Power-Plant
Job Objective
Seeking senior level assignments in the domain of Construction Management, Project Management
and commissioning with an organization of repute, preferably in Africa, Arab gulf area, Asia and
Europe
Summary
 A result oriented professional with nearly 20 years of experience in Civil , power plant , oil & gas
Projects Management, Site Management, Statutory Compliance, Bidding and Liaison
 Astute manager with a flair for adopting modern project execution methodologies and systems in
compliance with set quality standards
 Experience in organizing MTO for construction to progress in an organized manner
 Proficiency in obtaining approval of projects from related Department & other Govt. Department
 Ability to handle multiple functions & activities in high pressure environments with tight deadlines
 Strong relationship management & communication skills with the ability to network with Project
Members, Consultants and Contractors with consummate ease
Core Competencies
 Managing multiple projects including all construction, procurement, drawings & maintenance
activities and using techniques/ tools for the preparation of drawings and project plans
 Handling end-to-end projects entailing - resource planning, design, estimation, scope definition,
finalisation of techno-commercial aspects, coordination, budgeting & executing quality standards
 Overseeing a team of engineers for various types of job and resolving bottlenecks
 Verifying validity of inspection & test equipment and monitoring quality control activities &
conducting internal projects meetings to review & update quality control procedures
 Supervising the entire gamut of construction activities encompassing technical inputs for
methodologies of construction & coordinating site management activities
 Interacting with site purchasers & suppliers for achieving cost effective purchase of equipment,
tendering, issuing work order, client billing & timely material delivery to minimise project cost
Employment Details
TENGIZCHEVROIL (TCO) from Jan 2016 till now
Tengizchevrol is a Kazakhstan partnership that explores, develops, produces and markets crude oil
and gas, Tangizchevroil LPP was formed between republic of Kazakhstan and Chevron Corporation
Project overview:
Tengiz expansion consists of two projects executed together:
 Future Growth Project (FGP): Expands production by 12 MMTY
 Wellhead Pressure Management Project (WPMP): Keeps existing plants full
Project Scope
 Oil & Gas Processing
 Sour Gas Injection
 Pressure Boost Facility
 increases well deliverability
 benefits both FGP and existing facilities
Project control skills / responsibly
During the commercial phase:
 Development of the project schedule according to the commercial needs. Verify feasibility and
criticality
 Participate to the commercial risk management activities at project
MUSTAFA AHAMED ELDKHAKHNY
Alexandria. 6 massjed bader St. from Mostafa Kamel El syof
dkhakhny2000@yahoo.com & kh.dkhakhny@gmail.com
Egypt : +201001894599 & +201275726158
At project start up:
 implementation of the Planning and Progress Control System required by the contract complexity,
riskiness and duration, in compliance with the Project Breakdown Structure (WBS), Company
Standards and Contract specifications
 Interface and coordinate with other Company Functions or Discipline Leaders/Supervisors and
Managers to build up activities, assign milestones and constraints by issuing the logic network
 prepare all the reference baseline documents, and ensure that the project s planning and
scheduling requirements are properly and clearly communicated to those functionally responsible
for executing the work
 Issue all the relevant reporting
 Issue the Planning & Scheduling Procedure, Progress Measurement Procedure and Risk
Management Plan for the Project Control Manager verification
 Coordinate the risk management activities startup organizing the first brainstorming and the
qualitative / quantitative assessment of the identified risks & opportunities
 Perform the schedule risk analysis for highly critical projects
During the project execution phase:
 Ensure the effectiveness of the Planning and Progress Control System, monitoring the progress
measurement system and ensuring the proper information flow, progress status and completion
forecast are assessed and reported for Engineering, Procurement, Fabrication, Construction and
Commissioning phases
 Update all Project Schedules, collecting actual data, evaluating forecast dates and monitoring any
progress and productivity deviation compared with the baseline schedule, including the corrective
actions taken by the PM
 Maintain the risk management process organizing periodic meetings and verifying the risk owners
feedbacks
 Maintain records for all significant events, like contractual claims/obligations, productivity,
deliverables, materials status, with extensive use of Company/Partner/Client IT systems and
reports
 Create and maintain the 90 days look-ahead schedule, weekly, monthly. Isolate
any adverse trend and warn the PM on time to take corrective actions, issue
weekly and monthly project reports (internal and for the Client)
 Assist the Project Control Manager in the Project Status Report preparation
(dashboard)
 Participate in the coordination meetings (internal and/or with the Client
whenever opportune)
 Support the Project during the contract changes/claims process providing the
time impact analysis
At project closure:
 Support the Project Control Manager in the preparation of the Project close-out
Report and the schedule and productivity feed-back data to Project Control and
Commercial Department
Professional Enhancements
 AUC Certified for Primavera6 (P6) in 2009
 (PPM) AUC Certified for Practical Project Management in 2006
 AUC Certified FOR Primavera 3.1 Master Level 2, to Assign The Cost In The Tasks Schedule
(COST CONTROL ) in 2003
 Microsoft Certified System Engineer “MCSE” certificate – Completed first and second courses of
Windows in 2001
 AUC Certified For AutoCAD in 1999
 AUC Certified For MS Project in 1998
 AUC Certified For Primavera (P3.0 Project Planner) in 1997
Personal Details
Date of Birth 8th
August, 1970
Languages Arabic & English
Delta pride of (the best
emply in the project) G
to L Escrvos Naigira
Lsat 2 projects
S
D
B
-
P
R
S
D
B
-
Q
U
Preceding Assignments
Company : SAIPEM Azerbaijan
Period: August 2015 to September 2016
Location: Azerbaijan
Position: Senior planning Eng.
Project: Shah Deniz 2
Company: INTRACS Medill east LTD ,Yemen
Period: Jan. 2014 , to July 2014
Location: Yemen
Position: Projects construction manager
Project Description: EPF 3&4 (Early production facility 3 & 4
Company: Techint Engineering & Construction Egypt
Period: Since Apr’12 to October 2013
Location: Egypt Elain Elsokhna Area
Position: Lead Project Control Eng.
Project Description: El-Sokha Supercritical Thermal Power Plant 2 X 650MW Project
Company: TECHINT CimiMontubi Nig Ltd.
Period: Dec’09 to Dec’11
Location: Federal Republic of Nigeria ESCRAVOS
Position: Lead Project Control Eng.
Description: ESCRAVOS Gas to Liquid Project (EGTL)
Company: Weatherford Oil Tools Yemen
Period: May’08 to Oct’09
Location: Yemen
Position: Construction Manager
Project Description:
- Weatherford Masila New Base,
- OMV Off Loading Facility
- TOTAL completion and work over workshop services
Company: DNO YEMEN
Period: Dec’06 to Apr’08
Location: Sanaa, Yemen
Position: Principal Projects Control Eng.
Projects Description:
 : Nabrajah Qishn (CPF) Block 43
 Nabrajah Early Basement Production Facilities Block 43
 Permanent Camp Facilities Block 43
 16 km Black Top Road Block 43
 Godah Permanent Production Facilities Block 32
 Oil Storage/Atmospheric Treater Tank at Tasour CPF Block 32
 Godah-Tasour Fuel Gas Block 32
Company: SAIPEM Contracted Nigeria Ltd. (SCNL)/ Nigeria LNG (Slug Catcher)
Period: Jan’06 to Nov’06
Location: Nigeria PH
Position: Principal Project Control Eng.
Projects Description:
The GTS-2/4 Slug Catcher Project comprised of a slug catcher and a pressure control unit constructed at Nigeria
LNG’s Liquefaction Complex, Bonny Island, Rivers State, Nigeria.
.
Company: Nashar Alex Engineering and Constructions Co./ Elbhira Liquid Natural Gas (ELNG)
Period: Aug’04 to Dec’05
Location: EGYPT EDKO
Position: Principal Project Control Eng.
Projects Description:
Civil, Mechanical, Piping and Pipe Supports Erection Works for ELNG Process Plant, NASHAR ALEX was Bechtel subcontractor
to build a Tran tow for Liquid Natural Gas project
Company : Hitachi Plant Engineering & Construction Co./ Cairo North Power Plant
Period: May’04 to Aug’’04
Location: EGYPT EDKO
Position: Project Control (Planner)
Company : Carlo Gavazzi, Alexandria, Egypt/ Natural Gas Liquid Process Plant
Period: Aug’03 to May’04
Location: Arab Republic of Egypt Port Said
Position: Principal Project Control Eng.
Projects Description:
E & I Erection Works for NGL Process Plant (U G D C) in Port Said, Egypt. Carlo Gavazzi. Was the E & I contractor to Build a
Natural Gas Liquid for United Gas Derivatives Company in Port Said
Company: Carlo Gavazzi, Alexandria, Egypt/ Compressing Unit for Natural Gas Liquid Process Plant
Period: Jan’03 to Aug’03
Location: Arab Republic of Egypt EDKO
Position: Principal Project Control Eng.
Description: E & I Erection Works for Rosetta Field Development Plants in Alexandria, Egypt. Carlo Gavazzi was the E &
I contractor to build a compressing unit for Rashid Petroleum Company in Edko, Alexandria
Company : Carlo Gavazzi, Alexandria, Egypt/ Scarab Saffron Field Gas Development
Period: Aug’02 to Jan’03
Location: EDKO
Position: Principal Project Control Eng.
Projects Description:
E & I Erection Works for Scarab Saffron Field Gas Development Alexandria, Egypt. Carlo Gavazzi was the E & I
contractor to build a West Delta Deep Marine Concession Unit for Burullus Gas Company in Edko
Company : TR (Technicas Reunidas)/ AMOC Alexandria Mineral Oil
Period: Dec’2000 to Jun’02
Location: EGYPT Alex.
Position: Planning Eng.
Projects Description:
Piping and pipe support erection works for AMOC Alexandria mineral oil CO.TR (Technicas Reunidas) was
Mechanical contractor to build a new pipe rack for AMOC Alexandria Mineral Oil CO.
Project: Hitachi Plant Engineering & Construction Co./ Hot Strip Meal Project
Period: January ’2000 to Dec’ 2000
Location: EGYPT SUAS
Position: Planning Eng.
Company : Daelim Industrial Co., Alex, Egypt/ Medal East Refinery Alex. (MEDOR)
Period: May’98 to Dec’99
Location: EGYPT SUAS
Position: Planning Eng.
Company : ABB Petroleum Technology Co./ Khalada Petrolum Fileds
Client: Khalada Petrolum Co.
Period: Aug’97 to Apr’98
Location: Marsy Matrouh, Egypt
Position: Planning Eng.

More Related Content

What's hot

What's hot (19)

Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Cv of Shadrul with Pic
Cv of Shadrul with PicCv of Shadrul with Pic
Cv of Shadrul with Pic
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 
LOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAINLOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAIN
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
AMJATH-PLANNER CV
AMJATH-PLANNER CVAMJATH-PLANNER CV
AMJATH-PLANNER CV
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
محمد جمال
محمد جمالمحمد جمال
محمد جمال
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CVPlanning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
walid salah.CV
walid salah.CVwalid salah.CV
walid salah.CV
 

Viewers also liked

Viewers also liked (11)

Career Horn - How we can be your backbone.PDF
Career Horn - How we can be your backbone.PDFCareer Horn - How we can be your backbone.PDF
Career Horn - How we can be your backbone.PDF
 
Sociedad del conocimiento
Sociedad del conocimientoSociedad del conocimiento
Sociedad del conocimiento
 
Entrevistas en profundidad en la investigación educativa
Entrevistas en profundidad en la investigación educativaEntrevistas en profundidad en la investigación educativa
Entrevistas en profundidad en la investigación educativa
 
Libriño sobre a paz
Libriño sobre a pazLibriño sobre a paz
Libriño sobre a paz
 
updatedazad
updatedazadupdatedazad
updatedazad
 
Unites
Unites Unites
Unites
 
Introducción
IntroducciónIntroducción
Introducción
 
SMWi Bristol: When Does Influencer Become Advertiser and Why Should You Care?
SMWi Bristol: When Does Influencer Become Advertiser and Why Should You Care?SMWi Bristol: When Does Influencer Become Advertiser and Why Should You Care?
SMWi Bristol: When Does Influencer Become Advertiser and Why Should You Care?
 
La comunicación on-line
La comunicación on-line La comunicación on-line
La comunicación on-line
 
Dossier del proyecto POTOPOTO
Dossier del proyecto POTOPOTODossier del proyecto POTOPOTO
Dossier del proyecto POTOPOTO
 
Proyecto final
Proyecto finalProyecto final
Proyecto final
 

Similar to Mustafa_original CV

HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHosam Ahmed
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep Pandey
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_updateAriel Almes
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CVVenkatesh -
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016Karim Absawi
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000Ahmed Adel
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSanad Samir
 

Similar to Mustafa_original CV (20)

HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
 
Suprabhat Kumar Das - Resume
Suprabhat Kumar Das - ResumeSuprabhat Kumar Das - Resume
Suprabhat Kumar Das - Resume
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_update
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
CV - Mohammed El Sayed
CV - Mohammed El SayedCV - Mohammed El Sayed
CV - Mohammed El Sayed
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
Mina Mourad CV
Mina Mourad CVMina Mourad CV
Mina Mourad CV
 
Instrument Engineer
Instrument EngineerInstrument Engineer
Instrument Engineer
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 

Mustafa_original CV

  • 1. Power-Plant Job Objective Seeking senior level assignments in the domain of Construction Management, Project Management and commissioning with an organization of repute, preferably in Africa, Arab gulf area, Asia and Europe Summary  A result oriented professional with nearly 20 years of experience in Civil , power plant , oil & gas Projects Management, Site Management, Statutory Compliance, Bidding and Liaison  Astute manager with a flair for adopting modern project execution methodologies and systems in compliance with set quality standards  Experience in organizing MTO for construction to progress in an organized manner  Proficiency in obtaining approval of projects from related Department & other Govt. Department  Ability to handle multiple functions & activities in high pressure environments with tight deadlines  Strong relationship management & communication skills with the ability to network with Project Members, Consultants and Contractors with consummate ease Core Competencies  Managing multiple projects including all construction, procurement, drawings & maintenance activities and using techniques/ tools for the preparation of drawings and project plans  Handling end-to-end projects entailing - resource planning, design, estimation, scope definition, finalisation of techno-commercial aspects, coordination, budgeting & executing quality standards  Overseeing a team of engineers for various types of job and resolving bottlenecks  Verifying validity of inspection & test equipment and monitoring quality control activities & conducting internal projects meetings to review & update quality control procedures  Supervising the entire gamut of construction activities encompassing technical inputs for methodologies of construction & coordinating site management activities  Interacting with site purchasers & suppliers for achieving cost effective purchase of equipment, tendering, issuing work order, client billing & timely material delivery to minimise project cost Employment Details TENGIZCHEVROIL (TCO) from Jan 2016 till now Tengizchevrol is a Kazakhstan partnership that explores, develops, produces and markets crude oil and gas, Tangizchevroil LPP was formed between republic of Kazakhstan and Chevron Corporation Project overview: Tengiz expansion consists of two projects executed together:  Future Growth Project (FGP): Expands production by 12 MMTY  Wellhead Pressure Management Project (WPMP): Keeps existing plants full Project Scope  Oil & Gas Processing  Sour Gas Injection  Pressure Boost Facility  increases well deliverability  benefits both FGP and existing facilities Project control skills / responsibly During the commercial phase:  Development of the project schedule according to the commercial needs. Verify feasibility and criticality  Participate to the commercial risk management activities at project MUSTAFA AHAMED ELDKHAKHNY Alexandria. 6 massjed bader St. from Mostafa Kamel El syof dkhakhny2000@yahoo.com & kh.dkhakhny@gmail.com Egypt : +201001894599 & +201275726158
  • 2. At project start up:  implementation of the Planning and Progress Control System required by the contract complexity, riskiness and duration, in compliance with the Project Breakdown Structure (WBS), Company Standards and Contract specifications  Interface and coordinate with other Company Functions or Discipline Leaders/Supervisors and Managers to build up activities, assign milestones and constraints by issuing the logic network  prepare all the reference baseline documents, and ensure that the project s planning and scheduling requirements are properly and clearly communicated to those functionally responsible for executing the work  Issue all the relevant reporting  Issue the Planning & Scheduling Procedure, Progress Measurement Procedure and Risk Management Plan for the Project Control Manager verification  Coordinate the risk management activities startup organizing the first brainstorming and the qualitative / quantitative assessment of the identified risks & opportunities  Perform the schedule risk analysis for highly critical projects During the project execution phase:  Ensure the effectiveness of the Planning and Progress Control System, monitoring the progress measurement system and ensuring the proper information flow, progress status and completion forecast are assessed and reported for Engineering, Procurement, Fabrication, Construction and Commissioning phases  Update all Project Schedules, collecting actual data, evaluating forecast dates and monitoring any progress and productivity deviation compared with the baseline schedule, including the corrective actions taken by the PM  Maintain the risk management process organizing periodic meetings and verifying the risk owners feedbacks  Maintain records for all significant events, like contractual claims/obligations, productivity, deliverables, materials status, with extensive use of Company/Partner/Client IT systems and reports  Create and maintain the 90 days look-ahead schedule, weekly, monthly. Isolate any adverse trend and warn the PM on time to take corrective actions, issue weekly and monthly project reports (internal and for the Client)  Assist the Project Control Manager in the Project Status Report preparation (dashboard)  Participate in the coordination meetings (internal and/or with the Client whenever opportune)  Support the Project during the contract changes/claims process providing the time impact analysis At project closure:  Support the Project Control Manager in the preparation of the Project close-out Report and the schedule and productivity feed-back data to Project Control and Commercial Department Professional Enhancements  AUC Certified for Primavera6 (P6) in 2009  (PPM) AUC Certified for Practical Project Management in 2006  AUC Certified FOR Primavera 3.1 Master Level 2, to Assign The Cost In The Tasks Schedule (COST CONTROL ) in 2003  Microsoft Certified System Engineer “MCSE” certificate – Completed first and second courses of Windows in 2001  AUC Certified For AutoCAD in 1999  AUC Certified For MS Project in 1998  AUC Certified For Primavera (P3.0 Project Planner) in 1997 Personal Details Date of Birth 8th August, 1970 Languages Arabic & English Delta pride of (the best emply in the project) G to L Escrvos Naigira Lsat 2 projects S D B - P R S D B - Q U
  • 3. Preceding Assignments Company : SAIPEM Azerbaijan Period: August 2015 to September 2016 Location: Azerbaijan Position: Senior planning Eng. Project: Shah Deniz 2 Company: INTRACS Medill east LTD ,Yemen Period: Jan. 2014 , to July 2014 Location: Yemen Position: Projects construction manager Project Description: EPF 3&4 (Early production facility 3 & 4 Company: Techint Engineering & Construction Egypt Period: Since Apr’12 to October 2013 Location: Egypt Elain Elsokhna Area Position: Lead Project Control Eng. Project Description: El-Sokha Supercritical Thermal Power Plant 2 X 650MW Project Company: TECHINT CimiMontubi Nig Ltd. Period: Dec’09 to Dec’11 Location: Federal Republic of Nigeria ESCRAVOS Position: Lead Project Control Eng. Description: ESCRAVOS Gas to Liquid Project (EGTL) Company: Weatherford Oil Tools Yemen Period: May’08 to Oct’09 Location: Yemen Position: Construction Manager Project Description: - Weatherford Masila New Base, - OMV Off Loading Facility - TOTAL completion and work over workshop services Company: DNO YEMEN Period: Dec’06 to Apr’08 Location: Sanaa, Yemen Position: Principal Projects Control Eng. Projects Description:  : Nabrajah Qishn (CPF) Block 43  Nabrajah Early Basement Production Facilities Block 43  Permanent Camp Facilities Block 43  16 km Black Top Road Block 43  Godah Permanent Production Facilities Block 32  Oil Storage/Atmospheric Treater Tank at Tasour CPF Block 32  Godah-Tasour Fuel Gas Block 32 Company: SAIPEM Contracted Nigeria Ltd. (SCNL)/ Nigeria LNG (Slug Catcher) Period: Jan’06 to Nov’06 Location: Nigeria PH Position: Principal Project Control Eng. Projects Description: The GTS-2/4 Slug Catcher Project comprised of a slug catcher and a pressure control unit constructed at Nigeria LNG’s Liquefaction Complex, Bonny Island, Rivers State, Nigeria. .
  • 4. Company: Nashar Alex Engineering and Constructions Co./ Elbhira Liquid Natural Gas (ELNG) Period: Aug’04 to Dec’05 Location: EGYPT EDKO Position: Principal Project Control Eng. Projects Description: Civil, Mechanical, Piping and Pipe Supports Erection Works for ELNG Process Plant, NASHAR ALEX was Bechtel subcontractor to build a Tran tow for Liquid Natural Gas project Company : Hitachi Plant Engineering & Construction Co./ Cairo North Power Plant Period: May’04 to Aug’’04 Location: EGYPT EDKO Position: Project Control (Planner) Company : Carlo Gavazzi, Alexandria, Egypt/ Natural Gas Liquid Process Plant Period: Aug’03 to May’04 Location: Arab Republic of Egypt Port Said Position: Principal Project Control Eng. Projects Description: E & I Erection Works for NGL Process Plant (U G D C) in Port Said, Egypt. Carlo Gavazzi. Was the E & I contractor to Build a Natural Gas Liquid for United Gas Derivatives Company in Port Said Company: Carlo Gavazzi, Alexandria, Egypt/ Compressing Unit for Natural Gas Liquid Process Plant Period: Jan’03 to Aug’03 Location: Arab Republic of Egypt EDKO Position: Principal Project Control Eng. Description: E & I Erection Works for Rosetta Field Development Plants in Alexandria, Egypt. Carlo Gavazzi was the E & I contractor to build a compressing unit for Rashid Petroleum Company in Edko, Alexandria Company : Carlo Gavazzi, Alexandria, Egypt/ Scarab Saffron Field Gas Development Period: Aug’02 to Jan’03 Location: EDKO Position: Principal Project Control Eng. Projects Description: E & I Erection Works for Scarab Saffron Field Gas Development Alexandria, Egypt. Carlo Gavazzi was the E & I contractor to build a West Delta Deep Marine Concession Unit for Burullus Gas Company in Edko Company : TR (Technicas Reunidas)/ AMOC Alexandria Mineral Oil Period: Dec’2000 to Jun’02 Location: EGYPT Alex. Position: Planning Eng. Projects Description: Piping and pipe support erection works for AMOC Alexandria mineral oil CO.TR (Technicas Reunidas) was Mechanical contractor to build a new pipe rack for AMOC Alexandria Mineral Oil CO. Project: Hitachi Plant Engineering & Construction Co./ Hot Strip Meal Project Period: January ’2000 to Dec’ 2000 Location: EGYPT SUAS Position: Planning Eng. Company : Daelim Industrial Co., Alex, Egypt/ Medal East Refinery Alex. (MEDOR) Period: May’98 to Dec’99 Location: EGYPT SUAS Position: Planning Eng. Company : ABB Petroleum Technology Co./ Khalada Petrolum Fileds Client: Khalada Petrolum Co. Period: Aug’97 to Apr’98 Location: Marsy Matrouh, Egypt Position: Planning Eng.