an EAC
                                                                                                                       exceeding the Integrated
  plem




                                                                                                                       Baseline cost presumes that
                                                                                                                       these reserves will be
Im




                                                                                                                       exhausted.)

                                                                                                           4.7.2.c.2   Provide immediate written
                                                                                                                       notice and a recovery plan to
                                                                                                                       the Program Manager and
                                                                                                                       the MDAA if a milestone
                                                                                                                       listed for Phases C and D on
                                                                                                                       the project life-cycle chart
                                                                                                                       (Figure 2-4) is estimated to
                                                                                                                       be delayed in excess of six
                                                                                                                       months from the date
                                                                                                                       scheduled in the KDP C-
                                                                                                                       approved Integrated
                                                                                                                       Baseline.




                                                                                                                                                             Page 17
Phase D - Strategy
Project Emphasis: - Integration of Flight HW and SW
                  - Integrate Payload and Launch Vehicle


EVM Emphasis:     - Implement EV
                  - Project Office conducts IBR with emphasis on Risk to Reserves
                       - Does Project Plan support I&T Program
                       - Is EV data reliable as a predictor
                       - Quality of VARs
                       - Is the project using EVM data to manage
                       - Test EAC process
                       - Quality BOEs
                       - Can I&T be completed for estimated cost
                       - Is there sufficient schedule
                       - Are Risks known and mitigated
                       - Reliable reporting
                  - Support KDP E

    Phase D emphasizes use of EVM and the validity of EAC to complete work

                                                                                    Page 18
Precedence
MRO Phase CD         - Due to persistent contractor over runs to EACs, NASA initiates two
                     ‘Work to Go Audits’
Work to Go Audit 1:                               Work to Go Audit 2:
     • Conducted right after Environmental Test        • Conducted prior to ‘Ship to Cape’
     Readiness Review                                  Milestone
     • ‘Charge to the Board:                           • ‘Charge to the Board:
           • Assess to work-to-go and determine              • Determine if appropriate progress
           if adequate plans and margins are in              has been made since the last audit
           place that can lead to a successful               • Identify the remaining effort-to-go
           launch                                            between now and launch but focus on
           • Evaluate the remaining                          the period until ship
           development risk and determine if it              • Evaluate if there are reasonable
           is reasonable given the effort and                plans in place to accomplish this effort
           time to go to launch. Board may                   • Evaluate implementation margins
           identify additional risk mitigation               and determine if they are factored into
           measures                                          the program properly
           • Assess whether the workforce                    • Assess the residual risk and whether
           levels to achieve the work to go are              there are high priority items that need
           reasonable and can achieve a                      to be addressed prior to powering
           successful launch campaign’                       down the vehicle in April’


                                                                                              Page 19
Matt.gonzales
Matt.gonzales

More Related Content

What's hot

C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyersNASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paulNASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliottNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Jim.free
Jim.freeJim.free
Jim.freeNASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinalNASAPMC
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porterNASAPMC
 
Baldwin.kristen
Baldwin.kristenBaldwin.kristen
Baldwin.kristenNASAPMC
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarieNASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsenNASAPMC
 
Rhodes.donna
Rhodes.donnaRhodes.donna
Rhodes.donnaNASAPMC
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliottNASAPMC
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevonNASAPMC
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beeneNASAPMC
 
Sally godfreyheatherrarick
Sally godfreyheatherrarickSally godfreyheatherrarick
Sally godfreyheatherrarickNASAPMC
 
Esker.linda
Esker.lindaEsker.linda
Esker.lindaNASAPMC
 
Charles.leising
Charles.leisingCharles.leising
Charles.leisingNASAPMC
 

What's hot (20)

C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyers
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Snow lee
Snow leeSnow lee
Snow lee
 
Symons
SymonsSymons
Symons
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Jim.free
Jim.freeJim.free
Jim.free
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
Baldwin.kristen
Baldwin.kristenBaldwin.kristen
Baldwin.kristen
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Rhodes.donna
Rhodes.donnaRhodes.donna
Rhodes.donna
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
Sally godfreyheatherrarick
Sally godfreyheatherrarickSally godfreyheatherrarick
Sally godfreyheatherrarick
 
Esker.linda
Esker.lindaEsker.linda
Esker.linda
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 

Viewers also liked

Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidyNASAPMC
 
Rosenberg.i.blackwood.g
Rosenberg.i.blackwood.gRosenberg.i.blackwood.g
Rosenberg.i.blackwood.gNASAPMC
 
Fletcher.greg
Fletcher.gregFletcher.greg
Fletcher.gregNASAPMC
 
Baniszewski.john
Baniszewski.johnBaniszewski.john
Baniszewski.johnNASAPMC
 
Dickerson mark
Dickerson markDickerson mark
Dickerson markNASAPMC
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.ciolettiNASAPMC
 
York.melba
York.melbaYork.melba
York.melbaNASAPMC
 
Bilardo.vince
Bilardo.vinceBilardo.vince
Bilardo.vinceNASAPMC
 
James.smith
James.smithJames.smith
James.smithNASAPMC
 
Miller.charles
Miller.charlesMiller.charles
Miller.charlesNASAPMC
 
Sean carter dan_deans
Sean carter dan_deansSean carter dan_deans
Sean carter dan_deansNASAPMC
 
Sharyl butler
Sharyl butlerSharyl butler
Sharyl butlerNASAPMC
 
Jonathan.firth
Jonathan.firthJonathan.firth
Jonathan.firthNASAPMC
 
Dittemore.gary
Dittemore.garyDittemore.gary
Dittemore.garyNASAPMC
 
Dean.baker
Dean.bakerDean.baker
Dean.bakerNASAPMC
 
Kremic.tibor
Kremic.tiborKremic.tibor
Kremic.tiborNASAPMC
 

Viewers also liked (20)

Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidy
 
Rosenberg.i.blackwood.g
Rosenberg.i.blackwood.gRosenberg.i.blackwood.g
Rosenberg.i.blackwood.g
 
Fletcher.greg
Fletcher.gregFletcher.greg
Fletcher.greg
 
Baniszewski.john
Baniszewski.johnBaniszewski.john
Baniszewski.john
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 
Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Lukas
LukasLukas
Lukas
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
York.melba
York.melbaYork.melba
York.melba
 
Bilardo.vince
Bilardo.vinceBilardo.vince
Bilardo.vince
 
James.smith
James.smithJames.smith
James.smith
 
Miller.charles
Miller.charlesMiller.charles
Miller.charles
 
Sean carter dan_deans
Sean carter dan_deansSean carter dan_deans
Sean carter dan_deans
 
Sharyl butler
Sharyl butlerSharyl butler
Sharyl butler
 
Jonathan.firth
Jonathan.firthJonathan.firth
Jonathan.firth
 
Dittemore.gary
Dittemore.garyDittemore.gary
Dittemore.gary
 
Chaikin
ChaikinChaikin
Chaikin
 
Dean.baker
Dean.bakerDean.baker
Dean.baker
 
Cheng
ChengCheng
Cheng
 
Kremic.tibor
Kremic.tiborKremic.tibor
Kremic.tibor
 

Similar to Matt.gonzales

Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthewNASAPMC
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthewNASAPMC
 
Integrating Risk With Earned Value
Integrating Risk With Earned ValueIntegrating Risk With Earned Value
Integrating Risk With Earned ValueGlen Alleman
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeffNASAPMC
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerbyNASAPMC
 
Bizier.brenda
Bizier.brendaBizier.brenda
Bizier.brendaNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Bilbro james
Bilbro jamesBilbro james
Bilbro jamesNASAPMC
 
Build an integrated master plan and integrated master
Build an integrated master plan and integrated masterBuild an integrated master plan and integrated master
Build an integrated master plan and integrated masterGlen Alleman
 
Lou wheatcraft vv
Lou wheatcraft vvLou wheatcraft vv
Lou wheatcraft vvNASAPMC
 
David.graham
David.grahamDavid.graham
David.grahamNASAPMC
 
Cpm500 d _alleman__tpm lesson 3 (v1)
Cpm500 d _alleman__tpm lesson 3 (v1)Cpm500 d _alleman__tpm lesson 3 (v1)
Cpm500 d _alleman__tpm lesson 3 (v1)Glen Alleman
 
Dickey.alan
Dickey.alanDickey.alan
Dickey.alanNASAPMC
 
Power Point For Cmgt 410
Power Point For Cmgt 410Power Point For Cmgt 410
Power Point For Cmgt 410steffiann88
 
ادارة تكلفة المشروع
ادارة تكلفة المشروع ادارة تكلفة المشروع
ادارة تكلفة المشروع Mohamed Dahi
 
Dev ops for mainframe innovate session 2402
Dev ops for mainframe innovate session 2402Dev ops for mainframe innovate session 2402
Dev ops for mainframe innovate session 2402Rosalind Radcliffe
 
Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projectsmtingle
 
Correlation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modelingCorrelation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modelingSalvatore Scalera
 

Similar to Matt.gonzales (20)

Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 
Integrating Risk With Earned Value
Integrating Risk With Earned ValueIntegrating Risk With Earned Value
Integrating Risk With Earned Value
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerby
 
Bizier.brenda
Bizier.brendaBizier.brenda
Bizier.brenda
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Bilbro james
Bilbro jamesBilbro james
Bilbro james
 
Build an integrated master plan and integrated master
Build an integrated master plan and integrated masterBuild an integrated master plan and integrated master
Build an integrated master plan and integrated master
 
Lou wheatcraft vv
Lou wheatcraft vvLou wheatcraft vv
Lou wheatcraft vv
 
David.graham
David.grahamDavid.graham
David.graham
 
IV&V Cox Overview
IV&V Cox OverviewIV&V Cox Overview
IV&V Cox Overview
 
Risk Based Inspection
Risk Based InspectionRisk Based Inspection
Risk Based Inspection
 
Cpm500 d _alleman__tpm lesson 3 (v1)
Cpm500 d _alleman__tpm lesson 3 (v1)Cpm500 d _alleman__tpm lesson 3 (v1)
Cpm500 d _alleman__tpm lesson 3 (v1)
 
Dickey.alan
Dickey.alanDickey.alan
Dickey.alan
 
Power Point For Cmgt 410
Power Point For Cmgt 410Power Point For Cmgt 410
Power Point For Cmgt 410
 
ادارة تكلفة المشروع
ادارة تكلفة المشروع ادارة تكلفة المشروع
ادارة تكلفة المشروع
 
Dev ops for mainframe innovate session 2402
Dev ops for mainframe innovate session 2402Dev ops for mainframe innovate session 2402
Dev ops for mainframe innovate session 2402
 
Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projects
 
Correlation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modelingCorrelation of simulation_models_using_concept_modeling
Correlation of simulation_models_using_concept_modeling
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amandaNASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
 

Recently uploaded

Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 

Recently uploaded (20)

Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 

Matt.gonzales

  • 1. 7120.5d Integrated Baseline Review (IBR) Implementation Strategy M. Gonzales Jet Propulsion Laboratory Project Business Manager 818-354-3629
  • 2. IBR Mission Statement Add value to the project management team by: Gaining additional insight into the cost, schedule and technical plans established at each project phase gate and satisfy the requirements of the NASA prime contract. Page 1
  • 3. IBR Goals • Assist the project management team in understanding the viability of the cost and schedule plan to meet the project technical goals and statement of work. • Provide confidence in the Earned Value information that is reported and as a predictor of future performance. • Discern additional risks to project reserves • Comply with prime contract requirements to gain highest possible award fee scores Page 2
  • 4. IBR Assumptions • An IBR is a tool utilized by the project office – Project office manages the IBR implementation, but is supported by institution EV experts. – Project elements (subcontractors and major in-house builds) are treated the same and the project surveys these elements • This implementation approach models the ‘design review’ concepts – Multiple reviews that ‘feed forward’ to the next review • Conduct ‘Process’ focused reviews early and address EVM system ‘design’ problems in Requirements and Preliminary Design Phases (Phases A and B) • Conduct ‘Content’ (Scope of Work and EAC’s) focused reviews in Detail Design/Build and Test Phases (Phases C and D) Page 3
  • 5. IBR Strategy • Based on 7120.5d Requirements • Not a one time event, but a series of reviews that coincide with Project Phase Milestones or Key Decision Points • Review focus evolves with project life cycle – Pre-Phase A – System description and EV compliance – Phase A – Test of planning, controls, reports – Phase B – Validate preliminary baseline, test system – Phase C - Validate baseline, validate reports, test EAC process – Phase D – Validate baseline, validate reports, test EAC process Page 4
  • 6. IBR Strategy ‘Pyramid of Success’ Successful EVM system yields Phase D emphasizes desired results use of EVM and the validity of EAC to Time spent managing complete work content of SOW and EAC’s, not Phase C emphasizes use of EVM and fixing the validity of EAC to complete work process High Phase B emphasizes the validity of baseline to Confidence complete work Baseline at PDR Phase A emphasizes the EV Process and Initial Baseline Plan Establish a strong foundation in Pre-Phase A emphasizes the contractors and projects readiness for EVM Early Phases Page 5
  • 7. Reviews are Scalable Each review in each phase should be ‘sized’ appropriate to the application • Review ‘sizing’ is number of reviewer’s involved, number of CAM’s interviewed, size of data sampling, number of days and level of formality • ‘Risk Scale’ represents level of visibility into EVM plans and processes. • Low risk – Low visibility required – Review size ‘small’ • High Risk – High visibility required – Review size ‘large’ Low Risk Medium Low Risk Medium High Risk High Risk EVM Validated EVM System EVM Experience - Immature EVM System No EVM Capability Considerations System not Validated Technological Build to Print Medium to High Little Design Heritage New Hardware/New Considerations Design Heritage Technology Programmatic Above Design Principle At Design Principle Cost At Design Principle Cost Below Design Principles Considerations Cost and Schedule and Schedule Margins - and Schedule Margins - for Cost and Schedule Margins No Risk to Cost Attrition managable Attrition rate puts Cost Margins. Attrition rate Cap Cap at Risk unsustainable. Will overrun Cost Cap Contractual Meets minimum dollar Exceeds minimum dollar Exceeds minimum dollar Exceeds minimum dollar Considerations threshold threshold threshold by xxx% threshold by xxx% Single Instrument More complex H/W or Complex Subsystem or System Provider C/SSR Reporting Subsystem Segment Provider CPR Reporting CPR Reporting CPR Reporting (All formats) (format 1) (All formats) Page 6
  • 8. Implementation Pre-Phase A 4.3.2.c.1.iii - An assessment of potential infrastructure and workforce needs versus current plans, as well as opportunities to use infrastructure and workforce in other government agencies, industry, academia, and international organizations; 7120.5d Requirements 4.3.2.c.1.v - Identification of conceptual acquisition strategies for proposed major procurements. Request for Proposals written and let with the EVM/IBR Strategy requirements Contractors submit EVM Plans with proposals Pre- Review activities EVM Implementation Team Defined Proposal reviewed for EVM Readiness EVM Team reports level of readiness Review Level Review Description Review Criteria Contractor deemed ready and has full EVM capability No formal review held. Analysis of submitted plans and Review Level 1 - Existing Validated System other documents by Earned Value Implementation team 'Paper Review' deemed acceptable to retire EVM implementation risks. - Successful track record of EVM Implementation - Complete and comprehensive EVM descrption in Proposal Contractor described capability requires additional investigation Review Level 2 1/2 day review by Project Office Representatives and EV - No Validated System, but EVM principles implemented On-Sight Contractor Implementation Team at contractor site. Contractor Demonstration demonstrates ability to meet EVM objectives. - Minimal or no track record of EVM Implementation - Additional insight required Two to three day visit by Project Office Representatives Contractor needs validated system and does not have one Review Level 3 and EV Implementation Team. Contractor presents an - Validated System Description required Progress Assessment overview of the system it intends to use. Review team gives Visit (PAV) a critique. Bi-laterally determine tentative schedule for IBR - Formal Progress Assessments Required and Validation /sefl evalutation - Local DCMA involved in system validation Page 7
  • 9. IBR Roles Project office is responsible for planning and Project Office executing Integrated Baseline Reviews Project Manager • Authority delegated to Project Business Manager Project Business Manager to coordinate and ensure reviews are conducted on all appropriate project elements System Provider and Subcontractors with EV • Project Business Manager coordinates with CPAG DRDs and JPL EV Surveillance and Contractors counter PBM/CPAG/JPL Surveillance parts to conduct on-site IBRs In-house Measurable Control Accounts • Project Business Manager coordinate with JPL EV Surveillance and PEMs to conduct IBRs on in- PBM/JPL Surveillance house measurable Control Accounts. Page 8
  • 10. IBR Requirements (7120.5D) Project Project Project Project Phase Requirement Project Project Project Planning Events Requirment ID/ Phase Phase Rqmnt Gates Planning EVM Milestones Description Number Rqmnt Id Pre-Phase Concept 4.3.1 Purpose: During Pre-Phase A, a pre- * Mission 4.3.2.c.1.i A high-level Work * Progress A Studies project team studies a broad range of Concept Breakdown Structure (WBS) Assessment Visit mission concepts that contribute to Review consistent with the NASA (PAV) program and Mission Directorate standard space flight project * Validation goals and objectives. These WBS (Appendix G), a Review (VR) advanced studies, along with schedule, and a rough-order- interactions with customers and other of-magnitude cost estimate potential stakeholders, help the team and cost range to identify promising mission 4.3.2.c.1.iii An assessment of potential Formulation concept(s) and draft project-level infrastructure and workforce requirements. The team also needs versus current plans, identifies potential technology needs as well as opportunities to (based on the best mission concepts) use infrastructure and and assesses the gaps between such workforce in other needs and current and planned government agencies, technology readiness levels. These industry, academia, and activities are focused toward a international organizations; Mission Concept Review and KDP A. 4.3.2.c.1.v Identification of conceptual A summary of the required gate acquisition strategies for products for this phase is provided in proposed major Table 4-3. procurements. Page 9
  • 11. Pre-Phase A - Strategy Project Emphasis: - System Definition - Identify potential contractors and teammates - Identify contractors above $20M EVM Emphasis: - EVM implementation team defined - Contractors develop EVM plan - Progress Assessment Visit (PAV); Contractor presents EVM plan - EVM team evaluates - If Validation Review is required, EVM teams works with local DCMA - Conduct follow-up PAV - Support KDP A Pre-Phase A emphasizes the contractors and projects readiness for EVM Page 10
  • 12. IBR Requirements (7120.5D) Project Project Project Project Phase Requirement Project Project Project Planning Events Requirment ID/ Phase Phase Rqmnt Gates Planning EVM Milestones Description Number Rqmnt Id Phase A Concept & 4.4.1 Purpose: During Phase A, a project * System 4.4.2.c.5.ii The project's preliminary 4.4.2.c.3 Tech Dev team is formed to fully develop a Requireme Integrated Baseline includes * Integrated baseline mission concept and begin nts Review a preliminary integrated Baseline Review or assume responsibility for the * System master schedule, preliminary (IBR) development of needed technologies. Design life-cycle cost estimate, This work, along with interactions with Review workforce estimates, and the customers and other potential project's technical stakeholders, helps with the baseline/mission concept, all baselining of a mission concept and consistent with the program Formulation the program requirements on the requirements levied on the project. These activities are focused project. toward System Requirements Review (SRR) and System Definition Review 4.4.2.c.5.v The preliminary life-cycle (SDR/PNAR) (or Mission Definition cost estimate includes Review (MDR/PNAR)). The SRR and reserves, along with the level SDR/PNAR (or MDR/PNAR) process of confidence estimate culminates in KDP B. A summary of provided by the reserves the required gate products for this based on a cost-risk phase is provided in Table 4-3. analysis. Page 11
  • 13. Phase A - Strategy Project Emphasis: - Complete System Definition - Establish Requirements - Select Contractors - Award Contracts with EVM DRDs EVM Emphasis: - Contractor teams develop initial project cost and schedule baseline - Contractors submit EV reports per DRDs - Project Office conducts IBR with emphasis on Process - Compliance to EV Process - Data Quality - CAM Knowledge - Change Control - Validity of Baseline relative to Scope of Work - Support KDP B Phase A emphasizes the EV Process and Initial Baseline Plan Page 12
  • 14. IBR Requirements (7120.5D) Project Project Project Project Phase Requirement Project Project Project Planning Events Requirment ID/ Phase Phase Rqmnt Gates Planning EVM Milestones Description Number Rqmnt Id Phase B Preliminary 4.5.1 Purpose: During Phase B, the project * 4.5.2.c.5.ii The project's Integrated 4.5.2.c.2 Design & team completes its preliminary design Preliminary Baseline includes the * Integrated Technology and technology development. These Design integrated master schedule, Baseline Review Completion activities are focused toward Review baseline life-cycle cost (IBR) completing the Project Plan and estimate, workforce Preliminary Design Review (PDR) estimates, and the PDR- /Non Advocate Review (NAR). The technical baseline, all PDR/NAR process culminates in KDP consistent with the program C. A summary of the required gate requirements levied on the products for this phase is provided in project. Table 4-3. 4.5.2.c.5.iii The baseline life-cycle cost estimate is based on the PDR-technical baseline and integrated master schedule Implementation and is expected to include a review of the entire scope of work with a series of in- depth assessments of selected critical work elements of the WBS prior to and following the project's PDR/NAR preceding KDP C. (Note: The CADRe is updated to reflect changes.) 4.5.2.c.5.v The baseline life-cycle cost estimate includes reserves, along with the level of confidence estimate provided by the reserves based on a cost-risk analysis. Page 13
  • 15. Phase B - Strategy Project Emphasis: - Project Requirements Baselined - Preliminary Design Established - LL Procurements Let EVM Emphasis: - EV System is mature - Reports Submitted - Logs Established - Change Control Exercised - Project Office conducts IBR with emphasis on Risk to Reserves - Project Plan content - Completeness of Planning - Change control process - Basis of Estimate for Cost and Schedule - Can design be built with planned resources - Overall robustness of EVM system - Reconciliation to Phase A Baseline - Support KDP C Phase B emphasizes the validity of baseline to complete work Page 14
  • 16. IBR Requirements (7120.5D) Project Project Project Project Phase Requirement Project Project Project Planning Events Requirment ID/ Phase Phase Rqmnt Gates Planning EVM Milestones Description Number Rqmnt Id Phase C Final Design 4.6.1 Purpose: During Phase C, the project * Critical 4.6.2.c.1 Implement Earned Value 4.6.2.c.2 & completes the design that meets the Design Management (EVM) as * Integrated Fabrication detailed requirements and begins Review documented in the Project Baseline Review fabrication of test and flight article * Plan. (IBR) components, assemblies, and Production subsystems. These activities focus on Readiness 4.6.2.c.3 Provide immediate written preparing for the Critical Design Review notice and a recovery plan to Review (CDR) and the System * System the Program Manager and Integration Review (SIR). This phase Integration the MDAA, if the latest culminates in KDP D. A summary of Review Phase C through D the required gate products for this Estimate at Completion phase is provided in Table 4-3. (EAC) of the project exceeds by 15% or more the KDP C-approved Integrated Baseline cost for Phases C Implementation through D. (Note: Since the Integrated Baseline cost contains project reserves, an EAC exceeding the Integrated Baseline cost presumes that these reserves will be exhausted.) 4.6.2.c.4 Provide immediate written notice and a recovery plan to the Program Manager and the MDAA, if a milestone listed for Phases C and D on the project life-cycle chart (Figure 2-4) is estimated to be delayed in excess of six months from the date scheduled in the KDP C- approved Integrated Baseline. Page 15
  • 17. Phase C - Strategy Project Emphasis: - Complete Flight and Ground Designs - Conduct component and SS CDRs - Build BB and EMs - Initiate Acceptance Test Program for Flight HW EVM Emphasis: - Implement EV - Project Office conducts IBR with emphasis on Risk to Reserves - Does Project Plan support detail design - Is EV data reliable as a predictor - Quality of VARs - Is the project using EVM data to manage - Test EAC process - Quality BOEs - Can HW be built for estimated cost - Is there sufficient schedule - Are Risks known and mitigated - Reliable reporting - Support KDP D Phase C emphasizes use of EVM and the validity of EAC to complete work Page 16
  • 18. IBR Requirements (7120.5D) Project Project Project Project Phase Requirement Project Project Project Planning Events Requirment ID/ Phase Phase Rqmnt Gates Planning EVM Milestones Description Number Rqmnt Id Phase D System 4.7.1 Purpose: During Phase D, the project * System 4.7.2.b.1 Implement Earned Value 4.7.2.b.2 Assembly, performs system assembly, Acceptance Management (EVM) as * Integrated Integration & integration, and test. These activities Review documented in the Project Baseline Review Test, Launch focus on preparing for the Flight * Operation Plan (IBR) Readiness Review (FRR). This phase Readiness 4.7.2.c.1 Provide immediate written culminates in KDP E. A summary of Review notice and a recovery plan to the required gate products for this * Flight the Program Manager and phase is provided in Table 4-3. Readiness the MDAA if the latest Phase Review C through D Estimate at Completion (EAC) of the project exceeds by 15% or more the KDP C-approved Integrated Baseline cost for Phases C through D. (Note: Since the Integrated entation Baseline cost contains project reserves, an EAC exceeding the Integrated plem Baseline cost presumes that these reserves will be Im exhausted.) 4.7.2.c.2 Provide immediate written notice and a recovery plan to the Program Manager and the MDAA if a milestone listed for Phases C and D on the project life-cycle chart (Figure 2-4) is estimated to be delayed in excess of six months from the date scheduled in the KDP C- approved Integrated Baseline. Page 17
  • 19. Phase D - Strategy Project Emphasis: - Integration of Flight HW and SW - Integrate Payload and Launch Vehicle EVM Emphasis: - Implement EV - Project Office conducts IBR with emphasis on Risk to Reserves - Does Project Plan support I&T Program - Is EV data reliable as a predictor - Quality of VARs - Is the project using EVM data to manage - Test EAC process - Quality BOEs - Can I&T be completed for estimated cost - Is there sufficient schedule - Are Risks known and mitigated - Reliable reporting - Support KDP E Phase D emphasizes use of EVM and the validity of EAC to complete work Page 18
  • 20. Precedence MRO Phase CD - Due to persistent contractor over runs to EACs, NASA initiates two ‘Work to Go Audits’ Work to Go Audit 1: Work to Go Audit 2: • Conducted right after Environmental Test • Conducted prior to ‘Ship to Cape’ Readiness Review Milestone • ‘Charge to the Board: • ‘Charge to the Board: • Assess to work-to-go and determine • Determine if appropriate progress if adequate plans and margins are in has been made since the last audit place that can lead to a successful • Identify the remaining effort-to-go launch between now and launch but focus on • Evaluate the remaining the period until ship development risk and determine if it • Evaluate if there are reasonable is reasonable given the effort and plans in place to accomplish this effort time to go to launch. Board may • Evaluate implementation margins identify additional risk mitigation and determine if they are factored into measures the program properly • Assess whether the workforce • Assess the residual risk and whether levels to achieve the work to go are there are high priority items that need reasonable and can achieve a to be addressed prior to powering successful launch campaign’ down the vehicle in April’ Page 19