Typical Construction
Activities
By: Engr. Muhammad Irfan
Construction activities
encompass a wide range of
tasks and processes involved in
building, renovating, or
maintaining structures and
infrastructure. These activities
can vary significantly
depending on the type of
construction project, such as
residential, commercial,
industrial, or civil engineering
projects. Here is a list of
typical construction activities:
1. Site Preparation:
1. Clearing and grading the construction site.
2. Excavation and earthwork to create a level foundation.
3. Demolition of existing structures if required.
2. Foundation Work:
1. Pouring concrete footings and piers.
2. Constructing foundation walls or slabs.
3. Structural Framing:
1. Erecting structural steel or wooden framing.
2. Installing floor systems, walls, and roof structures.
4. Masonry Work:
1. Building walls using bricks, blocks, or stones.
2. Installing concrete or clay tiles for roofing.
5. Roofing and Siding:
• Roof installation (shingles,
metal, flat roofing, etc.).
• Installing exterior siding
materials.
6. Electrical Work:
• Wiring the building for electricity.
• Installing electrical panels and outlets.
7. Plumbing Work:
• Installing plumbing systems for
water supply and drainage.
• Fixtures installation, such as sinks,
toilets, and showers.
8. HVAC (Heating, Ventilation, and
Air Conditioning):
• Installing HVAC systems for
climate control.
• Ductwork installation.
9. Insulation:
1. Installing insulation materials for energy efficiency.
2. Soundproofing where necessary.
10. Interior Finishing:
1. Drywall installation and finishing.
2. Flooring installation (carpet,
hardwood, tile, etc.).
3. Painting and wallpapering.
11. Wood-Work
12. Installation of utilities,
Safety Measures, Quality
Control, Project Management,
and Environmental
Considerations.
13. Testing and
Commissioning and
Project Handing Over
14. Cleanup and Site Restoration: Removing construction debris, restoring the site to its
original condition, and landscaping as necessary.
Construction activities for new batch students.pptx

More Related Content

Similar to Construction activities for new batch students.pptx

PEB CLASS 1-1.pptx
PEB CLASS 1-1.pptxPEB CLASS 1-1.pptx
PEB CLASS 1-1.pptxsonu515144
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...DougDos
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardWriters Per Hour
 
Chapter 1
Chapter 1Chapter 1
Chapter 1Est
 
Chapter 1.pdf
Chapter 1.pdfChapter 1.pdf
Chapter 1.pdfXying Lee
 
Site report
Site reportSite report
Site reportHuiYik
 
Project report MINI PROJECT-2 (1).pptoox
Project report MINI PROJECT-2 (1).pptooxProject report MINI PROJECT-2 (1).pptoox
Project report MINI PROJECT-2 (1).pptooxParamveerThakur2
 
3. building stones, tiles and site orientation
3. building stones, tiles  and site orientation3. building stones, tiles  and site orientation
3. building stones, tiles and site orientationmuhammadumairallahdi
 
lecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxlecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxBossGold
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
Construction Estimate, Finding natives
Construction Estimate, Finding nativesConstruction Estimate, Finding natives
Construction Estimate, Finding nativesbeverly0bennett8
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGHafiz JUNAID
 

Similar to Construction activities for new batch students.pptx (20)

Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Purna.1.docx
Purna.1.docxPurna.1.docx
Purna.1.docx
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
PEB CLASS 1-1.pptx
PEB CLASS 1-1.pptxPEB CLASS 1-1.pptx
PEB CLASS 1-1.pptx
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample Harvard
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Chapter 1.pdf
Chapter 1.pdfChapter 1.pdf
Chapter 1.pdf
 
Site report
Site reportSite report
Site report
 
Project report MINI PROJECT-2 (1).pptoox
Project report MINI PROJECT-2 (1).pptooxProject report MINI PROJECT-2 (1).pptoox
Project report MINI PROJECT-2 (1).pptoox
 
3. building stones, tiles and site orientation
3. building stones, tiles  and site orientation3. building stones, tiles  and site orientation
3. building stones, tiles and site orientation
 
lecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxlecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptx
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Construction site
Construction siteConstruction site
Construction site
 
Construction Estimate, Finding natives
Construction Estimate, Finding nativesConstruction Estimate, Finding natives
Construction Estimate, Finding natives
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERING
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 

Construction activities for new batch students.pptx

  • 2. Construction activities encompass a wide range of tasks and processes involved in building, renovating, or maintaining structures and infrastructure. These activities can vary significantly depending on the type of construction project, such as residential, commercial, industrial, or civil engineering projects. Here is a list of typical construction activities:
  • 3. 1. Site Preparation: 1. Clearing and grading the construction site. 2. Excavation and earthwork to create a level foundation. 3. Demolition of existing structures if required.
  • 4. 2. Foundation Work: 1. Pouring concrete footings and piers. 2. Constructing foundation walls or slabs.
  • 5. 3. Structural Framing: 1. Erecting structural steel or wooden framing. 2. Installing floor systems, walls, and roof structures.
  • 6. 4. Masonry Work: 1. Building walls using bricks, blocks, or stones. 2. Installing concrete or clay tiles for roofing.
  • 7. 5. Roofing and Siding: • Roof installation (shingles, metal, flat roofing, etc.). • Installing exterior siding materials.
  • 8. 6. Electrical Work: • Wiring the building for electricity. • Installing electrical panels and outlets.
  • 9. 7. Plumbing Work: • Installing plumbing systems for water supply and drainage. • Fixtures installation, such as sinks, toilets, and showers.
  • 10. 8. HVAC (Heating, Ventilation, and Air Conditioning): • Installing HVAC systems for climate control. • Ductwork installation.
  • 11. 9. Insulation: 1. Installing insulation materials for energy efficiency. 2. Soundproofing where necessary.
  • 12. 10. Interior Finishing: 1. Drywall installation and finishing. 2. Flooring installation (carpet, hardwood, tile, etc.). 3. Painting and wallpapering.
  • 14. 12. Installation of utilities, Safety Measures, Quality Control, Project Management, and Environmental Considerations.
  • 15. 13. Testing and Commissioning and Project Handing Over
  • 16. 14. Cleanup and Site Restoration: Removing construction debris, restoring the site to its original condition, and landscaping as necessary.